{{#Wiki_filter:From: Sullivan.
{{#Wiki_filter:From:             Sullivan. Kenneth ,   OL,
Kenneth , -\1) OL, To: Frumkin. Daniel \ 60-_
                                        -\1)
To:                 Frumkin. Daniel \ 60-_


==Subject:==
==Subject:==
Oyster Creek Phase 1 Exemption Request Date: Thursday, September 24, 2009 3:39:36 PM Attachments:
Oyster Creek Phase 1 Exemption Request Date:             Thursday, September 24, 2009 3:39:36 PM Attachments:       OC Phase 1 Operator Manual Action Exemption Reauestr1l.odf OC 1990 SE.Ddf OC 1986 SE.ndf ban It is my understanding that in order for a pre-79 plant to credit prior staff acceptance of operator manual actions (OMAs) as a means of satisfying III.G.2, the MOAs have to be explicitly reviewed in an SE....I believe industry would agree -, in his presentation at the NEI conference, Chris Pragman of Exelon (Licensee of Oyster Creek - oddly enough) states that a Phase I review can only be performed if there is compelling evidence of prior NRC review and acceptance of OMAs. Otherwise a more detailed Phase 2 review is required.
OC Phase 1 Operator Manual Action Exemption Reauestr1l.odf OC 1990 SE.Ddf OC 1986 SE.ndf ban It is my understanding that in order for a pre-79 plant to credit prior staff acceptance of operator manual actions (OMAs) as a means of satisfying III.G.2, the MOAs have to be explicitly reviewed in an SE....I believe industry would agree -, in his presentation at the NEI conference, Chris Pragman of Exelon (Licensee of Oyster Creek -oddly enough) states that a Phase I review can only be performed if there is compelling evidence of prior NRC review and acceptance of OMAs. Otherwise a more detailed Phase 2 review is required.In its Phasel exemption request for OMAs, Oyster Creek (a pre-79 plant) states that the request is limited to those operator manual actions credited for 10 CFR 50, Appendix R, Section III.G.2 compliance that were previously found acceptable for OCNGS by the NRC in a Safety Evaluation Report (SER)_To support this claim OCNGS cites two SERs (March 24, 1986 and June 25, 1990) as follows:* The March 24, 1986 SER accepted the FHAR, and also accepted the OCNGS proposed resolution to the NRC reviewer's final comments regarding manual actions.* The June 25, 1990 SER clearly acknowledges that manual actions are performed outside the fire zone.The licensee claims that the March 24, 1986 SER accepted the FHAR in its entirety -including all OMAs described in the FHAR -However -Section 8 of the SE specifically states that the scope of the staffs review was limited to alternate shutdown capability Appendix R, Items III-G-3 and III.L. (which was the staff practice at that time) Section 8.3 Conclusion, of the SE states: We have reviewed the licensee's proposed alternate safe shutdown capability for Oyster Creek in accordance with Appendix R criteria.
In its Phasel exemption request for OMAs, Oyster Creek (a pre-79 plant) states that the request is limited to those operator manual actions credited for 10 CFR 50, Appendix R, Section III.G.2 compliance that were previously found acceptable for OCNGS by the NRC in a Safety Evaluation Report (SER)_
Based on that review, we conclude that the performance goals for accomplishing safe shutdown in the event of a fire, i.e., reactivity control, inventory control, decay heat removal, pressure control, process monitoring and support functions are met by the proposed alternate safe shutdown facility.
To support this claim OCNGS cites two SERs (March 24, 1986 and June 25, 1990) as follows:
Therefore, we conclude that the requirements of Appendix R, Sections III.6.3 and II7TL are satisfied.
* The March 24, 1986 SER accepted the FHAR, and also accepted the OCNGS proposed resolution to the NRC reviewer's final comments regarding manual actions.
The extent of the staff's review of any III.G.2 issue is limited to the review of the requested exemptions  
* The June 25, 1990 SER clearly acknowledges that manual actions are performed outside the fire zone.
-In all cases, staff acceptance is based on the capability of zone-specific, fire safety features (suppression, detection, fire loading, manual suppression capability, etc.) -and not the capability of MOAs -Since MOAs were not considered in the staff's evaluation...
The licensee claims that the March 24, 1986 SER accepted the FHAR in its entirety - including all OMAs described in the FHAR - However -Section 8 of the SE specifically states that the scope of the staffs review was limited to alternate shutdown capability Appendix R, Items III-G-3 and III.L. (which was the staff practice at that time) Section 8.3 Conclusion, of the SE states:
In no instance did the staff's acceptance of a requested exemption include an evaluation of MOAs Statements in the 1986 SER such as:* all required hot shutdown systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier.* The required shutdown-related cables are either protected by a 1-hour fire barrier or an alternate means for achieving safe-shutdown is available outside of this area.  
We have reviewed the licensee'sproposed alternate safe shutdown capability for Oyster Creek in accordance with Appendix R criteria.Based on that review, we conclude that the performance goals for accomplishing safe shutdown in the event of a fire, i.e., reactivity control, inventory control, decay heat removal, pressure control,process monitoring and support functions are met by the proposedalternate safe shutdown facility. Therefore, we conclude that the requirements of Appendix R, Sections III.6.3 and II7TL are satisfied.
" In the April 3, 1985 report, the licensee committed to relocate certain shutdown related cables and to protect others in a 1-hour fire-rated barrier.* those required shutdown systems that are vulnerable to fire damage in this area are protected by a 1-hour fire barrier.Clearly indicate that the staff was of the opinion that all required S5S cables were protected with a 1 hour rated barrier or an alternate shutdown capability was provided Neither of the referenced SERs explicitly approve all the MOAs identified in the OC submittal.
The extent of the staff's review of any III.G.2 issue is limited to the review of the requested exemptions - In all cases, staff acceptance is based on the capability of zone-specific, fire safety features (suppression, detection, fire loading, manual suppression capability, etc.) - and not the capability of MOAs - Since MOAs were not considered in the staff's evaluation... In no instance did the staff's acceptance of a requested exemption include an evaluation of MOAs Statements in the 1986 SER such as:
The SEs do, however, indicate that the staff was aware MOAs were being performed (for either hot or cold shutdown).
* all required hot shutdown systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier.
As stated in the June 25, 1990 SE, the extent of the staff review was limited to ensuring that they "would be accomplished from outside this zone and are not affected by a fire in this zone ." Does this constitute "tacit approval"?
* The requiredshutdown-related cables are eitherprotected by a 1-hour fire barrieror an alternate means for achieving safe-shutdown is available outside of this area.
OC also cites various telephone records and submittals  
 
-However ...It is my understanding that docketed submittals, meeting minutes, licensee presentations, and inspection reports, do not represent evidence of NRC approval....
    " In the April 3, 1985 report, the licensee committed to relocate certain shutdown related cables and to protect others in a 1-hour fire-ratedbarrier.
* those required shutdown systems that are vulnerable to fire damage in this area are protected by a 1-hour fire barrier.
Clearly indicate that the staff was of the opinion that all required S5S cables were protected with a 1 hour rated barrier or an alternate shutdown capability was provided Neither of the referenced SERs explicitly approve all the MOAs identified in the OC submittal.
The SEs do, however, indicate that the staff was aware MOAs were being performed (for either hot or cold shutdown). As stated in the June 25, 1990 SE, the extent of the staff review was limited to ensuring that they "would be accomplished from outside this zone and are not affected by a fire in this zone ." Does this constitute "tacit approval"?
OC also cites various telephone records and submittals - However ...It is my understanding that docketed submittals, meeting minutes, licensee presentations, and inspection reports, do not represent evidence of NRC approval....
Apologize for the length of this diatribe...
Apologize for the length of this diatribe...
Would appreciate hearing your views before I develop the RAIs ... Please give me a call (631-344-7915) anytime tomorrow to discuss further Thanks Ken Sullivan, BNL Exelon NucleaT www.exeloncorp.com 200 Exelon Way NUC]ear Kennett Square, PA 19348 10 CFR 50.12 March 3, 2009 RA-09-017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-1 6 NRC Docket No. 50-219  
Would appreciate hearing your views before I develop the RAIs ... Please give me a call (631-344-7915) anytime tomorrow to discuss further Thanks Ken Sullivan, BNL
 
Exelon NucleaT                     www.exeloncorp.com 200 Exelon Way                                                                             NUC]ear Kennett Square, PA 19348 10 CFR 50.12 March 3, 2009 RA-09-017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-1 6 NRC Docket No. 50-219


==Subject:==
==Subject:==
Line 41: Line 48:


==References:==
==References:==
: 1. Letter dated March 24, 1986, from J. Zwolinski, USNRC, to P. Fiedler, Oyster Creek Nuclear Generating Station, "Exemptions from Requirements of Appendix R to 10 CFR Part 50, Section III.G.2 and the Post Fire Safe Shutdown Capability (TAC 56740, 56786)." 2. Letter dated June 25,1990, from A. Dromerick, USNRC, to E. Fitzpatrick, Oyster Creek Nuclear Generating Station, "Exemption from Certain Technical Requirements Contained in Section III.G of Appendix R to 10 CFR Part 50 (TAC 62229)." 3. Letter dated April 3, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 1. Letter dated March 24, 1986, from J. Zwolinski, USNRC, to P. Fiedler, Oyster Creek Nuclear Generating Station, "Exemptions from Requirements of Appendix R to 10 CFR Part 50, Section III.G.2 and the Post Fire Safe Shutdown Capability (TAC 56740, 56786)."
: 2. Letter dated June 25,1990, from A. Dromerick, USNRC, to E. Fitzpatrick, Oyster Creek Nuclear Generating Station, "Exemption from Certain Technical Requirements Contained in Section III.G of Appendix R to 10 CFR Part 50 (TAC 62229)."
: 3. Letter dated April 3, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 4. Letter dated July 12, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 4. Letter dated July 12, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 5. Letter dated October 9, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 5. Letter dated October 9, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 6. Letter dated August 25, 1986, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 6. Letter dated August 25, 1986, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
In accordance with 10 CFR 50.12, "Specific exemptions," Exelon Generation Company, LLC (Exelon) hereby requests an exemption from the provisions of 10 CFR 50, Appendix R, Section Ill.G, "Fire Protection of Safe Shutdown Capability," for the use of operator manual actions for Oyster Creek Nuclear Generating Station (OCNGS) in lieu of the requirements of Paragraph III.G.2. This exemption is being requested in accordance with the requirements of 10 CFR 50.12(a)(2)(ii) since the application of the regulation in this particular circumstance would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule.
In accordance with 10 CFR 50.12, "Specific exemptions," Exelon Generation Company, LLC (Exelon) hereby requests an exemption from the provisions of 10 CFR 50, Appendix R, Section Ill.G, "Fire Protection of Safe Shutdown Capability," for the use of operator manual actions for Oyster Creek Nuclear Generating Station (OCNGS) in lieu of the requirements of Paragraph III.G.2. This exemption is being requested in accordance with the requirements of 10 CFR 50.12(a)(2)(ii) since the application of the regulation in this particular circumstance would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule.
10 CFR 50.12 Exemption Request Operator Manual Actions Docket No. 50-219 March 3, 2009 Page 2 The manual actions addressed in this exemption request (Phase 1) are those that were previously included in the OCNGS Fire Hazards Analysis Report (FHAR) submitted to the NRC, which was subsequently found acceptable in a fire protection safety evaluation report (SER).Reference 1 is an SER that accepts the OCNGS FHAR, which includes operator manual actions. Reference 2 is an SER that acknowledges that other manual actions not affected by a fire in the fire area are acceptable.
 
References 3 -6 comprise the submittals to the NRC referenced in the two SERs.In accordance with Regulatory Issue Summary (RIS) 2006-10, "Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions," an approved 10 CFR 50.12 exemption is required for all operator manual actions, even those that were accepted in a previously issued NRC SER. This exemption request is limited to those manual actions that were previously accepted in an NRC SER for OCNGS. Attachment 2 contains a list of the specific manual actions for which an exemption is being requested.
10 CFR 50.12 Exemption Request Operator Manual Actions Docket No. 50-219 March 3, 2009 Page 2 The manual actions addressed in this exemption request (Phase 1) are those that were previously included in the OCNGS Fire Hazards Analysis Report (FHAR) submitted to the NRC, which was subsequently found acceptable in a fire protection safety evaluation report (SER).
This exemption request will not result in undue risk to the public health and safety because Exelon has determined that the subject manual actions are feasible and the NRC has already found these manual actions to be acceptable for use in achieving post-fire safe shutdown.
Reference 1 is an SER that accepts the OCNGS FHAR, which includes operator manual actions. Reference 2 is an SER that acknowledges that other manual actions not affected by a fire in the fire area are acceptable. References 3 - 6 comprise the submittals to the NRC referenced in the two SERs.
In addition, the intent of 10 CFR 50, Appendix R, Section 11:.G.2, is to ensure that one train of systems necessary to achieve and maintain hot shutdown will remain available in the event of a fire. The manual actions discussed in this exemption request provide that assurance.
In accordance with Regulatory Issue Summary (RIS) 2006-10, "Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions," an approved 10 CFR 50.12 exemption is required for all operator manual actions, even those that were accepted in a previously issued NRC SER. This exemption request is limited to those manual actions that were previously accepted in an NRC SER for OCNGS. Attachment 2 contains a list of the specific manual actions for which an exemption is being requested.
If manual actions are not used to meet the underlying purpose of the rule, modifications to: (1) provide additional fire suppression systems, detection systems, or fire barriers, or (2) re-route cabling or wrap cabling, would be required to achieve compliance.
This exemption request will not result in undue risk to the public health and safety because Exelon has determined that the subject manual actions are feasible and the NRC has already found these manual actions to be acceptable for use in achieving post-fire safe shutdown. In addition, the intent of 10 CFR 50, Appendix R, Section 11:.G.2, is to ensure that one train of systems necessary to achieve and maintain hot shutdown will remain available in the event of a fire. The manual actions discussed in this exemption request provide that assurance. If manual actions are not used to meet the underlying purpose of the rule, modifications to: (1) provide additional fire suppression systems, detection systems, or fire barriers, or (2) re-route cabling or wrap cabling, would be required to achieve compliance. Such modifications represent an unwarranted burden on Exelon since they are not necessary to meet the underlying purpose of the rule. Therefore, the special circumstances for issuance of the exemption are satisfied in accordance with the requirements of 10 CFR 50.12(a)(2)(ii), since application of the rule is not necessary to achieve the underlying purpose of the rule. Furthermore, the requested exemption is authorized by law and is consistent with the common defense and security. Therefore, the requirements of 10 CFR 50.12(a)(1) are satisfied.
Such modifications represent an unwarranted burden on Exelon since they are not necessary to meet the underlying purpose of the rule. Therefore, the special circumstances for issuance of the exemption are satisfied in accordance with the requirements of 10 CFR 50.12(a)(2)(ii), since application of the rule is not necessary to achieve the underlying purpose of the rule. Furthermore, the requested exemption is authorized by law and is consistent with the common defense and security.
The Fire Protection Program at Oyster Creek, including defense-in-depth features such as fire detection and suppression systems installed in specific fire areas/zones within the plant, has been previously reviewed and approved by the NRC in various fire protection SERs and exemptions, and found acceptable during fire protection related inspections. Due to the mitigating factors and existing defense-in-depth features already provided, as discussed in , the existing level of defense in depth is considered acceptable for the manual actions contained in this exemption request. Nonetheless, Exelon has decided to enhance the existing fire protection defense in depth by adding detection or suppression capability to certain fire areas/zones within the plant. The modifications to install this detection or suppression are discussed within the applicable fire area descriptions in Attachment 1.
Therefore, the requirements of 10 CFR 50.12(a)(1) are satisfied.
 
The Fire Protection Program at Oyster Creek, including defense-in-depth features such as fire detection and suppression systems installed in specific fire areas/zones within the plant, has been previously reviewed and approved by the NRC in various fire protection SERs and exemptions, and found acceptable during fire protection related inspections.
Due to the mitigating factors and existing defense-in-depth features already provided, as discussed in Attachment 1, the existing level of defense in depth is considered acceptable for the manual actions contained in this exemption request. Nonetheless, Exelon has decided to enhance the existing fire protection defense in depth by adding detection or suppression capability to certain fire areas/zones within the plant. The modifications to install this detection or suppression are discussed within the applicable fire area descriptions in Attachment
: 1.
10 CFR 50.12 Exemption Request Operator Manual Actions Docket No. 50-219 March 3, 2009 Page 3 This exemption request includes no new regulatory commitments.
10 CFR 50.12 Exemption Request Operator Manual Actions Docket No. 50-219 March 3, 2009 Page 3 This exemption request includes no new regulatory commitments.
Information supporting the exemption request is contained in Attachments 1 and 2 to this letter.Exelon requests approval of this exemption request by March 3, 2010.If you have any questions or require additional information, please contact Glenn Stewart at 610-765-5529.
Information supporting the exemption request is contained in Attachments 1 and 2 to this letter.
Resp~ctfully,U  
Exelon requests approval of this exemption request by March 3, 2010.
/Pamela B. Cowan Director -Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:
If you have any questions or require additional information, please contact Glenn Stewart at 610-765-5529.
: 1. 10 CFR 50.12 Exemption Request, Operator Manual Actions 2. Appendix R, Section III.G.2, Operator Manual Actions cc: Regional Administrator  
Resp~ctfully,U   /
-NRC Region I NRC Senior Resident Inspector  
Pamela B. Cowan Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1. 10 CFR 50.12 Exemption Request, Operator Manual Actions
-OCNGS NRC Project Manager, NRR -OCNGS Director, Bureau of Nuclear Engineering, New Jersey Department of Environmental Protection Mayor of Lacey Township, Forked River, New Jersey Jon Corzine, State of New Jersey w/ attachments I'it 10 CFR 50.12 Exemption Request Operator Manual Actions Docket No. 50-219 March 3, 2009 Page 4 bcc: Sr. Vice President, Mid-Atlantic Operations Sr. Vice President, Operations Support Vice President, Engineering Site Vice President, OCNGS Plant Manager, OCNGS Director, Operations, OCNGS Director, Engineering Director, Site Engineering, OCNGS Director, Site Training, OCNGS Manager, Regulatory Assurance, OCNGS Manager, Licensing  
: 2. Appendix R, Section III.G.2, Operator Manual Actions cc:     Regional Administrator - NRC Region I                                   w/ attachments NRC Senior Resident Inspector - OCNGS NRC Project Manager, NRR - OCNGS Director, Bureau of Nuclear Engineering, New Jersey Department of Environmental Protection                                           I' it Mayor of Lacey Township, Forked River, New Jersey Jon Corzine, State of New Jersey
-KSA3-E G. Stewart -KSA3-E M. Carlson, OCNGS C. Pragman, KSA2-N Commitment Coordinator  
 
-KSA 3-E Records Management  
10 CFR 50.12 Exemption Request Operator Manual Actions Docket No. 50-219 March 3, 2009 Page 4 bcc:
-KSA 1-N-1 w/o attachments w/attachments II 11 ATTACHMENT I 10 CFR 50.12 Exemption Request Oyster Creek Nuclear Generating Station Docket No. 50-219 Request for Exemption from 10 CFR 50, Appendix R, Section Ill.G, "Fire Protection of Safe Shutdown Capability" (Phase 1)Operator Manual Actions 10 CFR 50.12 Exemption Request Page 1 of 49 Docket No. 50-219 ATTACHMENT 1 OPERATOR MANUAL ACTIONS I. SPECIFIC EXEMPTION REQUEST An exemption is requested by Exelon Generation Company, LLC (Exelon) from the requirements of Appendix R (Reference 1), Section Ill.G, "Fire Protection of Safe Shutdown Capability," for Oyster Creek Nuclear Generating Station (OCNGS), to the extent that operator manual actions are necessary to achieve and maintain hot shutdown for areas/zones in which both trains of systems required for safe shutdown could be affected by the same fire.
Sr. Vice President, Mid-Atlantic Operations w/o attachments Sr. Vice President, Operations Support Vice President, Engineering Site Vice President, OCNGS Plant Manager, OCNGS Director, Operations, OCNGS Director, Engineering Director, Site Engineering, OCNGS Director, Site Training, OCNGS Manager, Regulatory Assurance, OCNGS Manager, Licensing - KSA3-E                 w/attachments II G. Stewart - KSA3-E M. Carlson, OCNGS C. Pragman, KSA2-N                                   11 Commitment Coordinator - KSA 3-E Records Management - KSA 1-N-1
 
ATTACHMENT I 10 CFR 50.12 Exemption Request Oyster Creek Nuclear Generating Station Docket No. 50-219 Request for Exemption from 10 CFR 50, Appendix R, Section Ill.G, "Fire Protection of Safe Shutdown Capability" (Phase 1)
Operator Manual Actions
 
10 CFR 50.12 Exemption Request                                                         Page 1 of 49 Docket No. 50-219 ATTACHMENT 1 OPERATOR MANUAL ACTIONS I.       SPECIFIC EXEMPTION REQUEST An exemption is requested by Exelon Generation Company, LLC (Exelon) from the requirements of Appendix R (Reference 1), Section Ill.G, "Fire Protection of Safe Shutdown Capability," for Oyster Creek Nuclear Generating Station (OCNGS), to the extent that operator manual actions are necessary to achieve and maintain hot shutdown for areas/zones in which both trains of systems required for safe shutdown could be affected by the same fire.


==Background:==
==Background:==


The criteria for granting specific exemptions from 10 CFR 50 regulations are specified in 10 CFR 50.12. In accordance with 10 CFR 50.12(a)(1), the NRC is authorized to grant an exemption upon determining that the exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security.Regulatory Issue Summary (RIS) 2006-10 (Reference
The criteria for granting specific exemptions from 10 CFR 50 regulations are specified in 10 CFR 50.12. In accordance with 10 CFR 50.12(a)(1), the NRC is authorized to grant an exemption upon determining that the exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security.
: 2) documents the NRC position relative to the use of operator manual actions as part of a compliance strategy to meet the requirements of 10 CFR 50, Appendix R, Section III.G.2. The NRC requires that plants which credit manual actions for Section III.G.2 compliance obtain specific NRC approval for the manual actions via the exemption process in accordance with the requirements of 10 CFR 50.12. RIS 2006-10 addresses operator manual actions that were previously approved outside the exemption process as stated below: "For pre-1979 licensees, a staff decision in a safety evaluation report (SER) that approves the use of operator manual actions, in lieu of one of the means specified in paragraph III.G.2, does not eliminate the need for an exemption.
Regulatory Issue Summary (RIS) 2006-10 (Reference 2) documents the NRC position relative to the use of operator manual actions as part of a compliance strategy to meet the requirements of 10 CFR 50, Appendix R, Section III.G.2. The NRC requires that plants which credit manual actions for Section III.G.2 compliance obtain specific NRC approval for the manual actions via the exemption process in accordance with the requirements of 10 CFR 50.12. RIS 2006-10 addresses operator manual actions that were previously approved outside the exemption process as stated below:
Pre-1979 licensees who have SERs, but not a corresponding exemption, which approve manual actions should request an exemption under 10 CFR Part 50.12, citing the special circumstances of section 50.12(a)(2)(ii), citing the SER as the safety basis, and confirming that the safety basis established in the SER remains valid. The staff expects to grant the exemption on these bases without further review." 10 CFR 50.12(a)(2)(ii) states, "Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule." II. BASIS FOR EXEMPTION REQUEST This exemption request (Phase 1) is limited to those operator manual actions credited for 10 CFR 50, Appendix R, Section III.G.2 compliance that were previously found acceptable for OCNGS by the NRC in a Safety Evaluation Report (SER). References to the documentation that supports the inclusion of these manual actions as previously approved is provided.
    "For pre-1979 licensees, a staff decision in a safety evaluation report (SER) that approves the use of operator manual actions, in lieu of one of the means specified in paragraph III.G.2, does not eliminate the need for an exemption. Pre-1979 licensees who have SERs, but not a corresponding exemption, which approve manual actions should request an exemption under 10 CFR Part 50.12, citing the special circumstances of section 50.12(a)(2)(ii), citing the SER as the safety basis, and confirming that the safety basis established in the SER remains valid. The staff expects to grant the exemption on these bases without further review."
The operator manual actions that are the subject of this exemption request are essentially unchanged from their original acceptance (with minor changes as noted in Attachment 2);therefore, the original safety basis remains valid.
10 CFR 50.12(a)(2)(ii) states, "Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule."
10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 2 of 49 Docket No. 50-219 The intent of 10 CFR 50, Appendix R, Section III.G.2, is to ensure that one train of systems necessary to achieve and maintain hot shutdown will remain available in the event of a fire. The manual actions discussed in this exemption request provide that assurance.
II.       BASIS FOR EXEMPTION REQUEST This exemption request (Phase 1) is limited to those operator manual actions credited for 10 CFR 50, Appendix R, Section III.G.2 compliance that were previously found acceptable for OCNGS by the NRC in a Safety Evaluation Report (SER). References to the documentation that supports the inclusion of these manual actions as previously approved is provided. The operator manual actions that are the subject of this exemption request are essentially unchanged from their original acceptance (with minor changes as noted in Attachment 2);
If manual actions are not used to meet the underlying purpose of the rule, modifications to: (1) provide additional fire suppression systems, detection systems, or fire barriers, or (2) re-route cabling or wrap cabling, would be required to achieve compliance.
therefore, the original safety basis remains valid.
Such modifications represent an unwarranted burden on Exelon since they are not necessary to meet the underlying purpose of the rule. Therefore, the special circumstances for issuance of the exemption are satisfied in accordance with the requirements of 10 CFR 50.12(a)(2)(ii), since application of the rule is not necessary to achieve the underlying purpose of the rule.Ill. DEMONSTRATION THAT MANUAL ACTIONS ARE PREVIOUSLY APPROVED Overview Manual actions have been a part of the OCNGS Fire Safe Shutdown (FSSD) analysis since its inception for both Redundant and Alternative Shutdown areas. A discussion of manual actions required for each fire area/zone was included in Rev. 3 of the "Fire Hazards Analysis Report[FHAR] and Appendix R, Section III.G Safe Shutdown Evaluation" submitted to the NRC on April 3, 1985 (Reference 3), FHAR Rev. 4 submitted on July 12, 1985 (Reference
 
: 4) and FHAR Rev. Nos. 5 and 6 submitted on August 25, 1986 (Reference 5). By letter dated March 24, 1986 (Reference 6), the NRC accepted the OCNGS FHAR, which includes the operator manual actions. By letter dated June 25, 1990 (Reference 7), the NRC acknowledges that other manual actions not affected by a fire in the fire area are acceptable.
10 CFR 50.12 Exemption Request                                                         Attachment 1 Operator Manual Actions                                                                 Page 2 of 49 Docket No. 50-219 The intent of 10 CFR 50, Appendix R, Section III.G.2, is to ensure that one train of systems necessary to achieve and maintain hot shutdown will remain available in the event of a fire. The manual actions discussed in this exemption request provide that assurance. If manual actions are not used to meet the underlying purpose of the rule, modifications to: (1) provide additional fire suppression systems, detection systems, or fire barriers, or (2) re-route cabling or wrap cabling, would be required to achieve compliance. Such modifications represent an unwarranted burden on Exelon since they are not necessary to meet the underlying purpose of the rule. Therefore, the special circumstances for issuance of the exemption are satisfied in accordance with the requirements of 10 CFR 50.12(a)(2)(ii), since application of the rule is not necessary to achieve the underlying purpose of the rule.
Citations The information presented below provides a brief discussion regarding correspondence between GPU Nuclear (GPUN) and the NRC that relates to the NRC review of operator manual actions described in this exemption request.1. April 3, 1985- GPUN Letter to NRC, Submitting Rev. 3 of the FHAR (Reference 3)This version of the FHAR was submitted based on discussions with the NRC, and described the required manual actions for each fire area/zone, as well as describing them in Appendix A, including Figures A-1 and A-2 of the FHAR.For example, Section 1.2.1 .H states that manual actions for hot shutdown are required to align the Fire System water to the Isolation Condenser shell side for makeup. In some redundant shutdown areas/zones, these manual actions include taking control of certain components at the "Local Shutdown Panel(s)," which were installed to satisfy Alternative Shutdown requirements (III.G.3).
Ill. DEMONSTRATION THAT MANUAL ACTIONS ARE PREVIOUSLY APPROVED Overview Manual actions have been a part of the OCNGS Fire Safe Shutdown (FSSD) analysis since its inception for both Redundant and Alternative Shutdown areas. A discussion of manual actions required for each fire area/zone was included in Rev. 3 of the "Fire Hazards Analysis Report
[FHAR] and Appendix R, Section III.G Safe Shutdown Evaluation" submitted to the NRC on April 3, 1985 (Reference 3), FHAR Rev. 4 submitted on July 12, 1985 (Reference 4) and FHAR Rev. Nos. 5 and 6 submitted on August 25, 1986 (Reference 5). By letter dated March 24, 1986 (Reference 6), the NRC accepted the OCNGS FHAR, which includes the operator manual actions. By letter dated June 25, 1990 (Reference 7), the NRC acknowledges that other manual actions not affected by a fire in the fire area are acceptable.
Citations The information presented below provides a brief discussion regarding correspondence between GPU Nuclear (GPUN) and the NRC that relates to the NRC review of operator manual actions described in this exemption request.
: 1. April 3, 1985- GPUN Letter to NRC, Submitting Rev. 3 of the FHAR (Reference 3)
This version of the FHAR was submitted based on discussions with the NRC, and described the required manual actions for each fire area/zone, as well as describing them in Appendix A, including Figures A-1 and A-2 of the FHAR.
For example, Section 1.2.1 .H states that manual actions for hot shutdown are required to align the Fire System water to the Isolation Condenser shell side for makeup. In some redundant shutdown areas/zones, these manual actions include taking control of certain components at the "Local Shutdown Panel(s)," which were installed to satisfy Alternative Shutdown requirements (III.G.3).
Section 3.0 changes included adding a reference to the Shutdown Paths in Appendix A, Figures A-1 and A-2. These Figures tabulate the equipment used to provide shutdown in the event of a fire in any area of the plant, which include listing all manual actions that are required.
Section 3.0 changes included adding a reference to the Shutdown Paths in Appendix A, Figures A-1 and A-2. These Figures tabulate the equipment used to provide shutdown in the event of a fire in any area of the plant, which include listing all manual actions that are required.
10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 3 of 49 Docket No. 50-219 2. August 5,1985 -GPUN Telecon Summary -Telecon between GPUN and D. Kubicki (NRC)regarding April 3,1985 Rev. 3 FHAR submittal D. Kubicki, the NRC Fire Protection reviewer, requested a telephone conference to discuss the OCNGS fire protection submittal dated April 3, 1985. The purpose of this discussion was to clarify and/or resolve various concerns, which have resulted from the review of the submittal.
 
The page number listed below is from the April 3, 1985 submittal."Page 1-13 Concern: Here and elsewhere manual actions are required.
10 CFR 50.12 Exemption Request                                                          Attachment 1 Operator Manual Actions                                                                Page 3 of 49 Docket No. 50-219
Verify that these actions are accomplished outside the area involved in the fire."Response:
: 2. August 5,1985 - GPUN Telecon Summary - Telecon between GPUN and D. Kubicki (NRC) regarding April 3,1985 Rev. 3 FHAR submittal D. Kubicki, the NRC Fire Protection reviewer, requested a telephone conference to discuss the OCNGS fire protection submittal dated April 3, 1985. The purpose of this discussion was to clarify and/or resolve various concerns, which have resulted from the review of the submittal.
Manual actions referred to are accomplished outside the area involved in the fire." 3. October 9,1985- GPUN Letter to NRC Documenting the Verbal Resolution of a Number of NRC Concerns (Reference 8)This letter summarizes the agreement that was reached between the NRC and GPUN on the telephone, which shows that the NRC reviewed all manual actions and only required exemptions for the manual actions that were performed in the area of the fire."The NRC staff is currently reviewing the Oyster Creek "Fire Hazards Analysis and Appendix R Section III.G Safe Shutdown Evaluation," which was submitted by letter dated April 3, 1985. The staff contacted GPUN by telephone to identify those areas of the submittal, which involve staff concerns, and questions, which require resolution prior to completion of the Staffs Safety Evaluation Report (SER). After
The page number listed below is from the April 3, 1985 submittal.
    "Page 1-13 Concern: Here and elsewhere manual actions are required. Verify that these actions are accomplished outside the area involved in the fire.
    "Response: Manual actions referred to are accomplished outside the area involved in the fire."
: 3. October 9,1985- GPUN Letter to NRC Documenting the Verbal Resolution of a Number of NRC Concerns (Reference 8)
This letter summarizes the agreement that was reached between the NRC and GPUN on the telephone, which shows that the NRC reviewed all manual actions and only required exemptions for the manual actions that were performed in the area of the fire.
    "The NRC staff is currently reviewing the Oyster Creek "Fire Hazards Analysis and Appendix R Section III.G Safe Shutdown Evaluation," which was submitted by letter dated April 3, 1985. The staff contacted GPUN by telephone to identify those areas of the submittal, which involve staff concerns, and questions, which require resolution prior to completion of the Staffs Safety Evaluation Report (SER). After a number of discussions by telephone, GPUN and the staff have reached agreement on the resolution of these concerns.
    "Currently, GPUN is revising, on a page replacement basis, the April 3, 1985 submittal to incorporate the agreements reached; however
In the event that use of the IC is delayed, the FSSD support analyses show that there is at least 30 minutes for the operator to trip the recirculation pumps and restore FZL indication.
In the event that use of the IC is delayed, the FSSD support analyses show that there is at least 30 minutes for the operator to trip the recirculation pumps and restore FZL indication.
If the Control Room operator takes action in accordance with the EOPs (EMG-3200-01A"RPV Control -No ATWS EOP Flowchart")
If the Control Room operator takes action in accordance with the EOPs (EMG-3200-01A "RPV Control - No ATWS EOP Flowchart") to initially "stabilize" reactor pressure below 1045 psig with the Isolation Condenser System, and then control the cooldown rate of the reactor to the procedurally required rate of less than 100 degrees per hour if no makeup source is available, then significantly more than 30 minutes is expected to be available.
to initially "stabilize" reactor pressure below 1045 psig with the Isolation Condenser System, and then control the cooldown rate of the reactor to the procedurally required rate of less than 100 degrees per hour if no makeup source is available, then significantly more than 30 minutes is expected to be available.
Also, if a loss of offsite power occurs as is postulated in some of the areas, then these actions would not be required.
Also, if a loss of offsite power occurs as is postulated in some of the areas, then these actions would not be required.
10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 46 of 49 Docket No. 50-219 Only one operator would be required and it would take approximately 13 minutes for access to the area and to perform the action of tripping the breakers.
 
This manual action is not needed for at least 30 minutes; thus, there is adequate margin.10) The Control Room air conditioning system 'A' or 'B' is required whenever the Control Room is occupied.
10 CFR 50.12 Exemption Request                                                           Attachment 1 Operator Manual Actions                                                                 Page 46 of 49 Docket No. 50-219 Only one operator would be required and it would take approximately 13 minutes for access to the area and to perform the action of tripping the breakers. This manual action is not needed for at least 30 minutes; thus, there is adequate margin.
Under cases when the power supply is lost, USS 1A3 and USS 1 B3 (Item 14) are cross-tied at the intake structure in order to utilize HVAC 'B' system. One operator can perform this action. Total action time including egress time, time to rack the breaker in, and time to close the tiebreaker requires 20 minutes. This manual action is not required for 10 hours; therefore, sufficient margin exists to perform this action.Supportinq Information Triennial Fire Protection Inspections performed in 2003, 2005 and 2008, using the criteria provided in NRC IP 71111.05, reviewed the feasibility of a number of the manual actions and found them to be feasible.
: 10) The Control Room air conditioning system 'A' or 'B' is required whenever the Control Room is occupied. Under cases when the power supply is lost, USS 1A3 and USS 1 B3 (Item 14) are cross-tied at the intake structure in order to utilize HVAC 'B' system. One operator can perform this action. Total action time including egress time, time to rack the breaker in, and time to close the tiebreaker requires 20 minutes. This manual action is not required for 10 hours; therefore, sufficient margin exists to perform this action.
The results of these reviews by the NRC confirm that the safety basis of the original SERs remain valid.C. DEFENSE IN DEPTH Defense in depth is defined in Appendix R as follows:-To prevent fires from starting;-To detect rapidly, control, and extinguish promptly those fires that do occur; and-To provide protection for structures, systems, and components important to safety so that a fire that is not promptly extinguished by the fire suppression activities will not prevent the safe shutdown of the plant.OCNGS has administrative controls to prevent fires from starting.
Supportinq Information Triennial Fire Protection Inspections performed in 2003, 2005 and 2008, using the criteria provided in NRC IP 71111.05, reviewed the feasibility of a number of the manual actions and found them to be feasible. The results of these reviews by the NRC confirm that the safety basis of the original SERs remain valid.
These controls include:-Controls on hot work activities and ignition sources (involving cutting, welding, grinding, open flames or other heat producing activities);
C.       DEFENSE IN DEPTH Defense in depth is defined in Appendix R as follows:
-Controls and limits on combustible materials used in the plant or brought into the plant;-Housekeeping inspection programs;-Use of fire retardant cables and plastics; and-Use of wood is limited and restricted to fire retardant wood (except for large cribbing).
    - To prevent fires from starting;
Fire detection and suppression systems are installed in those areas that contain significant combustible hazards. Fire detection includes both smoke and heat detection systems that provide alarms to the Control Room. Suppression systems include pre-action, deluge and wet pipe sprinkler systems as well as halon and carbon dioxide systems. Lube oil hazards, cable concentrations and storage areas are examples of areas provided with fire protection systems.A summary of the fire protection features in the initiating fire area was provided previously within the description of each fire area. When fire protection systems become inoperable, compensatory measures are instituted.
    - To detect rapidly, control, and extinguish promptly those fires that do occur; and
The plant has a fire brigade composed of plant operators and maintenance craft that are currently trained to meet the level of "interior/exterior structural firefighters." Hose stations and fire extinguishers are located throughout the plant to facilitate firefighting activities by the fire brigade. These detection and suppression systems, as well as manual fire fighting equipment, are designed to detect fire at the appropriate stage to 10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 47 of 49 Docket No. 50-219 permit a response by plant personnel to the fire, including both operations and fire brigade. The suppression systems are designed to prevent a fire from rapidly growing and involving other areas. Manual suppression can be used to extinguish a fire or to prevent the fire from spreading to adjacent fire areas.OCNGS ensures safe shutdown in the event of a fire in several ways. First, the plant has been divided into fire areas/zones.
    -   To provide protection for structures, systems, and components important to safety so that a fire that is not promptly extinguished by the fire suppression activities will not prevent the safe shutdown of the plant.
Each fire area/zone is separated from adjacent fire areas with a barrier commensurate with the fire hazard. Typically, the fire barriers have a 3-hour fire resistance rating, including the barrier, the door(s), damper(s) and penetration seals. However, other barrier types are used to divide fire areas/zones.
OCNGS has administrative controls to prevent fires from starting. These controls include:
These fire area/zone boundaries are described in the OCNGS FHAR document.
    - Controls on hot work activities and ignition sources (involving cutting, welding, grinding, open flames or other heat producing activities);
In addition, analyses have been performed on how to achieve shutdown following a fire in any given fire area. The equipment lost and equipment available has been reviewed and actions necessary to ensure shutdown have been identified in the FSPs for each fire area/zone.
    - Controls and limits on combustible materials used in the plant or brought into the plant;
The manual actions addressed by this exemption request are part of the actions that may be necessary in a worst-case fire to achieve shutdown.V. ENVIRONMENT ASSESSMENT There are no environmental issues associated with this exemption request. The exemption request provides a formal vehicle for NRC approval of operator manual actions associated with Appendix R post-fire safe shutdown.
    - Housekeeping inspection programs;
These operator manual actions have been included in the FHAR, which was previously accepted by the NRC in prior correspondence.
    - Use of fire retardant cables and plastics; and
The proposed exemption will not significantly increase the probability or consequences of accidents, no changes are being made in the types or quantities of any radiological effluents that may be released offsite, and there is no significant increase in occupational or public radiation exposure.
    - Use of wood is limited and restricted to fire retardant wood (except for large cribbing).
Therefore, there are no significant radiological environmental impacts associated with the proposed exemption.
Fire detection and suppression systems are installed in those areas that contain significant combustible hazards. Fire detection includes both smoke and heat detection systems that provide alarms to the Control Room. Suppression systems include pre-action, deluge and wet pipe sprinkler systems as well as halon and carbon dioxide systems. Lube oil hazards, cable concentrations and storage areas are examples of areas provided with fire protection systems.
In addition, the proposed exemption does not affect non-radiological plant effluents and has no other environmental impact. Therefore, there are no significant non-radiological impacts associated with the proposed exemption.
A summary of the fire protection features in the initiating fire area was provided previously within the description of each fire area. When fire protection systems become inoperable, compensatory measures are instituted. The plant has a fire brigade composed of plant operators and maintenance craft that are currently trained to meet the level of "interior/exterior structural firefighters." Hose stations and fire extinguishers are located throughout the plant to facilitate firefighting activities by the fire brigade. These detection and suppression systems, as well as manual fire fighting equipment, are designed to detect fire at the appropriate stage to
As a result, in accordance with the requirements of 10 CFR 51.32, the proposed exemption will not have a significant effect on the quality of the human environment.
 
VI. CONCLUSION OCNGS identified operator manual actions necessary to achieve and maintain hot shutdown in the OCNGS FHAR that was submitted to the NRC under various docketed letters. The SERs indicate that the NRC has reviewed the safe shutdown capability, and accepted the manual actions.The operator manual actions addressed in this exemption request have been reviewed against the existing criteria the NRC has developed to determine the feasibility of these actions to be performed following a fire. This review determined that all of these manual actions could be performed and completed within the time lines established by the fire safe shutdown analyses.This provides the confirmation that the considerations used by the NRC to approve these operator manual actions in the referenced SERs remain valid. Defense-in-depth for the fire areas involved in this exemption include administrative controls on ignition sources and combustibles, fire protection systems in areas that present significant hazards, manual fire 10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 48 of 49 Docket No. 50-219 fighting capability, separation between fire areas to limit fire spread and safe shutdown procedures, based on a detailed analysis providing a path to shutdown for each fire area.The requested exemption will not result in undue risk to the public health and safety because Exelon has determined that the subject manual actions are feasible and the NRC has already found these manual actions to be acceptable for use in achieving post-fire safe shutdown.
10 CFR 50.12 Exemption Request                                                       Attachment 1 Operator Manual Actions                                                             Page 47 of 49 Docket No. 50-219 permit a response by plant personnel to the fire, including both operations and fire brigade. The suppression systems are designed to prevent a fire from rapidly growing and involving other areas. Manual suppression can be used to extinguish a fire or to prevent the fire from spreading to adjacent fire areas.
In addition, the intent of 10 CFR 50, Appendix R, Section III.G.2, is to ensure that one train of systems necessary to achieve and maintain hot shutdown will remain available in the event of a fire. The manual actions discussed in this exemption request provide that assurance.
OCNGS ensures safe shutdown in the event of a fire in several ways. First, the plant has been divided into fire areas/zones. Each fire area/zone is separated from adjacent fire areas with a barrier commensurate with the fire hazard. Typically, the fire barriers have a 3-hour fire resistance rating, including the barrier, the door(s), damper(s) and penetration seals. However, other barrier types are used to divide fire areas/zones. These fire area/zone boundaries are described in the OCNGS FHAR document. In addition, analyses have been performed on how to achieve shutdown following a fire in any given fire area. The equipment lost and equipment available has been reviewed and actions necessary to ensure shutdown have been identified in the FSPs for each fire area/zone. The manual actions addressed by this exemption request are part of the actions that may be necessary in a worst-case fire to achieve shutdown.
If manual actions are not used to meet the underlying purpose of the rule, modifications to: (1) provide additional fire suppression systems, detection systems, or fire barriers, or (2) re-route cabling or wrap cabling, would be required to achieve compliance.
V.       ENVIRONMENT ASSESSMENT There are no environmental issues associated with this exemption request. The exemption request provides a formal vehicle for NRC approval of operator manual actions associated with Appendix R post-fire safe shutdown. These operator manual actions have been included in the FHAR, which was previously accepted by the NRC in prior correspondence.
Such modifications represent an unwarranted burden on Exelon since they are not necessary to meet the underlying purpose of the rule. Therefore, the special circumstances for issuance of the exemption are satisfied in accordance with the requirements of 10 CFR 50.12(a)(2)(ii), since application of the rule is not necessary to achieve the underlying purpose of the rule. Furthermore, the requested exemption is authorized by law, and is consistent with the common defense and security.There is no law that precludes the activities covered by this exemption request, and the requested exemption has no impact on the common defense and security.
The proposed exemption will not significantly increase the probability or consequences of accidents, no changes are being made in the types or quantities of any radiological effluents that may be released offsite, and there is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed exemption. In addition, the proposed exemption does not affect non-radiological plant effluents and has no other environmental impact. Therefore, there are no significant non-radiological impacts associated with the proposed exemption. As a result, in accordance with the requirements of 10 CFR 51.32, the proposed exemption will not have a significant effect on the quality of the human environment.
Therefore, based on the above discussion, the criteria of 10 CFR 50.12(a)(1) are satisfied in that the requested exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security.VII. REFERENCES
VI.     CONCLUSION OCNGS identified operator manual actions necessary to achieve and maintain hot shutdown in the OCNGS FHAR that was submitted to the NRC under various docketed letters. The SERs indicate that the NRC has reviewed the safe shutdown capability, and accepted the manual actions.
: 1. 10 CFR 50, Appendix R, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979." 2. Regulatory Issue Summary (RIS) 2006-10, "Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions," dated June 30, 2006.3. Letter dated April 3, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
The operator manual actions addressed in this exemption request have been reviewed against the existing criteria the NRC has developed to determine the feasibility of these actions to be performed following a fire. This review determined that all of these manual actions could be performed and completed within the time lines established by the fire safe shutdown analyses.
This provides the confirmation that the considerations used by the NRC to approve these operator manual actions in the referenced SERs remain valid. Defense-in-depth for the fire areas involved in this exemption include administrative controls on ignition sources and combustibles, fire protection systems in areas that present significant hazards, manual fire
 
10 CFR 50.12 Exemption Request                                                         Attachment 1 Operator Manual Actions                                                               Page 48 of 49 Docket No. 50-219 fighting capability, separation between fire areas to limit fire spread and safe shutdown procedures, based on a detailed analysis providing a path to shutdown for each fire area.
The requested exemption will not result in undue risk to the public health and safety because Exelon has determined that the subject manual actions are feasible and the NRC has already found these manual actions to be acceptable for use in achieving post-fire safe shutdown. In addition, the intent of 10 CFR 50, Appendix R, Section III.G.2, is to ensure that one train of systems necessary to achieve and maintain hot shutdown will remain available in the event of a fire. The manual actions discussed in this exemption request provide that assurance. If manual actions are not used to meet the underlying purpose of the rule, modifications to: (1) provide additional fire suppression systems, detection systems, or fire barriers, or (2) re-route cabling or wrap cabling, would be required to achieve compliance. Such modifications represent an unwarranted burden on Exelon since they are not necessary to meet the underlying purpose of the rule. Therefore, the special circumstances for issuance of the exemption are satisfied in accordance with the requirements of 10 CFR 50.12(a)(2)(ii), since application of the rule is not necessary to achieve the underlying purpose of the rule. Furthermore, the requested exemption is authorized by law, and is consistent with the common defense and security.
There is no law that precludes the activities covered by this exemption request, and the requested exemption has no impact on the common defense and security. Therefore, based on the above discussion, the criteria of 10 CFR 50.12(a)(1) are satisfied in that the requested exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security.
VII. REFERENCES
: 1. 10 CFR 50, Appendix R, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979."
: 2. Regulatory Issue Summary (RIS) 2006-10, "Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions," dated June 30, 2006.
: 3. Letter dated April 3, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 4. Letter dated July 12, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 4. Letter dated July 12, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 5. Letter dated August 25, 1986, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 5. Letter dated August 25, 1986, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 6. Letter (SER) dated March 24, 1986, from J. Zwolinski, USNRC, to P. Fiedler, Oyster Creek Nuclear Generating Station, "Exemptions from Requirements of Appendix R to 10 CFR Part 50, Section III.G.2 and the Post Fire Safe Shutdown Capability (TAC 56740, 56786)." 7. Letter (SER) dated June 25, 1990, from A. Dromerick, USNRC, to E. Fitzpatrick, Oyster Creek Nuclear Generating Station, "Exemption from Certain Technical Requirements Contained in Section III.G of Appendix R to 10 CFR Part 50 (TAC 62229)."
: 6. Letter (SER) dated March 24, 1986, from J. Zwolinski, USNRC, to P. Fiedler, Oyster Creek Nuclear Generating Station, "Exemptions from Requirements of Appendix R to 10 CFR Part 50, Section III.G.2 and the Post Fire Safe Shutdown Capability (TAC 56740, 56786)."
10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 49 of 49 Docket No. 50-219 8. Letter dated October 9, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
: 7. Letter (SER) dated June 25, 1990, from A. Dromerick, USNRC, to E. Fitzpatrick, Oyster Creek Nuclear Generating Station, "Exemption from Certain Technical Requirements Contained in Section III.G of Appendix R to 10 CFR Part 50 (TAC 62229)."
: 9. Letter dated October 29, 1985, from NRC to GPU Nuclear, "August 1985 Progress Review Meeting on Licensing Actions." 10. Oyster Creek Nuclear Generating Station Fire Hazards Analysis Report, Revisions 3 through 6.11. NRC Inspection Procedure 71111.05, "Fire Protection," March 6, 2003.12. Oyster Creek Nuclear Generating Station Fire Hazards Analysis Report, Revision 14.13. Industrial Risk Insurers, Document P.1.1.4, "Transformer and Capacitor Dielectric Fluids," August 30, 1977.
 
