ML20093H543: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:_ . . _
{{#Wiki_filter:_..
GPU Nuclear Corporation NUCIMr                                                       Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057-0191 717 944 7621
GPU Nuclear Corporation NUCIMr Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
!                                                                                  TELEX 84 2386 Writer's Direct Dial Number:
July 10, 1984 5211-84-2144 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C. 20555
July 10, 1984 5211-84-2144 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C. 20555


==Dear Mr. Stolz:==
==Dear Mr. Stolz:==
Three Mile Island Nuclear Station, thit I (TMI-1)
Three Mile Island Nuclear Station, thit I (TMI-1)
Operating License No. OPR-50 Docket No. 50-289 Technical Specification Change Request No. 104, Rev. 2 Enclosed are three originals and forty conformed copies of Technical Specification Change Request No.104, Rev. 2.
Operating License No. OPR-50 Docket No. 50-289 Technical Specification Change Request No. 104, Rev. 2 Enclosed are three originals and forty conformed copies of Technical Specification Change Request No.104, Rev. 2.
Also enclosed is one signed copy of Certificate of Service for this request to the chief executives of the township and county in which the facility is located, as well as the Bureau of Radiation Protection.
Also enclosed is one signed copy of Certificate of Service for this request to the chief executives of the township and county in which the facility is located, as well as the Bureau of Radiation Protection.
Pursuant to 10 CFR 50.91(a)(1), we enclose our analyses, using the standards in 10 CFR 50.02 of significant hazards considerations. As stated above, pursuant to 10 CFR 50.91(a) of the regulations, we have provided a copy of this letter, the proposed enange in Technical Specifications, and our analyses of significant hazards considerations to Thomas Gerusky, the designated representative of the Commonwealth of Pennsylvania.
Pursuant to 10 CFR 50.91(a)(1), we enclose our analyses, using the standards in 10 CFR 50.02 of significant hazards considerations. As stated above, pursuant to 10 CFR 50.91(a) of the regulations, we have provided a copy of this letter, the proposed enange in Technical Specifications, and our analyses of significant hazards considerations to Thomas Gerusky, the designated representative of the Commonwealth of Pennsylvania.
Sincerely, 6401'250184 840710 p DR ADOCK 05000ggy PDR                             . D. I kill, Director, TMI-l HDH/CWS/mle
Sincerely, 6401'250184 840710 DR ADOCK 05000ggy p
PDR
. D. I kill, Director, TMI-l HDH/CWS/mle


==Enclosures:==
==Enclosures:==
: 1) Technical Specification Change Request No.104. Rev.2
: 1) Technical Specification Change Request No.104. Rev.2
: 2) Certificate of Service for Technical Specification Change Request No. 104. Rev.2                                                           dd[
: 2) Certificate of Service for Technical Specification Change Request No. 104. Rev.2 dd[
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation cc:   J. Van Vliet                                                                                 [~
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
e}}
[~
cc:
J. Van Vliet e}}

Latest revision as of 10:22, 13 December 2024

Forwards Application to Amend License DPR-50,consisting of Rev 2 to Tech Spec Change Request 104 to Reflect New Schedule for Withdrawal,Testing & Evaluation of Capsule TMI-1C
ML20093H543
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/10/1984
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20093H546 List:
References
5211-84-2144, NUDOCS 8407250184
Download: ML20093H543 (1)


Text

_..

GPU Nuclear Corporation NUCIMr Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

July 10, 1984 5211-84-2144 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stolz:

Three Mile Island Nuclear Station, thit I (TMI-1)

Operating License No. OPR-50 Docket No. 50-289 Technical Specification Change Request No. 104, Rev. 2 Enclosed are three originals and forty conformed copies of Technical Specification Change Request No.104, Rev. 2.

Also enclosed is one signed copy of Certificate of Service for this request to the chief executives of the township and county in which the facility is located, as well as the Bureau of Radiation Protection.

Pursuant to 10 CFR 50.91(a)(1), we enclose our analyses, using the standards in 10 CFR 50.02 of significant hazards considerations. As stated above, pursuant to 10 CFR 50.91(a) of the regulations, we have provided a copy of this letter, the proposed enange in Technical Specifications, and our analyses of significant hazards considerations to Thomas Gerusky, the designated representative of the Commonwealth of Pennsylvania.

Sincerely, 6401'250184 840710 DR ADOCK 05000ggy p

PDR

. D. I kill, Director, TMI-l HDH/CWS/mle

Enclosures:

1) Technical Specification Change Request No.104. Rev.2
2) Certificate of Service for Technical Specification Change Request No. 104. Rev.2 dd[

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

[~

cc:

J. Van Vliet e