| | APPENDIX B U.S. NUCLEAR REGULATORY COMMISSION |
| | |
| | ==REGION IV== |
| | _ |
| | ' |
| | NRC Inspection Report: '50-458/86-25 License: NPF-47 Docketi 50-458' ' |
| | ' |
| | . ',, |
| | Licensee:'lGulffStates Utilities (GSU) |
| | ' |
| | - River Bend Nuclear. Group P. O. Box 22 . - St. Francisville, Louisiana 70775 Facility Name: River Bend Station (RBS) |
| | . -Inspection At: River Bend Station, St. Francisville, Louisiana |
| | ; Inspection Conducted: July 21-25, 1986 l |
| | t |
| | . |
| | ' |
| | - |
| | -Inspector: . |
| | d a bird JT B'. Saird, Emerg sic {{PreparednessAnalyst h8/E6 Dhte' - |
| | Emergency Prepared d.suvand Safeguards Programs Section |
| | . - |
| | ,, |
| | , |
| | Approved: hdi t/t/f6 |
| | , L. A. Van ~ dell, Chief, Emergency Preparedness Date' |
| | and Safeguards Programs Section |
| | . |
| | Inspection Summary Inspection Conducted July 21-25, 1986 (Report 50-458/86-25) |
| | Areas Inspected: Routine, unannounced inspection of the licensee's emergency notifications and communication, shift staffing and augmentation, and dose calculation and assessmen Results: Within the emergency response areas inspected, one violation (failure to follow procedures, paragraph 2) and two deficiencies (dose assessment training, paragraph 5; dose assessment equipment, paragraph 5) were identifie _ |
| | G |
| | , . .- .. .. |
| | |
| | r |
| | . . |
| | , |
| | , |
| | * |
| | . |
| | ' * |
| | * |
| | |
| | . |
| | . |
| | . . |
| | DETAILS |
| | , Persons Contacted ' |
| | . |
| | ' |
| | Gulf States Utilities |
| | , , . *D. ~ A'ndrews',.. Director, Nuclear Training |
| | *J. Booker, Manager, Engineering, Fuels, and Licensing |
| | *J.' Cadwallader, Supervisor, Emergency Planning |
| | ' |
| | *W. Cahill,1 Senior.Vice President, RBNG |
| | *E.-Cargill,[ Supervisor, Radiological Programs D. Chase, Technical Staff Engineer M. Chilson', Nuclear Equipment Operator J. Clark, Nuclear Control Operator Foreman |
| | *H. Dennis, Prompt Notification System Operator W. Eisele, Health Physicist |
| | ., C. Fantacci, Radiation Prptection Supervisor |
| | *D. Feighart, Senior Emergency Planner " |
| | . |
| | ' |
| | *D. Gipson, Assistant Plant Manager , , |
| | , *T. Gildersleeve, Senior Emergency Planner , |
| | ' |
| | . |
| | ' |
| | *R. Jobe, Senior Emergency Planner |
| | , |
| | *R. King, Licensing ~ . |
| | : * Odell, Manager, Administration - |
| | *E. Oswood,- Senior Quality Assurance Engineer . - - |
| | *S. Perrin, Communications Foreman |
| | * |
| | ~ |
| | Contractor Personnel , . |
| | ' |
| | W. Smith, Impell .. . |
| | ~ |
| | State of Louisiana |
| | ' |
| | - |
| | . |
| | D. Zaloudek, Emergency Planning Supervisor, LNED Federal Emergency Management Agency |
| | - Jones, Community Planner NRC Personnel |
| | *D. Chamberlain, Senior Resident Inspector |
| | * Jones, Resident Inspector |
| | * Denotes those present at the exit intervie . Notifications and Communications The NRC inspector reviewed appropriate procedures for notifying and communicating with offsite agencies during an emergency. The River Bend emergency plan (hereafter referred to as "the Plan") and |
| | |
| | ,, - - |
| | . . |
| | - |
| | |
| | . |
| | - |
| | . . |
| | , |
| | . associated procedures appeared to be consistent with 10 CFR 50.72 notification requirements. The NRC inspector determined that the licensee . |
| | had provisions for message ver.ification by the state and county authorities upon notificatio The NRC inspector also observed , |
| | 'demonstrati6n of unannounced test notifications to state agencies from the TSC and control room by use of backup telephone numbers. The contacts were promptly made and no discrepancies were identified. Telephone numbers for all licensee and offsite support emergency response personnel |
| | ' |
| | and facilities wereglisted in EIP-2-029, " Emergency Telephone Numbers." |
| | |
| | The NRC-inspector,noted that this procedure required that the |
| | ' Supervisor-Emergency. Planning make a daily review of a listing of newly hired ~and terminating personnel, and ensure that all emergency telephone numbers were reviewed for accuracy and updated quarterly. The NRC inspector determined that the daily review had not been accomplished and that-emergency telephone numbers for offsite agencies listed in EIP-2-029 |
| | .had not been reviewed on a quarterly basis as required. This is an apparent Niolation of NRC requirements. (458/8625-01) |
| | The NRC insp~ector noted that the primary means of alerting and notitying the public in the plume exposure emergency planning zone (EPZ) is by 92 fixed sirens. The licensee verified the operability of this system through daily electronic interrogation and weekly silent tests. In addition, a weekly patrol with visual inspection and a quarterly preventive maintenance was being conducted. The NRC inspector reviewed a sample of test and maintenance records and noted no discrepancies. The |
| | , NRC inspector also made a visual inspection of 12 sirens in the EPZ and noted no apparent problens with the condition of the equipment. During the review of this. area, the NRC inspector noted that the licensea had instructions for the various checks and tests but no approved, written procedures for implementing the instruction . |
| | The NRC inspector reviewed communication links and equipment'as described |
| | , in the Plan and procedures. The description of communication links in the Plan was found to be consistent with the description in the state pla The NRC inspector noted that the licensee performed. communication drills periodically _and had a mechanism in place to correct any deficiencies noted. Primary and backup communication links for emergency response facilities and offsite support agencies were checked weekly. Primary communications links to state and local agencies were by telephone hotline with commercial telephone lines and radio used as backups. Monthly system checks of the emergency notification system (ENS) and health physics i network (HPN) were also performed. A review of selected records of these , |
| | tests over the past year verified that tests were performed as require l The NRC inspector also observed one of the weekly communications tests with offsite agencies and no problems were identified. While' reviewing this area, the NRC inspector noted that there were no approved, written procedures for performing the communications checks and generating the records of the tests. |
| | |
| | * |
| | ! |
| | - |
| | I |
| | -. |
| | - . . -- |
| | |
| | - - .~ -, . - . |
| | , . . - .- _. . .. -. |
| | . |
| | ... . |
| | . |
| | 4 . |
| | . |
| | |
| | Duri5g the inspection, the NRC inspector contacted.) representative of the |
| | ' |
| | Region VI Federal Emergency Management Agency (FEMA) office and inquired about the status of the FEMA review of the alert and notification syste ~ |