ATTACHMENT 2 10 CFR 50.12 Exemption Request Oyster Creek Nuclear Generating Station Docket No. 50-219 Request for Exemption from 10 CFR 50, Appendix R, Section IlI.G, "Fire Protection of Safe Shutdown Capability" (Phase 1)Appendix R, Section III.G.2, Operator Manual Actions 10 CFR 50.12 Exemption Request Docket No. 50-219 Page 1 of 10 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Equipment Fire Ara/Zonsthatcei"Item Equipment Manual Action Requiredeotn r rea- ones. a::. A-pplicable  
10 CFR 50.12 Exemption Request                                                   Attachment 1 Operator Manual Actions                                                         Page 49 of 49 Docket No. 50-219
... Comments Zonethis manual actionk References.
: 8. Letter dated October 9, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
4160V Switchgear Manual actions for Hot Shutdown are TB-FA-3B TB-FA-26, TB-FZ-I I B, Ref. 3, Sections Refer to Note #1 ID and LSP-ID required to isolate damaged cables and TB-FZ- IIC, TB-FZ-I ID, 1.2.2.D.1, reestablish control locally for the 4160V TB-FZ- I1E 1.2.2.E. 1, 1.2.2.F. 1, Switchgear ID. Also, trip 4160V breakers 1.2.2.G. I and lockout using the 69 Switch for all Feeder Breakers except IB2P and I1B3P. ef. 5, Figure A-i, Use Local Shutdown Panels to control Sheet 1, equipment as follows: Hot Shutdown Path l, Note I I LSP- ID 4160V Switchgear ID Breakers for USS IB2 and 1B3 (Operate Transfer Switch to "Alternate" and operate Control Switch for feeder breakers for USS 1B2 and IB3)1-424-993 Condensate Storage Tank (CST) level Ind. Yard OB-FA-9, OB-FZ-6A, OB- Ref. 3, Appendix LI-424-993 Local Gauge Used (Read Local FZ-8C, TB-FZ- I1 B, A, pg 5 of 13, CST Gauge) TB-FZ- l I E "Systems Used To Provide Shutdown 2 apability" Ref. 5, Figure A-I, Sheet 1, Hot Shutdown Path_____________________________________________
: 9. Letter dated October 29, 1985, from NRC to GPU Nuclear, "August 1985 Progress Review Meeting on Licensing Actions."
_________________________________________________________________A_
: 10. Oyster Creek Nuclear Generating Station Fire Hazards Analysis Report, Revisions 3 through 6.
10 CFR 50.12 Exemption Request Docket No. 50-219 Page 2 of 10 ATTACHMENT 2 Appendix R, Section lII.G.2, Operator Manual Actions SManal AtionR~ured quipentFire Areas/Zones that credit Applicable o en Ittee1m .Equp e t.i..pment , M anu.al Xi.la u l c ont quri .. o=n:=. Reqouior..eed::-.-.-_....  
: 11. NRC Inspection Procedure 71111.05, "Fire Protection," March 6, 2003.
=,.L= -o.c.=,.ati:..:,  
: 12. Oyster Creek Nuclear Generating Station Fire Hazards Analysis Report, Revision 14.
..; =.  
: 13. Industrial Risk Insurers, Document P.1.1.4, "Transformer and Capacitor Dielectric Fluids," August 30, 1977.
...,:~ Zonethis manual action* References  
 
*LSP-IB3 Manual actions for Hot Shutdown are CW-FA-14 TB-FA-26, TB-FZ-l B, Ref. 3, Sections Refer to Note #1 required to isolate damaged cables and TB-FZ-I 1C, TB-FZ-1 1D, 1.2.2.D.1, reestablish control locally for 480V USS TB-FZ- 1IE 1.2.2.E.1, 1.2.2.F.1, IB3 electrical power breakers.
ATTACHMENT 2 10 CFR 50.12 Exemption Request Oyster Creek Nuclear Generating Station Docket No. 50-219 Request for Exemption from 10 CFR 50, Appendix R, Section IlI.G, "Fire Protection of Safe Shutdown Capability" (Phase 1)
Use Local 1.2.2.G.1; 3 Shutdown Panels to control equipment as follows: Ref. 5, Figure A-i, Sheet 1, LSP-IB3 480V USS 1B3 incoming Hot Shutdown Path breaker. (Operate transfer Switch to 91, Note 11"Alternate" and then operate Control Switch for USS IB3 Breaker 1B3M)LSP-IB32 Manual actions for Hot Shutdown are MT-FA-12 TB-FZ-II B, TB-FZ-I IE Ref. 3, Sections required to isolate damaged cables and 1.2.2.D.1, 1.2.2.G.1 reestablish control locally for the Condensate Transfer Pump. Use Local Ref. 5, Figure A- 1, 4 Shutdown Panels to control equipment as Sheet 1, follows: ot Shutdown Path#1, Note II LSP-1B32 Condensate Transfer Pump 1-2 (Operate transfer switch to "Alternate" and operate Control Switch for Condensate Transfer Pump 1-2)LSP-DG2 Manual actions for Hot Shutdown are DG-FA-17 TB-FZ- I1B, TB-FZ-II D, Ref. 3, Sections required to isolate damaged cables and TB-FZ- I IE 1.2.2.F.1, 1.2.2.G.1 reestablish control locally for Emergency Diesel Generator  
Appendix R, Section III.G.2, Operator Manual Actions
#2 (EDG2). Use Local Ref. 5, Figure A-l, Shutdown Panels to control equipment as Sheet 1, 5 follows: ot Shutdown Path#1, Note II LSP-DG2, EDG2 and its Switchgear (Operate transfer Switches (3 total) to"Alternate" and operate Control Switch on Diesel Panel to start diesel) 10 CFR 50.12 Exemption Request Docket No. 50-219 Page 3 of 10 ATTACHMENT 2 Appendix R, Section lII.G.2, Operator Manual Actions Equipmnent~  
 
~r te.. *Eqmen Mnua cneueL u. LF ... ...tFire Areas/Zones that credit Applicable Item qp K, ~this manuahil actioii* References , Cmet 4. ~ Zone-USS-1B33 Breaker MCC I1B32 Feeder Breaker at USS I1B3 CW-FA-14 TB-FA-26, TB-FZ- I I B, Ref. 5, Figure A-1, Refer to Note #I 062C shall be manually re-closed after Diesel TB-FZ- I IC, TB-FZ- I ID, Sheet 1, 6 Generator start due to an undervoltage trip. TB-FZ- I IE ot Shutdown Path 1, Note 3 V-9-2099 (formerly Manual actions for Hot Shutdown are R-FZ-lE Th-FA-3B, OB-FZ-6B, ef. 3, Sections Refer to Note #2 V-1 1-44), V-I 1-49, required to align the Fire System water to OB-FZ-8A, OB-FZ-8B, 1.2.2.13.1, V-1 1-63, V-I 1-41 the Isolation Condenser shell side for OB-FZ-8C, OB-FZ- IOA, I1.2.2.H.1, 1.2.2.J.1, makeup. Manual valves V-9-2099 OB-FZ-1IOB, TB-FZ-1II F, 1.2.3.C. 1, (formerly V-i 11-44) and V-i 11-49 are TB-FZ-1II H, CW-FA- 14 1.2.3.D. 1, opened, and manual valves V-I 1-63 and V- 1.2.3.F. 1, 1.2.3.H.I1, 11-41 are closed to provide makeup. This 1.2.3.1.1, 1.2.6.A.1; action is required because there is no power ("B" Train) available to the Condensate Ref. 3, Appendix 7 Transfer System. A,pg 5of 13,"Systems Used To rovide Shutdown Capability" Ref. 5, Figure A-I1, Sheet 1, Hot Shutdown Path 92, Note 6 and Hot Shutdown Path_____ ___________
10 CFR 50.12 Exemption Request                                                                                                                                                   Page 1 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Equipment Fire Ara/Zonsthatcei "Item     Equipment               Manual Action Requiredeotn                             )ntF*rer          rea-         ones. a::.             A-pplicable
___________________________________
                                                                                                                                                          ...               Comments Zonethis             manual actionk               References.
__________________
4160V Switchgear Manual actions for Hot Shutdown are                   TB-FA-3B             TB-FA-26, TB-FZ-I IB,                 Ref. 3, Sections       Refer to Note #1 ID and LSP-ID   required to isolate damaged cables and                                       TB-FZ- IIC, TB-FZ-I ID,               1.2.2.D.1, reestablish control locally for the 4160V                                   TB-FZ- I1E                           1.2.2.E. 1, 1.2.2.F. 1, Switchgear ID. Also, trip 4160V breakers                                                                           1.2.2.G. I and lockout using the 69 Switch for all Feeder Breakers except IB2P and I1B3P.                                                                               ef. 5, Figure A-i, Use Local Shutdown Panels to control                                                                               Sheet 1, equipment as follows:                                                                                             Hot Shutdown Path l, Note I I LSP- ID 4160V Switchgear ID Breakers for USS IB2 and 1B3 (Operate Transfer Switch to "Alternate" and operate Control Switch for feeder breakers for USS 1B2 and IB3) 1-424-993       Condensate Storage Tank (CST) level Ind. Yard                               OB-FA-9, OB-FZ-6A, OB-               Ref. 3, Appendix LI-424-993 Local Gauge Used (Read Local                                     FZ-8C, TB-FZ- I1 B,                   A, pg 5 of 13, CST Gauge)                                                                   TB-FZ- l I E                         "Systems Used To Provide Shutdown 2                                                                                                                                       apability" Ref. 5, Figure A-I, Sheet 1, Hot Shutdown Path
1 Noe 20 __1,__Note___20._
_____________________________________________ _________________________________________________________________A_
10 CFR 50.12 Exemption Request Docket No. 50-219 Page 4 of 10 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions item. .quzpmen. Manual Action Required, Location:Fire
 
:'Chat .rei .... ...omments....'.. ..Zone: ~this mani Facition*',R.frncs*
10 CFR 50.12 Exemption Request                                                                                                                                                 Page 2 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section lII.G.2, Operator Manual Actions Ittee1m  .Equp  e t.i..pment,         u SManal M anu.al AtionR~ured l Xi.la c o=n:=.
LSP- I A2 Manual actions for Hot Shutdown are OB-FZ-6A OB-FZ-8C Ref. 3, Section required to isolate damaged cables and 1.2.3.F. I reestablish control locally for Unit Substation (USS) IA2 electrical breakers.
ont Reqouior..eed::-.-.-_....
Ref. 5, Figure A-I, Use Local Shutdown Panels to control Sheet 1, 8 equipment as follows: ot Shutdown Path 92, Note 13.LSP-IA2, CRD Hydraulic PP NC08A and 480V USS IA2 Incoming breaker (Operate transfer switch to "Alternate" and operate Control Switch for USS-IA2 Main Breaker IA2M and A CRD Pump).Remote Shutdown Manual actions for Hot Shutdown are OB-FZ-6B OB-FZ-6A Ref. 3, Section Panel required to isolate damaged cables and 1.2.3.C.1 reestablish control locally for Unit Substation (USS) 1B2 electrical breakers Ref. 5, Figure A-I, and CRD Hydraulic.
quri    ..            quipentFire Areas/Zones
Use Remote Sheet 1, Shutdown Panel to control equipment:
                                                                                                  =,.L=     that ::*:.:'=:*[
RSP. ot Shutdown Path 9 CRD Hydraulic PP NC08B and 480V USS I 1, Note 6.I B2 Incoming breaker (Operate USS I B2/CRD Transfer Switch (Partial initiation) to "Alternate" and operate Control Switches for USS-1B2 Main Breaker and B CRD Pump).125V DC Use static charger instead of MG Set "B" OB-FZ-8C OB-FZ-6A Ref. 5, Figure A-i, 10 Distribution Center due to damaged equipment and cables by Sheet 1, B and Static aligning breakers at Distribution Center B. Hot Shutdown Path Charger # 1, Note 22.
credit ..
10 CFR 50.12 Exemption Request Docket No. 50-219 Page 5 of 10 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Item Equipment Manual Action Required Eqimet.ie..LIocation Firei.. .it ACplicbommentsl-Locaion~ire this manual actioný' References  
* Applicable
~ omns Zone.. ~FI-225-998 Use CRD local flow gauge FI-225-998.
                                                                                                      -o.c.=,.ati:..:,               ; =. ".,='*n-F=ire..-          o          en C**..,.:=.:tomments ...
due RB-FZ-I D RB-FZ-IE, RB-FZ-IG Ref. 3, Section Refer to Note #3 to cable damage to the normal Control 1.2.1.E.1; Room flow indicator.
                                                                                  ,:~ Zonethis manual action*                 References
11 Ref. 5, Figure A-1, Sheet 1, Hot Shutdown Path 1, Note 8.V-15-30, V-15-52, Manually open V-15-237, throttle V-15-30 RB-FZ-IE RB-FZ-ID, RB-FZ-IE, Ref. 3, Appendix Refer to Notes #1 & 5 V-15-237, FI-225-2 using local flow indicator (FI-225-2) and RB-FZ-IF1, RB-FZ-IF2, A, pg 3 of 13, close V-15-52 to establish CRD flow to RB-FZ-IF4, RB-FZ-IF5, "Systems Used To Ref. 7 section 3.3 provided an Reactor due to the loss of instrument air to RB-FZ-1G, RB-FZ-1H, Provide Shutdown exemption for manually the CRD Flow Control Valve TB-FA-3A, TB-FA-3B, Capability" operating V-15-30 in OB-FZ-6A, OB-FZ-6B, RB-FZ-IE, since this valve is OB-FZ-8A, OB-FZ-8B, Ref. 5, Figure A-i, located within the fire zone OB-FZ-8C, OB-FA-9, Sheet 1, involved in the fire.12 OB-FZ-1OA, OB-FZ-10B, Hot Shutdown Path TB-FA-26, TB-FZ-1 1A, 1 and Path #2.TB-FZ- I1B, TB-FZ- I1C, TB-FZ-I ID, TB-FZ-I IE, TB-FZ-II F, TB-FZ-II G, TB-FZ-II H, AB-FA- 13, CW-FA- 14, DG-FA- 15, NR-FA-20, OG-FA-2 1, OR-FA-19 V-20-2 and V-20-4 Core Spray System II manual valves RB-FZ-IF2 RB-FZ-1F3 Ref. 3, Section Ref. 7 provides an exemption V-20-1 and V-20-2 are opened and V-20-4 1.2.1 .F. 1; for operating V-20-1.is closed to provide Reactor Coolant Ref. 5 has a typo so corrected 13 Makeup using Core Spray Pump instead of Ref. 5, Figure A-I, zone quadrant typo IF2 to IF3 the CRD Pump (manipulate valves to align Sheet 1, for the zone that requires this Core Spray to CST). This action is required Pot Shutdown Path manual action.because the fire damages both CRD Pumps. I I 1, Note 2 1 1 10 CFR 50.12 Exemption Request Docket No. 50-219 Page 6 of 10 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Equipment F Item Equipment Manual.Action Required Location Fire rerasZnstt.c.this maniual action* edit ferenlcae......smn USS 1B33 Provide power to Control Room A/C unit CW-FA-14 OB-FZ-8A.
* LSP-IB3         Manual actions for Hot Shutdown are               CW-FA-14     TB-FA-26, TB-FZ-l B,               Ref. 3, Sections           Refer to Note #1 required to isolate damaged cables and                         TB-FZ-I 1C, TB-FZ-1 1D,             1.2.2.D.1, reestablish control locally for 480V USS                       TB-FZ- 1IE                         1.2.2.E.1, 1.2.2.F.1, IB3 electrical power breakers. Use Local                                                         1.2.2.G.1; 3                   Shutdown Panels to control equipment as follows:                                                                                           Ref. 5, Figure A-i, Sheet 1, LSP-IB3 480V USS 1B3 incoming                                                                     Hot Shutdown Path breaker. (Operate transfer Switch to                                                               91, Note 11 "Alternate" and then operate Control Switch for USS IB3 Breaker 1B3M)
OB-FZ-8B, Ref. 5. Figure A-I1, Refer to Notes 4 & 6 from USS I BI by racking in and closing OB-FZ-8C Sheet 1, 14 tiebreaker US IT between USS I BI and Hot Shutdown Path IlAl. Later changed to crosstie USS IlA3 & 2, Note 14.1133 to restore ventilation to the Control Room.4160V Switchgear.
LSP-IB32         Manual actions for Hot Shutdown are               MT-FA-12     TB-FZ-II B, TB-FZ-I IE             Ref. 3, Sections required to isolate damaged cables and                                                             1.2.2.D.1, 1.2.2.G.1 reestablish control locally for the Condensate Transfer Pump. Use Local                                                               Ref. 5, Figure A- 1, 4                   Shutdown Panels to control equipment as                                                           Sheet 1, follows:                                                                                             ot Shutdown Path
Trip Reactor Feedwater Pumps I A (Breaker TB-FZ-1II C TB-FA-26, TB-FZ-lII B, Ref. 5, Figure A-I1, Refer to Note# #1 I A Breaker A8 and A8), IlB and ILC (Breakers B2 and BIO0) and TB-FZ- I IC, TB-FZ- I ID, Sheet 1, l B Breakers B2 lockout using 69 Switch. This manual TB-FZ- I IlE, OB-FZ-8C Hot Shutdown Path For.OB-FZ-8C, only have to 15 and BlO action is being performed to prevent a l 1and ff2, Tables trip the B & C pumps at the reactor overfill condition due to cable switch-ear.
                                                                                                                            #1, Note II LSP-1B32 Condensate Transfer Pump 1-2 (Operate transfer switch to "Alternate" and operate Control Switch for Condensate Transfer Pump 1-2)
damage and/or loss of control power to the Ref. 6, Section___________normal feedwater trip circuit. 8.1.1 4160V Switchgear.
LSP-DG2         Manual actions for Hot Shutdown are               DG-FA-17     TB-FZ- I1B, TB-FZ-II D,             Ref. 3, Sections required to isolate damaged cables and                         TB-FZ- IIE                          1.2.2.F.1, 1.2.2.G.1 reestablish control locally for Emergency Diesel Generator #2 (EDG2). Use Local                                                             Ref. 5, Figure A-l, Shutdown Panels to control equipment as                                                           Sheet 1, 5                   follows:                                                                                             ot Shutdown Path
All five Reactor Recirculation Pumps TB-FZ-1 IC TB-FZ- I IB, TB-FZ-1II E, Ref. 5, Figure A-i1, For OB-FZ-8C, only have to IlA Breakers A3, (NGO I-A, NGO1I-B, NGO I-C, NGO1ID and OB-FZ-8C.
                                                                                                                            #1, Note II LSP-DG2, EDG2 and its Switchgear (Operate transfer Switches (3 total) to "Alternate" and operate Control Switch on Diesel Panel to start diesel)
Sheet 1, trip the A, C & E pumps at A5 and A9 and NGO I E) must be tripped to use fuel zone Hot Shutdown Path switchgear.
 
16 Switchgear.
10 CFR 50.12 Exemption Request                                                                                                                                                   Page 3 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section lII.G.2, Operator Manual Actions Equipmnent~ ~r te.. *Eqmen               Mnua       cneueL       u.                   LF   tir*t,.. Areas/Zones
lB level instruments and to prevent the #l, Note 16 Breakers B4 and Isolation Condenser from tripping on high B8 flow. Also, lockout the 4160V breakers Ref. 6, Section________using the 69 Switch. 8.1.1___________
                                                                                                              ..         . that credit
4160V Switchgear Trip Breakers for Main Core Spray Pumps TB-FA-3A OB-FZ-6A, OB-FZ-8C, Ref. 3, Appendix Refer to Note ff I C Breakers CO NZO IA and NZO ID and lockout using 69 TB-FA-26, TB-FZ-l lIB, A,pg 4 of 13, and C5 switch at 4160V Switchgear I C. This TB-FZ- I IC, TB-FZ-1II D, "Systems Used To manual action is being performed to TB-FZ-1II E, TB-FZ-lII G Provide Shutdown 17 prevent a reactor overfill condition due to apability" cable damage and/or loss of control power to the normal Core Spray trip circuit. Ref. 5, Figure A-i, Sheet 1, Hot Shutdown Path_____________________~~~~~~~~~~~~~
                                                                                                                                  ..        Applicable                             tFire Item qp                                                                       K, ~this manuahil actioii*         References           ,           Cmet
1,__________________________________
: 4.     ~                                           Zone-USS-1B33 Breaker MCC I1B32 Feeder Breaker at USS I1B3                       CW-FA-14       TB-FA-26, TB-FZ- I IB,             Ref. 5, Figure A-1, Refer to Note #I 062C                 shall be manually re-closed after Diesel                               TB-FZ- IIC, TB-FZ- IID,           Sheet 1, 6                         Generator start due to an undervoltage trip.                           TB-FZ- IIE                            ot Shutdown Path 1, Note 3 V-9-2099 (formerly Manual actions for Hot Shutdown are                     R-FZ-lE         Th-FA-3B, OB-FZ-6B,                   ef. 3, Sections       Refer to Note #2 V-1 1-44), V-I 1-49, required to align the Fire System water to                             OB-FZ-8A, OB-FZ-8B,                 1.2.2.13.1, V-1 1-63, V-I 1-41 the Isolation Condenser shell side for                                   OB-FZ-8C, OB-FZ- IOA,             I1.2.2.H.1, 1.2.2.J.1, makeup. Manual valves V-9-2099                                         OB-FZ-1IOB, TB-FZ-1II F,           1.2.3.C. 1, (formerly V-i 11-44) and V-i 11-49 are                                 TB-FZ-1II H, CW-FA- 14             1.2.3.D. 1, opened, and manual valves V-I 1-63 and V-                                                                 1.2.3.F. 1, 1.2.3.H.I1, 11-41 are closed to provide makeup. This                                                                   1.2.3.1.1, 1.2.6.A.1; action is required because there is no power
lNote 12 10 CFR 50.12 Exemption Request Docket No. 50-219 Page 7 of 10 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Equipment  
("B" Train) available to the Condensate                                                                   Ref. 3, Appendix 7                         Transfer System.                                                                                         A,pg 5of 13, "Systems Used To rovide Shutdown Capability" Ref. 5, Figure A-I1, Sheet 1, Hot Shutdown Path 92, Note 6 and Hot Shutdown Path
~~*.Item Equipment Manual Action Required-.
_____ ___________   ___________________________________             __________________                   1 Noe 20               __1,__Note___20._
LocationiFire .e..e-....n.s..that.credit....pl.,a...
 
Comments Zone ~this maniual action.. References  
10 CFR 50.12 Exemption Request                                                                                                                     Page 4 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions item. . quzpmen.               Manual Action Required,           Location:Fire           .       rei     .         ...         . .. :'Chat omments.
*4160V Switchgear Trip Breakers for Main Core Spray Pumps TB-FA-3B TB-FA-3A, OB-FZ-6A, Ref 3, Appendix Refer to Note #1 ID Breakers D4 NZOIB and NZOIC and lockout using 69 OB-FZ-8A, OB-FZ-8B, A, pg 4 of 13, and D9 switch at 4160V Switchgear I D. This OB-FZ-8C, TB-FA-26, "Systems Used To manual action is being performed to TB-FZ-I I B, TB-FZ-1 I C, Provide Shutdown prevent a reactor overfill condition due to TB-FZ- ID, TB-FZ- IE, Capability" 18 cable damage and/or loss of control power TB-FZ-I IG to the normal Core Spray trip circuit. Ref. 5, Figure A-I, Sheet 1, Hot Shutdown Path#1, Note 13 and Hot Shutdown Path#2, Note 10 USS-IA2 Breakers Trip Breakers for Core Spray booster OB-FZ-6A OB-FZ-8C, TB-FZ-II C, TB- Ref. 3, Appendix Refer to Note #1 036B & 036C pumps NZ03A and NZ03D at 480V USS FZ- I1D, TB-FZ- I1E, A, pg 4 of 13, 1 A2 and remove close fuses. This manual TB-FA-26, TB-FZ-1 IB "Systems Used To action is being performed to prevent a Provide Shutdown reactor overfill condition due to cable Capability" 19 damage and/or loss of control power to the normal Core Spray trip circuit. Ref. 5, Figure A-l, Sheet 1, Hot Shutdown Path A 1, Note 14 and Hot Shutdown Path#2, Note II 10 CFR 50.12 Exemption Request Docket No. 50-219 Page 8 of 10 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Equipment Item .Equipment Manual Action Required .....Loeation Fire Fire Are: /ZoCth r-dit-Applicableomments
                          ... '..   . .                                 Zone:       ~this mani Facition*',R.frncs*
... .. .....," .this manual action* .References USS-IB2 Breakers Trip Breakers for Core Spray booster OB-FZ-6B OB-FZ-6A, OB-FZ-8A, Ref. 3, Appendix 046B & 046C pumps NZ03B and NZ03C at 480V USS OB-FZ-8B, OB-FZ-8C A., pg 4 of 13, IB2 and remove close fuses. This manual "Systems Used To action is being performed to prevent a rovide Shutdown reactor overfill condition due to cable Capability" 20 damage and/or loss of control power to the normal Core Spray trip circuit. Ref. 5, Figure A-I, Sheet 1, Hot Shutdown Path l, Note 15 and Hot Shutdown Path_2, Note 12 10 CFR 50.12 Exemption Request Page 9 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section Ill.G.2, Operator Manual Actions Fire Areas and Fire Zones are used interchangeably in Attachment 2, and both are considered to have adequate separation from adjacent fire areas or fire zones such that a single fire will not propagate between them. This separation has been justified in Reference 3, Section 1.3, and approved by Reference 6, Section 7.1.Applicable References specified in the table refer to the References specified in Attachment 1.Note 1: TB-FZ-1 1C and TB-FA-26 were analyzed together for safe shutdown analysis purposes, so TB-FA-26 was added as a fire area that credits this manual action. TB-FA-26 is a separate fire-rated room located within TB-FZ-1 1C. These areas were not considered a single analysis area in the original FHAR submittal.
LSP- IA2            Manual actions for Hot Shutdown are         OB-FZ-6A     OB-FZ-8C                       Ref. 3, Section required to isolate damaged cables and                                                   1.2.3.F. I reestablish control locally for Unit Substation (USS) IA2 electrical breakers.                                               Ref. 5, Figure A-I, Use Local Shutdown Panels to control                                                     Sheet 1, 8                     equipment as follows:                                                                       ot Shutdown Path 92, Note 13.
Note 2: This action has been slightly modified from that described in the original submittal to correct a valve number (i.e., V-1 1-44 changed to V-9-2099) and to add one additional valve (i.e., V-11-41), but the action location, timing and outcome are comparable.
LSP-IA2, CRD Hydraulic PP NC08A and 480V USS IA2 Incoming breaker (Operate transfer switch to "Alternate" and operate Control Switch for USS-IA2 Main Breaker IA2M and A CRD Pump).
The additional valve provides additional isolation to the spring check valve that already exists in the line. All of the applicable valves are three inches or smaller and are located within approximately three feet of each other.Note 3: RB-FZ-1 E and RB-FZ-1 G were analyzed together for safe shutdown analysis purposes, so RB-FZ-1G was added as a fire area that credits this manual action.These areas were not considered a single analysis area in the original FHAR submittal.
Remote Shutdown Manual actions for Hot Shutdown are             OB-FZ-6B     OB-FZ-6A                       Ref. 3, Section Panel               required to isolate damaged cables and                                                   1.2.3.C.1 reestablish control locally for Unit Substation (USS) 1B2 electrical breakers                                                 Ref. 5, Figure A-I, and CRD Hydraulic. Use Remote                                                           Sheet 1, Shutdown Panel to control equipment: RSP.                                                   ot Shutdown Path 9                       CRD Hydraulic PP NC08B and 480V USS                                                       I 1, Note 6.
Note 4: The Control Room air conditioning system 'A' or 'B' is required whenever the Control Room is occupied.
I B2 Incoming breaker (Operate USS I B2/CRD Transfer Switch (Partial initiation) to "Alternate" and operate Control Switches for USS-1B2 Main Breaker and B CRD Pump).
Wherever practical, HVAC System B' is the credited system for cooling under post-fire scenarios because it contains fewer dependencies and support systems than the 'A' System (e.g., doesn't require instrument air for its dampers, doesn't require any support systems for cooling, etc.). The 'B' HVAC was installed in 1988 after the FHAR revision 6 (Reference
125V DC             Use static charger instead of MG Set "B"   OB-FZ-8C     OB-FZ-6A                       Ref. 5, Figure A-i, 10 Distribution Center due to damaged equipment and cables by                                                   Sheet 1, B and Static       aligning breakers at Distribution Center B.                                             Hot Shutdown Path Charger                                                                                                     # 1, Note 22.
: 5) submittal was made.Therefore, the action to restore the Control Room ventilation power changed from USS 1 B1 to USS 1 B3 ('B' HVAC power source) so the action to crosstie the USS is at USS 1A3 and 1B3 instead of USS 1A1 and 1Bi; however, the timing and outcome are the same.Note 5: This action has been slightly modified from that described in the original FHAR submittal to change from using the pump discharge valve, V-1 5-7 or V-1 5-10 as a throttle valve to using V-1 5-30 (monitor flow locally at FI-225-2) in conjunction with opening V-15-237.
 
Also, added one additional valve, V-15-52. Changing the valve from V-1 5-7 or V-1 5-10 to V-1 5-30 and V-1 5-237 improved the location and timing of the action because V-1 5-237 is located next to V-1 5-30 while V-1 5-7 and V-1 5-10 are located in one of the Reactor Building corner rooms approximately 5 minutes away. V-15-52 is also located next to V-1 5-30 and this valve closes the CRD Charging Water Header. These changes were made to be consistent with the EOPs.The action location and timing has been improved and the outcome is essentially the same. All of the valves listed above are two-inch valves and they are within 10 CFR 50.12 Exemption Request Page 10 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions approximately four feet of each other. Additionally, the local flow indicator can be monitored while adjusting V-1 5-30.Note 6: OB-FZ-8A and OB-FZ-8B were analyzed together for safe shutdown analysis purposes, so OB-FZ-8A was added as a fire area that credits this manual action.These areas were not considered a single analysis area in the original FHAR submittal.
10 CFR 50.12 Exemption Request                                                                                                                         Page 5 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Item     Equipment               Manual Action Required             Eqimet.ie..LIocation Firei..               .it           ACplicbommentsl-Locaion~ire     this manual actioný'   References         ~         omns Zone..                                                       ~
0 UNITED STATES S,. NUCLEAR REGULATORY COMMISSION
FI-225-998         Use CRD local flow gauge FI-225-998. due RB-FZ-I D           RB-FZ-IE, RB-FZ-IG       Ref. 3, Section       Refer to Note #3 to cable damage to the normal Control                                                 1.2.1.E.1; Room flow indicator.
-~WASH INGTON, 0. C. 20555.0, March 24, 1986 Docket No. 50-219 Mr. P. B. Fiedler Vice President and Director Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731  
11                                                                                                           Ref. 5, Figure A-1, Sheet 1, Hot Shutdown Path 1, Note 8.
V-15-30, V-15-52, Manually open V-15-237, throttle V-15-30 RB-FZ-IE             RB-FZ-ID, RB-FZ-IE,     Ref. 3, Appendix     Refer to Notes #1 & 5 V-15-237, FI-225-2 using local flow indicator (FI-225-2) and                     RB-FZ-IF1, RB-FZ-IF2,   A, pg 3 of 13, close V-15-52 to establish CRD flow to                       RB-FZ-IF4, RB-FZ-IF5,   "Systems Used To     Ref. 7 section 3.3 provided an Reactor due to the loss of instrument air to                 RB-FZ-1G, RB-FZ-1H,     Provide Shutdown     exemption for manually the CRD Flow Control Valve                                   TB-FA-3A, TB-FA-3B,     Capability"           operating V-15-30 in OB-FZ-6A, OB-FZ-6B,                           RB-FZ-IE, since this valve is OB-FZ-8A, OB-FZ-8B,     Ref. 5, Figure A-i, located within the fire zone OB-FZ-8C, OB-FA-9,       Sheet 1,             involved in the fire.
12                                                                                   OB-FZ-1OA, OB-FZ-10B,   Hot Shutdown Path TB-FA-26, TB-FZ-1 1A,     1 and Path #2.
TB-FZ- I1B, TB-FZ- I1C, TB-FZ-I ID, TB-FZ-I IE, TB-FZ-II F, TB-FZ-II G, TB-FZ-II H, AB-FA- 13, CW-FA- 14, DG-FA- 15, NR-FA-20, OG-FA-2 1, OR-FA-19 V-20-2 and V-20-4 Core Spray System II manual valves             RB-FZ-IF2       RB-FZ-1F3               Ref. 3, Section       Ref. 7 provides an exemption V-20-1 and V-20-2 are opened and V-20-4                                               1.2.1 .F. 1;         for operating V-20-1.
is closed to provide Reactor Coolant                                                                         Ref. 5 has a typo so corrected 13                     Makeup using Core Spray Pump instead of                                               Ref. 5, Figure A-I, zone quadrant typo IF2 to IF3 the CRD Pump (manipulate valves to align                                               Sheet 1,             for the zone that requires this Core Spray to CST). This action is required                                           Pot Shutdown Path manual action.
because the fire damages both CRD Pumps. I                   I                           1, Note 2           1                               1
 
10 CFR 50.12 Exemption Request                                                                                                                                   Page 6 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Equipment F Item       Equipment                       Manual.Action Required             Location Fire rerasZnstt.c
                                                                                                .this maniual action* edit       ferenlcae......smn USS 1B33               Provide power to Control Room A/C unit CW-FA-14             OB-FZ-8A. OB-FZ-8B,           Ref. 5. Figure A-I1, Refer to Notes 4 & 6 from USS IBI by racking in and closing                       OB-FZ-8C                       Sheet 1, 14                           tiebreaker US IT between USS IBI and                                                       Hot Shutdown Path IlAl. Later changed to crosstie USS IlA3 &                                                 2, Note 14.
1133 to restore ventilation to the Control Room.
4160V Switchgear. Trip Reactor Feedwater Pumps IA (Breaker TB-FZ-1II C               TB-FA-26, TB-FZ-lII B,         Ref. 5, Figure A-I1, Refer to Note##1 IA Breaker A8 and A8), IlB and ILC (Breakers B2 and BIO0) and                         TB-FZ- IIC, TB-FZ- IID,       Sheet 1, l B Breakers B2         lockout using 69 Switch. This manual                         TB-FZ- I IlE, OB-FZ-8C         Hot Shutdown Path For.OB-FZ-8C, only have to 15 and BlO                 action is being performed to prevent a                                                       l1and ff2, Tables trip the B & C pumps at the reactor overfill condition due to cable                                                                           switch-ear.
damage and/or loss of control power to the                                                 Ref. 6, Section
___________normal            feedwater trip circuit.                                                         8.1.1 4160V Switchgear.       All five Reactor Recirculation Pumps           TB-FZ-1 IC   TB-FZ- IIB, TB-FZ-1II E,       Ref. 5, Figure A-i1, For OB-FZ-8C, only have to IlA Breakers A3,         (NGO I-A, NGO1I-B, NGO I-C, NGO1ID and                       OB-FZ-8C.                     Sheet 1,             trip the A, C & E pumps at A5 and A9 and           NGO IE) must be tripped to use fuel zone                                                   Hot Shutdown Path switchgear.
16 Switchgear. lB           level instruments and to prevent the                                                       #l, Note 16 Breakers B4 and         Isolation Condenser from tripping on high B8                     flow. Also, lockout the 4160V breakers                                                     Ref. 6, Section
________using              the 69 Switch.                                                                     8.1.1___________
4160V Switchgear Trip Breakers for Main Core Spray Pumps TB-FA-3A                   OB-FZ-6A, OB-FZ-8C,           Ref. 3, Appendix Refer to Note ff IC Breakers CO           NZO IA and NZO ID and lockout using 69                       TB-FA-26, TB-FZ-l lIB,         A,pg 4 of 13, and C5                 switch at 4160V Switchgear IC. This                         TB-FZ- IIC, TB-FZ-1II D,       "Systems Used To manual action is being performed to                         TB-FZ-1II E, TB-FZ-lII G       Provide Shutdown 17                           prevent a reactor overfill condition due to                                                   apability" cable damage and/or loss of control power to the normal Core Spray trip circuit.                                                     Ref. 5, Figure A-i, Sheet 1, Hot Shutdown Path
_____________________~~~~~~~~~~~~~                                                           lNote 12 1,__________________________________
 
10 CFR 50.12 Exemption Request                                                                                                                               Page 7 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Equipment     ~~
*.Item     Equipment             Manual Action Required-.         LocationiFire .e..e-....n.s..that.credit....pl.,a...                               Comments Zone       ~this maniual action..               References
* 4160V Switchgear Trip Breakers for Main Core Spray Pumps     TB-FA-3B     TB-FA-3A, OB-FZ-6A,                   Ref 3, Appendix Refer to Note #1 ID Breakers D4   NZOIB and NZOIC and lockout using 69                     OB-FZ-8A, OB-FZ-8B,                   A, pg 4 of 13, and D9           switch at 4160V Switchgear I D. This                     OB-FZ-8C, TB-FA-26,                   "Systems Used To manual action is being performed to                       TB-FZ-I I B, TB-FZ-1 I C,             Provide Shutdown prevent a reactor overfill condition due to               TB-FZ- ID, TB-FZ- IE,                 Capability" 18                 cable damage and/or loss of control power                 TB-FZ-I IG to the normal Core Spray trip circuit.                                                           Ref. 5, Figure A-I, Sheet 1, Hot Shutdown Path
                                                                                                                          #1, Note 13 and Hot Shutdown Path
                                                                                                                          #2, Note 10 USS-IA2 Breakers Trip Breakers for Core Spray booster       OB-FZ-6A     OB-FZ-8C, TB-FZ-II C, TB- Ref. 3, Appendix                 Refer to Note #1 036B & 036C     pumps NZ03A and NZ03D at 480V USS                         FZ- I1D, TB-FZ- I1E,                   A, pg 4 of 13, 1A2 and remove close fuses. This manual                   TB-FA-26, TB-FZ-1 IB                   "Systems Used To action is being performed to prevent a                                                           Provide Shutdown reactor overfill condition due to cable                                                         Capability" 19                 damage and/or loss of control power to the normal Core Spray trip circuit.                                                                 Ref. 5, Figure A-l, Sheet 1, Hot Shutdown Path A1, Note 14 and Hot Shutdown Path
                                                                                                                          #2, Note II
 
10 CFR 50.12 Exemption Request                                                                                                     Page 8 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions Equipment Item . Equipment               Manual Action Required ..... Loeation Fire Fire Are: /ZoCth       r-dit-Applicableomments
                                    . .. ..                         .....," .this       manual action* .       References USS-IB2 Breakers Trip Breakers for Core Spray booster       OB-FZ-6B       OB-FZ-6A, OB-FZ-8A,       Ref. 3, Appendix 046B & 046C     pumps NZ03B and NZ03C at 480V USS                         OB-FZ-8B, OB-FZ-8C         A., pg 4 of 13, IB2 and remove close fuses. This manual                                               "Systems Used To action is being performed to prevent a                                                 rovide Shutdown reactor overfill condition due to cable                                               Capability" 20                     damage and/or loss of control power to the normal Core Spray trip circuit.                                                       Ref. 5, Figure A-I, Sheet 1, Hot Shutdown Path l, Note 15 and Hot Shutdown Path
_2, Note 12
 
10 CFR 50.12 Exemption Request                                                         Page 9 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section Ill.G.2, Operator Manual Actions Fire Areas and Fire Zones are used interchangeably in Attachment 2, and both are considered to have adequate separation from adjacent fire areas or fire zones such that a single fire will not propagate between them. This separation has been justified in Reference 3, Section 1.3, and approved by Reference 6, Section 7.1.
Applicable References specified in the table refer to the References specified in Attachment 1.
Note 1:   TB-FZ-1 1C and TB-FA-26 were analyzed together for safe shutdown analysis purposes, so TB-FA-26 was added as a fire area that credits this manual action. TB-FA-26 is a separate fire-rated room located within TB-FZ-1 1C. These areas were not considered a single analysis area in the original FHAR submittal.
Note 2:   This action has been slightly modified from that described in the original submittal to correct a valve number (i.e., V-1 1-44 changed to V-9-2099) and to add one additional valve (i.e., V-11-41), but the action location, timing and outcome are comparable. The additional valve provides additional isolation to the spring check valve that already exists in the line. All of the applicable valves are three inches or smaller and are located within approximately three feet of each other.
Note 3:   RB-FZ-1 E and RB-FZ-1 G were analyzed together for safe shutdown analysis purposes, so RB-FZ-1G was added as a fire area that credits this manual action.
These areas were not considered a single analysis area in the original FHAR submittal.
Note 4:   The Control Room air conditioning system 'A' or 'B' is required whenever the Control Room is occupied. Wherever practical, HVAC System B' is the credited system for cooling under post-fire scenarios because it contains fewer dependencies and support systems than the 'A' System (e.g., doesn't require instrument air for its dampers, doesn't require any support systems for cooling, etc.). The 'B' HVAC was installed in 1988 after the FHAR revision 6 (Reference 5) submittal was made.
Therefore, the action to restore the Control Room ventilation power changed from USS 1 B1 to USS 1 B3 ('B' HVAC power source) so the action to crosstie the USS is at USS 1A3 and 1B3 instead of USS 1A1 and 1Bi; however, the timing and outcome are the same.
Note 5:   This action has been slightly modified from that described in the original FHAR submittal to change from using the pump discharge valve, V-1 5-7 or V-1 5-10 as a throttle valve to using V-1 5-30 (monitor flow locally at FI-225-2) in conjunction with opening V-15-237. Also, added one additional valve, V-15-52. Changing the valve from V-1 5-7 or V-1 5-10 to V-1 5-30 and V-1 5-237 improved the location and timing of the action because V-1 5-237 is located next to V-1 5-30 while V-1 5-7 and V-1 5-10 are located in one of the Reactor Building corner rooms approximately 5 minutes away. V-15-52 is also located next to V-1 5-30 and this valve closes the CRD Charging Water Header. These changes were made to be consistent with the EOPs.
The action location and timing has been improved and the outcome is essentially the same. All of the valves listed above are two-inch valves and they are within
 
10 CFR 50.12 Exemption Request                                                     Page 10 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section III.G.2, Operator Manual Actions approximately four feet of each other. Additionally, the local flow indicator can be monitored while adjusting V-1 5-30.
Note 6:   OB-FZ-8A and OB-FZ-8B were analyzed together for safe shutdown analysis purposes, so OB-FZ-8A was added as a fire area that credits this manual action.
These areas were not considered a single analysis area in the original FHAR submittal.
 
0                           UNITED STATES S,.                       NUCLEAR REGULATORY COMMISSION
                      -           ~WASH INGTON, 0. C. 20555
        .0,                                     March 24, 1986 Docket No. 50-219 Mr. P. B. Fiedler Vice President and Director Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731


==Dear Mr. Fiedler:==
==Dear Mr. Fiedler:==


==SUBJECT:==
==SUBJECT:==
EXEMPTIONS FROM REQUIREMENTS OF APPENDIX R TO 10 CFR PART 50, SECTION III.G.2 AND THE POST FIRE SAFE SHUTDOWN CAPABILITY (TAC 56740, 56786)Re- Oyster Creek Nuclear Generating Station The Commission has issued the enclosed exemptions to certain requirements of Section ITI.G.2 of 10 CFR Part 50, Appendix R, Fire Protection Pronram for Nuclear Power Facilities Operatinq Prior to January 1, 1979. This is in response to your letters of April 3, 1985; July 12, 1985; and October 9, 1985. The April 3, 1985, submittal superseded your previous submittal of December 16, 1983 and February 13, and May 3, 1984. In the meeting of February 11, 1986, your staff provided additional information on the need for the requested exemptions.
EXEMPTIONS FROM REQUIREMENTS OF APPENDIX R TO 10 CFR PART 50, SECTION III.G.2 AND THE POST FIRE SAFE SHUTDOWN CAPABILITY (TAC 56740, 56786)
The meeting minutes are dated February 28, 1986.Subsection III.G specifies the separation, fire barrier and suppression requirements where both trains for redundant safe shutdown components are located within the same fire area. Your initial request for seven exemptions from the specific provisions of Section III.G was reduced by the staff to four exemptions because the staff concluded that three were not needed (Enclosure 1). The bases for these four exemptions including the bases for the licensee not needing the three are presented in the Safety Evaluation (Enclosure 2). Also included in the Safety Evaluation (Section 8) is the staff approval of the post fire safe shutdown capability for Oyster Creek.In the enclosed Safety Evaluation supporting the exemptions from 10 CFR Part 50, Appendix R, and the post fire safe shutdown capability, there are several references to your commitments to future modifications.
Re-           Oyster Creek Nuclear Generating Station The Commission has issued the enclosed exemptions to certain requirements of Section ITI.G.2 of 10 CFR Part 50, Appendix R, Fire Protection Pronram for Nuclear Power Facilities Operatinq Prior to January 1, 1979. This is in response to your letters of April 3, 1985; July 12, 1985; and October 9, 1985. The April 3, 1985, submittal superseded your previous submittal of December 16, 1983 and February 13, and May 3, 1984.         In the meeting of February 11, 1986, your staff provided additional information on the need for the requested exemptions.       The meeting minutes are dated February 28, 1986.
Your commitments are that these modifications will be made before the restart from the upcoming Cycle 11 Refueling outage scheduled to commence in 4pril 1986. We request that appropriate technical specifications on the minimum open-close cycles for the accumulators and accessibility of local a.r cylinders to be provided for air-operated valves required for safe shutdown, in Section 8.1.4 of the Safety Evaluation, be submitted before restart from this outage.-9604070464-860324 -..PDR ADOCK 05000219 F PDR Mr. P. B. Fiedler-2-March 24, 1986 A Notice of Environmental Assessment and Findinq of No Significant Impact was published in the Federal Register on December 3, 1985 (50 FR 49633).This exemption is beina forwarded to the Office of the Federal Register for publication.
Subsection III.G specifies the separation, fire barrier and suppression requirements where both trains for redundant safe shutdown components are located within the same fire area. Your initial request for seven exemptions from the specific provisions of Section III.G was reduced by the staff to four exemptions because the staff concluded that three were not needed (Enclosure 1). The bases for these four exemptions including the bases for the licensee not needing the three are presented in the Safety Evaluation (Enclosure 2). Also included in the Safety Evaluation (Section 8) is the staff approval of the post fire safe shutdown capability for Oyster Creek.
Si ncere~y, JohnA. Zwolinski, Director BWR P oject Directorate  
In the enclosed Safety Evaluation supporting the exemptions from 10 CFR Part 50, Appendix R, and the post fire safe shutdown capability, there are several references to your commitments to future modifications.         Your commitments are that these modifications will be made before the restart from the upcoming Cycle 11 Refueling outage scheduled to commence in 4pril 1986. We request that appropriate technical specifications on the minimum open-close cycles for the accumulators and accessibility of local a.r cylinders to be provided for air-operated valves required for safe shutdown, in Section 8.1.4 of the Safety Evaluation, be submitted before restart from this outage.
#1 Division of BWR Licensing  
            -9604070464- 860324 -..
PDR ADOCK 05000219 F                 PDR
 
Mr. P. B. Fiedler                             March 24, 1986 A Notice of Environmental Assessment and Findinq of No Significant Impact was published in the Federal Register on December 3, 1985 (50 FR 49633).
This exemption is beina forwarded to the Office of the Federal Register for publication.
Si ncere~y, JohnA. Zwolinski, Director BWR P oject Directorate #1 Division of BWR Licensing


==Enclosures:==
==Enclosures:==
: 1. Exemptions
: 1. Exemptions
: 2. Safety Evaluation cc w/enclosures:
: 2. Safety Evaluation cc w/enclosures:
See next page 11 OR 2 4 19 Mr. P. B. Fiedler-2-open-close cycles for the accumulators and accessibility of local air cylinders to be provided for air-operated valves required for safe shutdown, in Section 8.1.4 of the Safety Evaluation, be submitted before restart from this outage.A Notice of Environmental Assessment and Finding of No Significant Impact was published in the Federal Register on December 3, 1985 (50 FR 49633).This exemption is being forwarded to for publication.
See next page 11
the Office of the Federal Register Sincerely, John A. Zwolinski, Director BWR Project Directorate  
 
#1 Division of RWR Licensing cc w/enclosures:
OR 2 4 19 Mr. P. B. Fiedler                     open-close cycles for the accumulators and accessibility of local air cylinders to be provided for air-operated valves required for safe shutdown, in Section 8.1.4 of the Safety Evaluation, be submitted before restart from this outage.
A Notice of Environmental Assessment and Finding of No Significant Impact was published in the Federal Register on December 3, 1985 (50 FR 49633).
This exemption is being forwarded to the Office of the Federal Register for publication.
Sincerely, John A. Zwolinski, Director BWR Project Directorate #1 Division of RWR Licensing cc w/enclosures:
See next page DISTRIBUTION
See next page DISTRIBUTION
%, ýocket File Local PDR BWD#1 Reading CJamerson JZwolinski OELD LJHarmon TBarnhart CMiles BGrimes (4)NRC PDR ACRS (10)JDonohew DVassallo JPartl ow DKubicki ELJordan RDicas (w/TACS)WJones RRernero DCrutchfield OParr*SEE PREVIOUS CONCURRENCE
%,ýocket File         OELD                  NRC PDR              ELJordan Local PDR         LJHarmon               ACRS (10)           RDicas (w/TACS)
* DBL:PD#1 CJamerson 12 /30(85 RBernero 3 /1-3/85'DVRL: PD#1 JDonohew:
BWD#1 Reading      TBarnhart  (4)        JDonohew            WJones CJamerson          CMiles                DVassallo            RRernero JZwolinski        BGrimes                JPartl ow            DCrutchfield DKubicki            OParr
tm 12/ r tk-41BL: PD#1 JStang 12123(85* OELD WShields 1 /0 0(86*DBL:PiD#<
*SEE PREVIOUS CONCURRENCE DBL:PD#1
6\l Jzo 7w s i&#xfd;'2 /88 Mr. P. B. Fiedler This exemption is for publication. being forwarded to the Office of the Federal Register Sincerely, John A. Zwolinski, Director BWR Project Directorate  
* OELD                        6 \l
#1 Division of BWR Licensing cc w/enclosures:
*                'DVRL: PD#1         -41BL:PD#1                         *DBL:PiD#<
See next page DISTRIBUTION Docket File Local PDR BWD#1 Reading CJamerson JZwolinski GLainas OELD DKubicki TBarnhart CMiles BGrimes GHolahan (4)NRC PDR ACRS (10)JDonohew DVassallo JPartlow JPKnight ELJordan RDiggs (w/TACS)RGoel RBernero DCrutchfield OPA DBL: PD#1k CJamerso%Ia./50/85 DB: JD e :tm/85 L. 1 J g/ /85 WShields/ / &/86 7 DBL: PD#1 JZwol inski I/ 1,A1/86 D: DBL RBernero/ /86 Mr. P. B. Fiedler Oyster Creek Nuclear Seneratinq Station cc: Ernest L. Blake, Jr.Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.Washington, D.C. 20036 J.9. Liberman, Esquire Bishop, Liberman, Cook,.et al.1155 Avenue of the Americas New York, New York 10036 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue Kina of Prussia, Pennsylvania 19406 BWR Licensing Manager GPU Nuclear 100 Tnterpace Parkway Parsippany, New Jersey 07054 Deputy Attorney General State of New ,lerse.v Department of Law and Public Safety 36 West State Street -CN 112 Trenton, New Jersey 08625 Oyster Creek Nuclear Generating Station Resident InsDector c/o U.S. NRC Post Office Box 445 Forked River, New Jersey. 08731 Commissioner New Jersey Department of Energy 101 Commerce Street Newark, New Jersey 07102 Eugene Fisher, Assistant Director Division of Environmental Quality Department of Environmental Protection 380 Scotch Road Trenton, New Jersey 08628 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 D. G. Holland Licensing Manager Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731 7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ))GPU NUCLEAR CORPORATION AND ) Docket No. 50-219 JERSEY CENTRAL POWER & LIGHT COMPANY )Oyster Creek Nuclear Generating  
CJamerson      JDonohew: tm      JStang            WShields        Jzo 7w   s i&#xfd;'
)Station )EXEMPTION I.The GPU Nuclear Corporation (the licensee), et al., is the holder of Provisional Operating License No. DPR-16 which authorizes operation of the Oyster Creek Nuclear Generating Station. The license provides, among other things, that it is subject to all rules, regulations and Orders of the Commission now or hereafter in effect.The Oyster Creek Station power source is a boiling water reactor located at the licensee's site in Ocean County, New Jersey.II.On November 19, 1980, the Commission published a revised Section 10 CFR 50.48 and a new Appendix R to 10 CFR Part 50 regarding fire protection features of nuclear power plants (45 FR 76602). The revised Section 50.48 and Appendix R became effective on February 17, 1981. Section III of Appendix R contains fifteen subsections, lettered A through 0, each of which specifies requirements for a particular aspect of the fire protection features at a nuclear power plant.One of these fifteen subsections, III.G., is the subject .of this exemption request. Specifically, Subsection III.G.2 requires that one train of'cables and equipment necessary to achieve and maintain safe shutdown be maintained free of fire damage by one of the following means: 8604070468 9,60324'.PDR ADOCK 0,5000219 F PDR 7590-01-2 -a. Separation of cables and equipment and associated non-safety circuits of redundant trains by a fire barrier having a 3-hour rating. Structural steel forminq a part of or supporting such fire barriers shall be protected to provide fire resistance eauivalent to that required of the barrier;b. Separation of cables and equipment and associated non-safety circuits or redundant trains by a horizontal distance of more than 20 feet with no intervening combustibles or fire hazards. In addition, fire detectors and an automatic fire suppression system shall be installed in the fire area;or c. Enclosure of cables and eouipment and associated non-safety circuits of one redundant train in a fire barrier having a 1-hour ratinq. In addition, fire detectors and an automatic fire suppression system shall be installed in the fire area.III.By letter dated April 3, 1985, as supplemented by letters dated July 12 and October 9, 1985, the licensee requested seven exemptions for thirteen fire areas from the requirements of Section III.G of Appendix R, to the extent that it requires physical separation and/or fire protection systems to protect redundant trains of safe shutdown related cable and equipment.
12 /30(85        12/r              12123(85          1 /00(86        2 /88 tk RBernero 3 /1-3/85
The April 3, 1985, submittal superseded the licensee's letters dated December 16, 1983, and February 13 and May 3, 1984.In the meeting summary dated February 28, 1986, the licensee pribvided information relevant to the "special circumstances" finding required by revised 10 CFR 50.12(a) (See 50 Fed. Reg. 50764). The licensee stated that 7590-01-3 -existing and proposed fire protection features at Oyster Creek accomplish the underlying purpose of the rule. Implementing additional modifications to provide additional suppression systems, detection systems, and fire barriers would require the expenditure of engineering and construction resources as well as the associated capital costs which would represent an unwarranted burden on the licensee's resources.
 
