Insp Rept 50-458/86-21 on 860512-16.No Violation or Deviation Noted.Major Areas Inspected:Licensed Operator Training & Nonlicensed Staff Training
ML20211G155
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/09/1986
From: Bennett W, Jaudon J, Skow M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20211G145 List:
References
50-458-86-21, NUDOCS 8606190315
Download: ML20211G155 (6)


Text

.a

.

.

-APPENDIX U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC. Inspection Report:

50-458/86-21 License:

NPF-47 -

Docket:

50-458 Licensee:

Gulf States Utilities P. O. Box 2951 Beaumont, Texas 77704 Facility Name:

River Bend Station Inspection At:

River Bend Site, St. Francisville, Louisiana Inspection Conducted:

May 12-16, 1986 ru/

MA

$

8[

-Inspectors: ( N (S R1 Ben tt~, Projelct Engineer, Project Date ectio A, Reactor Projects Branch

'

(parag aphs 1, 2, 3, and 5)

,

fa,

//lf\\

Y e

M.

kow, ojdct Eirgineer,' Project Date

-

ion A, Reactor Projects Branch (paragrap 1, 4, and 5)

Approved:

.

x(a. 6/1

[

-

J/ P. (Jau

, Chief, Project Section A Date LReactor rojects Branch Inspection Summary Inspection Conducted May 12-16, 1986 (Report 50-458/86-21)

0606190315 860613 PDR ADOCK 00000458 o

PDR

,_

.

.

Areas Inspected:

Routine, unannounced inspection of-licensed operator training and nonlicensed staff training.

~

Results: Within the two areas inspected, no violations or deviations were identified.

.

,

.

.

DETAILS 1.

Persons Contacted Gulf States Utilities (GSU)

D. Andrews, Director, Nuclear Training

  • D. J. Ashley, Nuclear ~ Training Coordinator-License
  • W. J. Cahill, Senior Vice President

~ *T. C. Crouse, Quality Assuraa::e (QA) Manager

  • P. F. Gillespie, Senior Compliance Analyst
  • D. R. Gipson, Assistant Plant Manager
  • R. J. King, Licensing Engineer
  • J. H. McQuirter, Nuclear Licensing Engineer
  • J. Normand, Plant Staff
  • W. H. Odell, Manager, Administration
  • T. F. Plunkett, Plant Manager
  • D. M. Reynerson, Nuclear Plant Engineering
  • R. R. Smith, Licensing Engineer
  • J. E. Spivey, QA Engineer
  • R. B. Stafford, Director, Operations QA
  • K. E. Suhrke, Manager, Projects L. Thompson, Maintenance and Test Equipment Supervisor
  • P. F. Tomlinson, Director, Quality Services D. M. Williamson, Operations Supervisor General Physics E. C. Brohl, Director, Training Services
  • R. Persons, Instructor Supervisor The NRC inspectors also contacted other site personnel including administrative, clerical, operations, and training personnel.
  • Denotes those attending the exit intervieu conducted on May 16, 1986.

2.

Licensee Action on Previous Inspection Findings a.

(Closed) Violation (458/8559-01):

Improper disposition of nonconformance reports (NCRs).

The NRC inspector reviewed the revised NCRs and determined that they were properly dispositioned.

This item is closed.

b.

(Closed) Violation (458/8566-01):

Failure to update procedures after issuance of three Temporary Change Notices (TCNs)

.

.

.

The NRC inspector reviewed system operating procedures and determined that all procedures had less than three TCNs except one which had a revision in progress.

This item is closed.

c.

(Closed) Violation (458/8566-02): Failure to properly prepare TCNs.

The NRC inspector reviewed River Bend Procedure ADM-003 to ensure that procedure required incorporation of previously approved TCNs when preparing a new TCN. The inspector sampled recently issued TCNs to verify that ADM-003 was being followed.

This item is closed.

d.

(Closed) Violation (458/8566-03): Change and issuance of TCN after final approval.

The NRC inspector reviewed River Bend Procedure ADM-003 to verify clarification of the TCN process.

This item is closed.

3.

Licensed Operator Training The purpose of the inspection was to evaluate the effectiveness of the licensed operator training program. The licensee stated that they are committed to provide their operator training program to the Institute of Nuclear Power Operations (INPO) in November 1986.