| | The FEMA representative stated that the design report was currently.under review and that a test date for the system would be established upon |
| | ! satisfactory completion of the design revie . |
| | , . |
| | . |
| | . |
| | i |
| | ' |
| | The following are observations the NRC inspector called to the licensee's |
| | ~ |
| | # attention. . These observations are neither violations nor unresolved ' |
| | : 's, |
| | - |
| | - |
| | -items.- These items were recommended for licensee consideration .for-improvement,,but have no specific regulatory requirement. |
| | |
| | ; * |
| | * |
| | ' |
| | Written procedurestshould be provided for testing of onsite |
| | , |
| | communica'tions' systems.and the generation and retention of test- |
| | ; record , |
| | ; .. |
| | ! l Operational checks, periodic maintenance and system operat. ion j |
| | ' |
| | - |
| | instructions should be incorporated into written procedures and generation-and retention of; records specifie ' Shift Staffing and Augmentation |
| | ' |
| | The NRC' inspector reviewed the Plan, discussed shift staffing and ' |
| | ' |
| | ? |
| | augmentation with licensee representatives and reviewed selected personnel qualification records to determine if the goals and criteria of Table B-1 |
| | ; of NUREG-0654 could be me The NRC inspector also review <J the results |
| | , of two^ unannounced augmentation drills conducted September 17 and |
| | ; October 2, 1985. These reviews inaicated that.the. licensee had made |
| | |
| | adequate provisions for shift staffing and augmentation to deal with emergencies. The NRC inspector noted that-the two augmentation drills |
| | ; described above had been conducted in response to an emergency |
| | ~ |
| | |
| | preparedness appraisal finding and subsequent periodic augmentation drills- |
| | * |
| | were not provided for in the Plan or specified as'one of the drills to bw , |
| | l conducted pursuant to Procedure EIP-2-102, " Training,. Drills, and |
| | . Exercises." |
| | |
| | ;- , |
| | ) The NRC inspector determined that contact of emergency response personnel needed to augment the onshift staff would be by radio pager contact |
| | . |
| | initiated by the on-duty' shift clerk with designated primary personnel-i assigned to the emergency respunse organization. Personnel who receive i |
| | ' |
| | the page use a call-back number to the pager system which verifies that contact has been made. Backup telephone calls are made if a person fails |
| | . |
| | -to call back. Key personnel contact other-plant personnel having roles in j staffing the c:nergency response ~ organization. The callout would proceed until sufficient staff would be notified to staff the emergency response |
| | ' |
| | ~ |
| | i facilitie Each of the key responders were assigned pagers. . Periodic testing of pagers;was conducted although such testing was not specifically-defined in procedures. The NRC inspector noted that' personnel ~ appeared to' - |
| | , |
| | understand the use of pagers, but.there was.no written procedure |
| | ; |
| | controlling the issuance, use, testing,-and maintenance of pagers. -The i |
| | licensee depended on having a number of personnel qualified and' assigned to |
| | : |
| | i |
| | , . - - , - , - - - ,-- . ~ , -., , - . . , ,. , . |
| | |
| | , |
| | . . |
| | . |
| | .- |
| | |
| | , |
| | |
| | emergency response positions for availability to respond to an augmentation call. The NRC inspector noted that an emergency telephone book (EIP-2-029) was maintained with pager numbers and home and work , |
| | telephone numbers for the emergency response organization. The call list was reviewed and updated once per quarte Tiie following are observations the NRC inspector called to the licensee's attention. The observations are neither violations nor unresolved item These items were recommended for licensee consideration for improvement, but they have no specific regulatory requirement Augmentation drills should be specifically included in procedures to be performed on a specified frequenc * |
| | A procedure should 5e issued to control the issuance, use, testing, and maintenance of :.ersonnel pager No violations or deviations were identifie . Dose Calculations and Assessment |
| | ~ |
| | The NRC inspector toured the emergency response facilities, examined dose assessment equipment and procedures, observed ' demonstrations of dose * * |
| | assessment, and held discussions with selected station personnel to- |
| | ' |
| | determine what provisions the licensee had made for dose calculation and assessment during a radiological emergency. A r.epresentative of the state of Louisiana was also contacted to discuss the state capability.and . ' |
| | compatibility o'f dose calculations. This discussion indicated that'the' * |
| | , state had experienced good cooperation with GSU on establishing dose assessment techniques, and no significant compatibility' problems had been identified during previous drills and exercise A review of dose assessment procedures showed that the li_censee had provided a programmable calculator and manual methods for rapidly performing emergency dose projections. The NRC inspector determined that the licensee's computerized method using the GSU digital radiation monitoring system (DRMS) had not been implemented ye The NRC inspector noted that a GSU letter datea February 28, 1986, committed the licensee to a completion date for this system of 2 months after the completion of 100 percent power testing. Licensee representative stated that the 2-month period referred to would end August 16, 1986. The dose assessment techniques were implemented in Procedure EIP-2-024, "Offsite Dose Calculations - Manual Method." The dose assessment methodology included assessment using vent monitor readings or release pathway grab sample results. The procedure also included a methodology for determining the release rate from field monitoring team measurements. Three manual methods were provided: manual calculation, programmable calculator calculation, and manual use of isopleth overlays for off-centerline dose Dose assessment could be performed in all of the emergency response |
| | , |
| | facilitie . |
| | |
| | - - - - - - |
| | . _ . |
| | __ |
| | , |
| | . . . |
| | . |
| | * |
| | |
| | . |
| | The NRC inspector observed demonstrations of the manual calculation, programmable calculator, and isopleth procedures in the control room, . |
| | technical support center (TSC), and emergency operations center (E0F), |