The licensee stated that the costs to be incurred are as follows: o Engineering and installation of additional piping, sprinkler heads, and supporting structures.
Mr. P. B. Fiedler                   This exemption is being forwarded to the Office of the Federal Register for publication.
o Engineering and installation of fire barriers, supports, support protection, and ongoing maintenance.
Sincerely, John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing cc w/enclosures:
o Significant rerouting of high power cabling and associated conduits, ducts, and supports." Possible need to provide additional fire pumDs and/or diesel generator capacity.o Increased surveillance on new or extended fire suppression and fire detection systems.o Increased congestion in numerous plant locations complicating future plant modifications/operation.
See next page DISTRIBUTION Docket File         OELD                  NRC PDR            ELJordan Local PDR           DKubicki              ACRS (10)          RDiggs RGoel  (w/TACS)
The licensee stated that these costs are significantly in excess of those required to meet the underlying purpose of the rule. The staff concludes that"special circumstances" exist for the licensee's requested exemptions ,in that application of the regulation in these particular circumstances is not necessary to achieve the underlying purposes of Appendix R to'10 CFR Part 50.See 10 CFR 50.12(a)(2)(ii).
BWD#1 Reading       TBarnhart (4)         JDonohew CJamerson            CMiles                DVassallo         RBernero JZwolinski          BGrimes              JPartlow           DCrutchfield GLainas              GHolahan              JPKnight           OPA DBL: PD#1k     DB:                 L. 1                       DBL: PD#1 7
7590-01-4 -The licensee's request for seven exemptions (thirteen fire areas) was reduced to four exemptions (eight fire areas) because the staff concluded that three exemptions (five areas) were not needed. The acceptability of the exemption requests for each of the eight fire areas is addressed below.Details are contained in the NRC staff's related Safety Evaluation.
CJamerso        JD      e :tm    J      g         WShields        JZwol inski
The fire areas related to the four exemptions addressed herein are: (1)(2)(3)(4)(5)(6)(7)(8)Reactor Building Elevation 51 feet (Fire Area RB-FZ-ID)Reactor Building Elevation 23 feet (Fire Area RB-FZ-1E)
%Ia./50/85           /85              / /85        / / &/86       I/1,A1/86 D: DBL RBernero
    /   /86
 
Mr. P. B. Fiedler                       Oyster Creek Nuclear Oyster Creek Nuclear Seneratinq Station  Generating Station cc:
Ernest L. Blake, Jr.                     Resident InsDector Shaw, Pittman, Potts and Trowbridge     c/o U.S. NRC 1800 M Street, N.W.                     Post Office Box 445 Washington, D.C. 20036                 Forked River, New Jersey. 08731 J.9. Liberman, Esquire                   Commissioner Bishop, Liberman, Cook,.et al.           New Jersey Department of Energy 1155 Avenue of the Americas             101 Commerce Street New York, New York 10036                 Newark, New Jersey 07102 Eugene Fisher, Assistant Director Regional Administrator, Region I         Division of Environmental Quality U.S. Nuclear Regulatory Commission       Department of Environmental 631 Park Avenue                           Protection Kina of Prussia, Pennsylvania 19406     380 Scotch Road Trenton, New Jersey 08628 BWR Licensing Manager GPU Nuclear 100 Tnterpace Parkway Parsippany, New Jersey   07054 Deputy Attorney General State of New ,lerse.v Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey   08731 D. G. Holland Licensing Manager Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731
 
7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                             )
                                            )
GPU NUCLEAR CORPORATION AND                  )              Docket No. 50-219 JERSEY CENTRAL POWER & LIGHT COMPANY        )
Oyster Creek Nuclear Generating             )
Station                                     )
EXEMPTION I.
The GPU Nuclear Corporation (the licensee),       et al., is the holder of Provisional Operating License No. DPR-16 which authorizes operation of the Oyster Creek Nuclear Generating Station.         The license provides, among other things, that it  is subject to all rules, regulations and Orders of the Commission now or hereafter in effect.
The Oyster Creek Station power source is a boiling water reactor located at the licensee's site in Ocean County, New Jersey.
II.
On November 19, 1980, the Commission published a revised Section 10 CFR 50.48 and a new Appendix R to 10 CFR Part 50 regarding fire protection features of nuclear power plants (45 FR 76602).         The revised Section 50.48 and Appendix R became effective on February 17, 1981.        Section III of Appendix R contains fifteen subsections,   lettered A through 0, each of which specifies requirements for a particular aspect of the fire protection features at a nuclear power plant.
One of these fifteen subsections,     III.G.,   is the subject .of this exemption request. Specifically, Subsection III.G.2 requires that one train of'cables and equipment necessary to achieve and maintain safe shutdown be maintained free of fire damage by one of the following means:
8604070468 9,60324'.
PDR ADOCK 0,5000219PDR F
 
7590-01
: a. Separation of cables and equipment and associated non-safety circuits of redundant trains by a fire barrier having a 3-hour rating. Structural steel forminq a part of or supporting such fire barriers shall be protected to provide fire resistance eauivalent to that required of the barrier;
: b. Separation of cables and equipment and associated non-safety circuits or redundant trains by a horizontal distance of more than 20 feet with no intervening combustibles or fire hazards. In addition, fire detectors and an automatic fire suppression system shall be installed in the fire area; or
: c. Enclosure of cables and eouipment and associated non-safety circuits of one redundant train in a fire barrier having a 1-hour ratinq. In addition, fire detectors and an automatic fire suppression system shall be installed in the fire area.
III.
By letter dated April 3, 1985, as supplemented by letters dated July 12 and October 9, 1985, the licensee requested seven exemptions for thirteen fire areas from the requirements of Section III.G of Appendix R, to the extent that it requires physical separation and/or fire protection systems to protect redundant trains of safe shutdown related cable and equipment. The April 3, 1985, submittal superseded the licensee's letters dated December 16, 1983, and February 13 and May 3, 1984.
In the meeting summary dated February 28, 1986, the licensee pribvided information relevant to the "special circumstances" finding required by revised 10 CFR 50.12(a) (See 50 Fed. Reg. 50764). The licensee stated that
 
7590-01 existing and proposed fire protection features at Oyster Creek accomplish the underlying purpose of the rule. Implementing additional modifications to provide additional suppression systems, detection systems, and fire barriers would require the expenditure of engineering and construction resources as well as the associated capital costs which would represent an unwarranted burden on the licensee's resources. The licensee stated that the costs to be incurred are as follows:
o Engineering and installation of additional piping, sprinkler heads, and supporting structures.
o Engineering and installation of fire barriers, supports,   support protection, and ongoing maintenance.
o Significant rerouting of high power cabling and associated conduits, ducts, and supports.
      " Possible need to provide additional fire pumDs and/or diesel generator capacity.
o Increased surveillance on new or extended fire suppression and fire detection systems.
o Increased congestion in numerous plant locations complicating future plant modifications/operation.
The licensee stated that these costs are significantly in excess of those required to meet the underlying purpose of the rule.     The staff concludes that "special circumstances" exist for the licensee's requested exemptions ,in that application of the regulation in these particular circumstances is not necessary to achieve the underlying purposes of Appendix R to'10 CFR Part 50.
See 10 CFR 50.12(a)(2)(ii).
 
7590-01 The licensee's request for seven exemptions (thirteen fire areas) was reduced to four exemptions (eight fire areas) because the staff concluded that three exemptions (five areas) were not needed. The acceptability of the exemption requests for each of the eight fire areas is addressed below.
Details are contained in the NRC staff's related Safety Evaluation.
The fire areas related to the four exemptions addressed herein are:
(1) Reactor Building Elevation 51 feet (Fire Area RB-FZ-ID)
(2)   Reactor Building Elevation 23 feet (Fire Area RB-FZ-1E) (1 of 2 exemptions)
(3)  Reactor Building Elevation (-) 19 feet (Fire Area RB-FZ-1F)
(4)  Turbine Building Lube Oil Area (Fire Area TB-FZ-11B)
(5)  Turbine Building Basement Floor-South End (Fire Area TB-FZ-11D)
(6)  Turbine Building Condenser Bay (Fire Area TB-FZ-11E)
(7)  Turbine Building Basement & Mezzanine (Fire Area TB-FZ-11H)
(8)  Office Building - 480V Switchgear Room (Fire Area OB-FA-6B)
(1 of 2 exemptions)
(1 of 2 exemptions)
Reactor Building Elevation
Based on our evaluation, we concluded that the three exemptions requested for the following areas are not needed:
(-) 19 feet (Fire Area RB-FZ-1F)Turbine Building Lube Oil Area (Fire Area TB-FZ-11B)
(9)   Reactor Building Elevation 23 feet (Fire Area RB-FZ-IE) (1 of 2 exemptions)
Turbine Building Basement Floor-South End (Fire Area TB-FZ-11D)
(10) Office Building - 480V Switchgear Room (Fire Area OB-FA-6B)   (I of 2 exemptions)
Turbine Building Condenser Bay (Fire Area TB-FZ-11E)
(11) Office Building - Motor Generator Set Room (Fire Area OB-FA-8A)
Turbine Building Basement & Mezzanine (Fire Area TB-FZ-11H)
(12/13) Office Building - Battery & Electrical Tray Room (Fire Area &B-FZ-8C)
Office Building -480V Switchgear Room (Fire Area OB-FA-6B)(1 of 2 exemptions) on our evaluation, we concluded that the three exemptions requested for Based the following areas are not needed: (9) Reactor Building Elevation 23 feet (Fire Area RB-FZ-IE)
(2 exemptions)
(1 of 2 exemptions)
 
(10) Office Building -480V Switchgear Room (Fire Area OB-FA-6B) (I of 2 exemptions)
4 I
(11) Office Building -Motor Generator Set Room (Fire Area OB-FA-8A)(12/13) Office Building -Battery & Electrical Tray Room (Fire Area &B-FZ-8C)(2 exemptions)
* k 7590-01 Exemption 1 (Fire Areas RB-FZ-1D,   1E and IF and Fire Area OB-FA-6B)
* k 4 I 7590-01-5-Exemption 1 (Fire Areas RB-FZ-1D, 1E and IF and Fire Area OB-FA-6B)The licensee requested an exemption from the technical requirements of Section III.G of Appendix R in each of these areas to the extent that it requires the installation of an area-wide automatic fire suppression system.Discussion (Fire Area RB-FZ-1D)This area is bounded by walls, floor and ceiling of reinforced concrete.However, this portion of the Reactor Building communicates, via unprotected openings, with other plant locations which the licensee has designated as separate fire areas. These penetrations are delineated in Appendix E of the licensee's April 3, 1985 report.This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2 and 3 as defined in the above-referenced report. For a fire in this area, hot shutdown is achieved using systems from path 1 and cold shutdown is achieved using path 3. All required hot shutdown path 1 systems that are located in this area are protected by a 1-hour fire-rated barrier. Cold shutdown path 3 systems in this area that would be damaged in a fire can either be repaired within 72 hours or an alternate means of achieving shutdown exists outside of this fire area via manual operation of certain valves.The fire loading in this area has been calculated to be 12,500 BTU/sq.ft.
The licensee requested an exemption from the technical requirements of Section III.G of Appendix R in each of these areas to the extent that it requires the installation of an area-wide automatic fire suppression system.
which corresponds to a fire severity of less than 10 minutes as determined by the ASTM E-119 time-temperature curve.Existing fire protection includes an area-wide fire detection system; two fixed, water spray deluge systems which cover cables in trays;,portable fire extinguishers and manual hose stations.
Discussion (Fire Area RB-FZ-1D)
The licensee has committed 7590-01-6-to reroute certain safe shutdown-related circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 fire hazards analysis report.Discussion (Fire Area RB-FZ-1E)This area is bounded by walls, floor and ceiling of reinforced concrete, which contain unprotected openings into adjoining plant locations, that the licensee has identified as separate fire areas, as delineated in the April 3, 1985 report.This fire area contains electrical circuits for hot shutdown paths 1, 2, 3 and 4 and for cold shutdown paths 1, 2 and 3 as defined in the above-referenced report. For a fire in this area, hot shutdown is achieved using shutdown path 1 and cold shutdown using path 3. With the exception of the reactor scram system circuitry, all required hot shutdown path 1 systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier. Cold shutdown path 3 systems in this area that would be subject to fire damage can either be repaired within 72 hours or an alternate means of achieving safe shutdown exists outside of this fire area by manual operation of certain valves.The fire loading in this area has been calculated to be 20,000 BTU/sq.ft.
This area is bounded by walls, floor and ceiling of reinforced concrete.
However, this portion of the Reactor Building communicates,   via unprotected openings, with other plant locations which the licensee has designated as separate fire areas. These penetrations are delineated in Appendix E of the licensee's April 3,   1985 report.
This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2 and 3 as defined in the above-referenced report. For a fire in this area, hot shutdown is achieved using systems from path 1 and cold shutdown is achieved using path 3. All required hot shutdown path 1 systems that are located in this area are protected by a 1-hour fire-rated barrier. Cold shutdown path 3 systems in this area that would be damaged in a fire can either be repaired within 72 hours or an alternate means of achieving shutdown exists outside of this fire area via manual operation of certain valves.
The fire loading in this area has been calculated to be 12,500 BTU/sq.ft.
which corresponds to a fire severity of less than 10 minutes as determined by the ASTM E-119 time-temperature curve.
Existing fire protection includes an area-wide fire detection system; two fixed, water spray deluge systems which cover cables in trays;,portable fire extinguishers and manual hose stations. The licensee has committed
 
7590-01 to reroute certain safe shutdown-related circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 fire hazards analysis report.
Discussion (Fire Area RB-FZ-1E)
This area is bounded by walls, floor and ceiling of reinforced concrete, which contain unprotected openings into adjoining plant locations, that the licensee has identified as separate fire areas, as delineated in the April 3, 1985 report.
This fire area contains electrical circuits for hot shutdown paths 1, 2, 3 and 4 and for cold shutdown paths 1, 2 and 3 as defined in the above-referenced report. For a fire in this area, hot shutdown is achieved using shutdown path 1 and cold shutdown using path 3. With the exception of the reactor scram system circuitry, all required hot shutdown path 1 systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier. Cold shutdown path 3 systems in this area that would be subject to fire damage can either be repaired within 72 hours or an alternate means of achieving safe shutdown exists outside of this fire area by manual operation of certain valves.
The fire loading in this area has been calculated to be 20,000 BTU/sq.ft.
which corresponds to a fire severity of less than 16 minutes as determined by the ASTM E-119 time-temperature curve.
which corresponds to a fire severity of less than 16 minutes as determined by the ASTM E-119 time-temperature curve.
7590-01-7-Existing fire protection includes an area-wide fire detection system; two fixed, water spray deluge systems which cover cables in trays; portable fire extinguishers and manual hose stations.
 
The licensee has committed to re-route certain safe-shutdown-related circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 report.Discussion (Fire Area RB-FZ-1F)This area is bounded by walls, floor and ceiling of reinforced concrete which contain unprotected openings into an adjoining plant location that the licensee has identified as a separate fire area.This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot shutdown is achieved using shutdown path 1 and cold shutdown using path 1. All required hot shutdown systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier. If cold shutdown path 3 systems were lost in a fire, an alternate means of achieving safe shutdown exists which is independent of this fire area.The fire loading in this area has been calculated to be 1,500 BTU/sq. ft.which corresponds to a fire severity of less than 2 minutes as determined by the ASTM E-119 time-temperature curve.
7590-01 Existing fire protection includes an area-wide fire detection system; two fixed, water spray deluge systems which cover cables in trays; portable fire extinguishers and manual hose stations. The licensee has committed to re-route certain safe-shutdown-related circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 report.
7590-01-8-Existing fire protection includes an automatic fire detection system;portable fire extinguishers and manual hose stations.
Discussion (Fire Area RB-FZ-1F)
The licensee has committed to reroute certain safe shutdown circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 report.Discussion (Fire Area OB-FA-6B)This fire area is bounded by walls, floor and ceiling of 3-hour fire-rated construction except for the 1-hour rated wall common with adjacent fire area OB-FA-6A.
This area is bounded by walls, floor and ceiling of reinforced concrete which contain unprotected openings into an adjoining plant location that the licensee has identified as a separate fire area.
In the event of a fire in this location, hot and cold shutdown will be achieved using shutdown path 2. The required shutdown-related cables are either protected by a 1-hour fire barrier or an alternate means for achieving safe-shutdown is available outside of this area.The fire load has been calculated to be 71,000 BTU/sq. ft. which represents a fire severity of less than 1-hour as determined by the ASTM E-119 time-temperature curve.Existing fire protection includes an area-wide fire detection system; an automatic halon fire suppression system for the switchgear room portion of this fire area; portable fire extinguishers and manual hose stations.
This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot shutdown is achieved using shutdown path 1 and cold shutdown using path 1. All required hot shutdown systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier. If cold shutdown path 3 systems were lost in a fire, an alternate means of achieving safe shutdown exists which is independent of this fire area.
In the April 3, 1985 report, the licensee proposed to make structural, ventilation system and halon system modifications to isolate this fire area from adjacent plant locations; to reroute certain shutdown related cables and to protect others in a 1-hour fire-rated barrier.
The fire loading in this area has been calculated to be 1,500 BTU/sq. ft.
7590-01-9-The licensee justified the exemptions in these four areas on the basis of the low fire loading, the existing fire protection and the proposed modifications.
which corresponds to a fire severity of less than 2 minutes as determined by the ASTM E-119 time-temperature curve.
Evaluation The technical requirements of Section III.G.2 are not met in these locations because of the absence of an area-wide automatic fire suppression system.In addition, Section III.G.3 is not met because of the absence of an area-wide, fixed, fire suppression system in a location where an alternate shutdown capability has been provided.Our principal concern was that in the event of a fire the absence of an area-wide automatic fire suppression system would result in loss of all shutdown capability.
 
However, the fire load in these areas is low, with combustible material generally dispersed.
7590-01 Existing fire protection includes an automatic fire detection system; portable fire extinguishers and manual hose stations. The licensee has committed to reroute certain safe shutdown circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 report.
Where concentrated quantities of combustible cable insulation exists, the cables are protected by a deluge system.All of these areas are protected by a fire detection system. If a fire should occur, the staff has determined that it will be detected in its incipient stages, before significant propagation occurred.
Discussion (Fire Area OB-FA-6B)
The fire would then be put out by the plant fire brigade using the portable fire extinguishers and manual hose stations.
This fire area is bounded by walls, floor and ceiling of 3-hour fire-rated construction except for the 1-hour rated wall common with adjacent fire area OB-FA-6A. In the event of a fire in this location, hot and cold shutdown will be achieved using shutdown path 2. The required shutdown-related cables are either protected by a 1-hour fire barrier or an alternate means for achieving safe-shutdown is available outside of this area.
If rapid room temperature rise occurred before the arrival of the brigade, existing fire suppression systems will actuate to limit fire spread, to protect the cables covered by the systems and to reduce room temperature.
The fire load has been calculated to be 71,000 BTU/sq. ft. which represents a fire severity of less than 1-hour as determined by the ASTM E-119 time-temperature curve.
Until the arrival of the brigade and eventual fire suppression, the 1-hour fire 7590-01-10 -barriers installed to protect one shutdown pathway provides sufficient passive fire protection to provide us with reasonable assurance that those systems would remain free of fire damage. For those redundant shutdown systems that are not similarly protected, the licensee has identified an alternate capability that is physically and electrically independent of these fire areas. For certain cold shutdown systems that might be lost in a fire, the licensee has repair procedures with materials on site, that will enable these systems to be restored to operable condition within 72 hours. Therefore, the absence of area-wide fire suppression systems is not necessary to provide reasonable assurance that safe-shutdown conditions can be achieved and maintained.
Existing fire protection includes an area-wide fire detection system; an automatic halon fire suppression system for the switchgear room portion of this fire area; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee proposed to make structural, ventilation system and halon system modifications to isolate this fire area from adjacent plant locations; to reroute certain shutdown related cables and to protect others in a 1-hour fire-rated barrier.
Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications, will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from an area-wide fire suppression system in the following areas should be granted: Reactor Building Elevation 51 feet (Fire Area RB-FZ-1D)Reactor Building Elevation 23 feet (Fire Area RB-FZ-1E)Reactor Building Elevation
 
(-) 19 feet (Fire Area RB-FZ-IF)Office Building-480V Switchgear Room (Fire Area OB-FA-6B) 7590-01-11 -Exemption 2 (Fire Areas TB-FZ-11B and TB-FZ-11H)
7590-01 The licensee justified the exemptions in these four areas on the basis of the low fire loading, the existing fire protection and the proposed modifications.
The licensee requested an exemption from the technical requirement of Section III.G.2 of Appendix R in these two areas to the extent that it requires that redundant shutdown circuits in a pit area be separated by a 3-hour fire barrier.Discussion (Fire Area TB-FZ-11B)
Evaluation The technical requirements of Section III.G.2 are not met in these locations because of the absence of an area-wide automatic fire suppression system.
This area is bounded by masonry walls, floor and ceiling. However, this portion of the Turbine Building communicates, via unprotected openings, with other plant areas that the licensee has identified as separate fire areas. These penetrations are delineated in Appendix E of the licensee's April 3, 1985 report.This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot shutdown is achieved using hot shutdown path 1, with isolation condenser system "A" instead of "B". Cold shutdown is achieved using path 1. Redundant shutdown-related circuits are located in a pit area where separation per the requirements of Section III.G.2 is not achieved.The fire load in this area has been calculated to be approximately 586,000 BTU/sq. ft., which represents a fire severity of approximately 7 hours as determined by the ASTM E-119 time-temperature curve. The principal combustible material consists of turbine lube oil and cable insulation:
In addition, Section III.G.3 is not met because of the absence of an area-wide,   fixed, fire suppression system in a location where an alternate shutdown capability has been provided.
7590-01-12 -Existing fire protection includes a fire detection system, an automatic sprinkler system over cable trays; water spray systems for the lube oil storage tank; a sprinkler system for the bearing lift pumps; portable fire extinguishers and manual hose stations.
Our principal concern was that in the event of a fire the absence of an area-wide automatic fire suppression system would result in loss of all shutdown capability. However, the fire load in these areas is low, with combustible material generally dispersed. Where concentrated quantities of combustible cable insulation exists, the cables are protected by a deluge system.
In the April 3, 1985 report, the licensee committed to reroute certain safe shutdown circuits outside of this fire area. The licensee also committed to fill the pit area where vulnerable shutdown-related cables are located with sand or with a fire-rated silicon foam.Discussion (TB-FZ-11H)
All of these areas are protected by a fire detection system. If a fire should occur, the staff has determined that it will be detected in its incipient stages, before significant propagation occurred. The fire would then be put out by the plant fire brigade using the portable fire extinguishers and manual hose stations. If rapid room temperature rise occurred before the arrival of the brigade, existing fire suppression systems will actuate to limit fire spread, to protect the cables covered by the systems and to reduce room temperature.
This area is bounded by reinforced concrete walls, floor and ceiling.However, this portion of the Turbine Building communicates, via unprotected openings, with other plant locations that the licensee has identified as separate fire areas.This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot and cold shutdown will be achieved using shutdown path 2. Shutdown path 2 circuits are located in a pit area where separation per the requirements of Section III.G.2 is not achieved.There are no in-situ fire hazards in this location.
Until the arrival of the brigade and eventual fire suppression,     the 1-hour fire
The fire load as calculated by the licensee is negligible.
 
7590-01-13 -Existing fire protection includes portable fire extinguishers and manual hose stations.
7590-01 barriers installed to protect one shutdown pathway provides sufficient passive fire protection to provide us with reasonable assurance that those systems would remain free of fire damage. For those redundant shutdown systems that are not similarly protected, the licensee has identified an alternate capability that is physically and electrically independent of these fire areas. For certain cold shutdown systems that might be lost in a fire, the licensee has repair procedures with materials on site, that will enable these systems to be restored to operable condition within 72 hours. Therefore, the absence of area-wide fire suppression systems is not necessary to provide reasonable assurance that safe-shutdown conditions can be achieved and maintained.
The licensee committed to fill the pit area where vulnerable shutdown cables are located with sand or with a fire-rated silicon foam.The licensee justified the exemptions in these locations on the basis that the fire hazard in the pits is negligible.
Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications, will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from an area-wide fire suppression system in the following areas should be granted:
Also, the fire hazard in the area around the pit is either negligible or mitigated by fire suppression systems. The licensee also justified these exemptions on the ability of the sand or silicon foam to prevent fire damage to redundant cables where they are vulnerable.
Reactor Building Elevation 51 feet (Fire Area RB-FZ-1D)
Evaluation The technical requirements of Section III.G.2 are not met in this area because redundant shutdown-related cables are not separated by a 3-hour barrier within the pit area.Our concern was that because of the lack of adequate physical separation, the cables in these pits would be vulnerable to fire damage. However, because the pits are located in the floor and because products of combustion rise in a fire, we do not expect a fire outside the pit to have any significant affect on the cables within the pit. Also, because the pit area will be filled with sand or a fire-rated silicon foam, we have reasonable assurance that a fire will not originate within it or that a possible flammable liquid spill would affect the cables.
Reactor Building Elevation 23 feet (Fire Area RB-FZ-1E)
7590-01-14 -Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications will achieve an acceptable level of fire protection equivalent to that provided by Section III.G.2. Therefore, the licensee's request for exemption from a 3-hour fire barrier in the following locations should be granted: Turbine Building Lube Oil Area (Fire Area TB-FZ-11B)
Reactor Building Elevation (-) 19 feet (Fire Area RB-FZ-IF)
Office Building-480V Switchgear Room (Fire Area OB-FA-6B)
 
7590-01
                                    - 11 -
Exemption 2 (Fire Areas TB-FZ-11B and TB-FZ-11H)
The licensee requested an exemption from the technical requirement of Section III.G.2 of Appendix R in these two areas to the extent that it   requires that redundant shutdown circuits in a pit area be separated by a 3-hour fire barrier.
Discussion (Fire Area TB-FZ-11B)
This area is bounded by masonry walls,   floor and ceiling. However, this portion of the Turbine Building communicates,   via unprotected openings, with other plant areas that the licensee has identified as separate fire areas. These penetrations are delineated in Appendix E of the licensee's April 3, 1985 report.
This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and cold shutdown paths 1, 2, and 3 as defined in the April 3,   1985 report. For a fire in this area, hot shutdown is achieved using hot shutdown path 1, with isolation condenser system "A" instead of "B".     Cold shutdown is achieved using path 1. Redundant shutdown-related circuits are located in a pit area where separation per the requirements of Section III.G.2 is not achieved.
The fire load in this area has been calculated to be approximately 586,000 BTU/sq. ft., which represents a fire severity of approximately 7 hours as determined by the ASTM E-119 time-temperature curve. The principal combustible material consists of turbine lube oil and cable insulation:
 
7590-01
                                    - 12 -
Existing fire protection includes a fire detection system, an automatic sprinkler system over cable trays; water spray systems for the lube oil storage tank; a sprinkler system for the bearing lift pumps; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee committed to reroute certain safe shutdown circuits outside of this fire area. The licensee also committed to fill the pit area where vulnerable shutdown-related cables are located with sand or with a fire-rated silicon foam.
Discussion (TB-FZ-11H)
This area is bounded by reinforced concrete walls, floor and ceiling.
However, this portion of the Turbine Building communicates,   via unprotected openings, with other plant locations that the licensee has identified as separate fire areas.
This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot and cold shutdown will be achieved using shutdown path 2. Shutdown path 2 circuits are located in a pit area where separation per the requirements of Section III.G.2 is not achieved.
There are no in-situ fire hazards in this location. The fire load as calculated by the licensee is negligible.
 
7590-01 Existing fire protection includes portable fire extinguishers and manual hose stations. The licensee committed to fill the pit area where vulnerable shutdown cables are located with sand or with a fire-rated silicon foam.
The licensee justified the exemptions in these locations on the basis that the fire hazard in the pits is negligible. Also, the fire hazard in the area around the pit is either negligible or mitigated by fire suppression systems. The licensee also justified these exemptions on the ability of the sand or silicon foam to prevent fire damage to redundant cables where they are vulnerable.
Evaluation The technical requirements of Section III.G.2 are not met in this area because redundant shutdown-related cables are not separated by a 3-hour barrier within the pit area.
Our concern was that because of the lack of adequate physical separation, the cables in these pits would be vulnerable to fire damage. However, because the pits are located in the floor and because products of combustion rise in a fire, we do not expect a fire outside the pit to have any significant affect on the cables within the pit. Also, because the pit area will be filled with sand or a fire-rated silicon foam, we have reasonable assurance that a fire will not originate within it or that a possible flammable liquid spill would affect the cables.
 
7590-01
                                      - 14 -
Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications will achieve an acceptable level of fire protection equivalent to that provided by Section III.G.2. Therefore, the licensee's request for exemption from a 3-hour fire barrier in the following locations should be granted:
Turbine Building Lube Oil Area (Fire Area TB-FZ-11B)
Turbine Building Basement & Mezzanine (Fire Area TB-FZ-11H)
Turbine Building Basement & Mezzanine (Fire Area TB-FZ-11H)
Exemption 3 (Fire Area TB-FZ-11D)
Exemption 3 (Fire Area TB-FZ-11D)
The licensee requested an exemption from the technical requirements of Section III.G.2 of Appendix R to the extent that it requires an area-wide automatic fire detection and suppression system.Discussion This area is bounded by walls, floor and ceiling of reinforced concrete., However, this portion of the Turbine Building communicates, through unprotected openings, with adjoining plant locations that the licensee has identified as separate fire areas. These penetrations are delineated in the licensee's April 3, 1985 report.This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2, and 3 as described in the above-referenced report.
The licensee requested an exemption from the technical requirements of Section III.G.2 of Appendix R to the extent that it requires an area-wide automatic fire detection and suppression system.
7590-01-15 -For a fire in this area both hot and cold shutdown is achieved using shutdown path 1. All required path 1 shutdown-related circuits are either protected by a 1-hour fire-rated barrier or the licensee has identified an alternate means which is independent of this area to safely shut down the plant.The fire load in this location has been calculated to be 12,400 BTU/sq.ft., which represents a fire severity of less than 10 minutes.Existing fire protection includes an automatic sprinkler system which protects cables in trays; a water spray system which covers the hydrogen seal oil unit; portable fire extinguishers and manual hose stations.
Discussion This area is bounded by walls, floor and ceiling of reinforced concrete.,
In the April 3, 1985 report, the licensee committed to relocate certain shutdown-related cables and to protect others in a 1-hour fire-rated barrier.The licensee justifies this exemption on the basis of the low fire loading, existing fire protection and proposed modifications.
However, this portion of the Turbine Building communicates,   through unprotected openings,   with adjoining plant locations that the licensee has identified as separate fire areas. These penetrations are delineated in the licensee's April 3,   1985 report.
This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2, and 3 as described in the above-referenced report.
 
7590-01 For a fire in this area both hot and cold shutdown is achieved using shutdown path 1. All required path 1 shutdown-related circuits are either protected by a 1-hour fire-rated barrier or the licensee has identified an alternate means which is independent of this area to safely shut down the plant.
The fire load in this location has been calculated to be 12,400 BTU/sq.ft.,
which represents a fire severity of less than 10 minutes.
Existing fire protection includes an automatic sprinkler system which protects cables in trays; a water spray system which covers the hydrogen seal oil unit; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee committed to relocate certain shutdown-related cables and to protect others in a 1-hour fire-rated barrier.
The licensee justifies this exemption on the basis of the low fire loading, existing fire protection and proposed modifications.
Evaluation The technical requirements of Section III.G. are not met in this area because of the absence of area-wide fire detection and suppression systems. Section III.G.3 is not met because a fixed fire detection and suppression system has not been provided for circuits for which an alternate shutdown capability has been provided.
Evaluation The technical requirements of Section III.G. are not met in this area because of the absence of area-wide fire detection and suppression systems. Section III.G.3 is not met because a fixed fire detection and suppression system has not been provided for circuits for which an alternate shutdown capability has been provided.
7590-01-16 -We were concerned that because this area was not protected by an area-wide fire detection and suppression system a fire would damage redundant shutdown systems. However, the fire load is low with combustible materials generally dispersed.
 
Where concentrated quantities of combustible materials exist, such as in cable trays and the hydrogen seal oil unit, these combustibles are protected by an automatic fire suppression system. Where no concentrated combustibles exist, we expect a fire in those locations to be of initially limited magnitude and extent. Upon discovery by plant operators, the fire brigade would be dispatched and would put out the fire using existing manual fire fighting equipment.
7590-01 We were concerned that because this area was not protected by an area-wide fire detection and suppression system a fire would damage redundant shutdown systems. However, the fire load is low with combustible materials generally dispersed. Where concentrated quantities of combustible materials exist, such as in cable trays and the hydrogen seal oil unit, these combustibles are protected by an automatic fire suppression system. Where no concentrated combustibles exist, we expect a fire in those locations to be of initially limited magnitude and extent. Upon discovery by plant operators, the fire brigade would be dispatched and would put out the fire using existing manual fire fighting equipment. If the fire occurred in the cable trays or in the seal oil unit, we expect the fire suppression systems to actuate and control fire spread. Until the arrival of the fire brigade and eventual fire extin-guishment, those required shutdown systems that are vulnerable to fire damage in this area are protected by a 1-hour fire barrier. Therefore, an area-wide fire detection and suppression system is not necessary to provide reasonable assurance that safe shutdown could be achieved and maintained.
If the fire occurred in the cable trays or in the seal oil unit, we expect the fire suppression systems to actuate and control fire spread. Until the arrival of the fire brigade and eventual fire extin-guishment, those required shutdown systems that are vulnerable to fire damage in this area are protected by a 1-hour fire barrier. Therefore, an area-wide fire detection and suppression system is not necessary to provide reasonable assurance that safe shutdown could be achieved and maintained.
Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from an area-wide fire detection and suppression system in the Turbine Building Basement Floor-South End (Fire Area TB-FZ-11D) should be granted.
Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from an area-wide fire detection and suppression system in the Turbine Building Basement Floor-South End (Fire Area TB-FZ-11D) should be granted.
7590-01-17 -Exemption 4 (Fire Area TB-FZ-11E)
 
The licensee requested an exemption from the technical requirements of Section III.G.3 of Appendix R to the extent that it requires a fixed fire detection system in an area for which an alternate shutdown capability has been provided.Discussion The area is bounded by reinforced concrete walls, floor and ceiling.However, this portion of the Turbine Building communicates, through unprotected openings, with other plant locations that the licensee has identified as separate fire areas.This fire area contains electrical circuits for hot shutdown paths 1, 2, 3 and 4 and for cold shutdown paths 1, 2, and 3 as defined in the licensee's April 3, 1985 report. For a fire in this area, hot and cold shutdown is achieved using shutdown path 1. For those required shutdown path 1 systems that are located in this area and may be damaged by a fire, the licensee has provided an alternate capability that is physically and electrically independent of this fire area.The fire load in this location has been calculated to be 8,100 BTU/sq. ft., which represents a fire severity of less than 7 minutes.Existing fire protection includes an automatic sprinkler system located throughout the condenser bay; portable fire extinguishers and manual hose stations.
7590-01 Exemption 4 (Fire Area TB-FZ-11E)
In the April 3, 1985 report, the licensee committed to reroute certain shutdown-related circuits outside of this fire area.
The licensee requested an exemption from the technical requirements of Section III.G.3 of Appendix R to the extent that it requires a fixed fire detection system in an area for which an alternate shutdown capability has been provided.
7590-01-18 -The licensee justified the exemption on the bases of the low fire load, the existing fire protection, the proposed modifications and the ability to safely shut down the plant if a fire should occur in this area.Evaluation The technical requirements of Section III.G.3 are not met in this area because of the absence of a fire detection systems.We were concerned that if a fire should occur, products of combustion would spread into adjoining fire areas and damage systems that would be necessary to safely shut down the plant. However, the fire load in this location is low. Combustible materials are dispersed throughout the area. We, therefore, expect a potential fire to develop slowly with initially low heat buildup and smoke generation.
Discussion The area is bounded by reinforced concrete walls, floor and ceiling.
Upon discovery of the fire, the plant fire brigade would respond and extinguish it using manual fire fighting equipment.
However, this portion of the Turbine Building communicates,   through unprotected openings, with other plant locations that the licensee has identified as separate fire areas.
If the fire increased in intensity prior to the arrival of the brigade, we expect the automatic sprinkler system to actuate to control the fire, to limit room temperature rise and to protect the shutdown systems that may be threatened.
This fire area contains electrical circuits for hot shutdown paths 1, 2, 3 and 4 and for cold shutdown paths 1, 2,   and 3 as defined in the licensee's April 3, 1985 report. For a fire in this area, hot and cold shutdown is achieved using shutdown path 1. For those required shutdown path 1 systems that are located in this area and may be damaged by a fire, the licensee has provided an alternate capability that is physically and electrically independent of this fire area.
If redundant shutdown systems were damaged within this location, an alternate shutdown capability exists that is outside this fire area. Because some of the walls and the ceiling contain unprotected openings we expect some smoke to propagate into adjoining fire areas. But because of the automatic sprinkler 7590-01-19 -system in this area and the low fire loadina, we conclude that the amount of smoke would not represent a significant threat to shutdown systems in the adjoining fire area. We, therefore, conclude that the absence of a smoke detector system in this area has no safety significance.
The fire load in this location has been calculated to be 8,100 BTU/sq. ft.,
Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications, will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from a fire detection system in the Turbine Buildinq Condenser Bay (Fire Area TR-FZ-1IE) should be granted.IV.Accordingly, the Commission has determined pursuant to 10 CFR 50.12(a), that (1) these exemptions as described in Section III are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security, and (2) special circumstances are present for these exemptions in that application of the regulation in these particular circumstances is not necessary to achieve the underlying purposes of Appendix R to 1O0CFR Part 50. Therefore, the Commission hereby grants the exemption requests identified in Section III above.Pursuant to 10 CFR 51.32 the Commission has determined that the grantinq of these exemptions will not result in any significant environmental impact (50 FR 49633, December 3, 1985).The Safety Evaluation dated March , 1986, related to this actton and the above referenced submittals by the licensee are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D.C. 20555, and at the Ocean County Library,,I01 Washinqton Street, Toms Rivers, New Jersey 08753.
which represents a fire severity of less than 7 minutes.
7590-01-20 -A copy of the Safety Evaluation may be obtained upon written request to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:
Existing fire protection includes an automatic sprinkler system located throughout the condenser bay; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee committed to reroute certain shutdown-related circuits outside of this fire area.
 
7590-01 The licensee justified the exemption on the bases of the low fire load, the existing fire protection, the proposed modifications and the ability to safely shut down the plant if a fire should occur in this area.
Evaluation The technical requirements of Section III.G.3 are not met in this area because of the absence of a fire detection systems.
We were concerned that if a fire should occur, products of combustion would spread into adjoining fire areas and damage systems that would be necessary to safely shut down the plant. However, the fire load in this location is low. Combustible materials are dispersed throughout the area. We, therefore, expect a potential fire to develop slowly with initially low heat buildup and smoke generation. Upon discovery of the fire, the plant fire brigade would respond and extinguish it using manual fire fighting equipment.     If the fire increased in intensity prior to the arrival of the brigade, we expect the automatic sprinkler system to actuate to control the fire, to limit room temperature rise and to protect the shutdown systems that may be threatened.
If redundant shutdown systems were damaged within this location, an alternate shutdown capability exists that is outside this fire area. Because some of the walls and the ceiling contain unprotected openings we expect some smoke to propagate into adjoining fire areas. But because of the automatic sprinkler
 
7590-01 system in this area and the low fire loadina, we conclude that the amount of smoke would not represent a significant threat to shutdown systems in the adjoining fire area. We, therefore,   conclude that the absence of a smoke detector system in this area has no safety significance.
Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications, will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3.     Therefore, the licensee's request for exemption from a fire detection system in the Turbine Buildinq Condenser Bay (Fire Area TR-FZ-1IE) should be granted.
IV.
Accordingly, the Commission has determined pursuant to 10 CFR 50.12(a),
that (1) these exemptions as described in Section III are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security, and (2) special circumstances are present for these exemptions in that application of the regulation in these particular circumstances is not necessary to achieve the underlying purposes of Appendix R to 1O0CFR Part 50.       Therefore, the Commission hereby grants the exemption requests identified in Section III above.
Pursuant to 10 CFR 51.32 the Commission has determined that the grantinq of these exemptions will not result in any significant environmental impact (50 FR 49633, December 3,   1985).
The Safety Evaluation dated March       , 1986, related to this actton and the above referenced submittals by the licensee are available for public inspection at the Commission's Public Document Room,       1717 H Street, N.W.,
Washington, D.C. 20555, and at the Ocean County Library,,I01 Washinqton Street, Toms Rivers, New Jersey     08753.
 
7590-01
                                  - 20 -
A copy of the Safety Evaluation may be obtained upon written request to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:
Director, Division of BWR Licensing.
Director, Division of BWR Licensing.
These exemptions are effective upon issuance.Dated at Bethesda, Maryland this24th day of March 1986.FOR THE NUCLEAR REGULATORY COMMISSION obert M. Bernero, Director Division of BWR Licensing Office of Nuclear Reactor Regulation  
These exemptions are effective upon issuance.
-UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING EXEMPTION FROM 10 CFR PART 50, APPENDIX R AND THE POST FIRE SAFE SHUTDOWN CAPABILITY GPU NUCLEAR CORPORATION AND JERSEY CENTRAL POWER & LIGHT COMPANY OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219  
Dated at Bethesda, Maryland this24th day of March 1986.
FOR THE NUCLEAR REGULATORY COMMISSION obert M. Bernero, Director Division of BWR Licensing Office of Nuclear Reactor Regulation
 
  -                             UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING EXEMPTION FROM 10 CFR PART 50, APPENDIX R AND THE POST FIRE SAFE SHUTDOWN CAPABILITY GPU NUCLEAR CORPORATION AND JERSEY CENTRAL POWER & LIGHT COMPANY OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219


==1.0 INTRODUCTION==
==1.0   INTRODUCTION==


By letter dated April 3, 1985, as supplemented by letters dated July 12 and October 9, 1985, the licensee submitted a revised Fire Hazards Analysis Report and Safe Shutdown Evaluation for Oyster Creek Nuclear Generating Station (Oyster Creek). This report supersedes the previous submittal dated December 16, 1983, and February 13 and May 3, 1984. Seven exemptions to the technical requirements of Section III.G of Appendix R to 10 CFR Part 50 were requested.
By letter dated April 3, 1985, as supplemented by letters dated July 12 and October 9, 1985, the licensee submitted a revised Fire Hazards Analysis Report and Safe Shutdown Evaluation for Oyster Creek Nuclear Generating Station (Oyster Creek). This report supersedes the previous submittal dated December 16, 1983, and February 13 and May 3, 1984. Seven exemptions to the technical requirements of Section III.G of Appendix R to 10 CFR Part 50 were requested.
Section III.G.2 of Appendix R requires that one train of cables and equipment necessary to achieved and maintain safe shutdown be maintained free of fire damage by one of the following means: a. Separation of cables and equipment and associated non-safety circuits of redundant trains by a fire barrier having a 3-hour rating. Structural steel forming a part
Section III.G.2 of Appendix R requires that one train of cables and equipment necessary to achieved and maintain safe shutdown be maintained free of fire damage by one of the following means:
: a. Separation of cables and equipment and associated non-safety circuits of redundant trains by a fire barrier having a 3-hour rating. Structural steel forming a part of or supporting such fire barriers shall be protected to provide fire resistance equivalent to that required of the barrier;
: b. Separation of cables and equipment and associated non-safety circuits of redundant trains by a horizontal distance of more than 20 feet with no intervening combustibles or fire hazards.      In addition, fire detectors and an automatic fire suppression system shall be installed in the fire area.
 