The NRC inspector reviewed River Bend Procedure TPP-7-011, " Licensed Operator Requalification Training," Revision 0, dated March 4,1985, to determine the adequacy of the program for licensed operator requalification. Review of requalification lecture schedules, attendance records, periodic tests, and training records of several licensed reactor operators and senior reactor operators determined that required subjects are being taught, all required personnel are attending required lectures, and training records are being adequately maintainsd. Records of control manipulations are being maintained and are regularly updated by the training department. The operations department has made a concerted effort to assure that all operators attend the required requalification lectures and has made provisions to ensure that all personnel who have missed lectures attend scheduled makeup lectures. The NRC inspector reviewed lesson plans and attended requalification lectures to assure that technical content of information presented is adequate. Lesson plans were found to be adequate for material presented. Lectures were given in a thorough, professional manner and followed the lesson plans.

Lesson plans were changed as required to reflect operating experience and any special needs of the operators. The first annual requalification exam is scheduled for November 1986.

l l

.

.:.

The NRC inspector reviewed River Bend Procedure TAP-5-005, " Configuration Management of Training Systems," Revision 1, dated January 2, 1986, to determine the adequacy of the program for ensuring operational problems and lessons learned are included in the requalification program.

The training department reviews all condition reports, Licensee Event Reports (LER's) and modification requests to determine requirements for inclusion in the requalification program.

Interviews with training department and operations department personnel showed that good communications exist between the departments for allowing operations input into the determination of training _needed.

No violations or deviations were identified in this portion of the inspection.

4.

Nonlicensed Staff Training The purpose of this portion of the inspection was to evaluate the effectiveness of the training programs for the nonlicensed staff.

In this regard, the NRC inspector reviewed the following documents:

)

Administrative Procedures Rev.

Date TAP-5-005 Configuration Management of Training Systems TPP-7-012 Nonlicensed Operator Training

10/30/85 TPP-7-015 Instrument Control Maintenance Training

02/07/85 Lesson Plans 1C-013 Temperature & Temperature Measurement 01/24/84

-

GET-010-1 Introduction, RBS, Site Orientation

08/28/85 and Plant Description

~

'

GET-011-1 Organization & Administration Plant Operation Policies GET-012-2 Quality Assurance

01/27/86 GET-013-2 Access Control and Security

01/09/86 GET-014-3 Industrial Health, Safety & Fire Protection

01/27/86 GET-015-1 Emergency Plan

11/14/85 GET-016-2 Basic Radiation Training

01/09/86

,.

GET-020-2 Administrative Radiation Control

01/08/86 GET-021-1 Practical Applications-Generic Training

01/07/85 GET-030-1 Respiratory Protection

09/06/85-NLO-22 Reactor Core Isolation Cooling

-

07/06/83 NE0-014 HPCS Diesel Generator

10/08/85 NE0-021-0 Radwaste Building-HVAC

01/10/86 NE0-027-1 Reactor Water Cleanup System

03/03/86 NE0-045-0 Off Gas System

02/13/86 NE0-063-0 High Pressure Core Spray

05/09/86 The administrative procedures were reviewed to determine that responsibility was clearly assigned for administering and evaluating related training.

The review also determined that means existed and that any lessons learned from events / activities could be factored into the training program.

The lesson plans were reviewed to verify that specific training would be of sufficient scope to enable personnel to effectively and safely discharge their duties.

Personnel were interviewed to determine that training did adequately prepare them for their jobs in the areas of maintenance, administrative controls, radiological health and safety, security, and quality assurance.

Training records were reviewed for 20 nonlicensed staff members.

The records reviewed verified that individual qualifications were in accordance with regulatory requirements and licensee commitments. The review also verified that required training had been successfully completed.

The licensee has committed to a training program accreditation by INP0.

The-licensee appears to be progressing as scheduled toward that goal. In the area of nonlicensed staff training, no violations or deviations were identified.

The licensees training program and its implementation appear to have been meeting regulatory requirements and licensee.:ommitments.

5.

Exit Interview An exit interview was held on May 16, 1986, with the personnel denoted in paragraph 1 of this report.

The NRC senior resident inspector also attended this meeting.

At this meeting, the scope of use inspection and the findings were summarized.