| | respectively. In the control room, the NRC inspector noted that the programmable' calculator was inoperable due to the batteries being down on the printe This resulted in the control operati'n'g foreman having to use the backup manual-manual method for demonstration of dose assessment capabilities. The foreman was able to complete the calculations, but made an error which caused the results to be incorrect. When questioned about training, the foreman stated that he had oeen adequately trained in the calculator method, but had only performed the manual-manual method once befor In the TSC, a health physicist successfully demonstrated the licensee's capability to perform dose assessment with the programmable calculator method in a timely manner. At the conclusion of the demonstration, the NRC inspector noted that the calculator printer module was put back in the storage box with the switch on. This was brought to the licensee's attention and the switch was turned off and a notice placed on all of the storage boxes reminding the users te turn the switch of Next, the NRC inspector observed the licensee's d'ose' asses'sment capability in the E0F. The health physicist selected to demonstrate the3 dose - |
| | assessment attempted to use the programmable calculator and found that it' |
| | was inoperable. The NRC inspector noted that-the health: physicist. |
| | |
| | . subsequently demonstrated dose assessment by the isopleth method in a- |
| | . |
| | satisfactory and t.imely manner. During the demonstration, the NRC inspector also noted that one of the values in' Table 1 of. Attachment 3 to EIP-2-024 was incorrect. The licensee took immediate corrective action in issuing a memorandum alerting the station staff to the error and providing the correct valu Based on the above, the following items are-considered to be einergenc a preparedness deficiencies: - |
| | . |
| | Dose assessment programmable calculators in the control room and E0F |
| | ~ |
| | were not maintained in operable condition. (458/8625-02) |
| | * |
| | Proficiency for performing backup manual dose assessment calcelations in the control room was not demonstrated to be adequat (458/8625-03) |
| | No violations or deviations were identifie . Exit Meeting The NRC inspector met with licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on July 25, 1986. The NRC inspector summarized the purpose and the scope of the inspection and the finding ' |
| | ; |
| | |
| | . |
| | NRC FollM 768 U.S. NUCLEAR REGULATORY COMMISSION PRWCIPAL INSFTCTOR fNamp Est hest se mee ntwa 0535 hq g d) 7* j3 ' |
| | INSPECTOR'S REPORT REVIEWER . |
| | Office of Inspection and Enforcement |
| | [ gg,fl INSTECTORS TRANSA TION REPORT NExT INSPEC DATE LICENSE E ' VENDOR DOCKE' NO 18 dtiss OR LICENSE NO 18V PRODUCTH13 dgw NO SEO MO vp fY && G g g |
| | ' |
| | 4 11 b % i f .l d,$ Q C) Q f f A M - MODIFY |
| | - |
| | D - 0ELETE C |
| | - |
| | R - REPLACE D 1 2 14 16 14 e EMOD OF INVESTKiATION %5PECTiON INSPECTION PERFORMED By ORGAN 2ATION CODE OF REG ON/MO CONDUC ING ACTIVITY (See tfMC 0530 ' Marooner Repor F^OM TO K 1 - REGIONAL OFFICE ST AF F OTHER gwg y,,,po.,, ngg w a y MO- DAY VR MO DAY TR 2 - RESIDENT INSPECTOR _R(GON DMSON I UANCH B |
| | oh ,;1 1 7 o!7 JIS Tl4 3 - PERFORMANCE AMRAISAL TEAM .4 3 l D 25 26 31 32 ' 33 34 35 TYPE OF ACTivif Y CONDUCTEDIChece one boa o'Wyl REGIONAL ACTION ICheck one bon or*vi N 02 - $AFETY _ |
| | 06 - MGMT vaSIT to - PLANT SE INQUIRV 1 - NRC FORM 591 03 - INC10ENT 07 - SPECtAL 11 - INVENT.vER 15 - #NVESTIGATION 2 - KEGON AL OFFICE LETTER 04 - ENFORCEMENT 08 - VENDOR 12 - SHIPMENTIEXPORT 05 - MGMT AUDIT 09 - MAT ACC iMPOR T 36 37 M sNSPECTiON W.ESTiU ATON fin >NGS TOTAL NWBER REPORT CONTAIN 2 790 |
| | " "" ENFORCEMENT CONFERENCE LETTER OR GEPORT TR ANSMtTT AL DATE OF VCLATCNS AND MELD INF ORM ATbON A B C D DEv;ATCNS ' |
| | , |
| | NRC FOPU 591 REPORT SENT |
| | -* TO MO FOR 1 - CLEAR - |
| | OR REG . |
| | LETTER ISSUED * ACTION g 2 - VIOLATON 3 - DEviATON A B D D |
| | " |
| | VR day C Af8 C A B C D MO "D A Y MO- VR 4 - VCLATCN & DEviATON g,l , , , { 1 - V ES 1 - YES df /l# hh l l l_ , |
| | W 4041 42 43 44 49 50 SS MODULE INFORMATiON MODut E INFORM ATON 4* |
| | C D MODULE NUMBER INSP yg 9 MODULE REO FOLLOWUP D MC E NUM8ER iNSP 9 MODULE REO FOLLOWUP 8* 6g## |
| | r 98 5 5 55 58 * |
| | - xs 8- : 4<ds5 - - - . 5 g- - - |
| | a- ad -*s5 s - - : a-r i i !5 9i f |
| | * |
| | 6 Siiss !:i3 $ i !I si i t i i !5 : s si !! $ g: |
| | 6 iii ! i !$ sI i |
| | : = z 25 : e n r aa:1 r8e : I so : = c ; I sa e - )dsisa:1 r8e : z su e; z |
| | . i r 3iol7, o,3l ^ |
| | oioia ii i liiI e i iIiiI ^ |
| | i i i i i IiiI |
| | * |
| | i i i i i liil ' |
| | i i i i i 'l i i l c |
| | i , i i i liiI c i i i i i liiI i t i i i liil i i i i liiI |
| | ^ ^ |
| | e i 5 1 2l2 i >i3! odi.A lici o t i liil e i iliil' i i i i i liil l i t i i i i l i l i i i i i l i i i I i t i i i i i i i i i f f t t t t I t f l I I ) |
| | = i S3iallioisl ^ |
| | o3m /ioi o c i IiiI e i iliiI ^ |
| | i i i i i IiiI |
| | * |
| | i i t i i liil ' |
| | i i i i lI i l 1 i t I i i I , i i I i ii t I t i i i l i l i l i ! i s i d illaci71 ^ |
| | ci3ia t ioio c- i liiI e i iIiiI ^ |
| | i i i i i IiiI |
| | ; I I i t I i i i i i i i l i |
| | ' |
| | i l i I i i i l i i i i i ! |
| | O CIRCtf SEQUENCE IF 0 I D I I VOL ATON OR DEviATON , , l l t l l l l l l l l l l l l l '1 l' 3l4 l5 10 12 13 15 16 18 19 20 21 l 26 1l2 3l 4 lS to 12 13 is 16 is is 20 2, 26} |
| | = |
| | |
| | , |
| | ~ |
| | f3RC $0RU 7E A REPoRV MODULE NUMBER DOCKET NO. al0RUCENSE |
| | 'j'f*pos3, woisyPRoo inia a. ,o ,,o. . , g gy , g INSPECTOR'S REPORT d6o oo +$J M /; 2 5 a vo''"o*$ma"'ORDEvjTioM i (Continuation) e , , , , , , c Office of Inspection and Enforcement _g |
| | _e, C C |
| | ] .o.oR-,,,,,..,._,._._,,.....,~.__..-_.....,,...E_,-....,,.,._, |
| | ' |
| | a Failure to Follow Procedures |
| | '~ CFR 50.54(q) requires that licensees shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the |
| | , requirements in Appendix E to Part 5 t 10 CFR 50.47(b)(6) requires, in part, that provisions be established for |
| | ,. |
| | prompt communications among principal response organizations and emergency personne . |
| | ,, River Bend Station Support Manual Procedure EIP-2-104, Revision No. 1 |
| | "- effective May 8,1985, " Maintenance of Emergency Telephone Numbers," had been established,fo support implementation of the emergency communications |
| | ,1 systems provisions of the emergency plan in accordance with the planning |
| | ' 8- standard in 10 CFR 50.47(b)(6). EIP-2-104 states, in Section 4.1, that |
| | ,a the Supervisor, Emergency Planning shall review listings of newly hired and terminating personnel on a daily basis, and ensure that all emergency |
| | . |
| | '5-telephone numbers in the emergency telephone book are reviewed for accuracy and updated quarterl . |
| | "~ Contrary to the above, on July 24, 1986, the NRC inspector determined that' |
| | the Supervisor, Emergency Planning, had not received and reviewed listings . |
| | i of newly hired and terminating personnel on a daily basis. In addition, |