==SUMMARY==
==SUMMARY==
AND CONCLUSIONS Based on our evaluation, the licensee's request for exemption in the followinq areas should be qranted: I .2.3.4.5.6.7.8.Reactor Building Elevation 51 feet (Fire Area RB-FZ-lD)Reactor Building Elevation 23 feet (Fire Area RB-FZ-IE)
AND CONCLUSIONS Based on our evaluation, the licensee's request for exemption in the followinq areas should be qranted:
(1 of 2 exemptions)
I . Reactor Building Elevation 51 feet (Fire Area RB-FZ-lD)
Reactor Building Elevation
: 2. Reactor Building Elevation 23 feet (Fire Area RB-FZ-IE) (1 of 2 exemptions)
(-)19 feet (Fire Area RB-FZ-IF)Turbine Building Lube Oil Area (Fire Area TB-FZ-IIB)
: 3. Reactor Building Elevation (-)19 feet (Fire Area RB-FZ-IF)
Turbine Building Basement Floor South End (Fire Area TR-FZ-IID)
: 4. Turbine Building Lube Oil Area (Fire Area TB-FZ-IIB)
Turbine Buildinq Condenser Bay (Fire Area TB-FZ-IIE)
: 5. Turbine Building Basement Floor South End (Fire Area TR-FZ-IID)
Turbine Building Basement & Mezzanine (Fire Ara TB-FZ-IIH)
: 6. Turbine Buildinq Condenser Bay (Fire Area TB-FZ-IIE)
Office Building -480V Switchgear Room (Fire Area OB-FA-6E)
: 7. Turbine Building Basement & Mezzanine (Fire Ara TB-FZ-IIH)
(1 of 2 exemptions)
: 8. Office Building -480V Switchgear Room (Fire Area OB-FA-6E) (1 of 2 exemptions)
Based on our evaluation, we conclude that the exemptions requested for the following areas are not needed: 9. Reactor Building Elevation 23 feet (Fire Area RB-FZ-lE)
Based on our evaluation, we conclude that the exemptions requested for the following areas are not needed:
(1 of 2 exemptions)
: 9. Reactor Building Elevation 23 feet (Fire Area RB-FZ-lE) (1 of 2 exemptions)
: 10. Office Building -480V Switchgear Room (Fire Area OB-FA-68)
: 10. Office Building -480V Switchgear Room (Fire Area OB-FA-68) (1 of 2 exemptions)
(1 of 2 exemptions)
: 11. Office Building - MG Set Room (Fire Area OR-FA-8A) 12/13. Office Building - Battery & Electrical Tray Room (Fire Area OR-FZ-8C0 (2 exemptions)
: 11. Office Building -MG Set Room (Fire Area OR-FA-8A)12/13. Office Building -Battery & Electrical Tray Room (Fire Area OR-FZ-8C0 (2 exemptions)
Based on our evaluation, we also conclude that the proposed design for alternate safe shutdown capability at Oyster Creek is acceptable and that appropriate technical specifications on the minimum open-close cycles for the accumulators and accessibility of local air cylinders to be provided for air-operated valves required for safe shutdown, in Section 8.1.4 of the Safety Evaluation, be submitted before restart from this outaqe.
Based on our evaluation, we also conclude that the proposed design for alternate safe shutdown capability at Oyster Creek is acceptable and that appropriate technical specifications on the minimum open-close cycles for the accumulators and accessibility of local air cylinders to be provided for air-operated valves required for safe shutdown, in Section 8.1.4 of the Safety Evaluation, be submitted before restart from this outaqe.Principal Contributors:
Principal Contributors:     D. Kubicki, and R. Goel.
Dated: March 24, 1986 D. Kubicki, and R. Goel.
Dated: March 24, 1986
4 I It June 25, 1990 Docket No. 50-219 Mr. E. E. Fitzpatrick Vice President and Director Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731  
 
4 I   It June 25, 1990 Docket No. 50-219 Mr. E. E. Fitzpatrick Vice President and Director Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731


==Dear Mr. Fitzpatrick:==
==Dear Mr. Fitzpatrick:==


==SUBJECT:==
==SUBJECT:==
EXEMPTION FROM CERTAIN TECHNICAL REQUIREMENTS CONTAINED IN SECTION III.G OF APPENDIX R TO 10 CFR PART 50 (TAC NO. 62229)The Commission has issued exemptions from certain technical requirements contained In Section III.G of Appendix R to 10 CFR Part 50 for specific areas of the Oyster Creek Nuclear Generating Station in response to your letter of August 25, 1986.We have reviewed GPU Nuclear Corporation's (GPUN) request and the supporting technical information.
EXEMPTION FROM CERTAIN TECHNICAL REQUIREMENTS CONTAINED IN SECTION III.G OF APPENDIX R TO 10 CFR PART 50 (TAC NO. 62229)
We agree with GPUN and In each case we have concluded that the requested exemption Is valid and should be granted. Our Safety Evaluation regarding this matter is enclosed.This exemption is being forwarded to the Office of the Federal Register for publication.
The Commission has issued exemptions from certain technical requirements contained In Section III.G of Appendix R to 10 CFR Part 50 for specific areas of the Oyster Creek Nuclear Generating Station in response to your letter of August 25, 1986.
Sincerely, Ortginal signed by Alexander W. Dromerick, Senior Project Manager Project Directorate 1-4 Division of Reactor Projects -I/I1 Office of Nuclear Reactor Regulation
We have reviewed GPU Nuclear Corporation's (GPUN) request and the supporting technical information. We agree with GPUN and In each case we have concluded that the requested exemption Is valid and should be granted. Our Safety Evaluation regarding this matter is enclosed.
This exemption is being forwarded to the Office of the Federal Register for publication.
Sincerely, Ortginal signed by Alexander W. Dromerick, Senior Project Manager Project Directorate 1-4 Division of Reactor Projects - I/I1 Office of Nuclear Reactor Regulation


==Enclosures:==
==Enclosures:==
: 1. Exemption 2. Safety Evaluation cc w/enclosures:
: 1. Exemption
See next page I, NOC.r-, V'4 DISTRIBUTION ocKet-File..
: 2. Safety Evaluation cc w/enclosures:
NRC & Local PDRs Plant File T. Hurley/F.
See next page I,       DISTRIBUTION ocKet-File..                             S. Norris NOC      NRC & Local PDRs                         A. Dromerick
Miraglia(12GIS)
.r-,    Plant File                               OGC T. Hurley/F. Miraglia(12GIS)              J. Partlow(120G1)
C. Rossi(1IE4)
C. Rossi(1IE4)                           B. Boger (4)(PI-137)
E. Jordan (MNBB 3302)ACRS(1O)OC/LFMB S. Norris A. Dromerick OGC J. Partlow(120G1)
(14A2)
B. Boger (14A2)G. Hill (4)(PI-137)
E. Jordan (MNBB 3302)                     G. Hill ACRS(1O)                                 GPA/PA V'4    OC/LFMB                                  John Stolz SNow t,i.*r---                    J Sto'
GPA/PA John Stolz S Now t, -/17/90 DOCUMENT NAME: 5-h 2/90 TAV 62229 J Sto'it/90 4 I I Mr. E. E. Fitzpatrick Oyster Creek Nuclear Generating Station Oyster Creek Nuclear Generating Station ccl Ernest L. Blake Jr.Show, Pittman, 0otts and Trowbridge 2300 N Street, tN Washington, D.C. 20037 J.B. Liberman, Esquire Bishop, Libermmn, Cook, et al.1155 Avenue of the Americas New York, New York 10036 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 BWR Licensing Manager GPU Nuclear Corporation I Upper Pond Road Parsippany, New Jersey 07054 Mayor Lacey Township 88 West Lacey Road Forked River, New Jersey 08732 Licensing Hanager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.P. 0. Box 388 Forked River, flew Jersey 08731 Resident Inspector/o U.S. NRC Post Office Box 445 Forked River, New Jersey 08731 Commissiuner New Jersey Department of Energy 101 Commerce Street Newark, New Jersey 071C2 Kent Tosch, Chief New Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, New Jersey 08625 U11111U b~iILj) NULLtAI( KLUULAIURY WUMMI!)IUt1 In the Matter of (GPU NUCLEAR CORPORATION AND Docket No. 50-219 JERSEY CENTRAL POWER & LIGHT COMPANY)(Oyster Creek Nuclear Generating Station)EXE4PTION I.The GPU Nuclear Corporation and Jersey Central Power & Light Company (GPUN/the licensee) are the holders of Provisional Operating License No.DPR-16, which authorizes operation of the Oyster Creek Nuclear Generating Station, (the facility) at steady state reactor core power levels not In excess of 1930 megawatts thermal. The license provides, among other things, that Oyster Creek Nuclear Generating Station is subject to all rules, regulations, and Orders of the Commission now or hereafter in effect.The plant is a boiling water reactor (BWR) located at the licensee's site in Ocean County, New Jersey.II.On November 19, 1980, the NRC published a revised Code of Federal Regulations, Section 10 CFR 50.48 and a new Appendix R to 10 CFR Part 50%o regarding fire protection features of nuclear power plants. The revised 10 Section 50.48 and Appendix R became effective on February 17, 1981. Section 400 III of Appendix R contains fifteen (15) subsections, lettered A through 0, oo0 each of which specifies requirements for a particular aspect of the fire 04 protection features at a nuclear power plant. One of these fifteen 10 ocr 00 subsections, III.G, is the subject of this exemption request. Specifically, Section III.G requires that the plant have fire protection of shutdown capability. MII.By letter dated August 25, 1986, the licensee requested exemptions from certain technical requirements of Section 111.G of Appendix R to 10 CFR Part 50 for specific areas of the plant. The specific exemptions requested are as follows: 1. An exemption is requested from the requirement of Section 111.G.2 for not providing area wide automatic fire suppression in Fire Zone RB-FZ-1D, Elevation 51 feet.2. An exemption is requested from the requirement of Section 111.G.2 for not providing area wide automatic fire suppression in Fire Zone RB-FZ-1E, Elevation 23 feet.3. For the Fire Zone RB-FZ-1E, elevation 23 feet, a second exemption is requested from the requirement of Section 111.G.2 for not providing specific protection for the reactor scram system circuitry in the fire zone.4. For the Fire Zone RB-FZ-1E, elevation 23 feet, a third exemption is requested from the requirement of Section 11I.G.2 for not providing either additional separation from insitu combustibles or protection for CRD Hydraulic System Bypass Valve V-15-30.5. For the Fire Zone RB-FZ-1E, elevation 23 feet, a fourth exemption is requested from the requirement of Section 111.G.2 for not providing a one-hour fire barrier for drywell penetration box P-13.6. An exemption is requested from the requirement of Section 11I.G.2 for not providing area wide automatic suppression In Fire Zone RB-FX-1F, elevation
          -/17/90           5-h 2/90                                                   it/90 DOCUMENT NAME:      TAV 62229
(-19) feet.7. For Fire Zone RB-FZ-1F, elevation
 
(-19) feet, a second exemption is requested from the requirement of Section 11I.G.2 for not providing either additional separation from insitu combustibles or protection for core spray system valve Y-20-1.8. An exemption is requested from the requirement of Section III.G.2 for not providing a 3-hour rated fire barrier for the portion of circuit 14-25 that is located in Fire Zone TF-FZ-18 Turbine Lube Oil Storage, Pumping and Purification Areas.9. An exemption is requested from the requirements of Section 111.G.2 and 11I.G.3 for not providing automatic fire detection in Fire Zone TB-FZ-I1D.
4 I I Mr. E. E. Fitzpatrick                   Oyster Creek Nuclear Oyster Creek Nuclear Generating Station  Generating Station ccl Ernest L. Blake Jr.                     Resident Inspector Show, Pittman, 0otts and Trowbridge     /o U.S. NRC 2300 N Street, tN                       Post Office Box 445 Washington, D.C. 20037                 Forked River, New Jersey  08731 J.B. Liberman, Esquire                 Commissiuner Bishop, Libermmn, Cook, et al.         New Jersey Department of Energy 1155 Avenue of the Americas             101 Commerce Street New York, New York 10036               Newark, New Jersey 071C2 Kent Tosch, Chief Regional Administrator, Region I       New Jersey Department of Environmental U.S. Nuclear Regulatory Commission       Protection 475 Allendale Road                     Bureau of Nuclear Engineering King of Prussia, Pennsylvania 19406     CN 415 Trenton, New Jersey 08625 BWR Licensing Manager GPU Nuclear Corporation I Upper Pond Road Parsippany, New Jersey 07054 Mayor Lacey Township 88 West Lacey Road Forked River, New Jersey 08732 Licensing Hanager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.
P. 0. Box 388 Forked River, flew Jersey 08731
 
U11111U b~iILj) NULLtAI(   KLUULAIURY   WUMMI!)IUt1 In the Matter of (GPU NUCLEAR CORPORATION AND                               Docket No. 50-219 JERSEY CENTRAL POWER & LIGHT COMPANY)
(Oyster Creek Nuclear Generating Station)
EXE4PTION I.
The GPU Nuclear Corporation and Jersey Central Power & Light Company (GPUN/the licensee) are the holders of Provisional Operating License No.
DPR-16, which authorizes operation of the Oyster Creek Nuclear Generating Station, (the facility) at steady state reactor core power levels not In excess of 1930 megawatts thermal. The license provides, among other things, that Oyster Creek Nuclear Generating Station is subject to all rules, regulations, and Orders of the Commission now or hereafter in effect.
The plant is a boiling water reactor (BWR)         located at the licensee's site in Ocean County, New Jersey.
II.
On November 19, 1980, the NRC published a revised Code of Federal Regulations, Section 10 CFR 50.48 and a new Appendix R to 10 CFR Part 50
  %o   regarding fire protection features of nuclear power plants. The revised 10400  Section 50.48 and Appendix R became effective on February 17, 1981. Section III of Appendix R contains fifteen (15) subsections, lettered A through 0, oo0   each of which specifies requirements for a particular aspect of the fire 04   protection features at a nuclear power plant.         One of these fifteen 10 ocr 00   subsections, III.G, is the subject of this exemption request.           Specifically, Section III.G requires that the plant have fire protection of shutdown capability.
 
MII.
By letter dated August 25, 1986, the licensee requested exemptions from certain technical requirements of Section 111.G of Appendix R to 10 CFR Part 50 for specific areas of the plant. The specific exemptions requested are as follows:
: 1. An exemption is requested from the requirement of Section 111.G.2 for not providing area wide automatic fire suppression in Fire Zone RB-FZ-1D, Elevation 51 feet.
: 2. An exemption is requested from the requirement of Section 111.G.2 for not providing area wide automatic fire suppression in Fire Zone RB-FZ-1E, Elevation 23 feet.
: 3. For the Fire Zone RB-FZ-1E, elevation 23 feet, a second exemption is requested from the requirement of Section 111.G.2 for not providing specific protection for the reactor scram system circuitry in the fire zone.
: 4. For the Fire Zone RB-FZ-1E, elevation 23 feet, a third exemption is requested from the requirement of Section 11I.G.2 for not providing either additional separation from insitu combustibles or protection for CRD Hydraulic System Bypass Valve V-15-30.
: 5. For the Fire Zone RB-FZ-1E, elevation 23 feet, a fourth exemption is requested from the requirement of Section 111.G.2 for not providing a one-hour fire barrier for drywell penetration box P-13.
: 6. An exemption is requested from the requirement of Section 11I.G.2 for not providing area wide automatic suppression In Fire Zone RB-FX-1F, elevation (-19) feet.
: 7. For Fire Zone RB-FZ-1F, elevation (-19) feet, a second exemption is requested from the requirement of Section 11I.G.2 for not providing either additional separation from insitu combustibles or protection for core spray system valve Y-20-1.
: 8. An exemption is requested from the requirement of Section III.G.2 for not providing a 3-hour rated fire barrier for the portion of circuit 14-25 that is located in Fire Zone TF-FZ-18 Turbine Lube Oil Storage, Pumping and Purification Areas.
: 9. An exemption is requested from the requirements of Section 111.G.2 and 11I.G.3 for not providing automatic fire detection in Fire Zone TB-FZ-I1D.
: 10. An exemption is requested from the requirement of Section III.G.3 for not providing automatic fire detection in Fire Zone TB-FZ-11E.
: 10. An exemption is requested from the requirement of Section III.G.3 for not providing automatic fire detection in Fire Zone TB-FZ-11E.
: 11. An exemption is requested from the requirement of Section III.6.2 for not providing a 3-hour fire barrier for Train "AO electrical power system circuit 14-22.12. An exemption has been requested from the requirement of Section III.G.2 for not providing automatic fire suppression for the corridor area of new Fire Zone 08-FZ-6B, which has been created out of the Fire Area O8-FA-6.13. An exemption has been requested from the requirement of Section 111.G.2 for not providing that at least one safe shutdown path needed to maintain hot shutdown is free of fire damage without any repair. The exemption is requested to allow minor repairs outside of Fire Area 08-FZ-6A-480 Volt Switchgear Room to provide the required hot shutdown capability for the new Fire Zone OB-FZ-6 created out of Fire Area OB-FA-6.14. An exemption has been requested from the requirements of Section 111.G.2 for not providing automatic fire detection in Fire Zone O8-FZ-8A Motor Generator Set Room.15. For the Fire Zone O8-FZ-BA, a second exemption is requested from the requirement of Section III.G.2 for not providing specific protection for the reactor recirculation valve circuits contained in this fire zone, 16. An exemption is requested from the requirements of Section t1I.G.2 for not providing specific protection to reactor scram circuits located in Fire Zone 0B-FZ-8C-Battery Room, Tunnel and Electrical Tray Room, elevation 35 feet.17. For the Fire Zone 08-FZ-8C, a second exemption is requested from the provisions of Section III.G.2 for not providing specific protection to the reactor recirculation valve circuits contained in this fire zone.The staff has reviewed the licensee's request and the supporting technical information contained in the licensee's August 25, 1986 letter, in a Safety Evaluation, dated June 25, 1990 .For the reasons set out in that evaluation, the staff agrees with GPU Nuclear Corporation and in each case we have concluded that the requested exemptions are valid and should be granted.IV.Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12.this exemption is authorized by law, will not present an undue risk to the....................
: 11. An exemption is requested from the requirement of Section III.6.2 for not providing a 3-hour fire barrier for Train "AO electrical power system circuit 14-22.
. public health and safety, and is ;onsistent with the common defense and security.
: 12. An exemption has been requested from the requirement of Section III.G.2 for not providing automatic fire suppression for the corridor area of new Fire Zone 08-FZ-6B, which has been created out of the Fire Area O8-FA-6.
The Commission has further determined that special circumstances, as set forth in 10 CFR 50.12(a)(2)(il), are present Justifying the exemption, namely that the application of the regulation in the particular circumstances.
: 13. An exemption has been requested from the requirement of Section 111.G.2 for not providing that at least one safe shutdown path needed to maintain hot shutdown is free of fire damage without any repair. The exemption is requested to allow minor repairs outside of Fire Area 08-FZ-6A-480 Volt Switchgear Room to provide the required hot shutdown capability for the new Fire Zone OB-FZ-6 created out of Fire Area OB-FA-6.
Is not necessary to achieve the underlying purpose of the rule. The under-lying purpose of this rule Is to provide the plant with fire protection of shutdown capability.
: 14. An exemption has been requested from the requirements of Section 111.G.2 for not providing automatic fire detection in Fire Zone O8-FZ-8A Motor Generator Set Room.
As a result of the staff's review, the staff concludes that because modifications assure that safe shutdown will occur for each affected fire zone, strict compliance of the rule is not necessary to achieve fire protection shutdown capability.
: 15. For the Fire Zone O8-FZ-BA, a second exemption is requested from the requirement of Section III.G.2 for not providing specific protection for the reactor recirculation valve circuits contained in this fire zone,
Accordingly, the Commission hereby grants an exemption as described In Section III above from the requirements of Section III.G of Appendix R to 10 CFR Part 50.Pursuant to 10 CFR 51.32, the Commission has determined that the granting of this exemption will have no significant impact on the environment (S5 FR 25752).This exemption is effective upon issuance.FOR THE NUCLEAR REGULATORY COPIiSSION Division of Reactor ecs -1/Il Office of Kuclear Reactor Regulation Dated at Rockville, Maryland this 25th day of June , 1990.
: 16. An exemption is requested from the requirements of Section t1I.G.2 for not providing specific protection to reactor scram circuits located in Fire Zone 0B-FZ-8C-Battery Room, Tunnel and Electrical Tray Room, elevation 35 feet.
V I'NIILUSIA IL{ REGULATORY COMMISSION WASHINGTON.
: 17. For the Fire Zone 08-FZ-8C, a second exemption is requested from the provisions of Section III.G.2 for not providing specific protection to the reactor recirculation valve circuits contained in this fire zone.
D. C. 20655 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR EXEMPTIONS FROM SPECIFIC TECHNICAL REQUIREMENTS OF APPENDIX R TO 10 CFR PART 50 GPU NUCLEAR CORPORATION AND JERSEY CENTRAL POWER & LIGHT COMPANY OYSTER CREEK NUCLEAR GENERATING STATION POCKET NO. 50-219 1.0 Introduction By letter dated August 25, 1986, GPU Nuclear Corporation (the licensee) re-quested exemptions with support ng justification from certain of the technical requirements of Section III.G of Appendix R to 10 CFR Part 50 for specific areas of the plant.The staff's evaluation of the requested exemptions based on its review of the supporting justification is given below: 2.0 Fire Zone RB-FZ-ID.
The staff has reviewed the licensee's request and the supporting technical information contained in the licensee's August 25, 1986 letter, in a Safety Evaluation, dated   June 25, 1990   . For the reasons set out in that evaluation, the staff agrees with GPU Nuclear Corporation and in each case we have concluded that the requested exemptions are valid and should be granted.
Elevation 51 Feet 2.1 Exemption Requested An exemption is requested from the requirement of Section III.G.2 for not providing area wide automatic fire suppression in the fire zone.2.1.1 Evaluation Modifications provided to protect safe shutdown capability located in this fire zone include: o Relocating selected electrical circuits In conduit within the zone.o Providing selected electrical circuits run in conduits with one-hour fire rated barriers.o Relocating selected electrical circuits outside this fire zone.* Assuring that all manual actions required for hot and cold shutdown due to fire in this zone will be accomplished from outside this zone and are not affected by a fire in this zone.o Installation of water curtain sprinklers and open heat deluge water spray systems to protect open hatch and stairway penetrations through floors. In addition to the modifications listed above several other mitigating factors are available in this zone which preclude the need for area wide automatic fire suppression in the zone. These factors are: a Fire loading in the zone Is low with approximately 12,600 BTU per square foot, consisting primarily of cable insulation, and corresponds to a fire severity of about 10 minutes as measured on the ASTH C-119 time/temperature curve.0 Automatic ftire detection capability which alarms locally and In the control room and which covers approximately 90% of the zone with all combustibles (cable trays) protected.
IV.
' Two automatic open-head water spray deluge systems are installed to protect the cable trays and the open equipment hatch and open stairwell.
Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12.
this exemption is authorized by law, will not present an undue risk to the
 
public health and safety, and is ;onsistent with the common defense and security. The Commission has further determined that special circumstances, as set forth in 10 CFR 50.12(a)(2)(il), are present Justifying the exemption, namely that the application of the regulation in the particular circumstances.
Is not necessary to achieve the underlying purpose of the rule. The under-lying purpose of this rule Is to provide the plant with fire protection of shutdown capability. As a result of the staff's review, the staff concludes that because modifications assure that safe shutdown will occur for each affected fire zone, strict compliance of the rule is not necessary to achieve fire protection shutdown capability. Accordingly, the Commission hereby grants an exemption as described In Section III above from the requirements of Section III.G of Appendix R to 10 CFR Part 50.
Pursuant to 10 CFR 51.32, the Commission has determined that the granting of this exemption will have no significant impact on the environment (S5 FR 25752).
This exemption is effective upon issuance.
FOR THE NUCLEAR REGULATORY COPIiSSION Division of Reactor     ecs - 1/Il Office of Kuclear Reactor Regulation Dated at Rockville, Maryland this 25th day of June   , 1990.
 
V                           I'NIILUSIAIL
{     *NUCLEAR                REGULATORY COMMISSION WASHINGTON. D. C. 20655 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR EXEMPTIONS FROM SPECIFIC TECHNICAL REQUIREMENTS OF APPENDIX R TO 10 CFR PART 50 GPU NUCLEAR CORPORATION AND JERSEY CENTRAL POWER & LIGHT COMPANY OYSTER CREEK NUCLEAR GENERATING STATION POCKET NO. 50-219 1.0   Introduction By letter dated August 25, 1986, GPU Nuclear Corporation (the licensee) re-quested exemptions with support ng justification from certain of the technical requirements of Section III.G of Appendix R to 10 CFR Part 50 for specific areas of the plant.
The staff's evaluation of the requested exemptions based on its review of the supporting justification is given below:
2.0 Fire Zone RB-FZ-ID. Elevation 51 Feet 2.1   Exemption Requested An exemption is requested from the requirement of Section III.G.2 for not providing area wide automatic fire suppression in the fire zone.
2.1.1 Evaluation Modifications provided to protect safe shutdown capability located in this fire zone include:
o     Relocating selected electrical circuits In conduit within the zone.
o     Providing selected electrical circuits run in conduits with one-hour fire rated barriers.
o     Relocating selected electrical circuits outside this fire zone.
* Assuring that all manual actions required for hot and cold shutdown due to fire in this zone will be accomplished from outside this zone and are not affected by a fire in this zone.
o     Installation of water curtain sprinklers and open heat deluge water spray systems to protect open hatch and stairway penetrations through floors.
 
In addition to the modifications listed above several other mitigating factors are available in this zone which preclude the need for area wide automatic fire suppression in the zone. These factors are:
a     Fire loading in the zone Is low with approximately 12,600 BTU per square foot, consisting primarily of cable insulation, and corresponds to a fire severity of about 10 minutes as measured on the ASTH C-119 time/temperature curve.
0     Automatic ftire detection capability which alarms locally and In the control room and which covers approximately 90% of the zone with all combustibles (cable trays) protected.
'     Two automatic open-head water spray deluge systems are installed to protect the cable trays and the open equipment hatch and open stairwell.
ach system is controlled by Its own cross-zoned automatic ionization fire detection system. Standpipe and hose station and portable extinguishers for manual fire fighting capability supplement the automatic fire suppression capability.
ach system is controlled by Its own cross-zoned automatic ionization fire detection system. Standpipe and hose station and portable extinguishers for manual fire fighting capability supplement the automatic fire suppression capability.
2.1.2 Conclusion Based on the above evaluation, we conclude that any fire in Fire Zone RB-FZ-1D, elevation 51 feet, will be promptly detected and extinguished, and that automatic fire suppression need not be expanded to provide coverage for the entire zone. We, therefore, conclude that this requested exemption should be granted.3.0 Fire Zone RB FZ-1E. Elevation 23 Feet 3.1 Exemption Requested An exemption Is requested from the requirement of Section ;II.G.2 for not providing area wide automatic fire suppression in this fire zone.3.1.1 Evaluation Modifications provided for protection of safe shutdown capability and other mitigating factors in this fire zone, are the same as those described for Fire Zone RB.FZ-1D, elevation 51 feet, in Section 2.1.1 above, except that the fire loading (while still low) is approximately 20,000 BTU per square foot and corresponds to a fire severity of about 15 minutes as measured on the ASTh.E-119 time/temperature curve.3.1.2 Conclusion For the same reason outlined In Section 2.1.2 above, we conclude that this requested exemption should be granted.3.2 Exemption Requested For the Fire Zone RB-FZ-IE, elevation 23 feet, a second exemption is requested from the requirement of Section I11.G.2 for not providing specific protection for the reactor scram system circuitry in this fire zone.
2.1.2   Conclusion Based on the above evaluation, we conclude that any fire in Fire Zone RB-FZ-1D, elevation 51 feet, will be promptly detected and extinguished, and that automatic fire suppression need not be expanded to provide coverage for the entire zone. We, therefore, conclude that this requested exemption should be granted.
a W3-3.2.1 Evaluation In addition to the modifications provided for protection of safe shutdown capability for this fire zone, the following conditions apply specifically to the reactor scram system circuitry.
3.0   Fire Zone RB FZ-1E. Elevation 23 Feet 3.1   Exemption Requested An exemption Is requested from the requirement of Section ;II.G.2 for not providing area wide automatic fire suppression in this fire zone.
3.1.1   Evaluation Modifications provided for protection of safe shutdown capability and other mitigating factors in this fire zone, are the same as those described for Fire Zone RB.FZ-1D, elevation 51 feet, in Section 2.1.1 above, except that the fire loading (while still low) is approximately 20,000 BTU per square foot and corresponds to a fire severity of about 15 minutes as measured on the ASTh.
E-119 time/temperature curve.
3.1.2   Conclusion For the same reason outlined In Section 2.1.2 above, we conclude that this requested exemption should be granted.
3.2 Exemption Requested For the Fire Zone RB-FZ-IE, elevation 23 feet, a second exemption is requested from the requirement of Section I11.G.2 for not providing specific protection for the reactor scram system circuitry in this fire zone.
 
a W3-3.2.1   Evaluation In addition to the modifications provided for protection of safe shutdown capability for this fire zone, the following conditions apply specifically to the reactor scram system circuitry.
: 1. All reactor scram circuitry is contained In conduit except for the backup scram valve circuitry.
: 1. All reactor scram circuitry is contained In conduit except for the backup scram valve circuitry.
: 2. There are no external system circuits contained within the reactor scram conduits.3. Reactor scram circuits are normally energized until reactor scram is desired. At this time, power is interrupted and the scram discharge volume (SOV) vent and drain pilot valves, the scram pilot air valves, and the backup scram pilot valves are deenergized to scram the reactor.4. To achieve a reactor scram either the scram pilot air valves or the backup scram pilot valves are required to be deenergized.
: 2. There are no external system circuits contained within the reactor scram conduits.
: 5. The effects of fire on the reactor scram circuits in conduit would be to interrupt power and Initiate a scram.3.2.2 Conclusion For all of the reasons given above, we conclude that additional protection is not required for the reactor scram system circuitry and that the requested exemption should be granted.3.3 Exemption Requested For the Fire Zone RB-FZ-1E, elevation 23 feet, a third exemption is requested from the requirement of Section 111.G.2 for not providing either additional separation from insitu combustibles or protection for CRD Hydraulic System Bypass Valve V-15-30.3.3.1 Evaluation In addition to the modifications provided for the protection of safe shutdown capability for this zone, the following conditions apply specifically to the CRO Hydraulic System Bypass Valve V-1S-30.Valve V-15-30 will be manually opened to provide a flow path for coolant makeup to the vessel with loss of offsIte power. Makeup to the vessel is not required until 3 hours 24 minutes after scram based on the vessel inventory analysis.
: 3. Reactor scram circuits are normally energized until reactor scram is desired. At this time, power is interrupted and the scram discharge volume (SOV) vent and drain pilot valves, the scram pilot air valves, and the backup scram pilot valves are deenergized to scram the reactor.
Fusing of this valve as a result of a fire such that the valve cannot be operated is not considered a credible event because of the low fire loading in this zone, and the pipes connected to the valve being filled with water which provides ample heat sink capability to protect the valves.In addition the principle combustible (cable Insulation) is protected by automatic fixed water spray deluge system, and the valve is physically located within the spray area of the cable tray deluge system (approximately 6 feet below the trays and 1 foot to the side).
: 4. To achieve a reactor scram either the scram pilot air valves or the backup scram pilot valves are required to be deenergized.
a-4-3.3.2 Conclusion Since a fire in this fire zone would not be of significant magnitude, the duration of the fire will be short due to automatic extinguishment or extinguishment by the plant fire brigade. The valve is located within the spray area of a deluge system and the heat conduction to the water filled piping will provide cooling of the valve. The valve is not required to operate for almost 31 hours after the fire. Therefore manual operation of the valve is considered to be achievable without the addition of any further protection.
: 5. The effects of fire on the reactor scram circuits in conduit would be to interrupt power and Initiate a scram.
We therefore conclude that this exemption should be granted.3.4 Exemption Requested For the Fire Zone RB-FZ-1E, elevation 23 feet, a fourth exemption is requested from the requirement of Section 111.G.2 for not providing a one-hour fire barrier for drywell penetration box P-13.3.4.1 Evaluation In addition to the modifications provided for the protection of safe shutdown capability for this zone, the following conditions apply specifically to the drywell penetration box P-13.1. The only portion of the EfRV circuits located In this fire zone which could potentially be subjected to spurious operation due to a hot short Is contained Inside the penetration box. (A short to ground will not cause spurious actuation).
3.2.2   Conclusion For all of the reasons given above, we conclude that additional protection is not required for the reactor scram system circuitry and that the requested exemption should be granted.
A tire cannot be initiated Inside the penetration boxes as the result of electrical fault protective devices.2. The penetration box is located approximately five (5) feet below the bottom of the fire zone ctiling. Fire detection utilized to actuate the cable tray deluge water spray systems is located on the ceiling in the area of the penetration box (area-wide Ionization detection is provided In the fire zone). Therefore afire in the zone will be detected and alarmed prior to any significant heat buildup at the elevation of the penetration box.3. The penetration box Is effectively within the spray pattern of the existing automatic cable tray deluge water spray system. The water spray will provide cooling and prevent the propagation of fire from outside into the penetration box.A fire in this zone would not be of significant magnitude, and the duration of the fire will be short due to self extinguishment, extinguishment by the deluge system, or extinguishment by the plant fire brigade. Consequently the general heat buildup in the ared due to the fire will be limited. The addition of fire barriers to the cables (not in conduit) could cause damage to the cables due to the inability to add adequate cable supports because of severe space limitations.
3.3 Exemption Requested For the Fire Zone RB-FZ-1E, elevation 23 feet, a third exemption is requested from the requirement of Section 111.G.2 for not providing either additional separation from insitu combustibles or protection for CRD Hydraulic System Bypass Valve V-15-30.
The box Is located within the spray area of the cable tray deluge system which will further limit any heat buildup inside the penetration box. Since a fire Initiated inside the penetration box is not a credible event and since the effects on the penetration box due to an outside fire will be limited by the low fire loading and water spray system, the addition of a fire barrier will not increase the level of lire protection safety above that provided by existing fire protectiott features in order to achieve safe shutdown.3.4.2 Conclusion For all of the reasons cited In the evaluation above, we conclude that this exemption should be granted.4.0 FieZone RB-FZ.IF.
3.3.1   Evaluation In addition to the modifications provided for the protection of safe shutdown capability for this zone, the following conditions apply specifically to the CRO Hydraulic System Bypass Valve V-1S-30.
Elevation.
Valve V-15-30 will be manually opened to provide a flow path for coolant makeup to the vessel with loss of offsIte power. Makeup to the vessel is not required until 3 hours 24 minutes after scram based on the vessel inventory analysis. Fusing of this valve as a result of a fire such that the valve cannot be operated is not considered a credible event because of the low fire loading in this zone, and the pipes connected to the valve being filled with water which provides ample heat sink capability to protect the valves.
(:) .;19 fet 4.1 Exemption Reqguested An exemption Is requested from the requirement of Section III.G.2 for not providing area wide automatic suppression in this fire zone.4.1.1 Evaluation The fire loading In this zone is negligible, consisting primarily of cable insulation at about 1500 STU per square foot. This corresponds to a fire severity of about two minutes as measured on the ASTM E-119 time/temperature curve. Auttnlatic fire detection capability, which alarms locally and in the control room, is located In this fire zone. Portable extinguishers and hose stations are provide for manual fire fighting operations.
In addition the principle combustible (cable Insulation) is protected by automatic fixed water spray deluge system, and the valve is physically located within the spray area of the cable tray deluge system (approximately 6 feet below the trays and 1 foot to the side).
A fire In this zone would not be of significant size or duration and would not compromise the one-hour fire rated barriers provided for protection of the safe shutdown ccmponents.
 
In addition, the automatic fire detection available in this fire zone is expected to alert the fire brigade to the onset of fire in the zone so that prompt manual suppression of any fire in the zone can be accomplished.
a 3.3.2   Conclusion Since a fire in this fire zone would not be of significant magnitude, the duration of the fire will be short due to automatic extinguishment or extinguishment by the plant fire brigade. The valve is located within the spray area of a deluge system and the heat conduction to the water filled piping will provide cooling of the valve. The valve is not required to operate for almost 31 hours after the fire. Therefore manual operation of the valve is considered to be achievable without the addition of any further protection.
4.1.2 Conclusion For all of the reasons listed in the evaluation above, we conclude that automatic fire suppression throughout this zone is not required and therefore, this requested exemption should be granted.4.2 Exemption Requested For the Fire Zone RB-FZ-IF, elevation
We therefore conclude that this exemption should be granted.
(-19) feet. a second exemption Is requested from the requirement of Section IIJ.G.2 for not providing either additional separation from insitu combustibles or protection for core spray system valve V-20-1.
3.4   Exemption Requested For the Fire Zone RB-FZ-1E, elevation 23 feet, a fourth exemption is requested from the requirement of Section 111.G.2 for not providing a one-hour fire barrier for drywell penetration box P-13.
8-6 4.2.1 Evaluation In addition to the conditions described above in Section 4.1.1 for this fire zone, the following conditions apply specifically to valve V-20-I in the core spray system.Manual action required for hot and cold shutdown for a fire in this zone will be accomplished outside of the fire zone except for opening valve V-20-1.This valve, located in Room RB-FZ-1F3 (North-West corner of room in the same fire zone) must be opened following a fire in RB-FZ-1F3 but only within 3 hours 24 minutes after scram to complete the alignment of the condensate storage tank to the core spray pump NZO1B. Other manual actions will not be affected by a fire In this zone.Fusing of this valve by heat from a fire in this zone resulting in the valve becoming inoperable is considered not credible because of (1) the low fuel loading in the zone, (2) the provision of automatic fire detection and manual fire suppression capability, and (3) the heat sink capability of the water filled piping connected to the valve.4.2.2 Conclusion Based on the above evaluation, we conclude that the provision of additional protection for this valve will not significantly enhance fire protection in this zone and, therefore, we recommend that this requested exemption be granted.5.0 Fire Zone TF-FZ-11B  
3.4.1   Evaluation In addition to the modifications provided for the protection of safe shutdown capability for this zone, the following conditions apply specifically to the drywell penetration box P-13.
-Turbine Lube Oil Storage, Pumping and Purification Areas 5.1 Exemption Requested An exemption is requested from the requirement of Section III.G.2 for not providing a 3-hour rated fire barrier for the portion of circuit 14-25 that is located in this fire zone.5.2 Evaluation A pull pit beneath the floor of a corridor in the turbine building contains circuit 14-25. The floor and walls of this pull pit are of sand, and all electrical cables routed through the pit are run in conduits.
: 1. The only portion of the EfRV circuits located In this fire zone which could potentially be subjected to spurious operation due to a hot short Is contained Inside the penetration box. (A short to ground will not cause spurious actuation). A tire cannot be initiated Inside the penetration boxes as the result of electrical fault protective devices.
Physical separation of the pit, and therefore circuit 14-25, from TB-FZ-11B, consists of (1) an aluminum cover plate bolted in place near the bottom of the floor slab penetration, (2) six inch minimum depth RTY foam floor penetration seal, and (3) a steel plate cover at the top of the floor slab, flush with the floor slab. Based on the separation of this pull pit from the remainder of the Fire Zone TB-FZ-1IB by the minimum 6-inches of RTV foam; the lack of combustibles in the pit; all cables routed in conduits; negligible fuel loading in the area above the pit; limited access to the pit because of high radiation levels and consequent low probability for an exposure fire due to transient combustibles; and the fact that all conduits enter and leave the pit through the sand walls-fire is considered not to be a credible event in this pull pit. Therefore, further fire protection modifications or additional protection for circuit 14.25 in the pull pit is not required.5.3 Conclusion Based upon the above evaluation, we conclude that further fire protection modifications or additional protection for circuit 14-25 in the pull pit in Fire Zone TB-FZ-1SB is not required and this requested exemption should be granted.6.0 Fire Zone TB-FZ-1ID 6.1 Exemption Requested An exemption Is requested from the requirements of Section III.G.2 and IIt.G.3 for not providing automatic fire detection in this zone.6.2 Evaluation Selected "B" train safe shutdown circuits have been relocated and/or protected by one-hour rated fire barriers.
: 2. The penetration box is located approximately five (5) feet below the bottom of the fire zone ctiling. Fire detection utilized to actuate the cable tray deluge water spray systems is located on the ceiling in the area of the penetration box (area-wide Ionization detection is provided In the fire zone). Therefore afire in the zone will be detected and alarmed prior to any significant heat buildup at the elevation of the penetration box.
Manual actions required for hot and cold shutdown due to a fire in this zone will be accomplished outside of this zone and will not be affected by any fire in this zone. In addition, the fire loading In this zone is low (about 22,000 BTU per square foot) and corresponds to a fire severity of about 16 minutes as measured on the ASTM E-119 time/temperature curve. This low fuel loading consists primarily of cable insulation, lubricating and hydrogen seal oil, and transient combustibles.
: 3. The penetration box Is effectively within the spray pattern of the existing automatic cable tray deluge water spray system. The water spray will provide cooling and prevent the propagation of fire from outside into the penetration box.
Fire protection provided in this fire zone consists of an area wide automatic sprinkler system and a localized automatic sprinkler system installed to protect the hydrogen seal oil units. Both of these sprinkler systems alarm in the control room and thus function also as a fire alarm system, although not as an early warning detection system.6.3 Conclusion Based upon the above evaluation, we conclude that any fire that might occur will not be of significant magnitude or duration, and that it will be promptly extinguished by one of the two automatic sprinkler systems installed in this fire zone. In addition, when the sprinklers operate, an alarm will sound in the control room, promptly alerting the fire brigade who will respond for any manual fire fighting or salvage operations that remain. For the above reasons we conclude that the addition of a zone wide fire detection system will not provide significantly more fire protection than what is already available, and therefore, the requested exemption should be granted. 7.0 Fire Zone TB-FZ-IIE 7.1 Exemption Requested An exemption is requested from the requirement of Section III.G.3 for not providing autcmatic fire detection in this zone.7.2 Evaluation The fire loading in this zone consists of electrical cable insulation in trays and minor amounts of lubrication oil in pumps. The fire loading is low (approximately 8,000 BTU per square foot) and corresponds to a fire severity of about 7 minutes as measured on the ASTM E-119 time/temperature curve. In addition, an automatic closed head sprinkler system protects all areas west of columns Line F and includes all cable trays. Operation of the sprinkler system alarms in the control room which serves the function of an automatic detection system. Such alarm will promptly alert the fire brigade for performing any residual fire fighting operations.
A fire in this zone would not be of significant magnitude, and the duration of the fire will be short due to self extinguishment, extinguishment by the deluge system, or extinguishment by the plant fire brigade. Consequently the general heat buildup in the ared due to the fire will be limited. The addition of fire barriers to the cables (not in conduit) could cause damage to the cables due to
7.3 Conclusion Based upon the above evaluation, we conclude that any fire that might occur will not be of significant magnitude or duration.
 
Also, any such fire will be promptly extinguished by operation of the automatic sprinkler systems. If for soue reason, the automatic sprinklers are able only to control the fire but not achieve extinguishment, the fire brigade, having been alerted as a result of alarm in the control room from the sprinkler system, will be able to achieve prompt extinguishment.
the inability to add adequate cable supports because of severe space limitations. The box Is located within the spray area of the cable tray deluge system which will further limit any heat buildup inside the penetration box. Since a fire Initiated inside the penetration box is not a credible event and since the effects on the penetration box due to an outside fire will be limited by the low fire loading and water spray system, the addition of a fire barrier will not increase the level of lire protection safety above that provided by existing fire protectiott features in order to achieve safe shutdown.
Therefore, we conclude that the addition of zone wide fire detection capability will not provide significantly more fire protection than what has already been provided and, therefore, the requested exemption should be granted.8.0 Fire  
3.4.2   Conclusion For all of the reasons cited In the evaluation above, we conclude that this exemption should be granted.
-.8ase'ent.and .ezzanineSoutheast End 8.1 ested An exemption Is requested from the requirement of Section III.G.2 for not providing a 3-hour fire rated barrier for Train "A" electrical power system circuit 14.22.8,2 Evalution The Train WA electrical power system circuit 14-22 cables in this fire zone are located in a pull pit located beneath the basement floor. It is similar to the pit described in Section 5 above. All of the cables in the pull pit are routed in electrical conduit. The pit has been filled with sand to provide the conduits with a minimum cover of six-inches.
4.0 FieZone RB-FZ.IF. Elevation. (:)   .;19 fet 4.1 Exemption Reqguested An exemption Is requested from the requirement of Section III.G.2 for not providing area wide automatic suppression in this fire zone.
Thus, there are no exposed combustibles in the pull pit. A steel plate flush with the zone floor covers the entrance to the pull pit. 8.3 Conclusion We conclude from the above evaluation that the lack of exposed cowbustibles in the pull pit, the fact that the electrical cables for the Train "A" electrical power system circuit 14-22 are routed in conduits, and the fact that these conduits have a minimum cover of 6-inches of sand and the steel plate cover to the pull pit, provide protectiorn at least equivalent to a three-hour fire rated barrier. Therefore, the provision of a 3-hour rated fire barrier between the cables in the pull pit and the remainder of Fire Zone TB-FZ-11H would not provide significantly more fire protection than what Is already available.
4.1.1   Evaluation The fire loading In this zone is negligible, consisting primarily of cable insulation at about 1500 STU per square foot. This corresponds to a fire severity of about two minutes as measured on the ASTM E-119 time/temperature curve. Auttnlatic fire detection capability, which alarms locally and in the control room, is located In this fire zone. Portable extinguishers and hose stations are provide for manual fire fighting operations.
Therefore, this requested exemption should be granted.9.0 Area 06-FA-6 -480 Volt Switchgear Room 9.1 Exetion Requested An exemption has been requested from the requirement of Section III.G.2 for not providing automatic fire suppression for the corridor area of new Fire Zone OB-FZ-68, which has been created out of the Fire Area OB-FA-6.9.1.1 Evaluation This requested exemption has already been accepted by the staff. It was discussed and evaluated In Section 2.0-2.4 of our safety evaluation that was transmitted to the licensee by ?IRC letter dated March 24, 1986.9.2 Exemption-Requested An exemption has been requested from the requirement of Section III.G.2 for not providing that at least one safe shutdown path needed to maintain hot shutdown is free of fire damage without any repair. The exemption Is requested to allow minor repairs outside of this zone to provide the required hot shutdown capability for the new Fire Zone OB-FZ-6A created out of Fire Area OB-FA-6.9.2.1 Evaluation The licensee stated that the 480V switchgear room, Fire Area 0B-FA-6, will be modified to create two separate Fire Zones, OB-FZ-6A and 6-B. Fire Zone OB-FZ-6A and 6B will contain the Bus 480V USS 1A2 and the redundant Bus 48QV USS 1B2 respectively.
A fire In this zone would not be of significant size or duration and would not compromise the one-hour fire rated barriers provided for protection of the safe shutdown ccmponents. In addition, the automatic fire detection available in this fire zone is expected to alert the fire brigade to the onset of fire in the zone so that prompt manual suppression of any fire in the zone can be accomplished.
For a fire in Fire Zone OB-FZ-6A, the licensee will use hot shutdown path 1 which, In turn, requires the Bus USS 1B2 to power the needed equipment for the hot shutdown path. The proposed design incorporates a cable tie between the buses. Consequently a fire Induced fault in the bus cable tie in Fire Zone OB-FZ-6A can result in loss of the Bus USS 1B2 and, therefore, comprise the hot shutdown capability for the Fire Zone OB-FZ-6A.Therefore, the licensee has proposed the following operator actions in the sequence described below outside the Fire Zone OB-FZ-6A to restore the Eus USS 182 and thereby ensure hot shutdown capability for the Fire Zone OB-FZ-6A. (1) Veenergize the Bus USS 1B2 locally in the Fire Zone OB-FZ-6B.(2) In the control room, trip the feeder breaker at 4160 switchgear IC feeding the Bus USS 1A2.(3) Disconnect the cable bus tie which Is directly bolted to the bus bars in USS IB2 In the Fire Zone OB-FZ-6B.(4) Reenergize the Bus USS 182.In their telephone conversations with us on February 16 and 20, 1989, the licensee stated that the above manual actions will require 20 minutes to complete and that they will be performed itmrediately after a fire in Fire Zone OB-FZ-6A.
4.1.2   Conclusion For all of the reasons listed in the evaluation above, we conclude that automatic fire suppression throughout this zone is not required and therefore, this requested exemption should be granted.
The licensee further stated that the plant areas where the manual acttors have to be performed will be easily accessible and will not involve any transient through the affected Fire Zone OB-FZ-6A.In their submittal, the licensee examined the impact of temporary unavailability of hot shutdown equipment in Fire Zone OB-FZ-6A resulting from short term loss of the Bus USS 1B2 which powers these equipment.
4.2   Exemption Requested For the Fire Zone RB-FZ-IF, elevation (-19) feet. a second exemption Is requested from the requirement of Section IIJ.G.2 for not providing either additional separation from insitu combustibles or protection for core spray system valve V-20-1.
These are"BO 480V switchgear HVAC supply andexhaust fans, reactor coolant makeup CRD pump INC08B, A/B battery room exhaust fan and static charger and MG set B. The licensee determined that reactor coolant makeup (because of available vessel water Inventory) and the battery room exhaust fan will net be needed for at least 3 hours after scram by which time the Bus USS IB2 would have been restored ano the above components powered by the bus; and the static charger and MG set B will not be needed for quite some time after scram since the DC loads supplied by the 125 VDC Distribution Center B can be powered from the station batteries alone for a time period well in excess of the time required to restore the Bus USS 1B2. The licensee further determtirned that since the rajority of the electrical loads in the Zone OB-FZ-6B are powered by the Bus USS 162 the loss of the bus will result in significant reduction in heat output In the zone and consequently the need for the 480Y switchgear supply and exhaust fans will not arise for a time period well in excess of the time required to restore the Bus USS 182 and power the fans.9.2.2 Conclusion Based on the above, we find that the identified operator actions (1) involve only one minor hot shutdown repair, namely, disconnecting the cable bus tie, 12) can be completed well before an unrecoverable reactor condition occurs, 3) do not involve any transit through the fire affected zone, and (4) do not require any offsite components or tools. For the above reasons, we have determined that with the completion of all the identified operator actions Including the minor repair in a timely manner, there is reasonable assurance that hot shutdown can be achieved and maintained following a fire In Fire Zone OB-FZ-GA.
 
