ML14169A441: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 27: | Line 27: | ||
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on April 21, 2014, to discuss draft request for additional information (RAI) 3.3.2.29-1, "Aging of concrete piping in the circulating water system (021)," for concrete piping added to the scope of license renewal in the applicant's Amendment 31 to its Callaway Plant, Unit 1 (Callaway), | The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on April 21, 2014, to discuss draft request for additional information (RAI) 3.3.2.29-1, "Aging of concrete piping in the circulating water system (021)," for concrete piping added to the scope of license renewal in the applicant's Amendment 31 to its Callaway Plant, Unit 1 (Callaway), | ||
license renewal application (LRA). Enclosure 1 provides a listing of the participants and Enclosure 2 contains a description of the items discussed. The participants agreed that the call was useful in clarifying the points of view. | license renewal application (LRA). Enclosure 1 provides a listing of the participants and Enclosure 2 contains a description of the items discussed. The participants agreed that the call was useful in clarifying the points of view. | ||
The applicant had an opportunity to comment on this summary. /RA/ John Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483 Enclosures: | The applicant had an opportunity to comment on this summary. /RA/ John Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483 | ||
==Enclosures:== | |||
1. List of Participants | |||
: 2. Summary of the Discussion | : 2. Summary of the Discussion | ||
Line 35: | Line 38: | ||
==SUBJECT:== | ==SUBJECT:== | ||
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON APRIL 21, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708) The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on April 21, 2014, to discuss draft request for additional information (RAI) 3.3.2.29-1, "Aging of concrete piping in the circulating water system (021)," for concrete piping added to the scope of license renewal in the applicant's Amendment 31 to its Callaway Plant, Unit 1 (Callaway), license renewal application (LRA). | SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON APRIL 21, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708) The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on April 21, 2014, to discuss draft request for additional information (RAI) 3.3.2.29-1, "Aging of concrete piping in the circulating water system (021)," for concrete piping added to the scope of license renewal in the applicant's Amendment 31 to its Callaway Plant, Unit 1 (Callaway), license renewal application (LRA). provides a listing of the participants and Enclosure 2 contains a description of the items discussed. The participants agreed that the call was useful in clarifying the points of view. | ||
The applicant had an opportunity to comment on this summary. /RA/ John Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483 | The applicant had an opportunity to comment on this summary. /RA/ John Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483 | ||
Line 58: | Line 58: | ||
The applicant indicated it would consider these points in light of the discussion and would request a follow-on conference call if needed. | The applicant indicated it would consider these points in light of the discussion and would request a follow-on conference call if needed. | ||
SUBJECT: | ==SUBJECT:== | ||
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON APRIL 21, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708) | |||
DISTRIBUTION: HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPM CallawayResource --------------------- | DISTRIBUTION: HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPM CallawayResource --------------------- | ||
JDaily FLyons YDiaz BMizuno (OGC) GPick (RIV) | JDaily FLyons YDiaz BMizuno (OGC) GPick (RIV) | ||
}} | }} |
Revision as of 07:31, 5 April 2018
ML14169A441 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 07/03/2014 |
From: | Daily J License Renewal Projects Branch 1 |
To: | |
Daily J, 415-3873 | |
References | |
TAC ME7708 | |
Download: ML14169A441 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 3, 2014
LICENSEE: Union Electric Company (Ameren Missouri)
FACILITY: Callaway Plant, Unit 1
SUBJECT:
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON APRIL 21, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on April 21, 2014, to discuss draft request for additional information (RAI) 3.3.2.29-1, "Aging of concrete piping in the circulating water system (021)," for concrete piping added to the scope of license renewal in the applicant's Amendment 31 to its Callaway Plant, Unit 1 (Callaway),
license renewal application (LRA). Enclosure 1 provides a listing of the participants and Enclosure 2 contains a description of the items discussed. The participants agreed that the call was useful in clarifying the points of view.
The applicant had an opportunity to comment on this summary. /RA/ John Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosures:
1. List of Participants
- 2. Summary of the Discussion
cc w/encls: Listserv July 3, 2014 LICENSEE: Union Electric Company (Ameren Missouri)
FACILITY: Callaway Plant, Unit 1
SUBJECT:
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON APRIL 21, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708) The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on April 21, 2014, to discuss draft request for additional information (RAI) 3.3.2.29-1, "Aging of concrete piping in the circulating water system (021)," for concrete piping added to the scope of license renewal in the applicant's Amendment 31 to its Callaway Plant, Unit 1 (Callaway), license renewal application (LRA). provides a listing of the participants and Enclosure 2 contains a description of the items discussed. The participants agreed that the call was useful in clarifying the points of view.
The applicant had an opportunity to comment on this summary. /RA/ John Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosures:
- 1. List of Participants 2. Summary of the Discussion cc w/encls: See next page
DISTRIBUTION: See next page ADAMS Accession No.: ML14169A441 *concurred via email OFFICE LA:RPB1:DLR* PM:RPB1:DLR BC:RPB1:DLR PM:RPB:DLR NAME IKing JDaily YDiaz Sanabria JDaily DATE 6/23/14 7/3/14 7/3/14 7/3/14 OFFICIAL RECORD COPY ENCLOSURE 1 SUMMARY OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS April 21, 2014 PARTICIPANTS AFFILIATIONSJohn Daily U.S. Nuclear Regulatory Commission (NRC) Bill Holston NRC John Wise NRC Chris Hovanec NRC Dave Shafer Union Electric Company (Ameren Missouri)
Roger Wink Ameren Missouri Sharon Merciel Ameren Missouri Andrew Burgess Ameren Missouri Eric Blocher STARS Center of Business
ENCLOSURE 2 SUMMARY OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION April 21, 2014 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on April 21, 2014, to discuss draft request for additional information (RAI) 3.3.2.29-1, "Aging of concrete piping in the circulating water system (021)," for concrete piping added to the scope of license renewal in the applicant's Amendment 31 to its Callaway Plant, Unit 1 (Callaway),
license renewal application (LRA).
Discussion The staff noted that Ameren Missouri submitted license renewal application (LRA) Amendment 31 by letter dated February 14, 2014, which added new sections and tables for the circulating water system as a new system within the scope of license renewal. It also added new aging management review items for circulating water system concrete piping which would be inspected using the applicant's Internal Surfaces in Miscellaneous Piping and Ducting Components and the External Surfaces Monitoring of Mechanical Components programs to manage aging effects.
The staff noted it was not clear on what inspection method(s) would be used for the "detection of aging effects," and what parameter(s) would be monitored for the "parameters monitored or inspected," program elements to address changes in material properties of internal and external surfaces of the concrete piping. In addition, the staff was unclear as to whether the mechanical aging management programs (AMPs) as proposed by the applicant included sufficient guidance for detection of the cited aging effects (cracking, loss of material, and changes in material properties) for concrete piping - which seemed to be more like structural components than piping components.
Some discussion was held as to whether the proposed AMPs represented the best fit for these concrete components.
The applicant indicated it would consider these points in light of the discussion and would request a follow-on conference call if needed.
SUBJECT:
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON APRIL 21, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI), PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708)
DISTRIBUTION: HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPM CallawayResource ---------------------
JDaily FLyons YDiaz BMizuno (OGC) GPick (RIV)