| | ''~ the Supervisor, Emergency Planning, had not reviewed offsite agencies' . * |
| | a backup telephone numbers in the eme'rgency telephone book for accuracy on a quarterly basi '' |
| | This is a Severity Level V violatio (SuppkementVIII)(458/8601) |
| | n 2 s |
| | |
| | 2? |
| | |
| | 29 |
| | |
| | 31. |
| | |
| | 33 3s |
| | |
| | 4 |
| | $1 U.S. NUCLEAR REGULATORY COMMISSloN |
| | .' T ^ |
| }} | | }} |
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000458/19900311990-11-19019 November 1990 Insp Rept 50-458/90-31 on 901105-09.No Violations or Deviations Noted.Major Areas Inspected:Verification of Isolation Component Exemptions IR 05000458/19900251990-11-0707 November 1990 Insp Rept 50-458/90-25 on 900924-28 & 1015-19.Noncited Violation Identified.Major Areas Inspected:Quality Verification Function Including Condition Rept Program, Internal Audit Program IR 05000458/19900281990-10-17017 October 1990 Insp Rept 50-458/90-28 on 901009-12.No Violations or Deviations Noted.Major Areas Inspected:Installation & Testing of Mods & Installation of Heat Shrinkable Insulation Tubing ML20058A5461990-10-17017 October 1990 Insp Rept 50-458/90-23 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected:Engineering Evaluation in Response to NRC Bulletin 88-004,action of Previously Identified Items & Review of Root Cause Analysis IR 05000458/19900221990-09-27027 September 1990 Insp Rept 50-458/90-22 on 900827-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Liquid & Gaseous Radwaste Mgt Program ML20059D6471990-08-28028 August 1990 Insp Rept 50-458/90-15 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Followup to Previous Insp Findings & Equipment IR 05000458/19900201990-08-21021 August 1990 Insp Rept 50-458/90-20 on 900723-26.No Violations or Deviations Noted.Major Areas Inspected:Training & Qualification Effectiveness IR 05000458/19902001990-07-26026 July 1990 Electrical Distribution Sys Functional Insp Rept 50-458/90-200 on 900521-0622.No Violations Noted.Major Areas Inspected:Design & Implementation of Plant Electrical Distribution Sys & Adequacy of Engineering Support IR 05000458/19900171990-07-19019 July 1990 Advises That Insp 50-458/90-17 Canceled,Therefore,No Insp Rept Will Be Issued IR 05000458/19900141990-06-19019 June 1990 Insp Rept 50-458/90-14 on 900521-22.One self-identified Violation Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Including High Radiation Area Controls IR 05000458/19890331989-09-21021 September 1989 Insp Rept 50-458/89-33 on 890801-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Test Observation,Ler Followup & Followup on 10CFR21 Repts IR 05000458/19890311989-08-29029 August 1989 Insp Rept 50-458/89-31 on 890701-31.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Test Observation,Esf Walkdown & Emergency Preparedness Drill IR 05000458/19890301989-08-17017 August 1989 Insp Rept 50-458/89-30 on 890619-23.Violations Noted.Major Areas Inspected:Physical Security Program IR 05000458/19890191989-08-10010 August 1989 Advises That Insp 50-458/89-19 Cancelled & No Insp Rept Will Be Issued for Rept Number IR 05000458/19890321989-07-31031 July 1989 Insp Rept 50-458/89-32 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Testing Program & Plant Instrumentation Calibr Program.Lists of Surveillance Test Performance & Loop Calibr Repts Encl IR 05000458/19890281989-07-27027 July 1989 Insp Rept 50-458/89-28 on 890601-30.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation & Licensee Action on Previous Insp Findings IR 05000458/19890251989-07-27027 July 1989 Insp Rept 50-458/89-25 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing. Conservative Error in Util Procedure for Manual Calculations of Core Thermal Power Identified IR 05000458/19890291989-07-14014 July 1989 Insp Rept 50-458/89-29 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Corrective Actions IR 05000458/19890271989-07-12012 July 1989 Insp Rept 50-458/89-27 on 890605-09 & 19-23.Violations Noted.Major Areas Inspected:Self Assessment Capabilities IR 05000458/19890241989-06-26026 June 1989 Insp Rept 50-458/89-24 on 890501-31.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification & Maint & Surveillance Test Observation IR 05000458/19890221989-06-20020 June 1989 Insp Rept 50-458/89-22 on 890525-27.No Violations or Deviations Noted.Major Areas Inspected:Containment Integrated Leak Rate Test & Review of Results of Local Leak Rate Test IR 05000458/19890261989-06-14014 June 1989 Insp Rept 50-458/89-26 on 890515-19.No Violations Noted. Major Areas Inspected:Action on Previously Indentified Insp Findings,Inservice Insp Data Review & Corrective Actions IR 05000458/19890011989-06-0707 June 1989 Insp Rept 50-458/89-01 on 890501-05.No Violations Noted. Major Areas Inspected:Facility Mods & Nonlicensed Staff Training ML20244C3561989-06-0505 June 1989 Insp Rept 50-458/89-18 on 890501-05 & 15-19.Violations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves,Welding Activities Associated W/Repairs to Svc Water Sys & Activities Re Instrument Air Sys Insp IR 05000458/19890231989-05-25025 May 1989 Insp Repts 50-458/89-23 on 890501-05.No Violations or Deviations Noted.Major Areas Inspected:Programs for Station Design Changes & Mods for Installation of Raychem Electrical Splices IR 05000458/19890111989-05-24024 May 1989 Insp Rept 50-458/89-11 on 890315-0430.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation,Refueling Activities & Licensee Action on Previous Findings IR 05000458/19890171989-05-16016 May 1989 Insp Rept 50-458/89-17 on 890409-19.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Planning & Preparation for in-reactor Pressure Vessel Repair of Feed Water Spargers IR 05000458/19890131989-05-15015 May 1989 Advises That Insp Rept 50-458/89-13 Cancelled.No Rept Will Be Issued for Rept Number ML20244D4511989-05-15015 May 1989 Partially Withheld Insp Rept 50-458/89-15 on 890402-06 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support,Security Program Plans & Audits & Protected & Vital Area Access IR 05000458/19890211989-05-10010 May 1989 Insp Rept 50-458/89-21 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Test Observation & Followup on Operating Events IR 05000458/19890101989-05-0909 May 1989 Insp Rept 50-458/89-10 on 890327-0406.No Violations or Deviations Noted.Major Areas Inspected:Review of Inservice Insp,Welding & Associated Documents & Procedures.Mod to RHR Sys Also Reviewed IR 05000458/19890141989-04-20020 April 1989 Insp Rept 50-458/89-14 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Testing of Pipe Supports & Restraint Sys ML20244B6001989-04-0606 April 1989 Insp Rept 50-458/89-12 on 890327-31.Violation Noted.Major Areas Inspected:Welding Activities.Welding Program Well Defined & Includes Monitoring by Qc.Weakness in Welder Qualification Program Noted IR 05000458/19890071989-04-0505 April 1989 Insp Rept 50-458/89-07 on 890201-0314.No Violations or Deviations Noted.Major Areas Inspected:Plant Events, Emergency Preparedness Exercise,Operational Safety Verification & Surveillance Test Observation IR 05000458/19890091989-03-30030 March 1989 Insp Rept 50-458/89-09 on 890301-03.No Violations or Deviations Noted.