Therefore, the requested exemption for performing the identified hot shutdown repair should be granted. 10.0 Fir one OB-FZ-8A .Hotor-enerator.Set Room 10.1 Exmption Reguested An exemption has been requested from the requirements of Section TTI.G.2 for not providing automatic fire detection in this fire zone.10.1.1 Evaluation The zone Is protected by an automatic fire suppression system (autcmatic sprinkler) which also serves as an automatic fire detection system (although not providing an early warning), since actuation of the system alarms in the control room. Such system actuation and automatic alarm will result in promptly alerting the plant fire brigade for performing any required fire fighting actions. In addition, the combustible fuel loading in the area is low and corresponds to a fire severity of about 35 minutes as measured on the ASTM E-119 time/temperature curve. Also, the licensee has rerouted some circuits within this fire zone in conduits and has rerouted other circuits out of the zone to assure that at least one train of safe shutdown circuits within the zone will not be damaged by any fire that may occur in this zone.10.1.2 Conclusion Based on the above evaluation, we conclude that any fire which might occur in Fire Zone OB-FZ-SA will be relatively small and will be controlled by the automatic sprikler system. Since operation of the sprinkler system will alarm in the control room, we expect prompt notification of, and response by, the fire brigade for arsy required manual fire fighting activities.
8-6 4.2.1   Evaluation In addition to the conditions described above in Section 4.1.1 for this fire zone, the following conditions apply specifically to valve V-20-I in the core spray system.
Therefore, the installation of a separate automatic fire detection system would not provide a significant Increase in fire protection for this fire zone and the requested exemption should be granted.10.2 Exemption-Resuested For the Fire Zone OB-FZ-8A, a second exemption is requested from the requirement of Section III.G.2 for not providing specific protection for the reactor recirculation valve circuits contained in this fire zone.10.2.1 Evaluation In addition to the information given above in Section 10.1.1 for this fire zone, the following information addresses the issue of protecting the reactor recirculation valve circuits.A. There are a total of five (5) recirculation loops located in two fire zones (OB-FZ-8A and OB-FZ-8C).
Manual action required for hot and cold shutdown for a fire in this zone will be accomplished outside of the fire zone except for opening valve V-20-1.
All five loops are open during normal power optration.
This valve, located in Room RB-FZ-1F3 (North-West corner of room in the same fire zone) must be opened following a fire in RB-FZ-1F3 but only within 3 hours 24 minutes after scram to complete the alignment of the condensate storage tank to the core spray pump NZO1B. Other manual actions will not be affected by a fire In this zone.
B. The Oyster Creek Technical Specificatiors require four (4) loops to be open during normal power operation.  
Fusing of this valve by heat from a fire in this zone resulting in the valve becoming inoperable is considered not credible because of (1) the low fuel loading in the zone, (2) the provision of automatic fire detection and manual fire suppression capability, and (3) the heat sink capability of the water filled piping connected to the valve.
.1-12-C. Two (2) recirculation loops are required to be open to provide natural circulation through the core for safe shutdown.D. Assuming fire damage to the valve for one recirculation loop, three (3) loops will remain open to provide natural circulation cooling of the core for safe shutdown.10.2.2 Conclusion Based on the evaluations in Sections 10.1.1 and 10.2.1 above, we conclude that any fire which might occur In Fire Zone OB-FZ-BA will not damage more than one reactor recirculation loop valve circuit. Since the remaining three open recirculation loops provide sufficient natural coolant circulation through the core to achieve and maintain safe shutdown, the requested exemption should be granted.11.0 Fire Zone OoEZ.8C...BatteryRoom.
4.2.2   Conclusion Based on the above evaluation, we conclude that the provision of additional protection for this valve will not significantly enhance fire protection in this zone and, therefore, we recommend that this requested exemption be granted.
Tunnel.and.Electricl.Tray.RoomElevation
5.0 Fire Zone TF-FZ-11B   - Turbine Lube Oil Storage, Pumping and Purification Areas 5.1   Exemption Requested An exemption is requested from the requirement of Section III.G.2 for not providing a 3-hour rated fire barrier for the portion of circuit 14-25 that is located in this fire zone.
.... ......."...... ..11.1 Exf1ptoLnR!3sted An exemption is requested from the requirements of Section 11I.G.2 for not providing specific protection to reactor scram circuits located in this fire zone.11.1.1 Evaluation The licensee has identified the battery room ventilation system modifications, instrument modifications and electrical modifications to assure safe shutdown capability for this zore. The licensee further stated that all manual actions for hot and cold shutdown will be accomplished from outside of this fire zone and will not be affected by a fire In this zone. Additionally, the licensee provided the following Justification to support this exemption request: A. All reactor scram circuitry is contained In conduit except for the backup scram valve circuitry.
5.2   Evaluation A pull pit beneath the floor of a corridor in the turbine building contains circuit 14-25. The floor and walls of this pull pit are of sand, and all electrical cables routed through the pit are run in conduits. Physical separation of the pit, and therefore circuit 14-25, from TB-FZ-11B, consists of (1) an aluminum cover plate bolted in place near the bottom of the floor slab penetration, (2) six inch minimum depth RTY foam floor penetration seal, and (3) a steel plate cover at the top of the floor slab, flush with the floor slab.
B. There are no external system circuits contained within the reactor scram conduits.C. Reactor scram circuits are normally energized until a reactor scram Is desired. At this time, power Is interrupted and the scram discharge volume (SDV) vent and drain pilot valves, scram pilot air valves and the backup scram pilot valves are deenergized to scram the reactor.D. To achieve a reactor scram either the scram pilot air valves or the backup scram pilot valves are required to be deenergized.
 
E. The effects of fire on the reactor scram circuits in conduit would be to Interrupt power and initiate a scram. 11.1.2 Conclusion Based on the above evaluation we conclude that the licensee's Justification for this requested exemption is valid and that it should be granted.11.2 Exemption Requested For the Fire Zone OB-FZ-8C, a second exemption Is requested from the provisions of Section II1.G.2 for not providing specific protection to the reactor recirculation valve circuits contained in this fire zone.11.2.1 Evaluation The situation for the reactor recirculation valve circuits located in this zone is similar to that described in Section 10.2.1 for the reactor recirculation valve circuits located in Fire Zone OB-FZ-8A and the same technical reasons which support that exemption request apply here also.11.2.2 Conclusion Based on the above, we conclude that this requested exemption should be granted.Dated: June 25. 1990 Principal Contributor:
Based on the separation of this pull pit from the remainder of the Fire Zone TB-FZ-1IB by the minimum 6-inches of RTV foam; the lack of combustibles in the pit; all cables routed in conduits; negligible fuel loading in the area above the pit; limited access to the pit because of high radiation levels and consequent low probability for an exposure fire due to transient combustibles; and the fact that all conduits enter and leave the pit through the sand walls
D. Notley}}
- fire is considered not to be a credible event in this pull pit. Therefore, further fire protection modifications or additional protection for circuit 14.25 in the pull pit is not required.
5.3   Conclusion Based upon the above evaluation, we conclude that further fire protection modifications or additional protection for circuit 14-25 in the pull pit in Fire Zone TB-FZ-1SB is not required and this requested exemption should be granted.
6.0 Fire Zone TB-FZ-1ID 6.1   Exemption Requested An exemption Is requested from the requirements of Section III.G.2 and IIt.G.3 for not providing automatic fire detection in this zone.
6.2   Evaluation Selected "B" train safe shutdown circuits have been relocated and/or protected by one-hour rated fire barriers. Manual actions required for hot and cold shutdown due to a fire in this zone will be accomplished outside of this zone and will not be affected by any fire in this zone. In addition, the fire loading In this zone is low (about 22,000 BTU per square foot) and corresponds to a fire severity of about 16 minutes as measured on the ASTM E-119 time/temperature curve. This low fuel loading consists primarily of cable insulation, lubricating and hydrogen seal oil, and transient combustibles.
Fire protection provided in this fire zone consists of an area wide automatic sprinkler system and a localized automatic sprinkler system installed to protect the hydrogen seal oil units. Both   of these sprinkler systems alarm in the control room and thus function also as a fire alarm system, although not as an early warning detection system.
6.3   Conclusion Based upon the above evaluation, we conclude that any fire that might occur will not be of significant magnitude or duration, and that it will be promptly extinguished by one of the two automatic sprinkler systems installed in this fire zone. In addition, when the sprinklers operate, an alarm will sound in the control room, promptly alerting the fire brigade who will respond for any manual fire fighting or salvage operations that remain. For the above reasons we conclude that the addition of a zone wide fire detection system will not provide significantly more fire protection than what is already available, and therefore, the requested exemption should be granted.
 
7.0   Fire Zone TB-FZ-IIE 7.1   Exemption Requested An exemption is requested from the requirement of Section III.G.3 for not providing autcmatic fire detection in this zone.
7.2 Evaluation The fire loading in this zone consists of electrical cable insulation in trays and minor amounts of lubrication oil in pumps. The fire loading is low (approximately 8,000 BTU per square foot) and corresponds to a fire severity of about 7 minutes as measured on the ASTM E-119 time/temperature curve. In addition, an automatic closed head sprinkler system protects all areas west of columns Line F and includes all cable trays. Operation of the sprinkler system alarms in the control room which serves the function of an automatic detection system. Such alarm will promptly alert the fire brigade for performing any residual fire fighting operations.
7.3 Conclusion Based upon the above evaluation, we conclude that any fire that might occur will not be of significant magnitude or duration. Also, any such fire will be promptly extinguished by operation of the automatic sprinkler systems. If for soue reason, the automatic sprinklers are able only to control the fire but not achieve extinguishment, the fire brigade, having been alerted as a result of alarm in the control room from the sprinkler system, will be able to achieve prompt extinguishment. Therefore, we conclude that the addition of zone wide fire detection capability will not provide significantly more fire protection than what has already been provided and, therefore, the requested exemption should be granted.
8.0 Fire Zone.TB*TZ.114 -.8ase'ent.and.ezzanineSoutheast   End 8.1   Exeqump*iog  ested An exemption Is requested from the requirement of Section III.G.2 for not providing a 3-hour fire rated barrier for Train "A"electrical power system circuit 14.22.
8,2 Evalution The Train WA electrical power system circuit 14-22 cables in this fire zone are located in a pull pit located beneath the basement floor. It is similar to the pit described in Section 5 above. All of the cables in the pull pit are routed in electrical conduit. The pit has been filled with sand to provide the conduits with a minimum cover of six-inches. Thus, there are no exposed combustibles in the pull pit. A steel plate flush with the zone floor covers the entrance to the pull pit.
 
8.3 Conclusion We conclude from the above evaluation that the lack of exposed cowbustibles in the pull pit, the fact that the electrical cables for the Train "A" electrical power system circuit 14-22 are routed in conduits, and the fact that these conduits have a minimum cover of 6-inches of sand and the steel plate cover to the pull pit, provide protectiorn at least equivalent to a three-hour fire rated barrier. Therefore, the provision of a 3-hour rated fire barrier between the cables in the pull pit and the remainder of Fire Zone TB-FZ-11H would not provide significantly more fire protection than what Is already available. Therefore, this requested exemption should be granted.
9.0 F*re Area 06-FA 480 Volt Switchgear Room 9.1   Exetion Requested An exemption has been requested from the requirement of Section III.G.2 for not providing automatic fire suppression for the corridor area of new Fire Zone OB-FZ-68, which has been created out of the Fire Area OB-FA-6.
9.1.1   Evaluation This requested exemption has already been accepted by the staff. It was discussed and evaluated In Section 2.0-2.4 of our safety evaluation that was transmitted to the licensee by ?IRC letter dated March 24, 1986.
9.2 Exemption-Requested An exemption has been requested from the requirement of Section III.G.2 for not providing that at least one safe shutdown path needed to maintain hot shutdown is free of fire damage without any repair. The exemption Is requested to allow minor repairs outside of this zone to provide the required hot shutdown capability for the new Fire Zone OB-FZ-6A created out of Fire Area OB-FA-6.
9.2.1   Evaluation The licensee stated that the 480V switchgear room, Fire Area 0B-FA-6, will be modified to create two separate Fire Zones, OB-FZ-6A and 6-B. Fire Zone OB-FZ-6A and 6B will contain the Bus 480V USS 1A2 and the redundant Bus 48QV USS 1B2 respectively. For a fire in Fire Zone OB-FZ-6A, the licensee will use hot shutdown path 1 which, In turn, requires the Bus USS 1B2 to power the needed equipment for the hot shutdown path. The proposed design incorporates a cable tie between the buses. Consequently a fire Induced fault in the bus cable tie in Fire Zone OB-FZ-6A can result in loss of the Bus USS 1B2 and, therefore, comprise the hot shutdown capability for the Fire Zone OB-FZ-6A.
Therefore, the licensee has proposed the following operator actions in the sequence described below outside the Fire Zone OB-FZ-6A to restore the Eus USS 182 and thereby ensure hot shutdown capability for the Fire Zone OB-FZ-6A.
 
(1) Veenergize the Bus USS 1B2 locally in the Fire Zone OB-FZ-6B.
(2)   In the control room, trip the feeder breaker at 4160 switchgear IC feeding the Bus USS 1A2.
(3) Disconnect the cable bus tie which Is directly bolted to the bus bars in USS IB2 In the Fire Zone OB-FZ-6B.
(4)   Reenergize the Bus USS 182.
In their telephone conversations with us on February 16 and 20, 1989, the licensee stated that the above manual actions will require 20 minutes to complete and that they will be performed itmrediately after a fire in Fire Zone OB-FZ-6A. The licensee further stated that the plant areas where the manual acttors have to be performed will be easily accessible and will not involve any transient through the affected Fire Zone OB-FZ-6A.
In their submittal, the licensee examined the impact of temporary unavailability of hot shutdown equipment in Fire Zone OB-FZ-6A resulting from short term loss of the Bus USS 1B2 which powers these equipment. These are "BO 480V switchgear HVAC supply andexhaust fans, reactor coolant makeup CRD pump INC08B, A/B battery room exhaust fan and static charger and MG set B. The licensee determined that reactor coolant makeup (because of available vessel water Inventory) and the battery room exhaust fan will net be needed for at least 3 hours after scram by which time the Bus USS IB2 would have been restored ano the above components powered by the bus; and the static charger and MG set B will not be needed for quite some time after scram since the DC loads supplied by the 125 VDC Distribution Center B can be powered from the station batteries alone for a time period well in excess of the time required to restore the Bus USS 1B2. The licensee further determtirned that since the rajority of the electrical loads in the Zone OB-FZ-6B are powered by the Bus USS 162 the loss of the bus will result in significant reduction in heat output In the zone and consequently the need for the 480Y switchgear supply and exhaust fans will not arise for a time period well in excess of the time required to restore the Bus USS 182 and power the fans.
9.2.2   Conclusion Based on the above, we find that the identified operator actions (1) involve only one minor hot shutdown repair, namely, disconnecting the cable bus tie,
: 12) can be completed well before an unrecoverable reactor condition occurs,
: 3) do not involve any transit through the fire affected zone, and (4) do not require any offsite components or tools. For the above reasons, we have determined that with the completion of all the identified operator actions Including the minor repair in a timely manner, there is reasonable assurance that hot shutdown can be achieved and maintained following a fire In Fire Zone OB-FZ-GA. Therefore, the requested exemption for performing the identified hot shutdown repair should be granted.
 
10.0   Fir one OB-FZ-8A .Hotor-enerator.Set     Room 10.1 Exmption Reguested An exemption has been requested from the requirements of Section TTI.G.2 for not providing automatic fire detection in this fire zone.
10.1.1   Evaluation The zone Is protected by an automatic fire suppression system (autcmatic sprinkler) which also serves as an automatic fire detection system (although not providing an early warning), since actuation of the system alarms in the control room. Such system actuation and automatic alarm will result in promptly alerting the plant fire brigade for performing any required fire fighting actions. In addition, the combustible fuel loading in the area is low and corresponds to a fire severity of about 35 minutes as measured on the ASTM E-119 time/temperature curve. Also, the licensee has rerouted some circuits within this fire zone in conduits and has rerouted other circuits out of the zone to assure that at least one train of safe shutdown circuits within the zone will not be damaged by any fire that may occur in this zone.
10.1.2 Conclusion Based on the above evaluation, we conclude that any fire which might occur in Fire Zone OB-FZ-SA will be relatively small and will be controlled by the automatic sprikler system. Since operation of the sprinkler system will alarm in the control room, we expect prompt notification of, and response by, the fire brigade for arsy required manual fire fighting activities. Therefore, the installation of a separate automatic fire detection system would not provide a significant Increase in fire protection for this fire zone and the requested exemption should be granted.
10.2 Exemption-Resuested For the Fire Zone OB-FZ-8A, a second exemption is requested from the requirement of Section III.G.2 for not providing specific protection for the reactor recirculation valve circuits contained in this fire zone.
10.2.1   Evaluation In addition to the information given above in Section 10.1.1 for this fire zone, the following information addresses the issue of protecting the reactor recirculation valve circuits.
A. There are a total of five (5) recirculation loops located in two fire zones (OB-FZ-8A and OB-FZ-8C). All five loops are open during normal power optration.
B. The Oyster Creek Technical Specificatiors require four (4) loops to be open during normal power operation.
 
.1 C. Two (2) recirculation loops are required to be open to provide natural circulation through the core for safe shutdown.
D. Assuming fire damage to the valve for one recirculation loop, three (3) loops will remain open to provide natural circulation cooling of the core for safe shutdown.
10.2.2   Conclusion Based on the evaluations in Sections 10.1.1 and 10.2.1 above, we conclude that any fire which might occur In Fire Zone OB-FZ-BA will not damage more than one reactor recirculation loop valve circuit. Since the remaining three open recirculation loops provide sufficient natural coolant circulation through the core to achieve and maintain safe shutdown, the requested exemption should be granted.
11.0   Fire Elevation 35*
Zone OoEZ.8C...BatteryRoom.
                                ....       . Tunnel.and.Electricl.Tray.Room 11.1 Exf1ptoLnR!3sted An exemption is requested from the requirements of Section 11I.G.2 for not providing specific protection to reactor scram circuits located in this fire zone.
11.1.1 Evaluation The licensee has identified the battery room ventilation system modifications, instrument modifications and electrical modifications to assure safe shutdown capability for this zore. The licensee further stated that all manual actions for hot and cold shutdown will be accomplished from outside of this fire zone and will not be affected by a fire In this zone. Additionally, the licensee provided the following Justification to support this exemption request:
A. All reactor scram circuitry is contained In conduit except for the backup scram valve circuitry.
B. There are no external system circuits contained within the reactor scram conduits.
C. Reactor scram circuits are normally energized until a reactor scram Is desired. At this time, power Is interrupted and the scram discharge volume (SDV) vent and drain pilot valves, scram pilot air valves and the backup scram pilot valves are deenergized to scram the reactor.
D. To achieve a reactor scram either the scram pilot air valves or the backup scram pilot valves are required to be deenergized.
E. The effects of fire on the reactor scram circuits in conduit would be to Interrupt power and initiate a scram.
 
11.1.2   Conclusion Based on the above evaluation we conclude that the licensee's Justification for this requested exemption is valid and that it should be granted.
11.2   Exemption Requested For the Fire Zone OB-FZ-8C, a second exemption Is requested from the provisions of Section II1.G.2 for not providing specific protection to the reactor recirculation valve circuits contained in this fire zone.
11.2.1   Evaluation The situation for the reactor recirculation valve circuits located in this zone is similar to that described in Section 10.2.1 for the reactor recirculation valve circuits located in Fire Zone OB-FZ-8A and the same technical reasons which support that exemption request apply here also.
11.2.2 Conclusion Based on the above, we conclude that this requested exemption should be granted.
Dated: June 25. 1990 Principal Contributor:   D. Notley}}

Latest revision as of 06:22, 11 March 2020

E-mail from K. Sullivan, BNL to D. Frumkin, NRR on Oyster Creek Phase 1 Exemption Request
ML110700082
Person / Time
Site: Oyster Creek
Issue date: 09/24/2009
From: Sullivan K
Brookhaven National Lab (BNL)
To: Daniel Frumkin
NRC/NRR/DRA/AFPB
References
FOIA/PA-2011-0069
Download: ML110700082 (128)


Text

From: Sullivan. Kenneth , OL,

-\1)

To: Frumkin. Daniel \ 60-_

Subject:

Oyster Creek Phase 1 Exemption Request Date: Thursday, September 24, 2009 3:39:36 PM Attachments: OC Phase 1 Operator Manual Action Exemption Reauestr1l.odf OC 1990 SE.Ddf OC 1986 SE.ndf ban It is my understanding that in order for a pre-79 plant to credit prior staff acceptance of operator manual actions (OMAs) as a means of satisfying III.G.2, the MOAs have to be explicitly reviewed in an SE....I believe industry would agree -, in his presentation at the NEI conference, Chris Pragman of Exelon (Licensee of Oyster Creek - oddly enough) states that a Phase I review can only be performed if there is compelling evidence of prior NRC review and acceptance of OMAs. Otherwise a more detailed Phase 2 review is required.

In its Phasel exemption request for OMAs, Oyster Creek (a pre-79 plant) states that the request is limited to those operator manual actions credited for 10 CFR 50, Appendix R, Section III.G.2 compliance that were previously found acceptable for OCNGS by the NRC in a Safety Evaluation Report (SER)_

To support this claim OCNGS cites two SERs (March 24, 1986 and June 25, 1990) as follows:

  • The March 24, 1986 SER accepted the FHAR, and also accepted the OCNGS proposed resolution to the NRC reviewer's final comments regarding manual actions.
  • The June 25, 1990 SER clearly acknowledges that manual actions are performed outside the fire zone.

The licensee claims that the March 24, 1986 SER accepted the FHAR in its entirety - including all OMAs described in the FHAR - However -Section 8 of the SE specifically states that the scope of the staffs review was limited to alternate shutdown capability Appendix R, Items III-G-3 and III.L. (which was the staff practice at that time) Section 8.3 Conclusion, of the SE states:

We have reviewed the licensee'sproposed alternate safe shutdown capability for Oyster Creek in accordance with Appendix R criteria.Based on that review, we conclude that the performance goals for accomplishing safe shutdown in the event of a fire, i.e., reactivity control, inventory control, decay heat removal, pressure control,process monitoring and support functions are met by the proposedalternate safe shutdown facility. Therefore, we conclude that the requirements of Appendix R, Sections III.6.3 and II7TL are satisfied.

The extent of the staff's review of any III.G.2 issue is limited to the review of the requested exemptions - In all cases, staff acceptance is based on the capability of zone-specific, fire safety features (suppression, detection, fire loading, manual suppression capability, etc.) - and not the capability of MOAs - Since MOAs were not considered in the staff's evaluation... In no instance did the staff's acceptance of a requested exemption include an evaluation of MOAs Statements in the 1986 SER such as:

  • all required hot shutdown systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier.
  • The requiredshutdown-related cables are eitherprotected by a 1-hour fire barrieror an alternate means for achieving safe-shutdown is available outside of this area.

" In the April 3, 1985 report, the licensee committed to relocate certain shutdown related cables and to protect others in a 1-hour fire-ratedbarrier.

  • those required shutdown systems that are vulnerable to fire damage in this area are protected by a 1-hour fire barrier.

Clearly indicate that the staff was of the opinion that all required S5S cables were protected with a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> rated barrier or an alternate shutdown capability was provided Neither of the referenced SERs explicitly approve all the MOAs identified in the OC submittal.

The SEs do, however, indicate that the staff was aware MOAs were being performed (for either hot or cold shutdown). As stated in the June 25, 1990 SE, the extent of the staff review was limited to ensuring that they "would be accomplished from outside this zone and are not affected by a fire in this zone ." Does this constitute "tacit approval"?

OC also cites various telephone records and submittals - However ...It is my understanding that docketed submittals, meeting minutes, licensee presentations, and inspection reports, do not represent evidence of NRC approval....

Apologize for the length of this diatribe...

Would appreciate hearing your views before I develop the RAIs ... Please give me a call (631-344-7915) anytime tomorrow to discuss further Thanks Ken Sullivan, BNL

Exelon NucleaT www.exeloncorp.com 200 Exelon Way NUC]ear Kennett Square, PA 19348 10 CFR 50.12 March 3, 2009 RA-09-017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-1 6 NRC Docket No. 50-219

Subject:

Request for Exemption from 10 CFR 50, Appendix R, Section III.G., "Fire Protection of Safe Shutdown Capability" (Phase 1)

References:

1. Letter dated March 24, 1986, from J. Zwolinski, USNRC, to P. Fiedler, Oyster Creek Nuclear Generating Station, "Exemptions from Requirements of Appendix R to 10 CFR Part 50, Section III.G.2 and the Post Fire Safe Shutdown Capability (TAC 56740, 56786)."
2. Letter dated June 25,1990, from A. Dromerick, USNRC, to E. Fitzpatrick, Oyster Creek Nuclear Generating Station, "Exemption from Certain Technical Requirements Contained in Section III.G of Appendix R to 10 CFR Part 50 (TAC 62229)."
3. Letter dated April 3, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
4. Letter dated July 12, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
5. Letter dated October 9, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
6. Letter dated August 25, 1986, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.

In accordance with 10 CFR 50.12, "Specific exemptions," Exelon Generation Company, LLC (Exelon) hereby requests an exemption from the provisions of 10 CFR 50, Appendix R, Section Ill.G, "Fire Protection of Safe Shutdown Capability," for the use of operator manual actions for Oyster Creek Nuclear Generating Station (OCNGS) in lieu of the requirements of Paragraph III.G.2. This exemption is being requested in accordance with the requirements of 10 CFR 50.12(a)(2)(ii) since the application of the regulation in this particular circumstance would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule.

10 CFR 50.12 Exemption Request Operator Manual Actions Docket No. 50-219 March 3, 2009 Page 2 The manual actions addressed in this exemption request (Phase 1) are those that were previously included in the OCNGS Fire Hazards Analysis Report (FHAR) submitted to the NRC, which was subsequently found acceptable in a fire protection safety evaluation report (SER).

Reference 1 is an SER that accepts the OCNGS FHAR, which includes operator manual actions. Reference 2 is an SER that acknowledges that other manual actions not affected by a fire in the fire area are acceptable. References 3 - 6 comprise the submittals to the NRC referenced in the two SERs.

In accordance with Regulatory Issue Summary (RIS) 2006-10, "Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions," an approved 10 CFR 50.12 exemption is required for all operator manual actions, even those that were accepted in a previously issued NRC SER. This exemption request is limited to those manual actions that were previously accepted in an NRC SER for OCNGS. Attachment 2 contains a list of the specific manual actions for which an exemption is being requested.

This exemption request will not result in undue risk to the public health and safety because Exelon has determined that the subject manual actions are feasible and the NRC has already found these manual actions to be acceptable for use in achieving post-fire safe shutdown. In addition, the intent of 10 CFR 50, Appendix R, Section 11:.G.2, is to ensure that one train of systems necessary to achieve and maintain hot shutdown will remain available in the event of a fire. The manual actions discussed in this exemption request provide that assurance. If manual actions are not used to meet the underlying purpose of the rule, modifications to: (1) provide additional fire suppression systems, detection systems, or fire barriers, or (2) re-route cabling or wrap cabling, would be required to achieve compliance. Such modifications represent an unwarranted burden on Exelon since they are not necessary to meet the underlying purpose of the rule. Therefore, the special circumstances for issuance of the exemption are satisfied in accordance with the requirements of 10 CFR 50.12(a)(2)(ii), since application of the rule is not necessary to achieve the underlying purpose of the rule. Furthermore, the requested exemption is authorized by law and is consistent with the common defense and security. Therefore, the requirements of 10 CFR 50.12(a)(1) are satisfied.

The Fire Protection Program at Oyster Creek, including defense-in-depth features such as fire detection and suppression systems installed in specific fire areas/zones within the plant, has been previously reviewed and approved by the NRC in various fire protection SERs and exemptions, and found acceptable during fire protection related inspections. Due to the mitigating factors and existing defense-in-depth features already provided, as discussed in , the existing level of defense in depth is considered acceptable for the manual actions contained in this exemption request. Nonetheless, Exelon has decided to enhance the existing fire protection defense in depth by adding detection or suppression capability to certain fire areas/zones within the plant. The modifications to install this detection or suppression are discussed within the applicable fire area descriptions in Attachment 1.

10 CFR 50.12 Exemption Request Operator Manual Actions Docket No. 50-219 March 3, 2009 Page 3 This exemption request includes no new regulatory commitments.

Information supporting the exemption request is contained in Attachments 1 and 2 to this letter.

Exelon requests approval of this exemption request by March 3, 2010.

If you have any questions or require additional information, please contact Glenn Stewart at 610-765-5529.

Resp~ctfully,U /

Pamela B. Cowan Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1. 10 CFR 50.12 Exemption Request, Operator Manual Actions

2. Appendix R,Section III.G.2, Operator Manual Actions cc: Regional Administrator - NRC Region I w/ attachments NRC Senior Resident Inspector - OCNGS NRC Project Manager, NRR - OCNGS Director, Bureau of Nuclear Engineering, New Jersey Department of Environmental Protection I' it Mayor of Lacey Township, Forked River, New Jersey Jon Corzine, State of New Jersey

10 CFR 50.12 Exemption Request Operator Manual Actions Docket No. 50-219 March 3, 2009 Page 4 bcc:

Sr. Vice President, Mid-Atlantic Operations w/o attachments Sr. Vice President, Operations Support Vice President, Engineering Site Vice President, OCNGS Plant Manager, OCNGS Director, Operations, OCNGS Director, Engineering Director, Site Engineering, OCNGS Director, Site Training, OCNGS Manager, Regulatory Assurance, OCNGS Manager, Licensing - KSA3-E w/attachments II G. Stewart - KSA3-E M. Carlson, OCNGS C. Pragman, KSA2-N 11 Commitment Coordinator - KSA 3-E Records Management - KSA 1-N-1

ATTACHMENT I 10 CFR 50.12 Exemption Request Oyster Creek Nuclear Generating Station Docket No. 50-219 Request for Exemption from 10 CFR 50, Appendix R, Section Ill.G, "Fire Protection of Safe Shutdown Capability" (Phase 1)

Operator Manual Actions

10 CFR 50.12 Exemption Request Page 1 of 49 Docket No. 50-219 ATTACHMENT 1 OPERATOR MANUAL ACTIONS I. SPECIFIC EXEMPTION REQUEST An exemption is requested by Exelon Generation Company, LLC (Exelon) from the requirements of Appendix R (Reference 1), Section Ill.G, "Fire Protection of Safe Shutdown Capability," for Oyster Creek Nuclear Generating Station (OCNGS), to the extent that operator manual actions are necessary to achieve and maintain hot shutdown for areas/zones in which both trains of systems required for safe shutdown could be affected by the same fire.

Background:

The criteria for granting specific exemptions from 10 CFR 50 regulations are specified in 10 CFR 50.12. In accordance with 10 CFR 50.12(a)(1), the NRC is authorized to grant an exemption upon determining that the exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security.

Regulatory Issue Summary (RIS) 2006-10 (Reference 2) documents the NRC position relative to the use of operator manual actions as part of a compliance strategy to meet the requirements of 10 CFR 50, Appendix R, Section III.G.2. The NRC requires that plants which credit manual actions for Section III.G.2 compliance obtain specific NRC approval for the manual actions via the exemption process in accordance with the requirements of 10 CFR 50.12. RIS 2006-10 addresses operator manual actions that were previously approved outside the exemption process as stated below:

"For pre-1979 licensees, a staff decision in a safety evaluation report (SER) that approves the use of operator manual actions, in lieu of one of the means specified in paragraph III.G.2, does not eliminate the need for an exemption. Pre-1979 licensees who have SERs, but not a corresponding exemption, which approve manual actions should request an exemption under 10 CFR Part 50.12, citing the special circumstances of section 50.12(a)(2)(ii), citing the SER as the safety basis, and confirming that the safety basis established in the SER remains valid. The staff expects to grant the exemption on these bases without further review."

10 CFR 50.12(a)(2)(ii) states, "Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule."

II. BASIS FOR EXEMPTION REQUEST This exemption request (Phase 1) is limited to those operator manual actions credited for 10 CFR 50, Appendix R, Section III.G.2 compliance that were previously found acceptable for OCNGS by the NRC in a Safety Evaluation Report (SER). References to the documentation that supports the inclusion of these manual actions as previously approved is provided. The operator manual actions that are the subject of this exemption request are essentially unchanged from their original acceptance (with minor changes as noted in Attachment 2);

therefore, the original safety basis remains valid.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 2 of 49 Docket No. 50-219 The intent of 10 CFR 50, Appendix R, Section III.G.2, is to ensure that one train of systems necessary to achieve and maintain hot shutdown will remain available in the event of a fire. The manual actions discussed in this exemption request provide that assurance. If manual actions are not used to meet the underlying purpose of the rule, modifications to: (1) provide additional fire suppression systems, detection systems, or fire barriers, or (2) re-route cabling or wrap cabling, would be required to achieve compliance. Such modifications represent an unwarranted burden on Exelon since they are not necessary to meet the underlying purpose of the rule. Therefore, the special circumstances for issuance of the exemption are satisfied in accordance with the requirements of 10 CFR 50.12(a)(2)(ii), since application of the rule is not necessary to achieve the underlying purpose of the rule.

Ill. DEMONSTRATION THAT MANUAL ACTIONS ARE PREVIOUSLY APPROVED Overview Manual actions have been a part of the OCNGS Fire Safe Shutdown (FSSD) analysis since its inception for both Redundant and Alternative Shutdown areas. A discussion of manual actions required for each fire area/zone was included in Rev. 3 of the "Fire Hazards Analysis Report

[FHAR] and Appendix R,Section III.G Safe Shutdown Evaluation" submitted to the NRC on April 3, 1985 (Reference 3), FHAR Rev. 4 submitted on July 12, 1985 (Reference 4) and FHAR Rev. Nos. 5 and 6 submitted on August 25, 1986 (Reference 5). By letter dated March 24, 1986 (Reference 6), the NRC accepted the OCNGS FHAR, which includes the operator manual actions. By letter dated June 25, 1990 (Reference 7), the NRC acknowledges that other manual actions not affected by a fire in the fire area are acceptable.

Citations The information presented below provides a brief discussion regarding correspondence between GPU Nuclear (GPUN) and the NRC that relates to the NRC review of operator manual actions described in this exemption request.

1. April 3, 1985- GPUN Letter to NRC, Submitting Rev. 3 of the FHAR (Reference 3)

This version of the FHAR was submitted based on discussions with the NRC, and described the required manual actions for each fire area/zone, as well as describing them in Appendix A, including Figures A-1 and A-2 of the FHAR.

For example, Section 1.2.1 .H states that manual actions for hot shutdown are required to align the Fire System water to the Isolation Condenser shell side for makeup. In some redundant shutdown areas/zones, these manual actions include taking control of certain components at the "Local Shutdown Panel(s)," which were installed to satisfy Alternative Shutdown requirements (III.G.3).

Section 3.0 changes included adding a reference to the Shutdown Paths in Appendix A, Figures A-1 and A-2. These Figures tabulate the equipment used to provide shutdown in the event of a fire in any area of the plant, which include listing all manual actions that are required.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 3 of 49 Docket No. 50-219

2. August 5,1985 - GPUN Telecon Summary - Telecon between GPUN and D. Kubicki (NRC) regarding April 3,1985 Rev. 3 FHAR submittal D. Kubicki, the NRC Fire Protection reviewer, requested a telephone conference to discuss the OCNGS fire protection submittal dated April 3, 1985. The purpose of this discussion was to clarify and/or resolve various concerns, which have resulted from the review of the submittal.

The page number listed below is from the April 3, 1985 submittal.

"Page 1-13 Concern: Here and elsewhere manual actions are required. Verify that these actions are accomplished outside the area involved in the fire.

"Response: Manual actions referred to are accomplished outside the area involved in the fire."

3. October 9,1985- GPUN Letter to NRC Documenting the Verbal Resolution of a Number of NRC Concerns (Reference 8)

This letter summarizes the agreement that was reached between the NRC and GPUN on the telephone, which shows that the NRC reviewed all manual actions and only required exemptions for the manual actions that were performed in the area of the fire.

"The NRC staff is currently reviewing the Oyster Creek "Fire Hazards Analysis and Appendix R Section III.G Safe Shutdown Evaluation," which was submitted by letter dated April 3, 1985. The staff contacted GPUN by telephone to identify those areas of the submittal, which involve staff concerns, and questions, which require resolution prior to completion of the Staffs Safety Evaluation Report (SER). After a number of discussions by telephone, GPUN and the staff have reached agreement on the resolution of these concerns.

"Currently, GPUN is revising, on a page replacement basis, the April 3, 1985 submittal to incorporate the agreements reached; however, in order to expedite the review process, Enclosure 1 provides a summary description of the agreements reached and the resultant changes in the submittal. This information provides the basis for the staff to complete their SER while the revisions to the submittal are being prepared. The projected schedule for submittal of the revised pages is November 30, 1985."

From Enclosure 1:

"Staff Concern: Manual actions are required within 45 minutes for postulated fires in numerous locations. Credit cannot be taken for manual actions, within the affected fire area, in less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

"Resolution: The manual actions referred to are accomplished at locations outside the Fire Zone involved in the fire. The submittal will be revised to clearly indicate that manual actions are accomplished in locations independent of the Fire Zone under consideration."

This demonstrates that, while performing their review for the SER, the NRC was aware that manual actions were required to be performed outside the area of the fire.

4. October 29,1985 - NRC letter to GPUN - "August 1985 Progress Review Meeting on Licensing Actions" (Reference 9)

This letter summarizes a meeting held on September 18, 1985, to discuss the status of several station Licensing Actions, including Appendix R.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 4 of 49 Docket No. 50-219 "The Staff has completed its review of the licensee's fire protection program dated April 12, 1985, but is waiting for the licensee's letter to document its commitment made by phone call in August 1985. These commitments were made to resolve the staffs concerns given in Attachment 3. A draft of this letter has been reviewed by the Staff. The licensee submitted this letter on October 9, 1985." of this letter states:

"Manual actions are required within 45 minutes for postulated fires in numerous locations.

Credit cannot be taken for manual actions, within the affected fire areas, in less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />."

5. March 24, 1986 - NRC Letter to GPUN - SER (Reference 6)

This letter transmits the NRC's approval of certain exemptions to Appendix R. This letter states that the NRC's approval of the overall post fire safe shutdown capability for Oyster Creek is included in Section 8.0 of the Safety Evaluation. This approval is based on the April 3, 1985 submittal of the FHAR (Rev. 3), July 12, 1985 submittal of the FHAR (Rev. 4) and GPUN's October 9, 1985 response to a request for additional information. Excerpts from the Safety Evaluation are provided below.

Section 6.0, Item 2 states:

"Exemption request from the requirements to provide 1-hour fire barriers for electrical circuits associated with the "C" battery room ventilation system in Fire Area OB-FA-6B."

The "Evaluation" portion of this section states:

"The licensee stated that the ventilation of the "C" battery room is not required for a minimum of 38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> after a loss of ventilation, and that the adequate ventilation can be achieved for this battery room by manually opening the battery room door and dampers D-1 and D-2 and D-4 in the ventilation duct work.

"Based on the above, as the ventilation of the "C" battery room is not needed for 38-hours and the alternate ventilation can be provided after this period, the staff concludes that an exemption request from the requirements to provide 1-hour barriers from the electrical circuits associated with [the] "C" battery room is not needed."

Section 8.0 states:

"By letter dated April 3, 1985, the licensee submitted the revised Fire Hazard Analysis Report and Section III.G Safe Shutdown Evaluation describing the means by which safe shutdown can be achieved in the event of fire and the proposed modifications to Oyster Creek to meet the requirements of Appendix R, Items III.G.3 and III.L.

"The licensee's revised safe shutdown analysis for a fire event has demonstrated that adequate redundancy and/or alternate safe shutdown methods exist for those systems required to effect hot or cold shutdown utilizing the alternate shutdown methods."

The manual actions specified in Attachment 2 of this exemption request that refer to Reference 3 were reviewed by this SER.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 5 of 49 Docket No. 50-219

6. August 25,1986 - GPUN Letter to NRC, Submitting Revision Nos. 5 and 6 of the FHAR (Reference 5)

Revision Nos. 5 and 6 of the FHAR incorporated GPUN's commitments submitted by letter dated October 9, 1985 (Reference 8).

The summary of changes for Rev. 5 clarified the manual action requirements for the majority of Sections 1.2 and 3.0 of the FHAR. The typical statement that was added is as follows:

"All manual actions for hot and cold shutdown will be accomplished from outside of this fire zone and are not affected by a fire in this zone."

The detailed manual actions were relocated from Sections 1.2 and 3.0 to Appendix A, Figures A-1 and A-2, "Appendix R Safe Shutdown Hot Shutdown Paths." The Shutdown Paths provided a generic tabulation of the systems required for Hot Shutdown that were applicable to all fire areas/zones that utilized this particular path as well as a tabulation of the applicable manual actions required for each fire area/zone. Only manual actions requiring special discussion remained in Sections 1.2 and 3.0, for example, those performed in the area of the fire, as indicated in the examples below.

Section 1.2.1.E states:

"Valve V-1 5-30 located in this zone will be opened after a fire, but within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 24 minutes after scram to assure a flow path from the CRD pumps to the reactor.

"All other manual actions will not be affected by a fire in this zone."

Section 3.1.6 states:

"In the event of a fire in this zone the following Safe Shutdown Paths have been selected:

Hot Shutdown - Path No. 1 Cold Shutdown - Path No. 1 "See Appendix A, Figures A-1 and A-2, for Safe Shutdown Path descriptions."

Section 3.1.6.d states:

"All manual actions for hot and cold shutdown will be accomplished from outside of this fire zone except as follows:

"Valve V-20-1 located in RB-FZ-1 F3 will be opened after a fire in RB-FZ-1 F3 but within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 24 minutes after scram to complete the alignment of the Condensate Storage tank to Core Spray Pump NZ01B.

"All other manual actions will not be affected by a fire in this zone."

7. June 25,1990 - NRC Letter to GPUN - SER (Reference 7)

Requested exemptions were submitted by Reference 5, which were based on GPUN commitments contained in Reference 8. These commitments were made from various GPUN and NRC discussions, including some discussions about manual actions. Below are examples from the SER where the NRC acknowledges that manual actions are performed outside the area of the fire.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 6 of 49 Docket No. 50-219 Section 2.1.1, "Evaluation," states:

"Assuring that all manual actions required for hot and cold shutdown due to fire in this zone will be accomplished from outside this zone and are not affected by a fire in this zone."

Section 3.1.1, "Evaluation," states:

"Modifications provided for protection of safe shutdown capability, and other mitigating factors in this fire zone [including manual actions], are the same as those described for Fire Zone RB-FZ-1 D, elevation 51 feet, in Section 2.1.1 above, except that the fire loading (while still low) is approximately 20,000 BTU per square foot and corresponds to a fire severity of about 15 minutes as measured on the ASTM E-1 19 time/temperature curve."

Section 4.2.1, "Evaluation," states:

"Manual action required for hot and cold shutdown for a fire in this zone will be accomplished outside of the fire zone except for opening valve V-20-1. This valve, located in Room RB-FZ-1 F3 (North-West corner of room in the same fire zone) must be opened following a fire in RB-FZ-1 F3 but only within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 24 minutes after scram to complete the alignment of the condensate storage tank to the core spray pump NZ01 B. Other manual actions will not be affected by a fire in this zone."

Section 6.2, "Evaluation," states:

"Manual actions required for hot and cold shutdown due to a fire in this zone will be accomplished outside of this zone and will not be affected by any fire in this zone."

Section 11.1.1, "Evaluation," states:

"The licensee further stated that all manual actions for hot and cold shutdown will be accomplished from outside of this fire zone and will not be affected by a fire in this zone."

Based on Reference 8 and the above statements extracted from this SER (Reference 7), it is apparent that the NRC reviewed and accepted the manual actions contained in the FHAR, and only required an exemption if the hot shutdown manual action was required to be performed in the affected fire area/zone.

Summary The March 24, 1986 SER (Reference 6) accepted the FHAR, and also accepted the OCNGS proposed resolution to the NRC reviewer's final comments regarding manual actions. The August 25, 1986 submittal of the FHAR Rev. 6 (Reference 5) documented the final resolution of the NRC reviewer's comments regarding manual actions. The June 25, 1990 SER (Reference

7) clearly acknowledges that manual actions are performed outside the fire zone. contains a summary list of the manual actions for which an exemption is being requested. These actions were contained in the OCNGS FHAR up through Revision 6, at the time the June 25, 1990 SER (Reference 7) was issued, but were not addressed in a previous exemption request. It is evident that the NRC reviewed OCNGS manual actions based on the specific comments and questions regarding manual actions previously cited. Therefore, only a small number of exemptions were requested and approved for manual actions in the affected fire area that are needed to maintain hot shutdown. Other manual actions not located in the affected fire area were included in the FHAR submittals and the NRC accepted the use of these manual actions without requiring an exemption.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 7 of 49 Docket No. 50-219 IV, TECHNICAL JUSTIFICATION FOR OPERATOR MANUAL ACTIONS This exemption request includes a summary of information, based on the OCNGS FHAR (Reference 10), safe shutdown drawings, procedures, etc., that would have been available (except for subsequent revisions over time) when the manual actions credited for post-fire safe shutdown were previously approved by the NRC. This exemption request provides a discussion of the initiating fire areas involved, the results of a feasibility review of the operator manual actions based on the criteria specified in NRC Inspection Procedure 71111.05 (Reference 11),

and a discussion of how the manual actions meet the defense-in-depth criteria specified in Appendix R. While Inspection Procedure 71111.05 did not exist at the time the SERs approving the manual actions were issued, it is apparent that NRC Regional Fire Inspectors and the Nuclear Reactor Regulation reviewer used similar criteria when reviewing the operator manual actions at that time.

NRC IP 71111.05 was revised on March 6, 2003, to specifically address the feasibility of operator manual actions in support of the proposed manual action rule. The operator manual actions addressed in this exemption request are those that were previously approved in the March 24, 1986 and June 25, 1990 fire protection SERs. RIS 2006-10 directs that operator manual actions that were approved in a fire protection SER should be included in a request for "an exemption under 10 CFR Part 50.12, citing the special circumstances of Section 50.12(a)(2)(ii), citing the SER as the safety basis, and confirming that the safety basis established in the SER remains valid." The approval SERs did not provide a detailed safety basis for the NRC approval of these operator manual actions; however, the manual actions remain essentially unchanged from their original accepted configuration. In order to confirm to the NRC that the operator manual actions are feasible, which would support the conclusion that the safety basis established in the SERs remains valid, each of the operator manual actions addressed by this exemption request was reviewed against the feasibility criteria listed in the March 6, 2003 revision of NRC IP 71111.05 and the defense-in-depth criteria provided in Appendix R.

The Fire Protection Program at Oyster Creek, including defense-in-depth features such as fire detection and suppression systems installed in specific fire areas/zones within the plant, has been previously reviewed and approved by the NRC in various SERs and exemptions, and found acceptable during fire protection related inspections. Due to the mitigating factors and existing defense-in-depth features already provided, as discussed in the individual fire area/zone descriptions below, the existing level of defense in depth is considered acceptable for the manual actions contained in this exemption request. Nonetheless, Exelon has decided to enhance the existing fire protection defense in depth by adding detection or suppression capability to certain fire areas/zones within the plant. The modifications to install this detection or suppression are discussed within the applicable fire area/zone descriptions below.

A. FIRE AREA/ZONE DESCRIPTIONS There are 34 initiating fire areas/zones included in this exemption request. An initiating fire area is the area where a fire that requires the manual action to be performed originates. A brief description of each fire area is provided below. This information provides a summary of the type of fires that are postulated to occur in each area and the type of combustibles located in each

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 8 of 49 Docket No. 50-219 area. Detection and suppression systems that are installed in the fire area are also discussed.

The information provided was obtained and summarized from the current OCNGS FHAR, Section 7 (Reference 12). Section 7 of the FHAR is divided up by fire area/zone. Each fire area/zone has subsections providing an area description (references fire area layout drawings that are contained in Attachment B of the FHAR), equipment located in the area, fire hazards, fire protection, safe shutdown method/strategy, exemptions for the area, evaluations applicable to the area and the analysis/conclusion for the area.

OCNGS fire area boundaries utilized for fire safe shutdown analysis purposes were approved in the SER dated March 24, 1986, in Section 7.1 (Reference 6) in which the NRC stated the following:

"In the April 3, 1985 report, the licensee described the non-fire-rated walls and floor/ceilings which bounded certain fire areas. The licensee stated that a number of these fire area boundaries contain unprotected openings such as stairways, hatchways and pipe penetrations. We have expressed our concerns to the Licensee that, because of these openings, a fire might spread from one area to the next and damage systems that are needed to achieve and maintain safe-shutdown conditions. We stated that where a fire area was protected by an automatic fire suppression system, we did not expect fire to spread through these openings into adjoining locations. Therefore, in areas protected by automatic fire suppression system, the presence of unprotected openings in walls and floor/ceilings and negligible safety significance. We also stated that in those areas where fire could spread into adjoining locations but safe-shutdown could still be achieved, the presence of unprotected openings had no safety significance. We defined this situation to be those areas where the adjacent fire area(s) contains no required shutdown related equipment or where the nearest shutdown related system is more than 50 feet horizontally from any unprotected opening in the walls or ceiling that define those areas.

