ML20077E033: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20077E033
| number = ML20077E033
| issue date = 07/22/1983
| issue date = 07/22/1983
| title = Forwards Vegetation Survey for Effects of Cooling Tower Drift & Environ Noise Impact of Davis-Besse Nuclear Power Station, in Response to NRC 821221 Ltr Re Application to Amend Tech Specs
| title = Forwards Vegetation Survey for Effects of Cooling Tower Drift & Environ Noise Impact of Davis-Besse Nuclear Power Station, in Response to NRC Re Application to Amend Tech Specs
| author name = Crouse R
| author name = Crouse R
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 973, NUDOCS 8307280069
| document report number = 973, NUDOCS 8307280069
| title reference date = 12-21-1982
| package number = ML20077E047
| package number = ML20077E047
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
| project =
| stage = Request
}}
}}


Line 26: Line 29:
==Dear Mr. Stolz:==
==Dear Mr. Stolz:==


This is in response to your letter dated December 21, 1982 (Log No. 1163) concerning application to amend Appendix B Technical Specifications for Davis-Besse Nuclear Power Station Unit 1 (DB-1).
This is in response to your {{letter dated|date=December 21, 1982|text=letter dated December 21, 1982}} (Log No. 1163) concerning application to amend Appendix B Technical Specifications for Davis-Besse Nuclear Power Station Unit 1 (DB-1).
Enclosure 1 of the letter dated December 21, 1982 contained specific NRC comments regarding Environmental Technical Specifications (ETS), Section 4.1 Operational Noise Surveillance.          In response to these comments Toledo Edison has completed a full load operational noise surveillance both on-and off-site at the Davis-Besse Nuclear Power Station. Enclosed with this letter, is Attachment 1, a report prepared by Acoustic Technology, Inc.
Enclosure 1 of the {{letter dated|date=December 21, 1982|text=letter dated December 21, 1982}} contained specific NRC comments regarding Environmental Technical Specifications (ETS), Section 4.1 Operational Noise Surveillance.          In response to these comments Toledo Edison has completed a full load operational noise surveillance both on-and off-site at the Davis-Besse Nuclear Power Station. Enclosed with this letter, is Attachment 1, a report prepared by Acoustic Technology, Inc.
titled " Report, Environmental Noise Impact of the Davis-Besse Nuclear Power Station, July 1983." This Environmental Noise Report addresses the objectives of ETS 4.1 Appendix B NRC comments contained in Enclosure 1, and Section 4.3 of the NRC recommended Environmental Protection Plan (EPP).
titled " Report, Environmental Noise Impact of the Davis-Besse Nuclear Power Station, July 1983." This Environmental Noise Report addresses the objectives of ETS 4.1 Appendix B NRC comments contained in Enclosure 1, and Section 4.3 of the NRC recommended Environmental Protection Plan (EPP).
Enclosure 2 of the December 21, 1982 letter contained a recommended
Enclosure 2 of the {{letter dated|date=December 21, 1982|text=December 21, 1982 letter}} contained a recommended
.          Environmental Protection Plan for the Davis-Besse Nuclear Power Station.
.          Environmental Protection Plan for the Davis-Besse Nuclear Power Station.
The Toledo Edison Company has prepared a Proposed Environmental Protection Plan with modifications to the NRC plan. Our Proposed cPP eliminates Section 4.2 Vegetation Survey-Aerial Remote Sensing, and Section 4.3 Operation Noise Surveillance from the NRC recommended EPP.
The Toledo Edison Company has prepared a Proposed Environmental Protection Plan with modifications to the NRC plan. Our Proposed cPP eliminates Section 4.2 Vegetation Survey-Aerial Remote Sensing, and Section 4.3 Operation Noise Surveillance from the NRC recommended EPP.

Latest revision as of 08:42, 27 September 2022

Forwards Vegetation Survey for Effects of Cooling Tower Drift & Environ Noise Impact of Davis-Besse Nuclear Power Station, in Response to NRC Re Application to Amend Tech Specs
ML20077E033
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/22/1983
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20077E047 List:
References
973, NUDOCS 8307280069
Download: ML20077E033 (2)


Text

, e TOLEDO

%s EDISON '

FbcHAno P. Cacus Docket No. 50-346 Vce Preseed Nxmv License No. NPF-3 atsias9-wat Serial No. 973 July 22, 1983.

Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission

, Washington, D. C. 20555

Dear Mr. Stolz:

This is in response to your letter dated December 21, 1982 (Log No. 1163) concerning application to amend Appendix B Technical Specifications for Davis-Besse Nuclear Power Station Unit 1 (DB-1).

Enclosure 1 of the letter dated December 21, 1982 contained specific NRC comments regarding Environmental Technical Specifications (ETS), Section 4.1 Operational Noise Surveillance. In response to these comments Toledo Edison has completed a full load operational noise surveillance both on-and off-site at the Davis-Besse Nuclear Power Station. Enclosed with this letter, is Attachment 1, a report prepared by Acoustic Technology, Inc.

titled " Report, Environmental Noise Impact of the Davis-Besse Nuclear Power Station, July 1983." This Environmental Noise Report addresses the objectives of ETS 4.1 Appendix B NRC comments contained in Enclosure 1, and Section 4.3 of the NRC recommended Environmental Protection Plan (EPP).

Enclosure 2 of the December 21, 1982 letter contained a recommended

. Environmental Protection Plan for the Davis-Besse Nuclear Power Station.

The Toledo Edison Company has prepared a Proposed Environmental Protection Plan with modifications to the NRC plan. Our Proposed cPP eliminates Section 4.2 Vegetation Survey-Aerial Remote Sensing, and Section 4.3 Operation Noise Surveillance from the NRC recommended EPP.

As mentioned above, Section 4.3 has been removed from the Toledo Edison Proposed EPP since a complete full load operational noise surveillance was performed. The purpose of Section 4.2, Vegetation Survey - Aerial Remote Sensing, is "to assess the significance of damage, or lack thereof, as related to cooling tower drift dispersions". These requirements have been addressed by a seven (7) year vegetation study of sites near the Davis-Besse cooling tower. The study was conducted by Bowling Green State University, under the direction of Dr. William B. Jackson, h00l THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 8307280069 830722 ~

PDR ADOCK 05000346 r P pg

~

'. ^

Docket No. 50-346 License No. NPF-3 Serial No. 973 July 22, 1983 Page 2 The purpose of this vegetation monitoring was to assess any effects of cooling tower operation upon sensitive plant species. These terrestrial monitoring reports were submitted to the NRC in the Semi-Annual Pre-operational Environmental Monitoring Programs, 1974-1976 and Annual Operating Reports 1977-1980.

A report reviewing and summarizing these vegetation studies has been prepared by Toledo Edison. This Toledo Edison report specifically addresses any NRC comments plus provides the justification for eliminating vegetation studies from the Toledo Edison Proposed EPP. This report, Attachment 2, is titled: " Vegetation Survey for the Effects of Cooling Tower Drift, Response to the United States Nuclear Regulatory Commission regarding Appendix B Technical Specification 3.1.2.b and Section 4.2 of the Proposed Environmental Protection Plan for the Davis-Besse Nuclear Power Station."

The Proposed EPP prepared by Toledo Edison will be submitted by August 31, 1983.

Very truly yours, ff m ;t-RPC/KLN/lrh Attachments cc: DB-1 NRC Resident Inspector L-