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000458/19890081989-03-10010 March 1989 Insp Rept 50-458/89-08 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Calibr Program, Emergency Diesel Fuel Oil Program Into QA Program & Receipt, Storage & Handling of Diesel Generator Fuel Oil IR 05000458/19890061989-03-0808 March 1989 Insp Rept 50-458/89-06 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves IR 05000458/19890051989-02-24024 February 1989 Insp Rept 50-458/89-05 on 890101-31.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Radiological Protection,Security,Surveillance Test Observation & Maint Observation IR 05000458/19890031989-02-23023 February 1989 Informs That Insp 50-458/89-03 Cancelled.No Insp Rept Will Be Issued for Subj Rept Number IR 05000458/19880291989-01-31031 January 1989 Partially Withheld Insp Rept 50-458/88-29 on 881212-16 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program Included Mgt Support, Security Program Plans,Audits & Records & Repts IR 05000458/19880191988-10-14014 October 1988 Insp Rept 50-458/88-19 on 880801-0917.Violation Noted.Major Areas Inspected:Surveillance & Maint Observation,Safety Sys Walkdown,Operational Safety Verification,Radiological Protection Observation & Security ML20155G8291988-10-0303 October 1988 Insp Rept 50-458/88-21 on 880912-15.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program ML20155E2471988-09-27027 September 1988 Insp Rept 50-458/88-22 on 880829-0915.Violations Noted.Major Areas Inspected:Fuel Bldg Ventilation Charcoal Filtration Sys IR 05000458/19880201988-09-14014 September 1988 Insp Rept 50-458/88-20 on 880822-25.No Violations Noted. Details Withheld (Ref 10CFR73.21) ML20153E4051988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records IR 05000458/19880181988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records ML20151Z8021988-08-22022 August 1988 Partially Withheld Insp Rept 50-458/88-14 on 880613-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Lers, Allegations,Security Procedures,Mgt Effectivenss,Security Program Audits & Records & Repts IR 05000458/19880171988-08-12012 August 1988 Insp Rept 50-458/88-17 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on NRC Bulletin 88-005,surveillance Test & Maint Observation, Operational Safety Verification & Security IR 05000458/19880161988-07-27027 July 1988 Insp Rept 50-458/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Release Program & Allegations Re Training & Qualifications of Supervisory Personnel ML20151G0971988-07-15015 July 1988 Insp Rept 50-458/88-13 on 880501-0630.Violation Noted.Major Areas Inspected:Previous Insp Findings,Nrc Bulletins 88-001 & 88-007,NRC Info Notices,Surveillance Test Observation, Maint Observation & Safety Sys Walkdown 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support ML20212L9771999-10-0505 October 1999 Notice of Violation from Insp on 990710.Violation Noted:From 990224-0325,River Bend Station Operated in Mode I Without Three Operable EDGs IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20205A4131999-03-23023 March 1999 NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222- 0303.All 14 Applicants Passed Exams ML20203A5351999-01-27027 January 1999 EN-99-005:on 990201,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Severity Level III Violations Involving Design Deficiency,Caused Uncertainty as to Ability of Div I & II IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E2111999-01-0707 January 1999 Notice of Violation from Insp on 981101-1212.Violation Noted:On 971022,radiation Protection Technicians Released One Container with Two Items Contaminated Above Limits Specified in Procedure RSP-0213 ML20199A2161999-01-0505 January 1999 Notice of Violation from Investigation Conducted on 971231. Violation Noted:On 971015,A Wells,Employee on Entergy Operations,Inc,Submitted to NRC Info Known to Be Inaccurate in Some Respect Matl to NRC ML20198T0691999-01-0505 January 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Info Was Provided to Senior Resident Inspector That Was Not Complete & Accurate in All Matl Respects Re 971010 of RWP 97-0002 ML20203A6601999-01-0505 January 1999 EN-99-001:on 990105,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Superintendent of Radiation Control at Licensee River Bend Station Facility ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9151998-12-29029 December 1998 Notice of Violation from Insp on 980720-0807.Violation Noted:On 980724,licensee Made Change to Facility as Described in Safety Analysis Rept,Which Created Unreviewed Safety Question,Without Prior Commission Approval IR 05000458/19980991998-12-22022 December 1998 SALP Rept 50-458/98-99 Canceled.Process Suspended for Two Yrs.No Insp Rept Will Be Issued for Number IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20154L7021998-08-17017 August 1998 Corrected Notice of Violation from Insp Completed on 980218. Corrected NOV Sent to Make Consistent with Ltr Sent on 980722 & to Make Clear That No Response Required ML20236V2081998-07-29029 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980601,while Accomplishing Clearance Order 98-0583, Operator Did Not Follow Sequence Shown on Clearance Order While Positioning Components IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154M5531998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980323. Violation Noted:On 970908,WJ Ginn,Employee of Contractor to Entergy Operations,Inc,Deliberately Submitted Info to Licensee That Was Incomplete & Inaccurate ML20154L7351998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980218. Violation Noted:On 970711,DL Brown Employee of Contractor to Util Deliberatly Submitted Info to Licensee That Brown Knew Incomplete & Inaccurate on Security Questionnaire IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4461998-04-17017 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Established Measures Did Not Assure That Deviation from Environ Design Criteria Was Controlled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support PNO-IV-98-016, on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing1998-04-14014 April 1998 PNO-IV-98-016:on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing ML20217B4701998-03-24024 March 1998 Notice of Violation from Insp on 980223-26.Violation Noted: Licensee Not Maintained Records of Reviews of Radiation Protection Program Content & Implementation ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability 1999-09-08
[Table view] |
Text
{{#Wiki_filter:-
.