"For all other areas we recommended that the licensee protect the openings to prevent fire spread. The licensee committed to seal such unprotected openings with at least six inches of a fire-rated silicone foam. Where the use of such foam would not be viable, such as at open stairways or hatchways, the licensee committed to install an automatic sprinkler system to protect the opening that conforms to the appropriate sections of NFPA standard No. 13. These commitments were by letter dated October 9, 1985. Because these commitments provide us with reasonable assurance that fire will not spread into adjoining plant fire areas, we find them acceptable."

The description of each initiating fire area/zone below also provides a discussion of the required operator manual action that this exemption applies to and the reason for the operator manual action. Some of the operator manual actions that are performed are repeated in numerous fire areas/zones because of the fire safe shutdown analysis assumptions. For example, instrument air will be lost for the majority of the fire areas/zones (unless otherwise demonstrated available by analysis), which causes the Control Rod Drive (CRD) flow control valve to fail closed requiring three valves (V-1 5-30, 52 and 237) to be manually operated to utilize the bypass line around the normal flow control valve (refer to manual action No. 12 in Attachment 2).

Fire Area AB-FA-13 Auxiliary Boiler House fire area is remotely located from the Reactor Building with open spatial separation of at least 65 feet. The boiler house is also detached from the Railroad Airlock by

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 9 of 49 Docket No. 50-219 approximately 10 feet. The boiler house is unprotected sheet metal with concrete floors containing two package boilers with feed pumps and exhaust stack. Combustibles in this area include diesel fuel oil contained in piping/pumps (for heating boiler and piping/pumps to transfer fuel oil to the emergency diesel) and cable insulation. The fire loading is "low" as defined in the FHAR. A rate compensated/fixed temperature thermal detection system is installed in the Building and will sound an alarm in the Augmented Off-Gas (AOG) Building and in the Control Room. A hydrant and hose house are located nearby and a hose station is located inside the boiler house. Portable fire extinguishers are located in the area. Manual suppression efforts from the hose station and nearby hydrant or the portable extinguishers will contain the fire to the Auxiliary Boiler House. Separation from adjacent areas would prevent the spread of fire to any adjacent area. No Fire Safe Shutdown equipment or cables are located in this area.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the Emergency Operating Procedure (EOP) contingency actions for reactor pressure vessel ( RPV) level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action.

Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate Fire Support Procedure (FSP) or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual action for AB-FA-1 3 by Item Number as identified in Attachment 2 of this letter.

TABLE AB-FA-13 ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Area CW-FA-14 Circulatory Water Intake fire area is an outside area greater than 100 feet from any building except for the fish sample pool enclosure that is located in this area, which is constructed of non-combustible material. Combustible loading consists of transformer oil and electrical motors.

The Unit Substation transformers (USS 1A3 and 1B3) are filled with Dow Corning 561 Silicon transformer oil. This material has characteristics that minimize the likelihood of a fire involving the insulating oil itself. A review of vendor information indicates that the flash and fire points are almost twice as high as other transformer oils, but more importantly, the heat release rate is almost 10 times lower, and any postulated fire originating at the transformer itself would tend to be limited in duration and would not involve sustained burning of the silicon oil. This judgment is supported by testing performed in 1977 by Industrial Risk Insurers of DC-561, which showed that the fluid tended to form a crust and self-extinguish (Reference 13). Based on the characteristics of the silicon fluid, any postulated fire event is expected to be very short in duration. No specific quantification of fire loading is considered necessary for this structure because it is an open structure with nothing to contain the heat release in the event of a fire.

Manual suppression is provided by a hydrant and hose house within approximately 100 feet of

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 10 of 49 Docket No. 50-219 the area and fire extinguishers. Transformers have dikes to contain the oil to the immediate area. A security tower monitors this area continuously; therefore, any fire of significance would be detected rapidly.

Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of the Condensate Transfer system to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the actions. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status.

The following table provides a summary of the manual actions for CW-FA-14 by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE CW-FA-14 ITEM # Manual Action Required Manually open V-9-2099 and V-1 1-49 and close V-1 1-63 and V-1 1-41 to align the fire 7 water system for make-up water to Isolation Condenser "B" since there is no power

("B" Train) available to the Condensate Transfer System 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Area DG-FA-15 Emergency Diesel Generator Room No. 1 fire area is part of the Emergency Diesel Generator Building. Emergency Diesel Generator Room No. 1 is separated from other fire areas (i.e.,

Emergency Diesel Generator Room No. 2 (DG-FA-17) and Emergency Diesel Fuel Oil Storage Area (FS-FA-1 6)), with rated fire barriers. Fire loading consists of diesel fuel, diesel lube oil and nominal electrical equipment including cables. Fire loading is "low" as defined in the FHAR.

Thermally activated rate-of-rise fire detection is installed throughout the general area and smoke detection systems are installed in the switchgear cubicle; both sound an alarm in the Control Room and at the local panel. A fire hydrant and hose house with Aqueous Film-Forming Foam (AFFF) supply are located nearby. Portable fire extinguishers are located in the area. Manual suppression utilizing hose lines and AFFF in conjunction with the rated fire barriers will contain a loss to one diesel generator unit. Emergency power will still be available from the other diesel generator.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 11 of 49 Docket No. 50-219 immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual action for DG-FA-1 5 by Item Number as identified in Attachment 2 of this letter.

TABLE DG-FA-15 ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Area NR-FA-20 New Radwaste fire area is separated from other fire areas by open space of at least 50 feet.

This area contains pumps, tanks, evaporators and other waste treatment equipment.

Combustible loading consists of health physics supplies, lubricating oils (minor amounts of lubricants enclosed in valve gear boxes, pump bearings, etc.), ion exchange resin, cable, paper products, and wood products. Fire loading is "low" as defined in the FHAR. Area-wide detection is made up of both thermal (rate compensated/fixed temperature) and smoke detectors. These detectors sound alarms locally and in the Control Room. Portable fire extinguishers and outside hose houses are available for manual suppression. The fire detection system will provide early warning of a fire to allow utilization of manual suppression. A fire will be contained within the area and will have no effect on safe shutdown. No Fire Safe Shutdown equipment or cables are located in this area.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, ifa fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual action for NR-FA-20 by Item Number as identified in Attachment 2 of this letter.

TABLE NR-FA-20 ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 12 of 49 Docket No. 50-219 Fire Area OB-FA-9 The Office Building is a three story facility enveloped by the Reactor Building (RB-FA-1) on the east side, the Turbine Building (TB-FA-1 1) on the west side, and the service area (OB-FA-10) on the north side. The Office Building is considered a light hazard occupancy with limited amounts of combustibles, primarily paper and furnishings. The overall combustible loading for this fire area is "low" as defined in the FHAR. The building's materials of construction are non-combustible with the shell structure being reinforced concrete and the highly compartmentalized interior being hollow concrete block or sheetrock. Smoke detectors are installed in the hallway on each floor. Detector actuation sounds an alarm locally and in the Control Room. Fire extinguishers are provided on each floor and hose stations are provided on the second and third floors. A fire hydrant is available for use from outside on the first floor.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual actions for OB-FA-9 by Item Number as identified in Attachment 2 of this letter.

TABLE OB-FA-9 ITEM # Manual Action Required 2 Locally read Condensate Storage Tank level at LI-424-993 due to damage to control circuits.

12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Zone OB-FZ-6A This fire zone is the 'A' 480V Switchgear Room. It is separated from the 'B' 480V Switchgear Room (OB-FZ-6B), Turbine Building (TB-FA-1 1) and Reactor Building (RB-FA-1) by fire rated barriers. The significant combustible loading is from transformer oil and cable insulation. There are also minor amounts of ordinary combustibles (paper and plastic). The fire loading is "moderate" as defined in the FHAR. The Unit Substation 1A2 transformer is filled with Dow Corning 561 Silicon transformer oil. This material has characteristics that minimize the likelihood of a fire involving the insulating oil itself. A review of vendor information indicates that the flash and fire points are almost twice as high as other transformer oils, but more importantly, the heat release rate is almost 10 times lower, and any postulated fire originating at the transformer itself would tend to be limited in duration and would not involve sustained burning of the silicon oil. This judgment is supported by testing performed in 1977 by Industrial Risk Insurers of DC-561, which showed that the fluid tended to form a crust and self-extinguish (Reference 13). Based on the characteristics of the silicon fluid, any postulated fire event is expected to be very short in duration. A fixed, total flooding, automatic Halon 1301

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 13 of 49 Docket No. 50-219 extinguishing system is installed throughout the zone. The system has reserve capacity for a full second discharge. A cross-zoned detection system consisting of ionization and photoelectric detectors is installed which sounds an alarm locally and in the Control Room upon operation of one detector in either detection zone. Detectors actuate the Halon system, shut down ventilation fans, and close ventilation system isolation dampers upon activation of a detector in the second zone. Remote alarms to the Control Room indicate detector actuation, Halon discharge and local panel trouble. Portable fire extinguishers are provided in the area and adjacent areas for manual fire fighting. Hose lines are available from a nearby Turbine Building hose station and from outside fire hydrants and hose houses.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual actions for OB-FZ-6A by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE OB-FZ-6A ITEM # Manual Action Required 2 Locally read Condensate Storage Tank level at LI-424-993 9 Manually control 480V USS 1B2 Breakers for CRD Pump NC08B and 1B2M from Remote Shutdown Panel 10 Manually align Static Charger to 125 VDC Distribution Center "B" 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 17 Manually trip 4160V 1C Breakers for Main Core Spray Pumps "A" and "D" 18 Manually trip 4160V 1D Breakers for Main Core Spray Pumps "B" and "C" 20 Manually trip 480V USS 1B2 Breakers for Core Spray Booster Pumps "B" and "C" Fire Zone OB-FZ-6B This fire zone is the 'B' 480V Switchgear Room. It is separated from the 'A' 480V Switchgear Room (OB-FZ-6A), Turbine Building (TB-FA-1 1) and Reactor Building (RB-FA-1) by fire rated barriers. The significant combustible loading is from transformer oil and cable insulation. There are also minor amounts of ordinary combustibles (paper and plastic). The fire loading is "moderate" as defined in the FHAR. The Unit Substation 1A2 transformer is filled with Dow Corning 561 Silicon transformer oil. This material has characteristics that minimize the likelihood of a fire involving the insulating oil itself. A review of vendor information indicates that the flash and fire points are almost twice as high as other transformer oils, but more importantly,

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 14 of 49 Docket No. 50-219 the heat release rate is almost 10 times lower, and any postulated fire originating at the transformer itself would tend to be limited in duration and would not involve sustained burning of the silicon oil. This judgment is supported by testing performed in 1977 by Industrial Risk Insurers of DC-561, which showed that the fluid tended to form a crust and self-extinguish (Reference 13). Based on the characteristics of the silicon fluid, any postulated fire event is expected to be very short in duration. A fixed, total flooding, automatic Halon 1301 extinguishing system is installed in the Switchgear Room. The system has reserve capacity for a full second discharge. A cross-zoned detection system consisting of ionization and photoelectric detectors is installed which sounds an alarm locally and in the Control Room upon operation of one detector in either detection zone. Detectors actuate the Halon system, shut down ventilation fans, and close ventilation system isolation dampers upon activation of a detector in the second zone. Remote alarms to the Control Room indicate detector actuation, Halon discharge and local panel trouble. Portable fire extinguishers are provided in the area and adjacent areas for manual fire fighting. Hose lines are available from a nearby Turbine Building hose station and from outside fire hydrants and hose houses.

Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of the Condensate Transfer System to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the actions. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status.

The following table provides a summary of the manual actions for OB-FZ-6B by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE OB-FZ-6B ITEM # Manual Action Required 7 Manually open V-9-2099 and V-1 1-49 and close V-1 1-63 and V-1 1-41 to align the fire water system for make-up water to Isolation Condenser "B" since there is no power

("B" Train) available to the Condensate Transfer System 12 Manually open V-1 5-237, throttle V-15-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Zone OB-FZ-8A Reactor Recirculation MG Set Room is part of the Office Building and is separated from the adjoining stairwell area (OB-FA-9), Turbine Building (TB-FA-11) and Reactor Building (RB-FA-1) by fire rated barriers. The ceiling is concrete with unrated openings to the Mechanical Equipment Room on 35' elevation (OB-FZ-8B), A/B Battery Room (OB-FZ-8C), and the Office Building (OB-FA-9), which has been evaluated as acceptable. This area/zone is analyzed

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 15 of 49 Docket No. 50-219 together with OB-FZ-8B for safe shutdown purposes, due to the lack of rated fire barriers between the zones. Combustible loading consists of lubricating oil in MG sets and cable insulation but the loading is tracked by combining it with OB-FZ-8B. The total fire loading for OB-FZ-8A & 8B is "low" as defined in the FHAR with the majority of the loading being in OB-FZ-8A. A closed head sprinkler system is installed throughout the majority of this fire zone (over MG Sets). An alarm is provided to the Control Room when water flows from a single sprinkler head. A smoke detector is provided in the exhaust duct of the ventilation system. SER dated June 25, 1990 (Reference 7) provided an exemption for not having automatic fire detection.

Fire extinguishers are provided for manual fire fighting backup. Hose lines are available from outside hydrants and hose houses.

Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of the Condensate Transfer System to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the actions. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status.

The following table provides a summary of the manual actions for OB-FZ-8A by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE OB-FZ-8A ITEM # Manual Action Required Manually open V-9-2099 and V-1 1-49 and close V-1 1-63 and V-1 1-41 to align the fire 7 water system for make-up water to Isolation Condenser "B" since there is no power

("B" Train) available to the Condensate Transfer System 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 14 Manually provide power to Control Room A/C unit by closing tiebreaker US3T between USS 1A3 and 1B3 18 Manually trip 4160V 1D Breakers for Main Core Spray Pumps "B" and "C" 20 Manually trip 480V USS 1 B2 Breakers for Core Spray Booster Pumps "B" and "C" Fire Zone OB-FZ-8B Mechanical Equipment Room (35' elevation) is part of the Office Building and is separated from the adjoining corridors (OB-FA-9) and Turbine Building (TB-FA-1 1) by fire rated barriers. The floor is concrete with unrated openings to the Reactor Recirculation MG Set Room (OB-FZ-8A),

and the north wall is sealed for Halon containment but is unrated to the A/B Battery Room (OB-FZ-8C), both of which have been evaluated as acceptable. This area/zone is analyzed together with OB-FZ-8A for safe shutdown purposes, due to the lack of rated fire barriers between the

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 16 of 49 Docket No. 50-219 zones. Combustible loading for this fire zone consists of minor amounts of cable insulation but the loading is tracked by combining it with OB-FZ-8A. The total fire loading for OB-FZ-8A & 8B is "low" as defined in the FHAR with the majority of the loading being in OB-FZ-8A. Manual fire fighting is available using hose lines and fire extinguishers from the Office Building corridor.

There is no fire safe shutdown equipment located in this area but there are safe shutdown cables in this area.

Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of the Condensate Transfer System to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the actions. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status. There is also significant time available to perform manual action Nos. 14, 18, and 20 (Attachment 2).

An enhancement is being made to install area-wide smoke detection in this area to provide for improved operator notification ability, thereby providing a quicker response time for any required actions.

The following table provides a summary of the manual actions for OB-FZ-8B by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE OB-FZ-8B ITEM # Manual Action Required Manually open V-9-2099 and V-1 1-49 and close V-1 1-63 and V-1 1-41 to align the fire 7 water system for make-up water to Isolation Condenser "B" since there is no power

("B" Train) available to the Condensate Transfer System 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 14 Manually provide power to Control Room A/C unit by closing tiebreaker US3T between USS 1A3 and 1B3 18 Manually trip 4160V 1 D Breakers for Main Core Spray Pumps "B" and "C" 20 Manually trip 480V USS 1 B2 Breakers for Core Spray Booster Pumps "B" and "C" Fire Zone OB-FZ-8C A/B Battery Room, Tunnel and Electrical Tray Room are part of the Office Building and are separated from the adjoining Office Building areas (OB-FA-9) and Turbine Building (TB-FA-1 1) by fire rated barriers except for the floor and south wall. The floor is concrete with unrated openings to the Reactor Recirculation MG Set Room (OB-FZ-8A), and the south wall is sealed for Halon containment but is unrated to the Mechanical Equipment Room at 35' elevation (OB-

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 17 of 49 Docket No. 50-219 FZ-8B), both of which have been evaluated as acceptable. Major combustible loading is from cable insulation and plastic battery cases and fiberglass laminated polyester battery racks.

There is also a minor amount of oil in the rotary inverter bearings. Fire loading is "low" as defined in the FHAR. A fixed, total flooding, Halon 1301 extinguishing system will discharge throughout the A/B Battery Room, Tunnel, and Electrical Tray Room. Smoke detectors are installed at the ceiling level and cross-zoned to sound a local alarm and an alarm in the Control Room upon actuation of one detector. Actuation of a second detector will sound a local alarm, discharge the halon system, trip supply and exhaust fans, and close dampers.

Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of the Condensate Transfer System to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the actions. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status.

The following table provides a summary of the manual actions for OB-FZ-8C by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE OB-FZ-8C ITEM # Manual Action Required 2 Locally read Condensate Storage Tank level at LI-424-993 Manually open V-9-2099 and V-1 1-49 and close V-1 1-63 and V-1 1-41 to align the fire 7 water system for make-up water to Isolation Condenser "B" since there is no power

("B" Train) available to the Condensate Transfer System 8 Manually control 480V USS 1A2 Breakers for "A" CRD Pump and 1A2M from LSP-1A2 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 14 Manually provide power to Control Room A/C unit by closing tiebreaker US3T between USS 1A3 and 1B3 15 Manually trip 4160V Breakers for Reactor Feedwater Pumps 1A, 1B, and 1C 16 Manually trip Reactor Recirculation Pumps ("A", "B", "C", "D" and "E") 4160V Switchgear 1A and 1 B.

17 Manually trip 4160V 1C Breakers for Main Core Spray Pumps "A" and "D" 18 Manually trip 4160V 1D Breakers for Main Core Spray Pumps "B" and "C" 19 Manually trip 480V USS 1A2 Breakers for Core Spray Booster Pumps "A" and "D" 20 Manually trip 480V USS 1B2 Breakers for Core Spray Booster Pumps "B" and "C"

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 18 of 49 Docket No. 50-219 Fire Zone OB-FZ-10A Monitor and Change Room Area and Operations Support Area are part of the Office Building (Service Area) and are located between the Reactor Building (RB-FA-1) and Turbine Building (TB-FA-1 1). The walls and ceiling are rated. The floor is concrete with unrated openings to the Chemical Lab (OB-FZ-1OB), which has been evaluated as acceptable. The Service Area equipment does not perform safety related functions although safety related cabling is routed through the building. Materials of construction are non-combustible, primarily reinforced concrete and concrete block. Major combustibles consist of electrical cable insulation located above the suspended ceiling. Other combustibles include health physics materials, Protective Clothing (PC) supplies, and other miscellaneous materials. The overall combustible loading for this fire area is "low" as defined in the FHAR. Smoke detectors are installed in a majority of the zone to provide early warning fire detection. A closed head automatic sprinkler system is installed above and below the ceiling in the Monitor and Change Room, in the Cable Tray Closet and above the ceiling in the Operations Support Area hallway to protect cable trays. In addition, a hose station located nearby outside the Control Room provides manual suppression capability.

Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of the Condensate Transfer System to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the actions. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status.

An enhancement is being made to add sprinkler heads to the existing automatic sprinkler system in the Monitor and Change Room, stairway area and Operations Support Area to make it area-wide, thereby improving survivability of area cables and reducing the likelihood of the fire spreading. Also, additional smoke detection is being added to this zone to provide area-wide detection.

The following table provides a summary of the manual actions for OB-FZ-1 OA by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE OB-FZ-10A ITEM # Manual Action Required 7 Manually open V-9-2099 and V-1 1-49 and close V-1 1-63 and V-1 1-41 to align the fire water system for make-up water to Isolation Condenser "B" since'there is no power

("B" Train) available to the Condensate Transfer System 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 19 of 49 Docket No. 50-219 Fire Zone OB-FZ-1OB Hot & Cold Chemical Lab, Instrument Lab, P.A.S.S., Count Room is part of the Office Building (Service Area) and is located between the Reactor Building (RB-FA-1) and Turbine Building (TB-FA-11). The floor and walls are rated. The ceiling is concrete with unrated openings to the Monitor and Change Room Area (OB-FZ-1OA), which has been evaluated as acceptable. Fire loading consists of miscellaneous materials in the Chemistry Lab (flammable liquids, plastics, rubber, etc.) and cable insulation. The flammable liquids are maintained in flammable cabinets except during times of usage. The fire loading is "low" as defined in the FHAR. Product-of-combustion type smoke detectors are provided throughout OB-FZ-10B, except spaces above suspended ceilings. Detectors are not provided in the space above the ceiling in the Chemistry Lab; however, this space does not contain cable tray or other combustible material. Detectors are provided below the suspended ceiling to provide notification of a fire condition. Manual hose stations and portable fire extinguishers are provided and are considered to be adequate for the hazards and loading in this area. There is no fire safe shutdown equipment located in this area; however, there are fire safe shutdown cables (non-protected train) located in this area.

Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of the Condensate Transfer System to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the actions. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status.

The following table provides a summary of the manual actions for OB-FZ-1 OB by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE OB-FZ-1OB ITEM # Manual Action Required 7 Manually open V-9-2099 and V-1 1-49 and close V-1 1-63 and V-1 1-41 to align the fire water system for make-up water to Isolation Condenser "B" since there is no power

("B" Train) available to the Condensate Transfer System 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Area OG-FA-21 Augmented Off Gas (AOG) Building fire area is separated from other fire areas by at least 50 feet. The floors and roof are concrete, with the outside walls being unprotected metal siding.

The building houses charcoal absorbers and hydrogen recombiners. Combustible loading

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 20 of 49 Docket No. 50-219 consists of charcoal beds, lubricating oils (minor amounts of lubricants enclosed in valve gear boxes, pump bearings, etc.), cable and miscellaneous combustibles such as wood and paper.

Fire loading is "moderate" as defined in the FHAR. Smoke detectors are installed throughout the building. The system will sound an alarm locally and in the Control Room. Hose stations are available from outside hydrants and a dry standpipe inside the building. Portable extinguishers are provided. Hydrogen detection is provided in areas containing process piping. No fire safe shutdown equipment or cables are located in this area.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual action for OG-FA-21 by Item Number as identified in Attachment 2 of this letter.

TABLE OG-FA-21 ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Area OR-FA-19 The Old Radwaste Building is located on the east side of the Reactor Building. The Old Radwaste Building is separated from the Reactor Building by approximately 15 feet, and by 50 feet to any other fire area. The building floor, ceiling and walls are reinforced concrete. This area also includes a prefabricated steel structure on the west side of the building that houses sample tanks. The fire loading in OR-FA-1 9 consists of health physics supplies, lubrication oils (minor amounts of lubricants enclosed in valve gear boxes, pump bearings, etc.), ion exchange resins, paper products and wood products. The fire loading is "low" as defined in the FHAR.

Fire protection features include a rate compensated/fixed temperature thermal detection system installed in portions of the building that will sound an alarm in the Augmented Off Gas Building and in the Control Room. There is no fire detection in the prefabricated steel enclosure. Fire detection is not considered required due to the very minimal combustible loading. Manual suppression is available utilizing fire extinguishers as well as hose lines that are available from outside fire hydrants and hose houses. No fire safe shutdown equipment or cables are located in this area.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 21 of 49 Docket No. 50-219 of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual action for OR-FA-1 9 by Item Number as identified in Attachment 2 of this letter.

TABLE OR-FA-19 ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Zone RB-FZ-1D This fire zone is located in the Reactor Building elevation 51'-3". The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were either sealed similar to a 1-hour minimum fire barrier (six inches of fire-rated silicone foam) or were evaluated as acceptable since some of these barriers are not credited with separating redundant safe shutdown equipment. The major fixed combustible is cable insulation. The fire loading is "low" as defined in the FHAR. Fire protection features include automatic fire detection, which alarms locally and in the Control Room. Primary fire suppression is provided by fixed automatic water spray systems protecting the primary fire hazard in this zone (i.e., grouped electrical cable trays). The automatic water spray system is also installed at the equipment hatch opening and open stairway to both RB-FZ-1 E (Reactor Building elevation 23'-6") and RB-FZ-1C (Reactor Building elevation 75'). The water spray systems are supplemented with hose stations and portable extinguishers. SER dated June 25, 1990 (Reference 7) provided an exemption for not having area-wide automatic fire suppression in this fire zone because it was concluded that the existing provisions would promptly detect and extinguish any fire.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual action for RB-FZ-1 D by Item Number as identified in Attachment 2 of this letter.

TABLE RB-FZ-1D ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 22 of 49 Docket No. 50-219 Fire Zone RB-FZ-IE This fire zone is located in the Reactor Building elevation 23'-6". The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were either sealed similar to a 1-hour minimum fire barrier (six inches of fire-rated silicone foam) or were evaluated as acceptable. The major fixed combustible is cable insulation. The fire loading is "low" as defined in the FHAR. Fire protection features include automatic fire detection, which alarms locally and in the Control Room. Primary fire suppression is provided by fixed automatic water spray systems protecting the primary fire hazard in this zone (i.e., grouped electrical cable trays). The automatic water spray system is also installed at the equipment hatch opening and open stairway to RB-FZ-1 D (Reactor Building elevation 51'-

3") as well as at the duct penetration at elevation 35'. The water spray systems are supplemented with hose stations and portable extinguishers. SER dated June 25, 1990 (Reference 7) provided an exemption for not having area-wide automatic fire suppression in this fire zone because it was concluded that the existing provisions would promptly detect and extinguish any fire.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual actions for RB-FZ-1 E by Item Number as identified in Attachment 2 of this letter.

TABLE RB-FZ-1E ITEM # Manual Action Required 11 Locally read CRD flow gauge FI-225-998 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Zones RB-FZ-1 F1, RB-FZ-1F2, RB-FZ-1F3, RB-FZ-1F4, and RB-FZ-1F5 These fire zones are located in the Reactor Building basement -19'-6" elevation (RB-FZ-1 F1 (Southeast corner), RB-FZ-1 F2 (Southwest corner), RB-FZ-1 F3 (Northwest corner), RB-FZ-1 F4 (Northeast corner), and RB-FZ-1 F5 (Torus room - remaining area of Reactor Building basement.)). The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were either sealed similar to a 1-hour minimum fire barrier (six inches of fire-rated silicone foam) or were evaluated as acceptable. The major fixed combustible is limited to molded fiberglass reinforced polyester grating and minor amounts of lube oil in the various pumps. The fire loading is "low" as defined in the FHAR. Smoke detectors, which alarm locally and in the Control Room, provide fixed fire

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 23 of 49 Docket No. 50-219 detection. For manual fire suppression, portable fire extinguishers are provided with hose stations for backup. SER dated June 25, 1990 (Reference 7) provided an exemption for not having area-wide automatic fire suppression in fire zone RB-FZ-1 F due to the fact that there is a 1-hour fire wrap present. This was approved because of the low combustible loading and the fact that the fire detection would alert the fire brigade to the onset of a fire in the zone so that prompt manual suppression of any fire could be accomplished. A second exemption was approved by the same SER for RB-FZ-1 F3 for not providing either additional separation from in-situ combustibles or protection for Core Spray system valve V-20-1 (re-entry into fire area required) and the exemption was approved due to the low fuel loading and automatic fire detection, as well as manual fire suppression capability and heat sink capability of the water-filled piping connected to the valve.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual actions for RB-FZ-1 F1, RB-FZ-1 F2, RB-FZ-1 F3, RB-FZ-1 F4, and RB-FZ-1 F5 by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE RB-FZ-1F1, RB-FZ-1F2, RB-FZ-1F3, RB-FZ-1F4, and RB-FZ-1 F5 ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve for RB-FZ-1 F1, RB-FZ-1 F2, RB-FZ-1 F4, and RB-FZ-1 F5 13 Manually open Core Spray valves V-20-1 and V-20-2 and close V-20-4 to provide Reactor Coolant Makeup from Condensate Storage Tank for RB-FZ-1 F3, Fire Zone RB-FZ-IG The Shutdown Cooling room is located on the north side of the Reactor Building (elevations 38' and 51'-3"). The ceiling is reinforced concrete with no openings. The floor and walls are reinforced concrete with non-rated openings to adjoining fire areas/zones. The non-rated openings were either sealed similar to a 1-hour minimum fire barrier (six inches of fire-rated silicone foam) or were evaluated as acceptable. Combustible loading consists of cable insulation, miscellaneous health physics material and pump motors. The fire loading is "low" as defined in the FHAR. Smoke detectors are installed and sound an alarm in the Control Room.

Hose stations and portable extinguishers installed in RB-FZ-1 D (Reactor Building elevation 51'-

3") are available for use in this area.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 24 of 49 Docket No. 50-219 Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed.from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual actions for RB-FZ-1G by Item Number as identified in Attachment 2 of this letter.

TABLE RB-FZ-1G ITEM # Manual Action Required 11 Locally read CRD flow gauge FI-225-998 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Zone RB-FZ-IH This fire zone is the Trunnion Room, elevation 23'-6, located in the Reactor Building. The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were evaluated as acceptable. Fire loading consists of minimal cable and MSIV damping oil within the MSIV actuators. The fire loading is "low" as defined in the FHAR. A hose station is provided in adjacent fire zone TB-FZ-11E (Condenser Bay) in the heater bay area. In addition, portable extinguishers are provided in access to the condenser bay area for use in this zone. The only fire safe shutdown equipment and cables located in the area are associated with the outboard MSIVs that are located outside the drywell.

The inboard MSIVs and cables are located inside the drywell and are not located in this area.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual action for RB-FZ-1 H by Item Number as identified in Attachment 2 of this letter.

TABLE RB-FZ-1 H

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 25 of 49 Docket No. 50-219 Fire Area TB-FA-3A The 4160V Emergency Switchgear 1C Vault is located in the Turbine Building Mezzanine 23'-6" elevation south end. The floor is reinforced concrete while the walls and ceiling are coated Metal lath with a fire resistant rating. All openings in these barriers are fire rated to adjoining fire areas/zones. Fire loading consists of minimal cable insulation, minimal amounts of plastics, and minimal amounts of hydrogen. The fire loading is "low" as defined in the FHAR. Fire Protection features include a manual, total flooding C02 system. Smoke detectors are installed at the ceiling of the vault and sound an alarm locally and in the Control Room. Actuation of one fire detector closes all fire dampers in both TB-FA-3A and TB-FA-3B. In addition, an automatic pre-action sprinkler system is installed over the roof of this fire area in fire zone TB-FZ-1 1C (4160 Volt Switchgear 1A and 1 B).

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual actions for TB-FA-3A by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE TB-FA-3A ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 18 Manually trip 4160V 1 D Breakers for Main Core Spray Pumps "B" and "C" Fire Area TB-FA-3B The 4160V Emergency Switchgear 1D Vault is located in the Turbine Building Mezzanine 23'-6" elevation south end. The floor is reinforced concrete while the walls and ceiling are coated Metal lath with a fire resistant rating. All openings in these barriers are fire rated to adjoining fire areas/zones. Fire loading consists of cable insulation, minimal amounts of plastics, and minimal amounts of hydrogen. The fire loading is "low" as defined in the FHAR. Fire Protection features include a manual, total flooding C02 system. Smoke detectors are installed at the ceiling of the vault and sound an alarm locally and in the Control Room. Actuation of one fire detector closes all fire dampers in both TB-FA-3A and TB-FA-3B. In addition, an automatic pre-action sprinkler system is installed over the roof of this fire area in fire zone TB-FZ-1 1C (4160 Volt Switchgear 1A and 1B).

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 26 of 49 Docket No. 50-219 Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of the Condensate Transfer System to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the actions. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status.

The following table provides a summary of the manual actions for TB-FA-3B by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE TB-FA-3B ITEM # Manual Action Required 7 Manually open V-9-2099 and V-1 1-49 and close V-1 1-63 and V-1 1-41 to align the fire water system for make-up water to Isolation Condenser "B" since there is no power

("B" Train) available to the Condensate Transfer System 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Area TB-FA-26 The 125 VDC Battery Room 'C' (elevation 23'-6") is located in the south end of the Turbine Building and is separated from adjoining fire zones TB-FZ-1i1C (4160 Volt Switchgear 1A and 1B), TB-FZ-i 1G (Turbine Mezzanine Truck Bay), and TB-FZ-1 D (Turbine Building basement -

south end) with fire rated barriers. Fire loading consists of battery cases and a minimum amount of cable. Fire loading is "low" as defined in the FHAR. Fire protection features include a particles-of-combustion detection system that will alarm locally and in the Control Room.

Hose lines are available from a hose station outside this area and from outside hydrants and hose houses. Fire extinguishers are also provided.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

An enhancement is being made to install new sprinkler heads (area-wide) in the 'C' 125 VDC Battery Room from the existing pre-action fire sprinkler system in the 4160V Switchgear 1A and

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 27 of 49 Docket No. 50-219 1 B zone, thereby improving survivability of area components and cables, and reducing the likelihood of the fire spreading.

The following table provides a summary of the manual actions for TB-FA-26 by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted. Note that TB-FA-26 is wholly contained within TB-FZ-1 1C, and that cables traveling to TB-FA-26 must traverse TB-FZ-1 1C. Therefore, TB-FZ-11C and TB-FA-26 are analyzed together for Fire Safe Shutdown analysis purposes, and therefore, the manual actions are duplicated in each area. A fire contained within TB-FA-26 is not expected to require most of the actions shown below. These areas were not considered a single analysis area in the original FHAR submittal.

TABLE TB-FA-26 ITEM # Manual Action Required 1 Manually trip 4160V 1D Breakers and control USS 1B2 and 1B3 480V Breakers locally at LSP-1 D 3 Manually control 1 B3M Breaker from LSP-1 B3 6 Manually re-close Feeder Breaker MCC 1 B32 at USS 1 B3 due to an undervoltage trip.

12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 15 Manually trip 4160V Breakers for Reactor Feedwater Pumps 1A, 1B, and 1C 17 Manually trip 4160V 1C Breakers for Main Core Spray Pumps "A" and "D" 18 Manually trip 4160V 1D Breakers for Main Core Spray Pumps "B" and "C" 19 Manually trip 480V USS 1A2 Breakers for Core Spray Booster Pumps "A" and "D" Fire Zone TB-FZ-11A The Turbine Operating Floor 46'-6" elevation is located in the Turbine Building and has reinforced fire rated floors with unprotected openings adjacent to fire zones TB-FZ-1 1 B (Lube Oil Bay), TB-FZ-1 1E (Condenser Bay), and TB-FZ-1 1G (Turbine Mezzanine Truck Bay). The walls are sheet metal on unprotected steel. The east wall adjoining OB-FZ-5 (Control Room) and TB-FZ-1 1B (Turbine Lube Oil Bay) is a fire resistive wall. The roof is a Class II metal deck on unprotected steel. The only significant combustible loading is the bearing lube oil and hydrogen for generator cooling. Fire loading is "moderate" as defined in the FHAR. The fire protection features include an automatic closed head sprinkler system provided over the bearing lift pump and turbine bearings. A fixed C02 extinguishing system is provided for localized protection of the generator bearings and exciter. Hose stations are provided throughout the operating floor. Fire extinguishers are also provided throughout this area. No fire safe shutdown equipment or cables are located in this area.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 28 of 49 Docket No. 50-219 Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual action for TB-FZ-1 1A by Item Number as identified in Attachment 2 of this letter.

TABLE TB-FZ-1 1A ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Zone TB-FZ-1 I B The Turbine Lube Oil Storage, Pumping & Purification Area is located on the north end of the Turbine Building, elevations 0-0", 27-0, 36-0, and 46'-6". The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were evaluated as acceptable. Turbine lube oil is the major fuel loading.

Cable insulation also provides some combustible loading. The fire loading is "high" as defined in the FHAR. Fire protection features include a closed head automatic sprinkler system that is provided over cable trays. Water spray system (open-head deluge system) is installed over oil handling equipment and the oil storage tank. Closed head sprinkler system is provided for the bearing lift pump. Rate-of-rise/fixed temperature thermal detectors are installed over the largest hazard in the a.rea, which is the lube oil storage tank; these detectors actuate the open head deluge (water spray) system. An alarm is provided to the Control Room when water flows from a single sprinkler head or from the deluge system. Hose stations are installed in the area at the basement level and in an adjacent corridor on the mezzanine level. Hose lines are also available from outside hydrants and hose houses. Fire extinguishers are provided throughout the area and AFFF Foam is staged in the Fire Brigade van for use, if necessary. Additional detection was not deemed necessary because the area is protected by an automatic wet-pipe sprinkler system and the open-head deluge system is located above the largest hazard (Lube Oil Tank) and both alarm to the Control Room when a flow condition occurs.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 29 of 49 Docket No. 50-219 The following table provides a summary of the manual actions for TB-FZ-1 1B by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE TB-FZ-1 1B ITEM # Manual Action Required 1 Manually trip 4160V 1 D Breakers and control USS 1 B2 and 1B3 480V Breakers locally at LSP-1 D 2 Locally read Condensate Storage Tank level 3 Manually control 1B3M Breaker from LSP-1 B3 4 Manually control Condensate Transfer Pump 1-2 from LSP-1 B32 5 Manual control Emergency Diesel Generator #2 from LSP- DG2 6 Manually re-close Feeder Breaker MCC 1 B32 at USS 1B3 due to an under voltage trip.

12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 15 Manually trip 4160V Breakers for Reactor Feedwater Pumps 1A, 1 B, and 1C 16 Manually trip Reactor Recirculation Pumps ("A", "B", "C", "D" and "E") 4160V Switchgear 1A and lB.

17 Manually trip 4160V 1C Breakers for Main Core Spray Pumps "A" and "D" 18 Manually trip 4160V 1 D Breakers for Main Core Spray Pumps "B" and "C" 19 Manually trip 480V USS 1A2 Breakers for Core Spray Booster Pumps "A" and "D" Fire Zone TB-FZ- 1C The 4160V Switchgear Room 1A and 1 B, is located at the west end of the Turbine Building on Mezzanine Level elevation 23'-6". The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were evaluated as acceptable. Fire loading consists of cable insulation and miscellaneous ordinary combustibles. The fire loading is "low" as defined in the FHAR. Fire protection features include smoke detection system installed at the ceiling over 4160V Switchgear 1A and 1 B which actuates an alarm locally and in the Control Room. This system also actuates a pre-action sprinkler system in this fire zone located over the 4160V 1C & 1 D Switchgear vaults (Fire areas TB-FA-3A and TB-FA-3B). Actuation of the pre-action sprinkler system alarms locally and in the Control Room. Hose lines are available from a hose station outside this area and from outside hydrants and hose houses. Fire extinguishers are also provided.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 30 of 49 Docket No. 50-219 An enhancement is being made to install additional sprinkler heads on the existing pre-action fire sprinkler system so that the sprinkler system within Fire Zone TB-FZ-1 1C is area-wide (except for the small caged area to the east of the "C" 4160V Switchgear Room), thereby improving survivability of area components and cables (hazards protected), and reducing the likelihood of the fire spreading.

The following table provides a summary of the manual actions for TB-FZ-1 1C by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE TB-FZ-1 1C ITEM # Manual Action Required 1 Manually trip 4160V 1D Breakers and control USS 1B2 and 1B3 480V Breakers locally at LSP-1 D 3 Manually control 1 B3M Breaker from LSP-1 B3 6 Manually re-close Feeder Breaker MCC 1B32 at USS 1 B3 due to an under voltage trip.

12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 15 Manually trip 4160V Breakers for Reactor Feedwater Pumps 1A, 1B, and 1C 17 Manually trip 4160V 1C Breakers for Main Core Spray Pumps "A" and "D" 18 Manually trip 4160V 1D Breakers for Main Core Spray Pumps "B" and "C" 19 Manually trip 480V USS 1A2 Breakers for Core Spray Booster Pumps "A" and "D" Fire Zone TB-FZ-11 D This fire zone is located in the Turbine Building Basement Floor south end elevation 3'-6". The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were evaluated as acceptable. Fire loading consists of cable insulation, transformer oil, lube oil (minor amounts of lubricants enclosed in valve gear boxes, pump bearings, etc.), and hydrogen seal oil; miscellaneous ordinary combustibles, such as wood and paper, exist in small quantities. The fire loading is "low" as defined in the FHAR. The Unit Substation 1Al and 1B1 transformers are filled with Dow Corning 561 Silicon transformer oil. This material has characteristics that minimize the likelihood of a fire involving the insulating oil itself. A review of vendor information indicates that the flash and fire points are almost twice as high as other transformer oils, but more importantly, the heat release rate is almost 10 times lower, and any postulated fire originating at the transformer itself would tend to be limited in duration and would not involve sustained burning of the silicon oil. This judgment is supported by testing performed in 1977 by Industrial Risk Insurers of DC-561, which showed that the fluid tended to form a crust and self-extinguish (Reference 13). Based on the characteristics of the silicon fluid, any postulated fire event is

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 31 of 49 Docket No. 50-219 expected to be very short in duration. The fire protection features include a closed-head automatic sprinkler system installed throughout the general area. A water spray system with closed head directional nozzles protects the hydrogen seal oil unit. Hose stations and fire extinguishers are also located in the area. SER dated June 25, 1990 (Reference 7) provided an exemption for not having automatic fire detection. The flow alarm for the sprinkler system alarms locally and in the Control Room. This was determined to be adequate'based on the fact that the fire will not be of significant magnitude or duration, it will be promptly extinguished by one of the two automatic sprinkler systems installed in this fire zone, and the flow alarms will promptly alert the fire brigade who will respond to manually fight the fire.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual actions for TB-FZ-1 1D by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE TB-FZ-1 1D ITEM # Manual Action Required 1 Manually trip 4160V 1D Breakers and control USS 1 B2 and 1B3 480V Breakers locally at LSP-1 D 3 Manually control 1 B3M Breaker from LSP-1 B3 5 Manual control Emergency Diesel Generator #2 from LSP- DG2 6 Manually re-close Feeder Breaker MCC 1B32 at USS 1 B3 due to an under voltage trip.

12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 15 Manually trip 4160V Breakers for Reactor Feedwater Pumps 1A, 1B, and 1C 17 Manually trip 4160V 1C Breakers for Main Core Spray Pumps "A" and "D" 18 Manually trip 4160V 1D Breakers for Main Core Spray Pumps "B" and "C" 19 Manually trip 480V USS 1A2 Breakers for Core Spray Booster Pumps "A" and "D" Fire Zone TB-FZ-1 I E The condenser bay is located in the Turbine Building elevation 0'-0". The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones.

The non-rated openings were evaluated as acceptable. The fire loading consists of fiberglass-reinforced polyester grating installed on permanent scaffolding (flame spread of 15 as

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 32 of 49 Docket No. 50-219 determined by ASTM E84) and cable insulation with a minor amount of lube oil in pumps. The low flame spread provides assurance that the grating will not contribute to a fire without a sustained external ignition source. The fire loading is "low" as defined in the FHAR. Fire protection features include closed head automatic sprinklers installed throughout the condenser bay and over cable trays in the condenser bay section. This system is not area-wide because the heater bay section does not have sprinkler heads except for the southwest corner where sprinkler heads were installed to protect an unsealed pipe and duct chase to another fire zone (TB-FZ-1 1H). There is very minimal combustible loading in the heater bay portion where the feedwater heaters are located and there are only a few cable trays that go to equipment/components that support the feedwater heaters (e.g., valves, etc.). Hose stations and fire extinguishers are also provided throughout this area. SER dated June 25, 1990 (reference 7) provided an exemption for not having automatic fire detection. The flow alarm for the sprinkler system alarms locally and in the Control Room. This was determined to be adequate based on the fact that the fire will not be of significant magnitude or duration, it will be promptly extinguished by the automatic sprinkler system installed in this fire zone, and the flow alarms will promptly alert the fire brigade who will respond to manually fight the fire.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed.

The following table provides a summary of the manual actions for TB-FZ-1 1E by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE TB-FZ-1 1E ITEM # Manual Action Required 1 Manually trip 4160V 1D Breakers and control USS 1 B2 and 1B3 480V Breakers locally at LSP-1D 2 Locally read Condensate Storage Tank level 3 Manually control 1 B3M Breaker from LSP-1 B3 4 Manually control Condensate Transfer Pump 1-2 from LSP-1B32 5 Manual control Emergency Diesel Generator #2 from LSP- DG2 6 Manually re-close Feeder Breaker MCC I B32 at USS 1 B3 due to an under voltage trip.

12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 15 Manually trip 4160V Breakers for Reactor Feedwater Pumps 1A, 1 B, and 1C 16 Manually trip Reactor Recirculation Pumps ("A", "B", "C", "D"and "E")

4160V Switchgear 1A and 1B.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 33 of 49 Docket No. 50-219 17 Manually trip 4160V 1C Breakers for Main Core Spray Pumps "A" and "D" 18 Manually trip 4160V 1 D Breakers for Main Core Spray Pumps "B" and "C" 19 Manually trip 480V USS 1A2 Breakers for Core Spray Booster Pumps "A" and "D" Fire Zone TB-FZ-1 I F The Feedwater Pump Room is located in the Turbine Building Basement elevation 3'6" on the east side. The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were evaluated as acceptable.

The fire loading is "low" as defined in the FHAR. The fire loading consists of cable insulation, plastics and lube oil in the pumps. Fire protection features include manual suppression available from fire extinguishers and hose stations.

Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of the Condensate Transfer System to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status.

An enhancement is being made to install area-wide rate compensated/fixed temperature thermal detection in the Feedwater Pump Room to provide for improved operator notification ability, thereby providing a quicker response time for any required actions.

The following table provides a summary of the manual actions for TB-FZ-1 1F by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE TB-FZ-1 1F ITEM # Manual Action Required 7 Manually open V-9-2099 and V-1i1-49 and close V-1 1-63 and V-1 1-41 to align the fire water system for make-up water to Isolation Condenser "B" since there is no power

("B" Train) available to the Condensate Transfer System 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve Fire Zone TB-FZ-11G This area is located in the Turbine Building Mezzanine South elevation 23'-6". The floor, walls and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were evaluated as acceptable. Fire loading consists of

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 34 of 49 Docket No. 50-219 cable insulation, plastics, rubber, and wood. The fire loading is "low" as defined in the FHAR.

Fire protection features include hose lines from a hose station outside this area and from outside hydrants and hose houses. Portable fire extinguishers are also located in the area. A closed head sprinkler system protects the area under the turbine. This system alarms locally and in the Control Room.

Manual action No. 12 in Attachment 2, credited for this area, essentially duplicates the EOP contingency actions for RPV level control, which is readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of this operator action, since the EOPs would direct the same action to be performed. There is also significant time available to perform manual action Nos. 17 and 18 (Attachment 2).

An enhancement is being made to install area-wide rate compensated/fixed temperature thermal detection into Fire Zone TB-FZ-1 1G to provide for improved operator notification ability, thereby providing a quicker response time for any required actions.

The following table provides a summary of the manual actions for TB-FZ-1 1G by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE TB-FZ-1 1G ITEM # Manual Action Required 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve 17 Manually trip 4160V 1C Breakers for Main Core Spray Pumps "A" and "D" 18 Manually trip 4160V 1D Breakers for Main Core Spray Pumps "B" and "C" Fire Zone TB-FZ-1 1 H The Demineralizer Tank and Steam Jet Air Ejector Area, elevations 3'-6" and 23'-6" is located in the Turbine Building southeast end. The walls are not rated. The floor and ceiling are reinforced concrete with both rated and non-rated openings to adjoining fire areas/zones. The non-rated openings were evaluated as acceptable. Fire loading consists of cable insulation, plastics and miscellaneous ordinary combustibles. The fire loading is "low" as defined in the FHAR. The fire protection feature includes manual fire suppression provided by hose station and fire extinguishers. No fire safe shutdown equipment is located in this area but there are two "B" Train 125 VDC control power cables (non-protected train) that traverse through the stairway area of this zone at approximately elevation 10'. There are also safe shutdown cables buried below the concrete floor and in one section, within a pull-pit covered by sand. SER dated June 25, 1990 (Reference 7) provided an exemption for not providing a 3-hour barrier for the "A"

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 35 of 49 Docket No. 50-219 Train power cable that is located in the stairway area of this zone since it is located in a pull-pit that is covered with a minimum of six inches of sand.

Manual action Nos. 7 and 12 in Attachment 2, credited for this area, essentially duplicate the EOP contingency actions for RPV level control and for the loss of Condensate Transfer System to the Isolation Condenser, both of which are readily diagnosed from the Control Room due to the numerous indications and symptoms available. There is also significant time available to perform the action. Therefore, if a fire occurred in this area and was not immediately discovered, any delay in the entry into the appropriate FSP or delay in suppression of the fire would not significantly affect the performance of the operator actions, since the EOPs would direct the same actions to be performed, based on system status.

The following table provides a summary of the manual actions for TB-FZ-1 1H by Item Number as identified in Attachment 2 of this letter.

The manual actions in the table below would be performed due to potential cable and/or equipment damage unless otherwise noted.

