ML14049A337: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 13: Line 13:
| page count = 31
| page count = 31
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
February 18, 2014
Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority
1101 Market Street, LP 3D-C Chattanooga, TN  37402-2801
==SUBJECT:==
PUBLIC MEETING SUMMARY FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328
==Dear Mr. Shea:==
This refers to the meeting conducted near the Sequoyah Nuclear Plant on February 4, 2014.
The meeting's purpose was to conduct a regulatory performance meeting to discuss the results of the supplemental and follow-up inspections completed on December 13, 2013, and the status of NRC's performance assessment of Sequoyah Nuclear Plant, Units 1 and 2.
A list of attendees and a copy of the presentation handout are enclosed. 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Pub lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4607.
Sincerely, 
/Frank Ehrhardt RA for/
Jonathan H. Bartley, Chief Reactor Projects Branch 6 Division of Reactor Projects
Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79
==Enclosures:==
: 1. List of Attendees
: 2. NRC Meeting Slides
: 3. TVA Meeting Slides
cc distribution via ListServ
___________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRP RII:DRP      SIGNATURE JDH /RA/ FJE /RA for/      NAME J. Hamman J.Bartley      DATE 02/15/2014 02/18/2014      E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO J. Shea 2 Letter to Joseph W. Shea from Jonathan Bartley dated February 18, 2014
==SUBJECT:==
PUBLIC MEETING SUMMARY FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328
Distribution
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS
PUBLIC RidsNrrPMSequoyah Resource
Enclosure 1 NRC ATTENDEES
W. Jones, Deputy Division Director, DRP, RII J. Bartley, Chief, Reactor Projects Branch 6, DRP, RII J. Heisserer, Senior Construction Inspector, RII W. Deschaine, Resident Inspector, Sequoyah Nuclear Plant Enclosure 1 Enclosure 2 Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2
Enclosure 2 Enclosure 3 Enclosure 3
Enclosure 3
Enclosure 3
Enclosure 3
Enclosure 3
Enclosure 3
Enclosure 3
Enclosure 3}}

Revision as of 17:26, 2 July 2018

2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328
ML14049A337
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/18/2014
From: Bartley J H
Reactor Projects Region 2 Branch 6
To: Shea J W
Tennessee Valley Authority
References
Download: ML14049A337 (31)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257

February 18, 2014

Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority

1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING SUMMARY FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328

Dear Mr. Shea:

This refers to the meeting conducted near the Sequoyah Nuclear Plant on February 4, 2014.

The meeting's purpose was to conduct a regulatory performance meeting to discuss the results of the supplemental and follow-up inspections completed on December 13, 2013, and the status of NRC's performance assessment of Sequoyah Nuclear Plant, Units 1 and 2.

A list of attendees and a copy of the presentation handout are enclosed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Pub lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4607.

Sincerely,

/Frank Ehrhardt RA for/

Jonathan H. Bartley, Chief Reactor Projects Branch 6 Division of Reactor Projects

Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79

Enclosures:

1. List of Attendees
2. NRC Meeting Slides
3. TVA Meeting Slides

cc distribution via ListServ

___________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE JDH /RA/ FJE /RA for/ NAME J. Hamman J.Bartley DATE 02/15/2014 02/18/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 2 Letter to Joseph W. Shea from Jonathan Bartley dated February 18, 2014

SUBJECT:

PUBLIC MEETING SUMMARY FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328

Distribution

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS

PUBLIC RidsNrrPMSequoyah Resource

Enclosure 1 NRC ATTENDEES

W. Jones, Deputy Division Director, DRP, RII J. Bartley, Chief, Reactor Projects Branch 6, DRP, RII J. Heisserer, Senior Construction Inspector, RII W. Deschaine, Resident Inspector, Sequoyah Nuclear Plant Enclosure 1 Enclosure 2 Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2

Enclosure 2 Enclosure 3 Enclosure 3

Enclosure 3

Enclosure 3

Enclosure 3

Enclosure 3

Enclosure 3

Enclosure 3

Enclosure 3