.
-. .
APPENDIX B U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
_
'
NRC Inspection Report: '50-458/86-25 License: NPF-47 Docketi 50-458' '
'
. ',,
Licensee:'lGulffStates Utilities (GSU)
'
- River Bend Nuclear. Group P. O. Box 22 . - St. Francisville, Louisiana 70775 Facility Name: River Bend Station (RBS)
. -Inspection At: River Bend Station, St. Francisville, Louisiana
- Inspection Conducted
- July 21-25, 1986 l
t
.
'
-
-Inspector: .
d a bird JT B'. Saird, Emerg sic {{PreparednessAnalyst h8/E6 Dhte' -
Emergency Prepared d.suvand Safeguards Programs Section
. -
,,
,
Approved: hdi t/t/f6
, L. A. Van ~ dell, Chief, Emergency Preparedness Date'
and Safeguards Programs Section
.
Inspection Summary Inspection Conducted July 21-25, 1986 (Report 50-458/86-25)
Areas Inspected: Routine, unannounced inspection of the licensee's emergency notifications and communication, shift staffing and augmentation, and dose calculation and assessmen Results: Within the emergency response areas inspected, one violation (failure to follow procedures, paragraph 2) and two deficiencies (dose assessment training, paragraph 5; dose assessment equipment, paragraph 5) were identifie _
G
, . .- .. ..
r
. .
,
,
*
.
' *
*
.
.
. .
DETAILS
, Persons Contacted '
.
'
Gulf States Utilities
, , . *D. ~ A'ndrews',.. Director, Nuclear Training
*J. Booker, Manager, Engineering, Fuels, and Licensing
*J.' Cadwallader, Supervisor, Emergency Planning
'
*W. Cahill,1 Senior.Vice President, RBNG
*E.-Cargill,[ Supervisor, Radiological Programs D. Chase, Technical Staff Engineer M. Chilson', Nuclear Equipment Operator J. Clark, Nuclear Control Operator Foreman
*H. Dennis, Prompt Notification System Operator W. Eisele, Health Physicist
., C. Fantacci, Radiation Prptection Supervisor
*D. Feighart, Senior Emergency Planner "
.
'
*D. Gipson, Assistant Plant Manager , ,
, *T. Gildersleeve, Senior Emergency Planner ,
'
.
'
*R. Jobe, Senior Emergency Planner
,
*R. King, Licensing ~ .
: * Odell, Manager, Administration -
*E. Oswood,- Senior Quality Assurance Engineer . - -
*S. Perrin, Communications Foreman
*
~
Contractor Personnel , .
'
W. Smith, Impell .. .
~
State of Louisiana
'
-
.
D. Zaloudek, Emergency Planning Supervisor, LNED Federal Emergency Management Agency
- Jones, Community Planner NRC Personnel
*D. Chamberlain, Senior Resident Inspector
* Jones, Resident Inspector
* Denotes those present at the exit intervie . Notifications and Communications The NRC inspector reviewed appropriate procedures for notifying and communicating with offsite agencies during an emergency. The River Bend emergency plan (hereafter referred to as "the Plan") and
,, - -
. .
-
.
-
. .
,
. associated procedures appeared to be consistent with 10 CFR 50.72 notification requirements. The NRC inspector determined that the licensee .
had provisions for message ver.ification by the state and county authorities upon notificatio The NRC inspector also observed ,
'demonstrati6n of unannounced test notifications to state agencies from the TSC and control room by use of backup telephone numbers. The contacts were promptly made and no discrepancies were identified. Telephone numbers for all licensee and offsite support emergency response personnel
'
and facilities wereglisted in EIP-2-029, " Emergency Telephone Numbers."
The NRC-inspector,noted that this procedure required that the
' Supervisor-Emergency. Planning make a daily review of a listing of newly hired ~and terminating personnel, and ensure that all emergency telephone numbers were reviewed for accuracy and updated quarterly. The NRC inspector determined that the daily review had not been accomplished and that-emergency telephone numbers for offsite agencies listed in EIP-2-029
.had not been reviewed on a quarterly basis as required. This is an apparent Niolation of NRC requirements. (458/8625-01)
The NRC insp~ector noted that the primary means of alerting and notitying the public in the plume exposure emergency planning zone (EPZ) is by 92 fixed sirens. The licensee verified the operability of this system through daily electronic interrogation and weekly silent tests. In addition, a weekly patrol with visual inspection and a quarterly preventive maintenance was being conducted. The NRC inspector reviewed a sample of test and maintenance records and noted no discrepancies. The
, NRC inspector also made a visual inspection of 12 sirens in the EPZ and noted no apparent problens with the condition of the equipment. During the review of this. area, the NRC inspector noted that the licensea had instructions for the various checks and tests but no approved, written procedures for implementing the instruction .
The NRC inspector reviewed communication links and equipment'as described
, in the Plan and procedures. The description of communication links in the Plan was found to be consistent with the description in the state pla The NRC inspector noted that the licensee performed. communication drills periodically _and had a mechanism in place to correct any deficiencies noted. Primary and backup communication links for emergency response facilities and offsite support agencies were checked weekly. Primary communications links to state and local agencies were by telephone hotline with commercial telephone lines and radio used as backups. Monthly system checks of the emergency notification system (ENS) and health physics i network (HPN) were also performed. A review of selected records of these ,
tests over the past year verified that tests were performed as require l The NRC inspector also observed one of the weekly communications tests with offsite agencies and no problems were identified. While' reviewing this area, the NRC inspector noted that there were no approved, written procedures for performing the communications checks and generating the records of the tests.
!
-
I
-.
- . . --
- - .~ -, . - .
, . . - .- _. . .. -.
.
... .
.
4 .
.