TABLE TB-FZ-1 1H ITEM # Manual Action Required 7 Manually open V-9-2099 and V-1 1-49 and close V-1 1-63 and V-1 1-41 to align the fire water system for make-up water to Isolation Condenser "B" since there is no power

("B" Train) available to the Condensate Transfer System 12 Manually open V-1 5-237, throttle V-1 5-30 while monitoring flow at FI-225-2 and close V-1 5-52 to establish CRD flow to Reactor due to the loss of instrument air to the CRD Flow Control Valve B. REVIEW OF FEASIBILITY USING THE CRITERIA LISTED IN INSPECTION PROCEDURE 71111.05 RIS 2006-10 addresses operator manual actions in which an SER issued by the NRC approves the operator manual actions, but is outside of the 10 CFR 50.12 exemption process. The RIS directs licensees to "request an exemption under 10CFR Part 50.12, citing the special circumstances of section 50.12(a)(2)(ii), citing the SER as the safety basis, and confirming that the safety basis established in the SER remains valid." The SERs that approved the operator manual actions did not list a specific safety basis. At the time the NRC issued the SERs, the criteria necessary to establish that operator manual actions were feasible had not yet been created; however, OCNGS has confirmed that the manual actions discussed in this exemption request are essentially unchanged from their original approved configuration, with minor changes as noted in Attachment 2. Subsequently, the NRC created criteria against which the feasibility of operator manual actions should be reviewed and placed the criteria in Inspection Procedure 71111.05. In order to confirm to the NRC that the operator manual actions are feasible, which would support the conclusion that the safety basis established in the 1986 and 1990 SERs remains valid, each of the operator manual actions addressed by this exemption request was reviewed against the feasibility criteria listed in the March 6, 2003 revision of

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 36 of 49 Docket No. 50-219 Inspection Procedure 71111.05. A general explanation of how the manual actions meet the criteria is provided below. Certain configurations are provided with a more detailed explanation.

Diagnostic Instrumentation: The Fire Support Procedures (FSPs) provide the operators with specific instructions in the event of a fire in a specific fire area. The FSPs for each fire area/zone provide a list of the key protected (credited) equipment available for a fire in that area. Therefore, the diagnostic instruments that are available are listed in each FSP along with actions to restore needed instruments that may be disabled by the fire. For hot shutdown using the Isolation Condenser, this list includes RPV coolant level, RPV pressure, condensate storage tank water level and certain system process monitoring instruments. For hot shutdown using Electromatic Relief Valves (EMRVs) and Core Spray, this list includes RPV coolant level, RPV pressure, torus water level, torus water temperature and certain system process monitoring instruments. These indications are consistent with the guidance in Generic Letter 81-12, " Fire Protection Rule (45 F/R 76602, November 19, 1980)," and Information Notice 84-09, " Lessons Learned From NRC Inspections of Fire Protection Safe Shutdown Systems (10 CFR 50, Appendix R)." If there are any "prompt" actions that are needed to restore an instrument for a fire in that area (i.e., those that need to be performed within 45 minutes), the applicable FSP identifies the action(s) as "prompt."

Environmental Considerations: These are conditions that operators performing the manual actions may encounter while traveling to the manual action location or where the manual action is to be performed. Adverse environmental conditions could prevent the operator from performing the required manual actions within the allotted time.

Radiation Levels: None of the manual actions require operators to enter areas that have radiation levels so high that access would be prohibited. This includes both at power and post shutdown conditions. At no time would operators be subjected to radiation doses close to the 10 CFR Part 20 limits. OCNGS Radiation Engineering has reviewed the operator manual actions in the areas listed and determined that no operator would have to perform a task that would result in a dose exceeding 100 millirem, given the anticipated plant conditions. Most of the actions are located in outdoor areas, electrical equipment rooms (e.g., switchgear, battery room, etc.) or general areas of the plant where the anticipated dose rates are less than 5 millirem per hour. The southwest Reactor Building corner room (RB-FZ-1 F2) area is normally a Locked High Radiation area. However, the manual actions in this area will result in a dose of less than 100 millirem for the duration of the actions.

Emergency Lighting: Each of the operator manual actions addressed by this exemption request is provided with emergency lighting in the location where the manual action is performed and in the access/egress route to the manual action location. Manual operation of safe shutdown equipment after eight hours does not require emergency lighting support in accordance with Appendix R, Section IIl.J. There are periodic tests that ensure that the lights are operating properly and that the lights are properly aimed. In a few cases, re-entry into the area where the fire occurred is required. It is assumed that the emergency lighting in the area where the fire occurred may be unavailable following the fire. Portable hand lights are available in the Fire Brigade Turnout Area (located next to the Control Room) for use by the safe shutdown equipment operators. These portable hand lights are tested on a periodic basis as part of a routine inventory surveillance test. For the actions that require re-entry into the initiating fire area, the time limit to complete the action is at least 180 minutes in all cases. This provides ample time to obtain the portable hand light prior to accessing the area to perform the operator

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 37 of 49 Docket No. 50-219 manual action. The emergency lighting has been reviewed in previous NRC fire protection inspections.

Temperature and Humidity Conditions: Most of the actions are located in outdoor areas, electrical equipment rooms (e.g., switchgear, battery room, etc.) or general areas of the plant.

Extreme temperature and humidity conditions are not anticipated in the areas where the manual actions are performed in the time frames in which they are required.

Fire Effects: This environmental condition considers if the operators will encounter fire effects (smoke and toxic gases) enroute to the location where the action is to be performed or at the location where the action is to be performed. To determine the fire effects, the initiating fire area spatial and ventilation relationship with the action and access locations were considered. Fire effects related to this exemption request could be placed into specific categories as described below.

Separate Buildings: The initiating fire area and the action fire area are located in separate buildings. These are cases of physically separate buildings. A fire in one building would not affect the other building. There would be no impact to operators performing actions in the other building and actions within this category need no further explanation.

Separate Fire Areas/Zones and Separate Ventilation Systems: The initiating fire area and the action fire area are separate fire areas/zones with separate ventilation systems.

The access route goes through fire areas/zones separate from the initiating fire area. There would be no impact to operators performing actions in separate fire areas/zones with separate ventilation systems and actions within this category need no further explanation.

The fire effects on the manual actions stipulated in the Attachment 2 Table are as follows:

1) Six of the manual actions (Items 2-6 and 14 from the Attachment 2 Table) are either located in the Diesel Building, intake area or yard area and the initiating fires either occur in the Turbine Building or Main Office Building, which are separate buildings from where the manual actions occur.
2) One of the manual actions (Item 7 from the Attachment 2 Table) is in the Reactor Building and the initiating fires either occur in the Turbine Building, Office Building or Intake Area, which are separate buildings from where the manual actions occur.
3) Three of the manual actions (Items 8, 10 and 19 from the Attachment 2 Table) occur either in "A" 480V Room (OB-FZ-6A), "B" 480V Room (OB-FZ-6B) or "A/B" Battery Room. All of these fire zones are separated from the initiating fire by rated barriers and all of the rooms have separate ventilation systems.
4) Two of the manual actions (Items 11 and 13 from the Attachment 2 Table) are in separate fire zones in the Reactor Building that have the same ventilation system.

There are 204 minutes (3.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />) between the start of the event and when the actions have to occur. The fire will be extinguished and the smoke vented from the area long before the action needs to be performed. The Reactor Building has a significant volume with its high ceilings and open equipment hatches and stairwells. This provides an advantage for the types of fires that are anticipated in this area; there will

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 38 of 49 Docket No. 50-219 be significant dilution of smoke and self-venting to the refuel floor (Reactor Building 119' elevation), which has no manual actions and also contains an automatic wet pipe sprinkler system. Additionally for the openings between the 23' to 51' elevations and 51' to 75' elevations, a water curtain is available (automatic or manual operation),

which will provide reasonable assurance of extinguishing any postulated fire and will also help with cooling and general improvement of overall environmental conditions.

The operators will not have any delay or need self-contained breathing apparatus (SCBA) to perform either of these actions.

5) One of the manual actions (Item 16 from the Attachment 2 Table) is in the Turbine Building Switchgear Room (TB-FZ-11C) and the initiating fires occurred in separate fire zones in the Turbine Building Condenser Bay (TB-FZ-1 1 E), Turbine Building Lube Oil Bay (TB-FZ-1 1B) or Office Building. The ventilation system is a common system in the Turbine Building but the system exhausts away from the Switchgear Room towards the Condenser Bay and eventually up the Plant stack. The Condenser Bay is the only fire zone that is in close proximity to the Switchgear Room. The fire zone boundary separating the Switchgear Room from the Condenser Bay is a concrete wall with all openings sealed in this area. Also, there is a Pre-Action Sprinkler System installed on the switchgear side of the fire zone boundary and a wet-pipe sprinkler system installed on the Condenser Bay side that protects this boundary. Therefore, there should not be any fire effects for this particular manual action.
6) Two of the manual actions (Items 17 and 18 from the Attachment 2 Table) may require the use of a SCBA for either traveling to the "C" or "D" 4160V Switchgear Rooms, or if C02 is present in the area. The manual actions are in the Turbine Building Switchgear Room (one action in either TB-FA-3A or 3B) and the initiating fires are in separate fire zones but there are some unsealed openings (Turbine Building fire zones) to the areas where access/egress is required and for one fire zone (TB-FZ-1 1G), post fire re-entry is required for access to the Switchgear Room. There are open equipment hatches that exist in the northeast corner of the ceiling of the Turbine Basement (TB-FZ-1 1D),

which goes to the Turbine Mezzanine (TB-FZ-1 1G) area on 23'-6" elevation. The equipment hatch also continues in the ceiling of TB-FZ-1 1G up to the Turbine Operating floor (TB-FZ-1 1A) on 46'-6" elevation. There is also a larger equipment hatch in the ceiling of TB-FZ-1 1G in the truck bay area in the southwest corner. The only access to the Switchgear Room is through TB-FZ-1 1G on the south side, which is approximately 55 feet south of the equipment hatch in the northeast corner. There is a closed-head, automatic sprinkler system installed throughout the general area in the Turbine Basement and there is a water spray system with closed head directional nozzles that protects the hydrogen seal oil unit. It is expected that the installed suppression systems will limit the amount of smoke and hot gases that rise up into the Turbine Mezzanine area plus any smoke that does enter into this area will tend to continue to rise up towards the Turbine Operating floor. In addition, the Turbine Operating floor large volume will dilute and stratify the smoke at the ceiling, providing for a less hostile environment at floor level. Also, the ventilation will pull the smoke towards the Turbine Operating floor as long as it continues to operate. Finally, in the area where the action is performed, there are two smoke detectors installed in each 4160V Vault area near the ceiling (total of 4 detectors) and the fire dampers in the "C" and "D" 4160V vaults would close immediately upon detection of smoke in either the "C" or "D" 4160V vaults. It only takes the actuation of one detector in the "C" or "D"

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 39 of 49 Docket No. 50-219 4160V vault to close the dampers in both the "C" and "D"4160V vaults. Therefore, it is unlikely that the SCBA would be required once the operator was inside the "C" and "D" 4160V vaults. Thus, there is reasonable assurance that the Turbine Mezzanine or the "C" and "D" 4160V area environment (e.g., visibility, heat, etc.) will not reach a point that will prohibit performance of these actions.

For a fire in TB-FA-3A or TB-FZ-1 1C, C02 may be present due to either spurious actuation of the C02 system or due to the fact that TB-FA-3A and TB-FA-3B have common discharge piping that actuates in both rooms ifthe C02 is manually actuated.

The Fire Brigade will be in the area for a fire in TB-FA-3A or TB-FZ-1 1C, and could assist with performing this manual action. Also, the action could be delayed until the area is ventilated since there are 120 minutes to perform this action.

In addition, the manual actions are tripping Core Spray 4160V breakers prior to the reactor pressure decreasing to 310 PSIG, which is the permissive for the opening of the Core Spray parallel injection valves. This action is being performed to prevent an inadvertent reactor overfill condition so that the Isolation Condenser remains available.

The Fire Safe Shutdown (FSSD) calculations conservatively state that these actions need to be accomplished in 120 minutes. This time limit assumes the Control Room operator takes action in accordance with the EOPs (EMG-3200-01A "RPV Control -

No ATWS EOP Flowchart") to initially "stabilize" reactor pressure below 1045 psig, and then control the cooldown rate of the reactor at the procedurally required rate of less than 100 degrees per hour. Furthermore, if reactor vessel make-up (CRD) were not immediately available, procedures instruct the Operator to "stabilize" reactor pressure, until vessel makeup is available, thereby further delaying the need for the action to trip the Core Spray pumps. Therefore, Operations controls how soon the Core Spray pumps need to be tripped by limiting cool down or they could override the Core Spray initiation logic from the Control Room (per EMG-3200-01A and EMG-SP10 "Support Procedure 10 - Stopping Injection From the Core Spray System") to keep the parallel injection valves closed until access to the Switchgear Room was available. In addition, if a loss of offsite power occurs, then these actions would not be required.

7) One of the manual actions (Item 1 from the Attachment 2 Table) may require the use of an SCBA to travel to the "D"4160V Switchgear Rooms or to perform the manual action if C02 actuated. This action has the same issue with smoke and/or C02 as number No. 6 above and that discussion applies to this manual action. The only access to the Switchgear Room is through TB-FZ-1 IG and this area may be affected by smoke from the other Turbine Building fire zones; additionally, as discussed above, C02 may be present in the area where the manual action is required.

This manual action is initiating Local Shutdown Panel LSP-1 D to isolate damaged cable and to control the breakers required to restore power to the required "D"4160V switchgear loads. Power needs to be restored within 45 minutes from the time that the Isolation Condenser is placed in service per the FSSD calculations so that the Condensate Transfer System can provide makeup to the Isolation Condenser.

However, if access is not available due to excessive smoke, then firewater could be utilized until access is available as directed by the EOPs. The water inventory study indicates that reactor vessel makeup would not be required for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and 24 minutes and the "B" Battery that is utilized for the Isolation Condenser is sized to provide power

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 40 of 49 Docket No. 50-219 for all connected loads for up to 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. After 60 minutes, when the fire is expected to be extinguished, the smoke/C02 would be vented from the areas allowing the manual action to be performed and power to be easily restored within the 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

8) Two of the manual actions (Items 9 and 20 from the Attachment 2 Table) may require the use of an SCBA to access the "B" 480V Switchgear Room to trip a breaker and remove its close fuse and/or to partially initiate the Remote Shutdown Panel (RSP)

(operating control switches). The barriers between the two fire zones are rated and they both have their own ventilation system; however, fire-fighting activities may allow smoke to enter this area. The SCBA is staged in this area and the operators are all trained on the use of SCBA since they are all members of the fire brigade. It is not expected that a large amount of smoke will be in this area because the initiating area is protected by halon and the fire brigade is trained to allow a 20-minute soak time before entering. Additionally, if the first discharge did not work, then a second discharge of halon will be initiated with another soak time. The actions would not have to be performed for at least 120 minutes; therefore, if necessary, the actions could be delayed until the fire is extinguished and the area vented. Also, if power were lost to USS 1 B2 as is postulated for this area, one of the actions would not be required.

Lastly, the five fire brigade members would be in the area to assist since they would be in standby while the halon was soaking.

9) One of the manual actions (Item 12 from the Attachment 2 Table) requires re-entry into the fire zone where the fire initiated. The action is to manually manipulate three two-inch valves that are located within approximately four feet of each other. There are 204 minutes between the start of the event and when the actions need to occur to restore CRD flow. The fire will be extinguished and the smoke vented from the area long before the action needs to be performed. The operators will not have any delay or need SCBA to perform this action. SER dated June 25, 1990, Section 3.3.2 (Reference 7), approved operating one of the valves (V-1 5-30) and the SER concluded the following:

"Since the fire in this fire zone would not be of significant magnitude, the duration of the fire will be short due to automatic extinguishment or extinguishment by the plant fire brigade. The valve is located within the spray area of a deluge system and the heat conduction to the water filled piping will provide cooling of the valve.

The valve is not required to operate for almost 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after the fire. Therefore manual operation of the valve is considered to be achievable without the addition of any further protection."

10) One of the manual actions (Item 15 from the Attachment 2 Table) requires re-entry into the fire zone where the fire initiated. This action is to manually trip the Reactor Feedwater Pumps at the 4160V Switchgear Room. The feedwater flow is originally stopped using the feedwater regulating valves and this action is to stop the pumps since the regulating valves may not remain closed with the loss of instrument air.

These valves lock up and will stay in that position indefinitely if there are no air leaks on the valves. If there are leaks, then the valves may drift back open so it is assumed that there are minor leaks and that the feedwater pumps should be tripped in 180 minutes (3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />). The fire will be extinguished and the smoke vented from the area long before the action needs to be performed. The operators will not have any delay or

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 41 of 49 Docket No. 50-219 need SCBA to perform this action. In addition, if a loss of offsite power occurs, as is postulated in a few of the areas, then these actions would not be required.

Staffing: There are five personnel (operators and maintenance personnel) assigned fire brigade duty and four operators assigned as safe shutdown operators for each shift. The four operators assigned as safe shutdown operators are not assigned fire brigade responsibilities; two of them will be responsible for performing the operator manual actions outside of the Control Room while the other two operators remain in the Control Room. Time estimates have been performed for the manual actions contained in this exemption request, as well as other actions for which an exemption is not being requested at this time. These time estimates are maintained within the individual fire safe shutdown analysis calculations for each fire area/zone, and have been reviewed on several occasions by the NRC as part of triennial inspections.

These time estimates show that the available operators can complete all of the manual actions.

Communications: OCNGS credits the use of portable radios during an Appendix R Event.

Two-way voice communications is available between the Control Room, Remote/Local Shutdown Panels and manual action locations. The communication system is provided with three trains of repeaters located in different plant areas. The three repeaters are provided with (individual) battery backups sized to support the repeaters for at least 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> (main repeater battery is sized for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />), which is sufficient to ensure the completion of the time-critical operator actions. Line-of-sight radio communication ("talk-around") and face-to-face communication are also available. This system has been analyzed to demonstrate one train is free of fire damage for all postulated fire scenarios. Most of the manual actions are simple in nature and do not require constant interface with the Control Room while performing the action; however, the radios are available if necessary. Upon completion of the action, the operator can report directly back to the Control Room, if necessary, or use the radio. Routine surveillances are performed to ensure that the radios function properly at various locations in the plant.

Special Tools: In order to perform the operator manual actions, tools and equipment may be required. The majority of the keys required for accessing or operating equipment for post fire safe shutdown are provided on separate FSSD key rings that are provided to the FSSD Operators. Where other keys, tools or special equipment are required to perform an operator manual action, the FSP states what equipment is needed and where the tools, keys or equipment can be obtained. Equipment, tools and keys staged for the operator manual actions have been walked down as part of the validation effort to ensure equipment availability for a fire event. The operators responsible for performing the manual actions are familiar with the location of the tools and equipment storage areas.

Training: The operator manual actions covered by this exemption request are similar to activities performed by plant operators as part of normal work assignments. In addition, the operator manual actions addressed by this exemption request are similar to those performed for the Control Room evacuation shutdown procedure. Since these actions are similar to those performed as part of a typical work activity, these can be considered straightforward and training and demonstration demands are minimal. The operator actions addressed by this exemption request fall into one of the following categories:

- Operating switches. This is considered a skill of the craft activity. The switches are clearly labeled.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 42 of 49 Docket No. 50-219

- Verifying breaker position. This is considered a skill of the craft activity. This is done frequently by operators while establishing clearance boundaries.

- Opening/Closing breakers. This is considered a skill of the craft activity. Equipment operators frequently perform breaker manipulation as part of their normal routine.

- Racking breakers in and out. This is considered a skill of the craft activity. Equipment operators frequently perform breaker manipulation as part of their normal routine.

- Reading local indicators. This is considered a skill of the craft activity. The indicators are clearly labeled.

- Removing (pulling) individual fuses is considered a required skill performed by plant equipment operators during normal work functions. Fuses are pulled while applying clearances to establish safe work boundaries.

- Manually manipulating valves is considered to be a required skill by plant equipment operators and operation of these components is performed during normal work functions and is a common part of many work activities.

Licensed and non-licensed operators are trained biennially on the FSPs.

Accessibility: The equipment that needs to be operated is readily accessible and adequate time is allotted to permit access. In addition, tools needed for the manual action are available and accessible by the operators. The actions to verify breaker position, open/close breakers, operate switches and read local indicators can be done from the floor. All of the valves that have to be operated can be reached from the floor, from permanent platforms accessed by permanently mounted ladders or with a small stepladder, which is called out in the procedure and is staged in the area of the-action.

Procedures: At Oyster Creek, the FSPs are formatted similar to the EOP support procedures.

Each initiating fire area/zone has a corresponding FSP. Each FSP includes a section that lists the equipment that is credited to safely shut down the plant and any manual actions that may be required for that credited equipment. The individual steps describe the purpose of the action, equipment needed, and a step-by-step process to perform the action, including room and panel or valve locations. Most actions have a significant time available to perform, and thus are performed on a symptomatic basis, with the Control Room determining the priority and sequencing of actions based on actual plant conditions. For actions expected to be required to be performed within the first 45 minutes, such actions are designated as "prompt" actions in the FSPs.

Verification and Validation: Plant walkdowns have validated the manual actions. Note that in cases where the same action is performed for fires in a number of different fire areas, the validation was only performed once.

A summary of action times and travel times as well as the time available to perform the function is provided below. The time available to perform the function ("time limit") is defined by the safe shutdown calculations and supporting analyses. It should be noted that for the manual actions that are not considered a prompt action, the ability to perform the action in the stipulated time below is not considered critical as long as the action gets completed within the allotted time

("time limit") for the action. Walkdowns were performed to obtain travel times.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 43 of 49 Docket No. 50-219 The information below is divided into groups based on restoring a desired function. This may combine several actions that are identified in the Attachment 2 Table to restore the desired function and will cross reference back to this attachment by listing the applicable Item number in parenthesis. The information provided below does not take into account the effects of other manual actions that are not required for the particular function.

1) For some of the Turbine Building fire zones, offsite power is assumed lost due to cable damage. In order to restore power so that the Condensate Transfer System can be utilized for makeup to the Isolation Condenser within 45 minutes from the time that the Isolation Condenser was initiated, various manual actions have to be performed. The worst case would be Operator 1 would have to initiate LSP-DG2 (Item 5) to isolate damaged cables and start emergency diesel 2 to restore power to the "D"4160 bus, initiate LSP-1 B3 (Item 3) to isolate damaged cables and restore power to USS 1 B3, reset undervoltage trip to MCC 1B32 on USS 1B3 (Item 6), and initiate LSP-1 B32 to isolate damaged cables and control one condensate transfer pump to makeup to an Isolation Condenser (Item 4). Operator 2 would trip and lock out all non-required breakers on the "D" 4160V Bus and then initiate LSP-1D (Item 1) to isolate damaged cables and close 4160V breaker for USS 1 B2 and 1B3.

The actions at the local shutdown panels only require taking a key locked switch to the "alternate" position to isolate the damaged cables and then turning the applicable control switch(es) to the desired position. Operator 1 would take approximately 28 minutes for access to the areas and for performing the actions, which is within the minimum allotted time of 45 minutes with sufficient margin to ensure completion of the task. In parallel, Operator 2 would take approximately 18 minutes for access to the area and for performing the actions, which is within the minimum allotted time of 45 minutes with sufficient margin to ensure completion of the task.

2) The Condensate Transfer System is a two-pump system fed from a single train of emergency power. When this single train of power is not available, a redundant means of providing makeup to the shell of the Isolation Condenser(s) is to utilize the firewater system.

Utilizing firewater requires the manipulation of manual valves. When the Condensate Transfer System is not available to makeup to the Isolation Condenser, firewater is utilized (Item 7) within 45 minutes from the time that the Isolation Condenser was initiated. Only one operator is required to perform this task. Operator 1 would take approximately 16 minutes for access to the area and to perform the actions, which is within the minimum allotted time of 45 minutes with sufficient margin to ensure completion of the task.

3) When CRD is credited for Reactor Inventory makeup, a single CRD pump is required within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and 24 minutes. If cable damage prevents controlling the CRD pump from the Control Room, then the "A" CRD pump is controlled from LSP-1A2 (Item 8) or the "B" CRD pump is controlled by performing a partial initiation of the RSP (Item 9). Both panels are in close proximity to each other so the access time is the same and both panels only require taking a key locked switch to the "alternate" position to isolate the damaged cables and then turning two control switches to their required positions, so the action time is the same.

Although the two CRD pumps are fed from redundant safety-related power supplies, the normal CRD flow control valve is a single component and does not have a redundant counterpart. This valve may fail to operate due to control or power cable damage, or due to the assumed loss of instrument air. Ifthe normal flow control valve were not available due to the loss of instrument air or cable damage, then the operator would have to manually

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 44 of 49 Docket No. 50-219 align three manual valves (Item 12) to bypass the flow control valve. Operator 1 would take approximately 23 minutes for access to the areas and for performing the actions, which is within the minimum allotted time of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and 24 minutes with sufficient margin to ensure completion of the task. For a fire initiating in RB-FZ-1 E, Operator 2 would go to the Reactor Building to assist Operator 1 with adjusting CRD flow (Item 11) since the flow indicator is on a different elevation than the valves. For this task, it requires re-entry into the fire area and will allow 90 minutes before re-entry. Operators 1 & 2 would take approximately 100 minutes for access to the areas and for performing the actions, which is within the minimum allotted time of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and 24 minutes with sufficient margin to ensure completion of the task.

4) For OB-FA-9, OB-FZ-6A, OB-FZ-8C, TB-FZ-1 1 B and 11 E, Condensate Storage Tank (CST) level may not be available in the Control Room due to cable damage so an operator would have to check level locally at LI-424-993 (Item 2) to ensure adequate water inventory is available in the CST for various system makeups (e.g., Isolation Condenser, RPV from CRD, etc.). The level indicator in the Control Room is a single component and does not have a redundant counterpart. The Operator would take approximately seven minutes for access to the area and for performing the action, which is within the minimum allotted time of 73 minutes with sufficient margin to ensure completion of the task.
5) The static charger (Item 10) may have to be lined up to the "B" 125 VDC Battery in the A/B Battery Room within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. This manual action will be required as a result of fire-induced cable failure on the "B" MG Set, and this action ensures the charger is restored before the battery is depleted. Only one operator would be required and it would take approximately 17 minutes for access to the area and to perform the actions, which is within the minimum allotted time of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> with sufficient margin to ensure completion of the task. It should be noted that the normal line-up is to have the static charger aligned to the "B" 125 VDC Battery so the majority of the time this action would not be required; however, there are periods when the static charger is aligned to the "A" 125 VDC Battery due to equipment failures and/or maintenance activities.
6) Manually aligning valves V-20-2 and V-20-4 (Item 13) is necessary so that one Core Spray System II pump is aligned to the Condensate Storage Tank (CST) for makeup to the reactor vessel within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and 24 minutes. No CRD pumps are available for a fire in Fire Area RB-FZ-1F3; therefore, the Core Spray pump will be utilized. Only one operator is required to perform this task. Operator 1 would take approximately 35 minutes for access to the area and to perform the actions, which is within the minimum allotted time of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and 24 minutes with sufficient margin to ensure completion of the task. Note that the Core Spray pump cannot be utilized until V-20-1 is also re-positioned manually; however, this valve requires re-entry into the area where the fire occurred. It is assumed that the area can be reentered within 90 minutes, which is within the minimum allotted time of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and 24 minutes. SER dated June 25, 1990 (Reference 7) provided the exemption for manually operating V-20-1.
7) Tripping of the feedwater pumps at the 4160V Switchgear (Item 15) is required within approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. Tripping the feedwater pump breakers from the Control Room is lost as a result of fire-induced cable damage. The feedwater flow is originally stopped using the feedwater regulating valves and this action is to trip the feedwater pumps at the 4160V switchgear since the regulating valves may not remain closed with the assumed loss of

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 45 of 49 Docket No. 50-219 instrument air. These valves lock up and will stay in that position indefinitely if there are no air leaks on the valves. If there are leaks, then the valves may drift back open so it was assumed that there are minor leaks and that the feedwater pumps should be tripped in 180 minutes. Only one Operator would be required and it would take approximately 11 minutes for access to the area and to perform the actions, which is within the minimum allotted time of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> with sufficient margin to ensure completion of the task. In addition, if a loss of offsite power occurs, as is postulated in some of the areas, then these actions would not be required.

8) Tripping of the Core Spray Main Pumps (Items 17 and 18) and Core Spray Booster Pumps (Items 19 and 20) is required within 120 minutes to prevent a Reactor overfill condition. It should be noted that the tripping of the booster pumps is for equipment protection because once the main pumps are tripped; the booster pumps have no water source to inject into the RPV. One Operator would go to the 4160V area while the second operator would go in parallel to the 480V area. Operator 1 would take approximately 17 minutes for access to the areas and for performing the actions, which is within the minimum allotted time of 120 minutes with sufficient margin to ensure completion of the task. Operator 2 would take approximately 19 minutes for access to the areas and for performing the actions, which is within the minimum allotted time of 120 minutes with sufficient margin to ensure completion of the task. In addition, if a loss of offsite power occurs, as is postulated in some of the areas, then these actions would not be required.
9) Tripping of the Recirculation Pumps (Item 16) is required due to the interaction with the Isolation Condenser (IC) and Fuel Zone Level (FZL) Indicators. The IC has high flow sensors that will close all IC valves if the flow exceeds 300%. With the recirculation pumps running, the flow through the IC can increase to above the high flow isolation setpoint.

However, the high flow signal can be overridden by taking each IC valve control switch from "auto" to "open" in the Control Room to allow the IC to be placed back in service. The FSPs direct the operator to reopen the IC valves and use the IC for decay heat removal in the event that high flow isolation does occur. Thus, there is no time limit associated with tripping the recirculation pumps for the IC since it can still be initiated from the Control Room. The FZL indicators are used by the operators to monitor RPV water level ifthe level drops below the range of the normal level instruments (85" TAF). The FZL instruments use differential pressure across the core to determine water level in the RPV. The instruments are not compensated for the change in differential pressure across the core due to flow from the recirculation pumps and thus will not provide accurate readings with the recirculation pumps running. The Isolation Condenser System is placed in service very early in the event, and reactor water level should be indicated on the normal water level instruments (GEMAC and/or YARWAY), making use of the Fuel Zone instruments non-essential.

In the event that use of the IC is delayed, the FSSD support analyses show that there is at least 30 minutes for the operator to trip the recirculation pumps and restore FZL indication.

If the Control Room operator takes action in accordance with the EOPs (EMG-3200-01A "RPV Control - No ATWS EOP Flowchart") to initially "stabilize" reactor pressure below 1045 psig with the Isolation Condenser System, and then control the cooldown rate of the reactor to the procedurally required rate of less than 100 degrees per hour if no makeup source is available, then significantly more than 30 minutes is expected to be available.

Also, if a loss of offsite power occurs as is postulated in some of the areas, then these actions would not be required.

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 46 of 49 Docket No. 50-219 Only one operator would be required and it would take approximately 13 minutes for access to the area and to perform the action of tripping the breakers. This manual action is not needed for at least 30 minutes; thus, there is adequate margin.

10) The Control Room air conditioning system 'A' or 'B' is required whenever the Control Room is occupied. Under cases when the power supply is lost, USS 1A3 and USS 1 B3 (Item 14) are cross-tied at the intake structure in order to utilize HVAC 'B' system. One operator can perform this action. Total action time including egress time, time to rack the breaker in, and time to close the tiebreaker requires 20 minutes. This manual action is not required for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />; therefore, sufficient margin exists to perform this action.

Supportinq Information Triennial Fire Protection Inspections performed in 2003, 2005 and 2008, using the criteria provided in NRC IP 71111.05, reviewed the feasibility of a number of the manual actions and found them to be feasible. The results of these reviews by the NRC confirm that the safety basis of the original SERs remain valid.

C. DEFENSE IN DEPTH Defense in depth is defined in Appendix R as follows:

- To prevent fires from starting;

- To detect rapidly, control, and extinguish promptly those fires that do occur; and

- To provide protection for structures, systems, and components important to safety so that a fire that is not promptly extinguished by the fire suppression activities will not prevent the safe shutdown of the plant.

OCNGS has administrative controls to prevent fires from starting. These controls include:

- Controls on hot work activities and ignition sources (involving cutting, welding, grinding, open flames or other heat producing activities);

- Controls and limits on combustible materials used in the plant or brought into the plant;

- Housekeeping inspection programs;

- Use of fire retardant cables and plastics; and

- Use of wood is limited and restricted to fire retardant wood (except for large cribbing).

Fire detection and suppression systems are installed in those areas that contain significant combustible hazards. Fire detection includes both smoke and heat detection systems that provide alarms to the Control Room. Suppression systems include pre-action, deluge and wet pipe sprinkler systems as well as halon and carbon dioxide systems. Lube oil hazards, cable concentrations and storage areas are examples of areas provided with fire protection systems.

A summary of the fire protection features in the initiating fire area was provided previously within the description of each fire area. When fire protection systems become inoperable, compensatory measures are instituted. The plant has a fire brigade composed of plant operators and maintenance craft that are currently trained to meet the level of "interior/exterior structural firefighters." Hose stations and fire extinguishers are located throughout the plant to facilitate firefighting activities by the fire brigade. These detection and suppression systems, as well as manual fire fighting equipment, are designed to detect fire at the appropriate stage to

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 47 of 49 Docket No. 50-219 permit a response by plant personnel to the fire, including both operations and fire brigade. The suppression systems are designed to prevent a fire from rapidly growing and involving other areas. Manual suppression can be used to extinguish a fire or to prevent the fire from spreading to adjacent fire areas.

OCNGS ensures safe shutdown in the event of a fire in several ways. First, the plant has been divided into fire areas/zones. Each fire area/zone is separated from adjacent fire areas with a barrier commensurate with the fire hazard. Typically, the fire barriers have a 3-hour fire resistance rating, including the barrier, the door(s), damper(s) and penetration seals. However, other barrier types are used to divide fire areas/zones. These fire area/zone boundaries are described in the OCNGS FHAR document. In addition, analyses have been performed on how to achieve shutdown following a fire in any given fire area. The equipment lost and equipment available has been reviewed and actions necessary to ensure shutdown have been identified in the FSPs for each fire area/zone. The manual actions addressed by this exemption request are part of the actions that may be necessary in a worst-case fire to achieve shutdown.

V. ENVIRONMENT ASSESSMENT There are no environmental issues associated with this exemption request. The exemption request provides a formal vehicle for NRC approval of operator manual actions associated with Appendix R post-fire safe shutdown. These operator manual actions have been included in the FHAR, which was previously accepted by the NRC in prior correspondence.

The proposed exemption will not significantly increase the probability or consequences of accidents, no changes are being made in the types or quantities of any radiological effluents that may be released offsite, and there is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed exemption. In addition, the proposed exemption does not affect non-radiological plant effluents and has no other environmental impact. Therefore, there are no significant non-radiological impacts associated with the proposed exemption. As a result, in accordance with the requirements of 10 CFR 51.32, the proposed exemption will not have a significant effect on the quality of the human environment.

VI. CONCLUSION OCNGS identified operator manual actions necessary to achieve and maintain hot shutdown in the OCNGS FHAR that was submitted to the NRC under various docketed letters. The SERs indicate that the NRC has reviewed the safe shutdown capability, and accepted the manual actions.

The operator manual actions addressed in this exemption request have been reviewed against the existing criteria the NRC has developed to determine the feasibility of these actions to be performed following a fire. This review determined that all of these manual actions could be performed and completed within the time lines established by the fire safe shutdown analyses.

This provides the confirmation that the considerations used by the NRC to approve these operator manual actions in the referenced SERs remain valid. Defense-in-depth for the fire areas involved in this exemption include administrative controls on ignition sources and combustibles, fire protection systems in areas that present significant hazards, manual fire

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 48 of 49 Docket No. 50-219 fighting capability, separation between fire areas to limit fire spread and safe shutdown procedures, based on a detailed analysis providing a path to shutdown for each fire area.

The requested exemption will not result in undue risk to the public health and safety because Exelon has determined that the subject manual actions are feasible and the NRC has already found these manual actions to be acceptable for use in achieving post-fire safe shutdown. In addition, the intent of 10 CFR 50, Appendix R, Section III.G.2, is to ensure that one train of systems necessary to achieve and maintain hot shutdown will remain available in the event of a fire. The manual actions discussed in this exemption request provide that assurance. If manual actions are not used to meet the underlying purpose of the rule, modifications to: (1) provide additional fire suppression systems, detection systems, or fire barriers, or (2) re-route cabling or wrap cabling, would be required to achieve compliance. Such modifications represent an unwarranted burden on Exelon since they are not necessary to meet the underlying purpose of the rule. Therefore, the special circumstances for issuance of the exemption are satisfied in accordance with the requirements of 10 CFR 50.12(a)(2)(ii), since application of the rule is not necessary to achieve the underlying purpose of the rule. Furthermore, the requested exemption is authorized by law, and is consistent with the common defense and security.

There is no law that precludes the activities covered by this exemption request, and the requested exemption has no impact on the common defense and security. Therefore, based on the above discussion, the criteria of 10 CFR 50.12(a)(1) are satisfied in that the requested exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security.

VII. REFERENCES

1. 10 CFR 50, Appendix R, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979."
2. Regulatory Issue Summary (RIS) 2006-10, "Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions," dated June 30, 2006.
3. Letter dated April 3, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
4. Letter dated July 12, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
5. Letter dated August 25, 1986, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
6. Letter (SER) dated March 24, 1986, from J. Zwolinski, USNRC, to P. Fiedler, Oyster Creek Nuclear Generating Station, "Exemptions from Requirements of Appendix R to 10 CFR Part 50, Section III.G.2 and the Post Fire Safe Shutdown Capability (TAC 56740, 56786)."
7. Letter (SER) dated June 25, 1990, from A. Dromerick, USNRC, to E. Fitzpatrick, Oyster Creek Nuclear Generating Station, "Exemption from Certain Technical Requirements Contained in Section III.G of Appendix R to 10 CFR Part 50 (TAC 62229)."

10 CFR 50.12 Exemption Request Attachment 1 Operator Manual Actions Page 49 of 49 Docket No. 50-219

8. Letter dated October 9, 1985, from P. Fiedler, GPU Nuclear, to J. Zwolinski, USNRC, Oyster Creek Nuclear Generating Station, Fire Protection.
9. Letter dated October 29, 1985, from NRC to GPU Nuclear, "August 1985 Progress Review Meeting on Licensing Actions."
10. Oyster Creek Nuclear Generating Station Fire Hazards Analysis Report, Revisions 3 through 6.
11. NRC Inspection Procedure 71111.05, "Fire Protection," March 6, 2003.
12. Oyster Creek Nuclear Generating Station Fire Hazards Analysis Report, Revision 14.
13. Industrial Risk Insurers, Document P.1.1.4, "Transformer and Capacitor Dielectric Fluids," August 30, 1977.

ATTACHMENT 2 10 CFR 50.12 Exemption Request Oyster Creek Nuclear Generating Station Docket No. 50-219 Request for Exemption from 10 CFR 50, Appendix R, Section IlI.G, "Fire Protection of Safe Shutdown Capability" (Phase 1)

Appendix R,Section III.G.2, Operator Manual Actions

10 CFR 50.12 Exemption Request Page 1 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R,Section III.G.2, Operator Manual Actions Equipment Fire Ara/Zonsthatcei "Item Equipment Manual Action Requiredeotn )ntF*rer rea- ones. a::. A-pplicable

... Comments Zonethis manual actionk References.

4160V Switchgear Manual actions for Hot Shutdown are TB-FA-3B TB-FA-26, TB-FZ-I IB, Ref. 3, Sections Refer to Note #1 ID and LSP-ID required to isolate damaged cables and TB-FZ- IIC, TB-FZ-I ID, 1.2.2.D.1, reestablish control locally for the 4160V TB-FZ- I1E 1.2.2.E. 1, 1.2.2.F. 1, Switchgear ID. Also, trip 4160V breakers 1.2.2.G. I and lockout using the 69 Switch for all Feeder Breakers except IB2P and I1B3P. ef. 5, Figure A-i, Use Local Shutdown Panels to control Sheet 1, equipment as follows: Hot Shutdown Path l, Note I I LSP- ID 4160V Switchgear ID Breakers for USS IB2 and 1B3 (Operate Transfer Switch to "Alternate" and operate Control Switch for feeder breakers for USS 1B2 and IB3) 1-424-993 Condensate Storage Tank (CST) level Ind. Yard OB-FA-9, OB-FZ-6A, OB- Ref. 3, Appendix LI-424-993 Local Gauge Used (Read Local FZ-8C, TB-FZ- I1 B, A, pg 5 of 13, CST Gauge) TB-FZ- l I E "Systems Used To Provide Shutdown 2 apability" Ref. 5, Figure A-I, Sheet 1, Hot Shutdown Path

_____________________________________________ _________________________________________________________________A_

10 CFR 50.12 Exemption Request Page 2 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section lII.G.2, Operator Manual Actions Ittee1m .Equp e t.i..pment, u SManal M anu.al AtionR~ured l Xi.la c o=n:=.

ont Reqouior..eed::-.-.-_....

quri .. quipentFire Areas/Zones

=,.L= that ::*:.:'=:*[

credit ..

  • Applicable

-o.c.=,.ati:..:,  ; =. ".,='*n-F=ire..- o en C**..,.:=.:tomments ...

,:~ Zonethis manual action* References

  • LSP-IB3 Manual actions for Hot Shutdown are CW-FA-14 TB-FA-26, TB-FZ-l B, Ref. 3, Sections Refer to Note #1 required to isolate damaged cables and TB-FZ-I 1C, TB-FZ-1 1D, 1.2.2.D.1, reestablish control locally for 480V USS TB-FZ- 1IE 1.2.2.E.1, 1.2.2.F.1, IB3 electrical power breakers. Use Local 1.2.2.G.1; 3 Shutdown Panels to control equipment as follows: Ref. 5, Figure A-i, Sheet 1, LSP-IB3 480V USS 1B3 incoming Hot Shutdown Path breaker. (Operate transfer Switch to 91, Note 11 "Alternate" and then operate Control Switch for USS IB3 Breaker 1B3M)

LSP-IB32 Manual actions for Hot Shutdown are MT-FA-12 TB-FZ-II B, TB-FZ-I IE Ref. 3, Sections required to isolate damaged cables and 1.2.2.D.1, 1.2.2.G.1 reestablish control locally for the Condensate Transfer Pump. Use Local Ref. 5, Figure A- 1, 4 Shutdown Panels to control equipment as Sheet 1, follows: ot Shutdown Path

  1. 1, Note II LSP-1B32 Condensate Transfer Pump 1-2 (Operate transfer switch to "Alternate" and operate Control Switch for Condensate Transfer Pump 1-2)

LSP-DG2 Manual actions for Hot Shutdown are DG-FA-17 TB-FZ- I1B, TB-FZ-II D, Ref. 3, Sections required to isolate damaged cables and TB-FZ- IIE 1.2.2.F.1, 1.2.2.G.1 reestablish control locally for Emergency Diesel Generator #2 (EDG2). Use Local Ref. 5, Figure A-l, Shutdown Panels to control equipment as Sheet 1, 5 follows: ot Shutdown Path

  1. 1, Note II LSP-DG2, EDG2 and its Switchgear (Operate transfer Switches (3 total) to "Alternate" and operate Control Switch on Diesel Panel to start diesel)

10 CFR 50.12 Exemption Request Page 3 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section lII.G.2, Operator Manual Actions Equipmnent~ ~r te.. *Eqmen Mnua cneueL u. LF tir*t,.n . Areas/Zones

.. . that credit

.. Applicable tFire Item qp K, ~this manuahil actioii* References , Cmet

4. ~ Zone-USS-1B33 Breaker MCC I1B32 Feeder Breaker at USS I1B3 CW-FA-14 TB-FA-26, TB-FZ- I IB, Ref. 5, Figure A-1, Refer to Note #I 062C shall be manually re-closed after Diesel TB-FZ- IIC, TB-FZ- IID, Sheet 1, 6 Generator start due to an undervoltage trip. TB-FZ- IIE ot Shutdown Path 1, Note 3 V-9-2099 (formerly Manual actions for Hot Shutdown are R-FZ-lE Th-FA-3B, OB-FZ-6B, ef. 3, Sections Refer to Note #2 V-1 1-44), V-I 1-49, required to align the Fire System water to OB-FZ-8A, OB-FZ-8B, 1.2.2.13.1, V-1 1-63, V-I 1-41 the Isolation Condenser shell side for OB-FZ-8C, OB-FZ- IOA, I1.2.2.H.1, 1.2.2.J.1, makeup. Manual valves V-9-2099 OB-FZ-1IOB, TB-FZ-1II F, 1.2.3.C. 1, (formerly V-i 11-44) and V-i 11-49 are TB-FZ-1II H, CW-FA- 14 1.2.3.D. 1, opened, and manual valves V-I 1-63 and V- 1.2.3.F. 1, 1.2.3.H.I1, 11-41 are closed to provide makeup. This 1.2.3.1.1, 1.2.6.A.1; action is required because there is no power

("B" Train) available to the Condensate Ref. 3, Appendix 7 Transfer System. A,pg 5of 13, "Systems Used To rovide Shutdown Capability" Ref. 5, Figure A-I1, Sheet 1, Hot Shutdown Path 92, Note 6 and Hot Shutdown Path

_____ ___________ ___________________________________ __________________ 1 Noe 20 __1,__Note___20._

10 CFR 50.12 Exemption Request Page 4 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R,Section III.G.2, Operator Manual Actions item. . quzpmen. Manual Action Required, Location:Fire . rei . ... . .. :'Chat omments.

... '.. . . Zone: ~this mani Facition*',R.frncs*

LSP- IA2 Manual actions for Hot Shutdown are OB-FZ-6A OB-FZ-8C Ref. 3, Section required to isolate damaged cables and 1.2.3.F. I reestablish control locally for Unit Substation (USS) IA2 electrical breakers. Ref. 5, Figure A-I, Use Local Shutdown Panels to control Sheet 1, 8 equipment as follows: ot Shutdown Path 92, Note 13.

LSP-IA2, CRD Hydraulic PP NC08A and 480V USS IA2 Incoming breaker (Operate transfer switch to "Alternate" and operate Control Switch for USS-IA2 Main Breaker IA2M and A CRD Pump).

Remote Shutdown Manual actions for Hot Shutdown are OB-FZ-6B OB-FZ-6A Ref. 3, Section Panel required to isolate damaged cables and 1.2.3.C.1 reestablish control locally for Unit Substation (USS) 1B2 electrical breakers Ref. 5, Figure A-I, and CRD Hydraulic. Use Remote Sheet 1, Shutdown Panel to control equipment: RSP. ot Shutdown Path 9 CRD Hydraulic PP NC08B and 480V USS I 1, Note 6.

I B2 Incoming breaker (Operate USS I B2/CRD Transfer Switch (Partial initiation) to "Alternate" and operate Control Switches for USS-1B2 Main Breaker and B CRD Pump).

125V DC Use static charger instead of MG Set "B" OB-FZ-8C OB-FZ-6A Ref. 5, Figure A-i, 10 Distribution Center due to damaged equipment and cables by Sheet 1, B and Static aligning breakers at Distribution Center B. Hot Shutdown Path Charger # 1, Note 22.

10 CFR 50.12 Exemption Request Page 5 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R,Section III.G.2, Operator Manual Actions Item Equipment Manual Action Required Eqimet.ie..LIocation Firei.. .it ACplicbommentsl-Locaion~ire this manual actioný' References ~ omns Zone.. ~

FI-225-998 Use CRD local flow gauge FI-225-998. due RB-FZ-I D RB-FZ-IE, RB-FZ-IG Ref. 3, Section Refer to Note #3 to cable damage to the normal Control 1.2.1.E.1; Room flow indicator.

11 Ref. 5, Figure A-1, Sheet 1, Hot Shutdown Path 1, Note 8.

V-15-30, V-15-52, Manually open V-15-237, throttle V-15-30 RB-FZ-IE RB-FZ-ID, RB-FZ-IE, Ref. 3, Appendix Refer to Notes #1 & 5 V-15-237, FI-225-2 using local flow indicator (FI-225-2) and RB-FZ-IF1, RB-FZ-IF2, A, pg 3 of 13, close V-15-52 to establish CRD flow to RB-FZ-IF4, RB-FZ-IF5, "Systems Used To Ref. 7 section 3.3 provided an Reactor due to the loss of instrument air to RB-FZ-1G, RB-FZ-1H, Provide Shutdown exemption for manually the CRD Flow Control Valve TB-FA-3A, TB-FA-3B, Capability" operating V-15-30 in OB-FZ-6A, OB-FZ-6B, RB-FZ-IE, since this valve is OB-FZ-8A, OB-FZ-8B, Ref. 5, Figure A-i, located within the fire zone OB-FZ-8C, OB-FA-9, Sheet 1, involved in the fire.