Duri5g the inspection, the NRC inspector contacted.) representative of the
'
Region VI Federal Emergency Management Agency (FEMA) office and inquired about the status of the FEMA review of the alert and notification syste ~
The FEMA representative stated that the design report was currently.under review and that a test date for the system would be established upon
! satisfactory completion of the design revie .
, .
.
.
i
'
The following are observations the NRC inspector called to the licensee's
~
# attention. . These observations are neither violations nor unresolved '
- 's,
-
-
-items.- These items were recommended for licensee consideration .for-improvement,,but have no specific regulatory requirement.
- *
*
'
Written procedurestshould be provided for testing of onsite
,
communica'tions' systems.and the generation and retention of test-
; record ,
- ..
! l Operational checks, periodic maintenance and system operat. ion j
'
-
instructions should be incorporated into written procedures and generation-and retention of; records specifie ' Shift Staffing and Augmentation
'
The NRC' inspector reviewed the Plan, discussed shift staffing and '
'
?
augmentation with licensee representatives and reviewed selected personnel qualification records to determine if the goals and criteria of Table B-1
- of NUREG-0654 could be me The NRC inspector also review <J the results
, of two^ unannounced augmentation drills conducted September 17 and
- October 2, 1985. These reviews inaicated that.the. licensee had made
adequate provisions for shift staffing and augmentation to deal with emergencies. The NRC inspector noted that-the two augmentation drills
; described above had been conducted in response to an emergency
~
preparedness appraisal finding and subsequent periodic augmentation drills-
were not provided for in the Plan or specified as'one of the drills to bw ,
l conducted pursuant to Procedure EIP-2-102, " Training,. Drills, and
. Exercises."
- - ,
) The NRC inspector determined that contact of emergency response personnel needed to augment the onshift staff would be by radio pager contact
.
initiated by the on-duty' shift clerk with designated primary personnel-i assigned to the emergency respunse organization. Personnel who receive i
'
the page use a call-back number to the pager system which verifies that contact has been made. Backup telephone calls are made if a person fails
.
-to call back. Key personnel contact other-plant personnel having roles in j staffing the c:nergency response ~ organization. The callout would proceed until sufficient staff would be notified to staff the emergency response
'
~
i facilitie Each of the key responders were assigned pagers. . Periodic testing of pagers;was conducted although such testing was not specifically-defined in procedures. The NRC inspector noted that' personnel ~ appeared to' -
,
understand the use of pagers, but.there was.no written procedure
controlling the issuance, use, testing,-and maintenance of pagers. -The i
licensee depended on having a number of personnel qualified and' assigned to
i
, . - - , - , - - - ,-- . ~ , -., , - . . , ,. , .
,
. .
.
.-
,
emergency response positions for availability to respond to an augmentation call. The NRC inspector noted that an emergency telephone book (EIP-2-029) was maintained with pager numbers and home and work ,
telephone numbers for the emergency response organization. The call list was reviewed and updated once per quarte Tiie following are observations the NRC inspector called to the licensee's attention. The observations are neither violations nor unresolved item These items were recommended for licensee consideration for improvement, but they have no specific regulatory requirement Augmentation drills should be specifically included in procedures to be performed on a specified frequenc *
A procedure should 5e issued to control the issuance, use, testing, and maintenance of :.ersonnel pager No violations or deviations were identifie . Dose Calculations and Assessment
~
The NRC inspector toured the emergency response facilities, examined dose assessment equipment and procedures, observed ' demonstrations of dose * *
assessment, and held discussions with selected station personnel to-
'
determine what provisions the licensee had made for dose calculation and assessment during a radiological emergency. A r.epresentative of the state of Louisiana was also contacted to discuss the state capability.and . '
compatibility o'f dose calculations. This discussion indicated that'the' *
, state had experienced good cooperation with GSU on establishing dose assessment techniques, and no significant compatibility' problems had been identified during previous drills and exercise A review of dose assessment procedures showed that the li_censee had provided a programmable calculator and manual methods for rapidly performing emergency dose projections. The NRC inspector determined that the licensee's computerized method using the GSU digital radiation monitoring system (DRMS) had not been implemented ye The NRC inspector noted that a GSU letter datea February 28, 1986, committed the licensee to a completion date for this system of 2 months after the completion of 100 percent power testing. Licensee representative stated that the 2-month period referred to would end August 16, 1986. The dose assessment techniques were implemented in Procedure EIP-2-024, "Offsite Dose Calculations - Manual Method." The dose assessment methodology included assessment using vent monitor readings or release pathway grab sample results. The procedure also included a methodology for determining the release rate from field monitoring team measurements. Three manual methods were provided: manual calculation, programmable calculator calculation, and manual use of isopleth overlays for off-centerline dose Dose assessment could be performed in all of the emergency response
,
facilitie .
- - - - - -
. _ .
__
,
. . .
.
*
.
The NRC inspector observed demonstrations of the manual calculation, programmable calculator, and isopleth procedures in the control room, .
technical support center (TSC), and emergency operations center (E0F),
respectively. In the control room, the NRC inspector noted that the programmable' calculator was inoperable due to the batteries being down on the printe This resulted in the control operati'n'g foreman having to use the backup manual-manual method for demonstration of dose assessment capabilities. The foreman was able to complete the calculations, but made an error which caused the results to be incorrect. When questioned about training, the foreman stated that he had oeen adequately trained in the calculator method, but had only performed the manual-manual method once befor In the TSC, a health physicist successfully demonstrated the licensee's capability to perform dose assessment with the programmable calculator method in a timely manner. At the conclusion of the demonstration, the NRC inspector noted that the calculator printer module was put back in the storage box with the switch on. This was brought to the licensee's attention and the switch was turned off and a notice placed on all of the storage boxes reminding the users te turn the switch of Next, the NRC inspector observed the licensee's d'ose' asses'sment capability in the E0F. The health physicist selected to demonstrate the3 dose -
assessment attempted to use the programmable calculator and found that it'
was inoperable. The NRC inspector noted that-the health: physicist.
. subsequently demonstrated dose assessment by the isopleth method in a-
.
satisfactory and t.imely manner. During the demonstration, the NRC inspector also noted that one of the values in' Table 1 of. Attachment 3 to EIP-2-024 was incorrect. The licensee took immediate corrective action in issuing a memorandum alerting the station staff to the error and providing the correct valu Based on the above, the following items are-considered to be einergenc a preparedness deficiencies: -
.
Dose assessment programmable calculators in the control room and E0F
~
were not maintained in operable condition. (458/8625-02)
*
Proficiency for performing backup manual dose assessment calcelations in the control room was not demonstrated to be adequat (458/8625-03)
No violations or deviations were identifie . Exit Meeting The NRC inspector met with licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on July 25, 1986. The NRC inspector summarized the purpose and the scope of the inspection and the finding '
;
.
NRC FollM 768 U.S. NUCLEAR REGULATORY COMMISSION PRWCIPAL INSFTCTOR fNamp Est hest se mee ntwa 0535 hq g d) 7* j3 '
INSPECTOR'S REPORT REVIEWER .
Office of Inspection and Enforcement
[ gg,fl INSTECTORS TRANSA TION REPORT NExT INSPEC DATE LICENSE E ' VENDOR DOCKE' NO 18 dtiss OR LICENSE NO 18V PRODUCTH13 dgw NO SEO MO vp fY && G g g
'
4 11 b % i f .l d,$ Q C) Q f f A M - MODIFY
-
D - 0ELETE C
-
R - REPLACE D 1 2 14 16 14 e EMOD OF INVESTKiATION %5PECTiON INSPECTION PERFORMED By ORGAN 2ATION CODE OF REG ON/MO CONDUC ING ACTIVITY (See tfMC 0530 ' Marooner Repor F^OM TO K 1 - REGIONAL OFFICE ST AF F OTHER gwg y,,,po.,, ngg w a y MO- DAY VR MO DAY TR 2 - RESIDENT INSPECTOR _R(GON DMSON I UANCH B
oh ,;1 1 7 o!7 JIS Tl4 3 - PERFORMANCE AMRAISAL TEAM .4 3 l D 25 26 31 32 ' 33 34 35 TYPE OF ACTivif Y CONDUCTEDIChece one boa o'Wyl REGIONAL ACTION ICheck one bon or*vi N 02 - $AFETY _
06 - MGMT vaSIT to - PLANT SE INQUIRV 1 - NRC FORM 591 03 - INC10ENT 07 - SPECtAL 11 - INVENT.vER 15 - #NVESTIGATION 2 - KEGON AL OFFICE LETTER 04 - ENFORCEMENT 08 - VENDOR 12 - SHIPMENTIEXPORT 05 - MGMT AUDIT 09 - MAT ACC iMPOR T 36 37 M sNSPECTiON W.ESTiU ATON fin >NGS TOTAL NWBER REPORT CONTAIN 2 790
" "" ENFORCEMENT CONFERENCE LETTER OR GEPORT TR ANSMtTT AL DATE OF VCLATCNS AND MELD INF ORM ATbON A B C D DEv;ATCNS '
,
NRC FOPU 591 REPORT SENT
-* TO MO FOR 1 - CLEAR -
OR REG .
LETTER ISSUED * ACTION g 2 - VIOLATON 3 - DEviATON A B D D
"
VR day C Af8 C A B C D MO "D A Y MO- VR 4 - VCLATCN & DEviATON g,l , , , { 1 - V ES 1 - YES df /l# hh l l l_ ,
W 4041 42 43 44 49 50 SS MODULE INFORMATiON MODut E INFORM ATON 4*
C D MODULE NUMBER INSP yg 9 MODULE REO FOLLOWUP D MC E NUM8ER iNSP 9 MODULE REO FOLLOWUP 8* 6g##
r 98 5 5 55 58 *
- xs 8- : 4<ds5 - - - . 5 g- - -
a- ad -*s5 s - - : a-r i i !5 9i f
*
6 Siiss !:i3 $ i !I si i t i i !5 : s si !! $ g:
6 iii ! i !$ sI i
: = z 25 : e n r aa:1 r8e : I so : = c ; I sa e - )dsisa:1 r8e : z su e; z
. i r 3iol7, o,3l ^
oioia ii i liiI e i iIiiI ^
i i i i i IiiI
*
i i i i i liil '
i i i i i 'l i i l c
i , i i i liiI c i i i i i liiI i t i i i liil i i i i liiI
^ ^
e i 5 1 2l2 i >i3! odi.A lici o t i liil e i iliil' i i i i i liil l i t i i i i l i l i i i i i l i i i I i t i i i i i i i i i f f t t t t I t f l I I )
= i S3iallioisl ^
o3m /ioi o c i IiiI e i iliiI ^
i i i i i IiiI
*
i i t i i liil '
i i i i lI i l 1 i t I i i I , i i I i ii t I t i i i l i l i l i ! i s i d illaci71 ^
ci3ia t ioio c- i liiI e i iIiiI ^
i i i i i IiiI
- I I i t I i i i i i i i l i
'
i l i I i i i l i i i i i !
O CIRCtf SEQUENCE IF 0 I D I I VOL ATON OR DEviATON , , l l t l l l l l l l l l l l l l '1 l' 3l4 l5 10 12 13 15 16 18 19 20 21 l 26 1l2 3l 4 lS to 12 13 is 16 is is 20 2, 26}
=
,
~
f3RC $0RU 7E A REPoRV MODULE NUMBER DOCKET NO. al0RUCENSE
'j'f*pos3, woisyPRoo inia a. ,o ,,o. . , g gy , g INSPECTOR'S REPORT d6o oo +$J M /; 2 5 a vo"o*$ma"'ORDEvjTioM i (Continuation) e , , , , , , c Office of Inspection and Enforcement _g
_e, C C
] .o.oR-,,,,,..,._,._._,,.....,~.__..-_.....,,...E_,-....,,.,._,
'
a Failure to Follow Procedures
'~ CFR 50.54(q) requires that licensees shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the
, requirements in Appendix E to Part 5 t 10 CFR 50.47(b)(6) requires, in part, that provisions be established for
,.
prompt communications among principal response organizations and emergency personne .
,, River Bend Station Support Manual Procedure EIP-2-104, Revision No. 1
"- effective May 8,1985, " Maintenance of Emergency Telephone Numbers," had been established,fo support implementation of the emergency communications
,1 systems provisions of the emergency plan in accordance with the planning
' 8- standard in 10 CFR 50.47(b)(6). EIP-2-104 states, in Section 4.1, that
,a the Supervisor, Emergency Planning shall review listings of newly hired and terminating personnel on a daily basis, and ensure that all emergency
.
'5-telephone numbers in the emergency telephone book are reviewed for accuracy and updated quarterl .
"~ Contrary to the above, on July 24, 1986, the NRC inspector determined that'
the Supervisor, Emergency Planning, had not received and reviewed listings .
i of newly hired and terminating personnel on a daily basis. In addition,
~ the Supervisor, Emergency Planning, had not reviewed offsite agencies' . *
a backup telephone numbers in the eme'rgency telephone book for accuracy on a quarterly basi
This is a Severity Level V violatio (SuppkementVIII)(458/8601)
n 2 s
2?
29
31.
33 3s
4
$1 U.S. NUCLEAR REGULATORY COMMISSloN