12 OB-FZ-1OA, OB-FZ-10B, Hot Shutdown Path TB-FA-26, TB-FZ-1 1A, 1 and Path #2.

TB-FZ- I1B, TB-FZ- I1C, TB-FZ-I ID, TB-FZ-I IE, TB-FZ-II F, TB-FZ-II G, TB-FZ-II H, AB-FA- 13, CW-FA- 14, DG-FA- 15, NR-FA-20, OG-FA-2 1, OR-FA-19 V-20-2 and V-20-4 Core Spray System II manual valves RB-FZ-IF2 RB-FZ-1F3 Ref. 3, Section Ref. 7 provides an exemption V-20-1 and V-20-2 are opened and V-20-4 1.2.1 .F. 1; for operating V-20-1.

is closed to provide Reactor Coolant Ref. 5 has a typo so corrected 13 Makeup using Core Spray Pump instead of Ref. 5, Figure A-I, zone quadrant typo IF2 to IF3 the CRD Pump (manipulate valves to align Sheet 1, for the zone that requires this Core Spray to CST). This action is required Pot Shutdown Path manual action.

because the fire damages both CRD Pumps. I I 1, Note 2 1 1

10 CFR 50.12 Exemption Request Page 6 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R,Section III.G.2, Operator Manual Actions Equipment F Item Equipment Manual.Action Required Location Fire rerasZnstt.c

.this maniual action* edit ferenlcae......smn USS 1B33 Provide power to Control Room A/C unit CW-FA-14 OB-FZ-8A. OB-FZ-8B, Ref. 5. Figure A-I1, Refer to Notes 4 & 6 from USS IBI by racking in and closing OB-FZ-8C Sheet 1, 14 tiebreaker US IT between USS IBI and Hot Shutdown Path IlAl. Later changed to crosstie USS IlA3 & 2, Note 14.

1133 to restore ventilation to the Control Room.

4160V Switchgear. Trip Reactor Feedwater Pumps IA (Breaker TB-FZ-1II C TB-FA-26, TB-FZ-lII B, Ref. 5, Figure A-I1, Refer to Note##1 IA Breaker A8 and A8), IlB and ILC (Breakers B2 and BIO0) and TB-FZ- IIC, TB-FZ- IID, Sheet 1, l B Breakers B2 lockout using 69 Switch. This manual TB-FZ- I IlE, OB-FZ-8C Hot Shutdown Path For.OB-FZ-8C, only have to 15 and BlO action is being performed to prevent a l1and ff2, Tables trip the B & C pumps at the reactor overfill condition due to cable switch-ear.

damage and/or loss of control power to the Ref. 6, Section

___________normal feedwater trip circuit. 8.1.1 4160V Switchgear. All five Reactor Recirculation Pumps TB-FZ-1 IC TB-FZ- IIB, TB-FZ-1II E, Ref. 5, Figure A-i1, For OB-FZ-8C, only have to IlA Breakers A3, (NGO I-A, NGO1I-B, NGO I-C, NGO1ID and OB-FZ-8C. Sheet 1, trip the A, C & E pumps at A5 and A9 and NGO IE) must be tripped to use fuel zone Hot Shutdown Path switchgear.

16 Switchgear. lB level instruments and to prevent the #l, Note 16 Breakers B4 and Isolation Condenser from tripping on high B8 flow. Also, lockout the 4160V breakers Ref. 6, Section

________using the 69 Switch. 8.1.1___________

4160V Switchgear Trip Breakers for Main Core Spray Pumps TB-FA-3A OB-FZ-6A, OB-FZ-8C, Ref. 3, Appendix Refer to Note ff IC Breakers CO NZO IA and NZO ID and lockout using 69 TB-FA-26, TB-FZ-l lIB, A,pg 4 of 13, and C5 switch at 4160V Switchgear IC. This TB-FZ- IIC, TB-FZ-1II D, "Systems Used To manual action is being performed to TB-FZ-1II E, TB-FZ-lII G Provide Shutdown 17 prevent a reactor overfill condition due to apability" cable damage and/or loss of control power to the normal Core Spray trip circuit. Ref. 5, Figure A-i, Sheet 1, Hot Shutdown Path

_____________________~~~~~~~~~~~~~ lNote 12 1,__________________________________

10 CFR 50.12 Exemption Request Page 7 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R,Section III.G.2, Operator Manual Actions Equipment ~~

  • .Item Equipment Manual Action Required-. LocationiFire .e..e-....n.s..that.credit....pl.,a... Comments Zone ~this maniual action.. References
  • 4160V Switchgear Trip Breakers for Main Core Spray Pumps TB-FA-3B TB-FA-3A, OB-FZ-6A, Ref 3, Appendix Refer to Note #1 ID Breakers D4 NZOIB and NZOIC and lockout using 69 OB-FZ-8A, OB-FZ-8B, A, pg 4 of 13, and D9 switch at 4160V Switchgear I D. This OB-FZ-8C, TB-FA-26, "Systems Used To manual action is being performed to TB-FZ-I I B, TB-FZ-1 I C, Provide Shutdown prevent a reactor overfill condition due to TB-FZ- ID, TB-FZ- IE, Capability" 18 cable damage and/or loss of control power TB-FZ-I IG to the normal Core Spray trip circuit. Ref. 5, Figure A-I, Sheet 1, Hot Shutdown Path
  1. 1, Note 13 and Hot Shutdown Path
  1. 2, Note 10 USS-IA2 Breakers Trip Breakers for Core Spray booster OB-FZ-6A OB-FZ-8C, TB-FZ-II C, TB- Ref. 3, Appendix Refer to Note #1 036B & 036C pumps NZ03A and NZ03D at 480V USS FZ- I1D, TB-FZ- I1E, A, pg 4 of 13, 1A2 and remove close fuses. This manual TB-FA-26, TB-FZ-1 IB "Systems Used To action is being performed to prevent a Provide Shutdown reactor overfill condition due to cable Capability" 19 damage and/or loss of control power to the normal Core Spray trip circuit. Ref. 5, Figure A-l, Sheet 1, Hot Shutdown Path A1, Note 14 and Hot Shutdown Path
  1. 2, Note II

10 CFR 50.12 Exemption Request Page 8 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R,Section III.G.2, Operator Manual Actions Equipment Item . Equipment Manual Action Required ..... Loeation Fire Fire Are: /ZoCth r-dit-Applicableomments

. .. .. .....," .this manual action* . References USS-IB2 Breakers Trip Breakers for Core Spray booster OB-FZ-6B OB-FZ-6A, OB-FZ-8A, Ref. 3, Appendix 046B & 046C pumps NZ03B and NZ03C at 480V USS OB-FZ-8B, OB-FZ-8C A., pg 4 of 13, IB2 and remove close fuses. This manual "Systems Used To action is being performed to prevent a rovide Shutdown reactor overfill condition due to cable Capability" 20 damage and/or loss of control power to the normal Core Spray trip circuit. Ref. 5, Figure A-I, Sheet 1, Hot Shutdown Path l, Note 15 and Hot Shutdown Path

_2, Note 12

10 CFR 50.12 Exemption Request Page 9 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R, Section Ill.G.2, Operator Manual Actions Fire Areas and Fire Zones are used interchangeably in Attachment 2, and both are considered to have adequate separation from adjacent fire areas or fire zones such that a single fire will not propagate between them. This separation has been justified in Reference 3, Section 1.3, and approved by Reference 6, Section 7.1.

Applicable References specified in the table refer to the References specified in Attachment 1.

Note 1: TB-FZ-1 1C and TB-FA-26 were analyzed together for safe shutdown analysis purposes, so TB-FA-26 was added as a fire area that credits this manual action. TB-FA-26 is a separate fire-rated room located within TB-FZ-1 1C. These areas were not considered a single analysis area in the original FHAR submittal.

Note 2: This action has been slightly modified from that described in the original submittal to correct a valve number (i.e., V-1 1-44 changed to V-9-2099) and to add one additional valve (i.e., V-11-41), but the action location, timing and outcome are comparable. The additional valve provides additional isolation to the spring check valve that already exists in the line. All of the applicable valves are three inches or smaller and are located within approximately three feet of each other.

Note 3: RB-FZ-1 E and RB-FZ-1 G were analyzed together for safe shutdown analysis purposes, so RB-FZ-1G was added as a fire area that credits this manual action.

These areas were not considered a single analysis area in the original FHAR submittal.

Note 4: The Control Room air conditioning system 'A' or 'B' is required whenever the Control Room is occupied. Wherever practical, HVAC System B' is the credited system for cooling under post-fire scenarios because it contains fewer dependencies and support systems than the 'A' System (e.g., doesn't require instrument air for its dampers, doesn't require any support systems for cooling, etc.). The 'B' HVAC was installed in 1988 after the FHAR revision 6 (Reference 5) submittal was made.

Therefore, the action to restore the Control Room ventilation power changed from USS 1 B1 to USS 1 B3 ('B' HVAC power source) so the action to crosstie the USS is at USS 1A3 and 1B3 instead of USS 1A1 and 1Bi; however, the timing and outcome are the same.

Note 5: This action has been slightly modified from that described in the original FHAR submittal to change from using the pump discharge valve, V-1 5-7 or V-1 5-10 as a throttle valve to using V-1 5-30 (monitor flow locally at FI-225-2) in conjunction with opening V-15-237. Also, added one additional valve, V-15-52. Changing the valve from V-1 5-7 or V-1 5-10 to V-1 5-30 and V-1 5-237 improved the location and timing of the action because V-1 5-237 is located next to V-1 5-30 while V-1 5-7 and V-1 5-10 are located in one of the Reactor Building corner rooms approximately 5 minutes away. V-15-52 is also located next to V-1 5-30 and this valve closes the CRD Charging Water Header. These changes were made to be consistent with the EOPs.

The action location and timing has been improved and the outcome is essentially the same. All of the valves listed above are two-inch valves and they are within

10 CFR 50.12 Exemption Request Page 10 of 10 Docket No. 50-219 ATTACHMENT 2 Appendix R,Section III.G.2, Operator Manual Actions approximately four feet of each other. Additionally, the local flow indicator can be monitored while adjusting V-1 5-30.

Note 6: OB-FZ-8A and OB-FZ-8B were analyzed together for safe shutdown analysis purposes, so OB-FZ-8A was added as a fire area that credits this manual action.

These areas were not considered a single analysis area in the original FHAR submittal.

0 UNITED STATES S,. NUCLEAR REGULATORY COMMISSION

- ~WASH INGTON, 0. C. 20555

.0, March 24, 1986 Docket No. 50-219 Mr. P. B. Fiedler Vice President and Director Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731

Dear Mr. Fiedler:

SUBJECT:

EXEMPTIONS FROM REQUIREMENTS OF APPENDIX R TO 10 CFR PART 50, SECTION III.G.2 AND THE POST FIRE SAFE SHUTDOWN CAPABILITY (TAC 56740, 56786)

Re- Oyster Creek Nuclear Generating Station The Commission has issued the enclosed exemptions to certain requirements of Section ITI.G.2 of 10 CFR Part 50, Appendix R, Fire Protection Pronram for Nuclear Power Facilities Operatinq Prior to January 1, 1979. This is in response to your letters of April 3, 1985; July 12, 1985; and October 9, 1985. The April 3, 1985, submittal superseded your previous submittal of December 16, 1983 and February 13, and May 3, 1984. In the meeting of February 11, 1986, your staff provided additional information on the need for the requested exemptions. The meeting minutes are dated February 28, 1986.

Subsection III.G specifies the separation, fire barrier and suppression requirements where both trains for redundant safe shutdown components are located within the same fire area. Your initial request for seven exemptions from the specific provisions of Section III.G was reduced by the staff to four exemptions because the staff concluded that three were not needed (Enclosure 1). The bases for these four exemptions including the bases for the licensee not needing the three are presented in the Safety Evaluation (Enclosure 2). Also included in the Safety Evaluation (Section 8) is the staff approval of the post fire safe shutdown capability for Oyster Creek.

In the enclosed Safety Evaluation supporting the exemptions from 10 CFR Part 50, Appendix R, and the post fire safe shutdown capability, there are several references to your commitments to future modifications. Your commitments are that these modifications will be made before the restart from the upcoming Cycle 11 Refueling outage scheduled to commence in 4pril 1986. We request that appropriate technical specifications on the minimum open-close cycles for the accumulators and accessibility of local a.r cylinders to be provided for air-operated valves required for safe shutdown, in Section 8.1.4 of the Safety Evaluation, be submitted before restart from this outage.

-9604070464- 860324 -..

PDR ADOCK 05000219 F PDR

Mr. P. B. Fiedler March 24, 1986 A Notice of Environmental Assessment and Findinq of No Significant Impact was published in the Federal Register on December 3, 1985 (50 FR 49633).

This exemption is beina forwarded to the Office of the Federal Register for publication.

Si ncere~y, JohnA. Zwolinski, Director BWR P oject Directorate #1 Division of BWR Licensing

Enclosures:

1. Exemptions
2. Safety Evaluation cc w/enclosures:

See next page 11

OR 2 4 19 Mr. P. B. Fiedler open-close cycles for the accumulators and accessibility of local air cylinders to be provided for air-operated valves required for safe shutdown, in Section 8.1.4 of the Safety Evaluation, be submitted before restart from this outage.

A Notice of Environmental Assessment and Finding of No Significant Impact was published in the Federal Register on December 3, 1985 (50 FR 49633).

This exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely, John A. Zwolinski, Director BWR Project Directorate #1 Division of RWR Licensing cc w/enclosures:

See next page DISTRIBUTION

%,ýocket File OELD NRC PDR ELJordan Local PDR LJHarmon ACRS (10) RDicas (w/TACS)

BWD#1 Reading TBarnhart (4) JDonohew WJones CJamerson CMiles DVassallo RRernero JZwolinski BGrimes JPartl ow DCrutchfield DKubicki OParr

  • SEE PREVIOUS CONCURRENCE DBL:PD#1
  • OELD 6 \l
  • 'DVRL: PD#1 -41BL:PD#1 *DBL:PiD#<

CJamerson JDonohew: tm JStang WShields Jzo 7w s iý'

12 /30(85 12/r 12123(85 1 /00(86 2 /88 tk RBernero 3 /1-3/85

Mr. P. B. Fiedler This exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely, John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing cc w/enclosures:

See next page DISTRIBUTION Docket File OELD NRC PDR ELJordan Local PDR DKubicki ACRS (10) RDiggs RGoel (w/TACS)

BWD#1 Reading TBarnhart (4) JDonohew CJamerson CMiles DVassallo RBernero JZwolinski BGrimes JPartlow DCrutchfield GLainas GHolahan JPKnight OPA DBL: PD#1k DB: L. 1 DBL: PD#1 7

CJamerso JD e :tm J g WShields JZwol inski

%Ia./50/85 /85 / /85 / / &/86 I/1,A1/86 D: DBL RBernero

/ /86

Mr. P. B. Fiedler Oyster Creek Nuclear Oyster Creek Nuclear Seneratinq Station Generating Station cc:

Ernest L. Blake, Jr. Resident InsDector Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 1800 M Street, N.W. Post Office Box 445 Washington, D.C. 20036 Forked River, New Jersey. 08731 J.9. Liberman, Esquire Commissioner Bishop, Liberman, Cook,.et al. New Jersey Department of Energy 1155 Avenue of the Americas 101 Commerce Street New York, New York 10036 Newark, New Jersey 07102 Eugene Fisher, Assistant Director Regional Administrator, Region I Division of Environmental Quality U.S. Nuclear Regulatory Commission Department of Environmental 631 Park Avenue Protection Kina of Prussia, Pennsylvania 19406 380 Scotch Road Trenton, New Jersey 08628 BWR Licensing Manager GPU Nuclear 100 Tnterpace Parkway Parsippany, New Jersey 07054 Deputy Attorney General State of New ,lerse.v Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 D. G. Holland Licensing Manager Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731

7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

GPU NUCLEAR CORPORATION AND ) Docket No. 50-219 JERSEY CENTRAL POWER & LIGHT COMPANY )

Oyster Creek Nuclear Generating )

Station )

EXEMPTION I.

The GPU Nuclear Corporation (the licensee), et al., is the holder of Provisional Operating License No. DPR-16 which authorizes operation of the Oyster Creek Nuclear Generating Station. The license provides, among other things, that it is subject to all rules, regulations and Orders of the Commission now or hereafter in effect.

The Oyster Creek Station power source is a boiling water reactor located at the licensee's site in Ocean County, New Jersey.

II.

On November 19, 1980, the Commission published a revised Section 10 CFR 50.48 and a new Appendix R to 10 CFR Part 50 regarding fire protection features of nuclear power plants (45 FR 76602). The revised Section 50.48 and Appendix R became effective on February 17, 1981. Section III of Appendix R contains fifteen subsections, lettered A through 0, each of which specifies requirements for a particular aspect of the fire protection features at a nuclear power plant.

One of these fifteen subsections, III.G., is the subject .of this exemption request. Specifically, Subsection III.G.2 requires that one train of'cables and equipment necessary to achieve and maintain safe shutdown be maintained free of fire damage by one of the following means:

8604070468 9,60324'.

PDR ADOCK 0,5000219PDR F

7590-01

a. Separation of cables and equipment and associated non-safety circuits of redundant trains by a fire barrier having a 3-hour rating. Structural steel forminq a part of or supporting such fire barriers shall be protected to provide fire resistance eauivalent to that required of the barrier;
b. Separation of cables and equipment and associated non-safety circuits or redundant trains by a horizontal distance of more than 20 feet with no intervening combustibles or fire hazards. In addition, fire detectors and an automatic fire suppression system shall be installed in the fire area; or
c. Enclosure of cables and eouipment and associated non-safety circuits of one redundant train in a fire barrier having a 1-hour ratinq. In addition, fire detectors and an automatic fire suppression system shall be installed in the fire area.

III.

By letter dated April 3, 1985, as supplemented by letters dated July 12 and October 9, 1985, the licensee requested seven exemptions for thirteen fire areas from the requirements of Section III.G of Appendix R, to the extent that it requires physical separation and/or fire protection systems to protect redundant trains of safe shutdown related cable and equipment. The April 3, 1985, submittal superseded the licensee's letters dated December 16, 1983, and February 13 and May 3, 1984.

In the meeting summary dated February 28, 1986, the licensee pribvided information relevant to the "special circumstances" finding required by revised 10 CFR 50.12(a) (See 50 Fed. Reg. 50764). The licensee stated that

7590-01 existing and proposed fire protection features at Oyster Creek accomplish the underlying purpose of the rule. Implementing additional modifications to provide additional suppression systems, detection systems, and fire barriers would require the expenditure of engineering and construction resources as well as the associated capital costs which would represent an unwarranted burden on the licensee's resources. The licensee stated that the costs to be incurred are as follows:

o Engineering and installation of additional piping, sprinkler heads, and supporting structures.

o Engineering and installation of fire barriers, supports, support protection, and ongoing maintenance.

o Significant rerouting of high power cabling and associated conduits, ducts, and supports.

" Possible need to provide additional fire pumDs and/or diesel generator capacity.

o Increased surveillance on new or extended fire suppression and fire detection systems.

o Increased congestion in numerous plant locations complicating future plant modifications/operation.

The licensee stated that these costs are significantly in excess of those required to meet the underlying purpose of the rule. The staff concludes that "special circumstances" exist for the licensee's requested exemptions ,in that application of the regulation in these particular circumstances is not necessary to achieve the underlying purposes of Appendix R to'10 CFR Part 50.

See 10 CFR 50.12(a)(2)(ii).

7590-01 The licensee's request for seven exemptions (thirteen fire areas) was reduced to four exemptions (eight fire areas) because the staff concluded that three exemptions (five areas) were not needed. The acceptability of the exemption requests for each of the eight fire areas is addressed below.

Details are contained in the NRC staff's related Safety Evaluation.

The fire areas related to the four exemptions addressed herein are:

(1) Reactor Building Elevation 51 feet (Fire Area RB-FZ-ID)

(2) Reactor Building Elevation 23 feet (Fire Area RB-FZ-1E) (1 of 2 exemptions)

(3) Reactor Building Elevation (-) 19 feet (Fire Area RB-FZ-1F)

(4) Turbine Building Lube Oil Area (Fire Area TB-FZ-11B)

(5) Turbine Building Basement Floor-South End (Fire Area TB-FZ-11D)

(6) Turbine Building Condenser Bay (Fire Area TB-FZ-11E)

(7) Turbine Building Basement & Mezzanine (Fire Area TB-FZ-11H)

(8) Office Building - 480V Switchgear Room (Fire Area OB-FA-6B)

(1 of 2 exemptions)

Based on our evaluation, we concluded that the three exemptions requested for the following areas are not needed:

(9) Reactor Building Elevation 23 feet (Fire Area RB-FZ-IE) (1 of 2 exemptions)

(10) Office Building - 480V Switchgear Room (Fire Area OB-FA-6B) (I of 2 exemptions)

(11) Office Building - Motor Generator Set Room (Fire Area OB-FA-8A)

(12/13) Office Building - Battery & Electrical Tray Room (Fire Area &B-FZ-8C)

(2 exemptions)

4 I

  • k 7590-01 Exemption 1 (Fire Areas RB-FZ-1D, 1E and IF and Fire Area OB-FA-6B)

The licensee requested an exemption from the technical requirements of Section III.G of Appendix R in each of these areas to the extent that it requires the installation of an area-wide automatic fire suppression system.

Discussion (Fire Area RB-FZ-1D)

This area is bounded by walls, floor and ceiling of reinforced concrete.

However, this portion of the Reactor Building communicates, via unprotected openings, with other plant locations which the licensee has designated as separate fire areas. These penetrations are delineated in Appendix E of the licensee's April 3, 1985 report.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2 and 3 as defined in the above-referenced report. For a fire in this area, hot shutdown is achieved using systems from path 1 and cold shutdown is achieved using path 3. All required hot shutdown path 1 systems that are located in this area are protected by a 1-hour fire-rated barrier. Cold shutdown path 3 systems in this area that would be damaged in a fire can either be repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or an alternate means of achieving shutdown exists outside of this fire area via manual operation of certain valves.

The fire loading in this area has been calculated to be 12,500 BTU/sq.ft.

which corresponds to a fire severity of less than 10 minutes as determined by the ASTM E-119 time-temperature curve.

Existing fire protection includes an area-wide fire detection system; two fixed, water spray deluge systems which cover cables in trays;,portable fire extinguishers and manual hose stations. The licensee has committed

7590-01 to reroute certain safe shutdown-related circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 fire hazards analysis report.

Discussion (Fire Area RB-FZ-1E)

This area is bounded by walls, floor and ceiling of reinforced concrete, which contain unprotected openings into adjoining plant locations, that the licensee has identified as separate fire areas, as delineated in the April 3, 1985 report.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3 and 4 and for cold shutdown paths 1, 2 and 3 as defined in the above-referenced report. For a fire in this area, hot shutdown is achieved using shutdown path 1 and cold shutdown using path 3. With the exception of the reactor scram system circuitry, all required hot shutdown path 1 systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier. Cold shutdown path 3 systems in this area that would be subject to fire damage can either be repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or an alternate means of achieving safe shutdown exists outside of this fire area by manual operation of certain valves.

The fire loading in this area has been calculated to be 20,000 BTU/sq.ft.

which corresponds to a fire severity of less than 16 minutes as determined by the ASTM E-119 time-temperature curve.

7590-01 Existing fire protection includes an area-wide fire detection system; two fixed, water spray deluge systems which cover cables in trays; portable fire extinguishers and manual hose stations. The licensee has committed to re-route certain safe-shutdown-related circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 report.

Discussion (Fire Area RB-FZ-1F)

This area is bounded by walls, floor and ceiling of reinforced concrete which contain unprotected openings into an adjoining plant location that the licensee has identified as a separate fire area.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot shutdown is achieved using shutdown path 1 and cold shutdown using path 1. All required hot shutdown systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier. If cold shutdown path 3 systems were lost in a fire, an alternate means of achieving safe shutdown exists which is independent of this fire area.

The fire loading in this area has been calculated to be 1,500 BTU/sq. ft.

which corresponds to a fire severity of less than 2 minutes as determined by the ASTM E-119 time-temperature curve.

7590-01 Existing fire protection includes an automatic fire detection system; portable fire extinguishers and manual hose stations. The licensee has committed to reroute certain safe shutdown circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 report.

Discussion (Fire Area OB-FA-6B)

This fire area is bounded by walls, floor and ceiling of 3-hour fire-rated construction except for the 1-hour rated wall common with adjacent fire area OB-FA-6A. In the event of a fire in this location, hot and cold shutdown will be achieved using shutdown path 2. The required shutdown-related cables are either protected by a 1-hour fire barrier or an alternate means for achieving safe-shutdown is available outside of this area.

The fire load has been calculated to be 71,000 BTU/sq. ft. which represents a fire severity of less than 1-hour as determined by the ASTM E-119 time-temperature curve.

Existing fire protection includes an area-wide fire detection system; an automatic halon fire suppression system for the switchgear room portion of this fire area; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee proposed to make structural, ventilation system and halon system modifications to isolate this fire area from adjacent plant locations; to reroute certain shutdown related cables and to protect others in a 1-hour fire-rated barrier.

7590-01 The licensee justified the exemptions in these four areas on the basis of the low fire loading, the existing fire protection and the proposed modifications.

Evaluation The technical requirements of Section III.G.2 are not met in these locations because of the absence of an area-wide automatic fire suppression system.

In addition,Section III.G.3 is not met because of the absence of an area-wide, fixed, fire suppression system in a location where an alternate shutdown capability has been provided.

Our principal concern was that in the event of a fire the absence of an area-wide automatic fire suppression system would result in loss of all shutdown capability. However, the fire load in these areas is low, with combustible material generally dispersed. Where concentrated quantities of combustible cable insulation exists, the cables are protected by a deluge system.

All of these areas are protected by a fire detection system. If a fire should occur, the staff has determined that it will be detected in its incipient stages, before significant propagation occurred. The fire would then be put out by the plant fire brigade using the portable fire extinguishers and manual hose stations. If rapid room temperature rise occurred before the arrival of the brigade, existing fire suppression systems will actuate to limit fire spread, to protect the cables covered by the systems and to reduce room temperature.

Until the arrival of the brigade and eventual fire suppression, the 1-hour fire

7590-01 barriers installed to protect one shutdown pathway provides sufficient passive fire protection to provide us with reasonable assurance that those systems would remain free of fire damage. For those redundant shutdown systems that are not similarly protected, the licensee has identified an alternate capability that is physically and electrically independent of these fire areas. For certain cold shutdown systems that might be lost in a fire, the licensee has repair procedures with materials on site, that will enable these systems to be restored to operable condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Therefore, the absence of area-wide fire suppression systems is not necessary to provide reasonable assurance that safe-shutdown conditions can be achieved and maintained.

Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications, will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from an area-wide fire suppression system in the following areas should be granted:

Reactor Building Elevation 51 feet (Fire Area RB-FZ-1D)

Reactor Building Elevation 23 feet (Fire Area RB-FZ-1E)

Reactor Building Elevation (-) 19 feet (Fire Area RB-FZ-IF)

Office Building-480V Switchgear Room (Fire Area OB-FA-6B)

7590-01

- 11 -

Exemption 2 (Fire Areas TB-FZ-11B and TB-FZ-11H)

The licensee requested an exemption from the technical requirement of Section III.G.2 of Appendix R in these two areas to the extent that it requires that redundant shutdown circuits in a pit area be separated by a 3-hour fire barrier.

Discussion (Fire Area TB-FZ-11B)

This area is bounded by masonry walls, floor and ceiling. However, this portion of the Turbine Building communicates, via unprotected openings, with other plant areas that the licensee has identified as separate fire areas. These penetrations are delineated in Appendix E of the licensee's April 3, 1985 report.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot shutdown is achieved using hot shutdown path 1, with isolation condenser system "A" instead of "B". Cold shutdown is achieved using path 1. Redundant shutdown-related circuits are located in a pit area where separation per the requirements of Section III.G.2 is not achieved.

The fire load in this area has been calculated to be approximately 586,000 BTU/sq. ft., which represents a fire severity of approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> as determined by the ASTM E-119 time-temperature curve. The principal combustible material consists of turbine lube oil and cable insulation:

7590-01

- 12 -

Existing fire protection includes a fire detection system, an automatic sprinkler system over cable trays; water spray systems for the lube oil storage tank; a sprinkler system for the bearing lift pumps; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee committed to reroute certain safe shutdown circuits outside of this fire area. The licensee also committed to fill the pit area where vulnerable shutdown-related cables are located with sand or with a fire-rated silicon foam.

Discussion (TB-FZ-11H)

This area is bounded by reinforced concrete walls, floor and ceiling.

However, this portion of the Turbine Building communicates, via unprotected openings, with other plant locations that the licensee has identified as separate fire areas.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot and cold shutdown will be achieved using shutdown path 2. Shutdown path 2 circuits are located in a pit area where separation per the requirements of Section III.G.2 is not achieved.

There are no in-situ fire hazards in this location. The fire load as calculated by the licensee is negligible.

7590-01 Existing fire protection includes portable fire extinguishers and manual hose stations. The licensee committed to fill the pit area where vulnerable shutdown cables are located with sand or with a fire-rated silicon foam.

The licensee justified the exemptions in these locations on the basis that the fire hazard in the pits is negligible. Also, the fire hazard in the area around the pit is either negligible or mitigated by fire suppression systems. The licensee also justified these exemptions on the ability of the sand or silicon foam to prevent fire damage to redundant cables where they are vulnerable.

Evaluation The technical requirements of Section III.G.2 are not met in this area because redundant shutdown-related cables are not separated by a 3-hour barrier within the pit area.

Our concern was that because of the lack of adequate physical separation, the cables in these pits would be vulnerable to fire damage. However, because the pits are located in the floor and because products of combustion rise in a fire, we do not expect a fire outside the pit to have any significant affect on the cables within the pit. Also, because the pit area will be filled with sand or a fire-rated silicon foam, we have reasonable assurance that a fire will not originate within it or that a possible flammable liquid spill would affect the cables.

7590-01

- 14 -

Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications will achieve an acceptable level of fire protection equivalent to that provided by Section III.G.2. Therefore, the licensee's request for exemption from a 3-hour fire barrier in the following locations should be granted:

Turbine Building Lube Oil Area (Fire Area TB-FZ-11B)

Turbine Building Basement & Mezzanine (Fire Area TB-FZ-11H)

Exemption 3 (Fire Area TB-FZ-11D)

The licensee requested an exemption from the technical requirements of Section III.G.2 of Appendix R to the extent that it requires an area-wide automatic fire detection and suppression system.

Discussion This area is bounded by walls, floor and ceiling of reinforced concrete.,

However, this portion of the Turbine Building communicates, through unprotected openings, with adjoining plant locations that the licensee has identified as separate fire areas. These penetrations are delineated in the licensee's April 3, 1985 report.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2, and 3 as described in the above-referenced report.

7590-01 For a fire in this area both hot and cold shutdown is achieved using shutdown path 1. All required path 1 shutdown-related circuits are either protected by a 1-hour fire-rated barrier or the licensee has identified an alternate means which is independent of this area to safely shut down the plant.

The fire load in this location has been calculated to be 12,400 BTU/sq.ft.,

which represents a fire severity of less than 10 minutes.

Existing fire protection includes an automatic sprinkler system which protects cables in trays; a water spray system which covers the hydrogen seal oil unit; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee committed to relocate certain shutdown-related cables and to protect others in a 1-hour fire-rated barrier.

The licensee justifies this exemption on the basis of the low fire loading, existing fire protection and proposed modifications.

Evaluation The technical requirements of Section III.G. are not met in this area because of the absence of area-wide fire detection and suppression systems.Section III.G.3 is not met because a fixed fire detection and suppression system has not been provided for circuits for which an alternate shutdown capability has been provided.

7590-01 We were concerned that because this area was not protected by an area-wide fire detection and suppression system a fire would damage redundant shutdown systems. However, the fire load is low with combustible materials generally dispersed. Where concentrated quantities of combustible materials exist, such as in cable trays and the hydrogen seal oil unit, these combustibles are protected by an automatic fire suppression system. Where no concentrated combustibles exist, we expect a fire in those locations to be of initially limited magnitude and extent. Upon discovery by plant operators, the fire brigade would be dispatched and would put out the fire using existing manual fire fighting equipment. If the fire occurred in the cable trays or in the seal oil unit, we expect the fire suppression systems to actuate and control fire spread. Until the arrival of the fire brigade and eventual fire extin-guishment, those required shutdown systems that are vulnerable to fire damage in this area are protected by a 1-hour fire barrier. Therefore, an area-wide fire detection and suppression system is not necessary to provide reasonable assurance that safe shutdown could be achieved and maintained.

Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from an area-wide fire detection and suppression system in the Turbine Building Basement Floor-South End (Fire Area TB-FZ-11D) should be granted.

7590-01 Exemption 4 (Fire Area TB-FZ-11E)

The licensee requested an exemption from the technical requirements of Section III.G.3 of Appendix R to the extent that it requires a fixed fire detection system in an area for which an alternate shutdown capability has been provided.

Discussion The area is bounded by reinforced concrete walls, floor and ceiling.

However, this portion of the Turbine Building communicates, through unprotected openings, with other plant locations that the licensee has identified as separate fire areas.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3 and 4 and for cold shutdown paths 1, 2, and 3 as defined in the licensee's April 3, 1985 report. For a fire in this area, hot and cold shutdown is achieved using shutdown path 1. For those required shutdown path 1 systems that are located in this area and may be damaged by a fire, the licensee has provided an alternate capability that is physically and electrically independent of this fire area.

The fire load in this location has been calculated to be 8,100 BTU/sq. ft.,

which represents a fire severity of less than 7 minutes.

Existing fire protection includes an automatic sprinkler system located throughout the condenser bay; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee committed to reroute certain shutdown-related circuits outside of this fire area.

7590-01 The licensee justified the exemption on the bases of the low fire load, the existing fire protection, the proposed modifications and the ability to safely shut down the plant if a fire should occur in this area.

Evaluation The technical requirements of Section III.G.3 are not met in this area because of the absence of a fire detection systems.

We were concerned that if a fire should occur, products of combustion would spread into adjoining fire areas and damage systems that would be necessary to safely shut down the plant. However, the fire load in this location is low. Combustible materials are dispersed throughout the area. We, therefore, expect a potential fire to develop slowly with initially low heat buildup and smoke generation. Upon discovery of the fire, the plant fire brigade would respond and extinguish it using manual fire fighting equipment. If the fire increased in intensity prior to the arrival of the brigade, we expect the automatic sprinkler system to actuate to control the fire, to limit room temperature rise and to protect the shutdown systems that may be threatened.

If redundant shutdown systems were damaged within this location, an alternate shutdown capability exists that is outside this fire area. Because some of the walls and the ceiling contain unprotected openings we expect some smoke to propagate into adjoining fire areas. But because of the automatic sprinkler

7590-01 system in this area and the low fire loadina, we conclude that the amount of smoke would not represent a significant threat to shutdown systems in the adjoining fire area. We, therefore, conclude that the absence of a smoke detector system in this area has no safety significance.

Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications, will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from a fire detection system in the Turbine Buildinq Condenser Bay (Fire Area TR-FZ-1IE) should be granted.

IV.

Accordingly, the Commission has determined pursuant to 10 CFR 50.12(a),

that (1) these exemptions as described in Section III are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security, and (2) special circumstances are present for these exemptions in that application of the regulation in these particular circumstances is not necessary to achieve the underlying purposes of Appendix R to 1O0CFR Part 50. Therefore, the Commission hereby grants the exemption requests identified in Section III above.

Pursuant to 10 CFR 51.32 the Commission has determined that the grantinq of these exemptions will not result in any significant environmental impact (50 FR 49633, December 3, 1985).

The Safety Evaluation dated March , 1986, related to this actton and the above referenced submittals by the licensee are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W.,

Washington, D.C. 20555, and at the Ocean County Library,,I01 Washinqton Street, Toms Rivers, New Jersey 08753.

7590-01

- 20 -

A copy of the Safety Evaluation may be obtained upon written request to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention:

Director, Division of BWR Licensing.

These exemptions are effective upon issuance.

Dated at Bethesda, Maryland this24th day of March 1986.

FOR THE NUCLEAR REGULATORY COMMISSION obert M. Bernero, Director Division of BWR Licensing Office of Nuclear Reactor Regulation

- UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING EXEMPTION FROM 10 CFR PART 50, APPENDIX R AND THE POST FIRE SAFE SHUTDOWN CAPABILITY GPU NUCLEAR CORPORATION AND JERSEY CENTRAL POWER & LIGHT COMPANY OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219

1.0 INTRODUCTION

By letter dated April 3, 1985, as supplemented by letters dated July 12 and October 9, 1985, the licensee submitted a revised Fire Hazards Analysis Report and Safe Shutdown Evaluation for Oyster Creek Nuclear Generating Station (Oyster Creek). This report supersedes the previous submittal dated December 16, 1983, and February 13 and May 3, 1984. Seven exemptions to the technical requirements of Section III.G of Appendix R to 10 CFR Part 50 were requested.

Section III.G.2 of Appendix R requires that one train of cables and equipment necessary to achieved and maintain safe shutdown be maintained free of fire damage by one of the following means:

a. Separation of cables and equipment and associated non-safety circuits of redundant trains by a fire barrier having a 3-hour rating. Structural steel forming a part of or supporting such fire barriers shall be protected to provide fire resistance equivalent to that required of the barrier;
b. Separation of cables and equipment and associated non-safety circuits of redundant trains by a horizontal distance of more than 20 feet with no intervening combustibles or fire hazards. In addition, fire detectors and an automatic fire suppression system shall be installed in the fire area.
c. Enclosure of cables and equipment and associated non-safety circuits of one redundant train in a fire barrier having a 1-hour rating..! In addition, fire detectors and an automatic fire suppression system shall be installed in the fire area.

60p 47 0219 8bo4070 PDR ADOCK 0 PDR F  :

If these conditions are not met Section III.G.3 requires an alternative shutdown capability independent of the fire area of concern. It also requires that a fixed suppression system be installed in the fire area of concern if it contains a large concentration of cables or other combustibles. These alternative requirements are not deemed to be equivalent; however, they provide equivalent protection for those configurations in which they are accepted.

Because it is not possible to predict the specific conditions under which fires may occur and propagate, the design basis protective features are specified in the rule rather than the design basis fire. Plant-specific features may require protection different from the measures specified in Section III.G. In such a case, the licensee must demonstrate, by means of a detailed fire hazards analysis, that existing protection or existing protection in conjunction with proposed modifications will provide a level of safety equivalent to the technical requirements of Section III.G of Appendix R.

In summary,Section III.G is related to fire protection features for ensuring that systems and associated circuits used to achieve and maintain safe shut-down are free of fire damage. Fire protection configurations must either meet the specific requirements of Section III.G or an alternative fire protec-tion configuration must be justified by a fire hazard analysis.

Our general criteria for accepting an alternative fire protection configura-tion are the following:

O The alternative assures that one train of equipment necessary to achieve hot shutdown from either the control room or emergency con-trol stations is free of fire damage.

" The alternative assures that fire damage to at least one train of equipment necessary to achieve cold shutdown is limited such that it can be repaired within a reasonable time (minor repairs with com-ponents stored on-site).

O Modifications required to meet Section III.G would not enhance fire protection safety above that provided by either existing or proposed alternatives.

o Modifications required to meet Section III.G would be detrimental to overall facility safety.

Therefore, by letter dated April 3, 1985, as supplemented by letters dated July 12 and October 9, 1985, the licensee has requested 7 exemptions for 13 fire areas from the requirements of Section III.G of Appendix R, to'.the extent that it requires physical separation and/or fire protection systems to protect redundant trains of safe shutdown related cable or equipment. Based on our evaluation, we conclude that 3 exemptions for 5 fire areas are not needed. This is addressed in Section 6.0. The other 4 exemptions for 8 fire areas are addressed below in Sections 2.0 through 5.0.

2.0 EXEMPTION 1 2.0.1 Reactor Building Elevation 51 feet (Fire Area RB-FZ-ID) 2.0.2 Reactor Building Elevation 23 feet (Fire Area RB-FZ-1E) 2.0.3 Reactor Building Elevation (-) 19 feet (Fire Area RB-FZ-1F) 2.0.4 Office Building - 480V Switchgear Room (Fire Area OB-FA-6B) 2.1 Exemption Requested The licensee requested an exemption from the technical requirements of Section III.G of Appendix R in each of these areas to the extent that it requires the installation of an area-wide automatic fire suppression system.

2.2.1 Discussion (Fire Area RB-FZ-1D)

This area is bounded by walls, floor and ceiling of reinforced concrete.

However, this portion of the Reactor Building communicates, via unprotected openings, with other plant locations which the licensee has designated as separate fire areas. These penetrations are delineated in Appendix E of the licensee's April 3, 1985 report.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2 and 3 as defined in the above-referenced report. For a fire in this area, hot shutdown is achieved using systems from path 1 and cold shutdown is achieved using path 3. All required hot shutdown path 1 systems that are located in this area are protected by a 1-hour fire-rated barrier. Cold shutdown path 3 systems in this area that would be damaged in a fire can either be repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or an alternate means of achieving shutdown exists outside of this fire area via manual operation of certain valves.

The fire loading in this area has been calculated to be 12,500 BTU/sq.ft.

which corresponds to a fire severity of less than 10 minutes as determined by the ASTM E-119 time-temperature curve.

Existing fire protection includes an area-wide fire detection system; two fixed, water spray deluge systems which cover cables in trays; portable fire extinguishers and manual hose stations. The licensee has committed to re-route certain safe shutdown-related circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 fire hazards analysis report.

2.2.2 Discussion (Fire Area RB-FZ-1E)

This area is bounded by walls, floor and ceiling of reinforced concrete, which contain unprotected openings into adjoining plant locations, th'at the licensee has identified as separate fire areas, as delineated in the April 3, 1985 report.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3 and 4 and for cold shutdown paths 1, 2 and 3 as defined in the above-referenced report. For a fire in this area, hot shutdown is achieved using shutdown path 1 and cold shutdown using path 3. With the exception of the reactor scram system circuitry (refer to Section 6.0 of this report), all required hot shutdown path I systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier. Cold shutdown path 3 systems in this area that would be subject to fire damage can either be required within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or an alternate means of achieving safe shutdown exists outside of this fire area by manual operation of certain valves.

The fire loading in this area has been calculated to be 20,000 BTU/sq.ft.

which corresponds to a fire severity of less than 16 minutes as determined by the ASTM E-119 time temperature curve.

Existing fire protection includes an area-wide fire detection system; two fixed, water spray deluge systems which cover cables in trays; portable fire extinguishers and manual hose stations. The licensee has committed to re-route certain safe-shutdown-related circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 report.

2.2.3 Discussion (Fire Area RB-FZ-lF)

This area is bounded by walls, floor and ceiling of reinforced concrete which contain unprotected openings into an adjoining plant location that the licensee has identified as a separate fire area.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot shutdown is achieved using shutdown path 1 and cold shutdown using path 1. All required hot shutdown systems that would be damaged by a fire in this area are protected by a 1-hour fire barrier. If cold shutdown path 3 systems were lost in a fire, an alternate means of achieving safe shutdown exists which is independent of this fire area.

The fire loading in this area has been calculated to be 1,500 BTU/sq. ft.

which corresponds to a fire severity of less than 2 minutes as determined by the ASTM E-119 time-temperature curve.

Existing fire protection includes an automatic fire detection system; portable fire extinguishers and manual hose stations. The licensee has committed to re-route certain safe shutdown circuits outside of this fire area and to protect others in a 1-hour fire barrier as delineated in the April 3, 1985 report.

2.2.4 Discussion (Fire Area OB-FA-6B)

This fire area is bounded by walls, floor and ceiling of 3-hour fire-rated construction except for the 1-hour rated wall common with adjacent fire area OB-FA-6A. In the event of a fire in this location, hot and cold shutdown will be achieved using shutdown path 2. The required shutdown-related cables are either protected by a 1-hour fire barrier or an alternate means for achieving safe-shutdown is available outside of this area.

The fire load has been calculated to be 71,000 BTU/sq. ft. which represents a fire severity of less than 1-hour as determined by the ASTM E-119 time-temperature curve.

Existing fire protection includes an area-wide fire detection system; an automatic halon fire suppression system for the switchgear room portion of this fire area; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee proposed to make structural ventilation system and halon system modifications to isolate this fire area from adjacent plant locations; to reroute certain shutdown related cables and to protect others in a 1-hour fire-rated barrier.

The licensee justified the exemptions in these four areas on the basis of the low fire loading, the existing fire protection and the proposed modifications.

2.3 Evaluation The technical requirements of Section III.G.2 are not met in these locations because of the absence of an area-wide automatic fire suppression system.

In addition,Section III.G.3 is not met because of the absence of an area-wide, fixed, fire suppression system in a location where an alternate shutdown capability has been provided.

Our principal concern was that in the event of a fire the absence of an area-wide automatic fire suppression system would result in loss of all shutdown capability. However, the fire load in these areas is low, with combustible material generally dispersed. Where concentrated quantities of combustible cable insulation exists, the cables are protected by a deluge system.

All of these areas are protected by a fire detection system. If a fire should occur, we expect it to be detected in its formative stages, before significant propagation occurred. The fire would then be put out by the plant fire brigade using the portable fire extinguishers and uianual hose stations. If rapid room temperature rise occurred before the arrival of the brigade, We expect existing fire suppression systems to actuate to limit fire spread, to protect the cables covered by the systems and to reduce room temRdrature.

Until the arrival of the brigade and eventual fire suppression, the '1-hour fire barriers installed to protect one shutdown pathway, provides sufficient passive fire protection to provide us with reasonable assurance that those systems

would remain free of fire damage. For those redundant shutdown systems that are not similarly protected, the licensee has identified an alternate capability that is physically and electrically independent of these fire areas. For certain cold shutdown systems that might be lost in a fire, the licensee has repair procedures with materials on site, that will enable these systems to be restored to operable condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Therefore, the absence of area-wide fire suppression systems is not necessary to provide reasonable assurance that safe-shutdown conditions can be achieved and maintained.

2.4 Conclusion Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications, will achieve an acceptable level of fire protection equivalent to that provided by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from an area-wide fire suppression system in the following areas should be granted:

Reactor Building Elevation 51 feet (Fire Area RB-FZ-ID)

Reactor Building Elevation 23 feet (Fire Area RB-FZ-lE)

Reactor Building Elevation (-) 19 feet (Fire Area RB-FZ-lF)

Office Building-480V Switchgear Room (Fire Area OB-FA-6B) 3.0 EXEMPTION 2 3.0.1 Turbine Building Lube Oil Area (Fire Area TB-FZ-IIB) 3.0.2 Turbine Building Basement & Mezzanine (Fire Area TB-FZ-lIH) 3.1 Exemption Requested The licensee requested an exemption from the technical requirement of Section III.G.2 of Appendix R in these two areas to the extent that it requires that redundant shutdown circuits in a pit area be separated by a 3-hour fire barrier.

3.2.1 Discussion (Fire Area TB-FZ-11B)

This area is bounded by masonry walls, floor and ceiling. However, this portion of the Turbine Building communicates, via unprotected openings, with other plant areas that the licensee has identified as separate fire areas. These penetrations are delineated in Appendix E of the licensee's April 3, 1985 report.

This fire area contains electrical circuits for hot shutdown paths 1,,2,-

3, and 4 and cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot shutdown is achieved using hot~shutdown path 1, with isolation condenser system "A" instead of "B". Cold shiutdown is achieved using path 1. Redundant shutdown-related circuits are located in a pit area where separation per the requirements of Section 111G*2 is not achieved.

The fire load in this area has been calculated to be approximately 586,000 BTU/sq. ft., which represents a fire severity of approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> as determined by the ASTM E-119 time-temperature curve. The principal combustible material consists of turbine lube oil and cable insulation.

Existing fire protection includes a fire detection system, an automatic sprinkler system over cable trays; water spray systems for the lube oil storage tank; a sprinkler system for the bearing lift pumps; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee committed to re-route certain safe shutdown circuits outside of this fire area. The licensee also committed to fill the pit area where vulnerable shutdown-related cables are located with sand or with a fire-rated silicon foam.

3.2.2 Discussion (TB-FZ-11H)

This area is bounded by reinforced concrete walls, floor and ceiling. However, this portion of the Turbine Building communicates, via unprotected openings, with other plant locations that the licensee has identified as separate fire areas.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and cold shutdown paths 1, 2, and 3 as defined in the April 3, 1985 report. For a fire in this area, hot and cold shutdown will be achieved using shutdown path 2. Shutdown path 2 circuits are located in a pit area where separation per the requirements of Section III.G.2 is not achieved.

There are no in-situ fire hazards in this location. The fire load as calculated by the licensee is negligible.

Existing fire protection includes portable fire extinguishers and manual hose stations. The licensee committed to fill the pit area where vulnerable shutdown cables are located with sand or with a fire-rate silicon foam.

The licensee justified the exemptions in these locations on the basis that the fire hazard in the pits are negligible. Also, the fire hazards in the area around the pit is either negligible or mitigated by fire suppression systems. The licensee also justified these exemptions on the ability of the sand or silicon foam to prevent fire damage to redundant cables where they are vulnerable.

3.3 Evaluation The technical requirements of Section III.G.2 are not met in these area because redundant shutdown-related cables are not separated by a 3-hour barrier within the pit area.

Our concern was that because of the lack of adequate physical separation, the cables in these pits would be vulnerable to fire damage. However, because the pits are located in the floor and because products of combustion rise in a fire, we do not expect a fire outside the pit to have any significant effect on the cables within the pit. Also, because the pit area will be filled with sand or a fire rated silicon foam, we have reasonable assurance that a fire will not originate within it or that a possible flammable liquid spill would affect the cables.

3.4 Conclusion Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications will achieve an acceptable level of fire protection equivalent to that required by Section III.G.2. Therefore, the licensees request for exemption from a 3-hour fire barrier in the following locations should be granted:

.Turbine Building Lube Oil Area (Fire Area TB-FZ-IIB)

Turbine Building Basement & Mezzanine (Fire Area TB-FZ-lIH) 4.0 EXEMPTION 3 4.0 Turbine Building Basement Floor-South End (Fire Area TB-FZ-IID) 4.1 Exemption Requested The licensee requested an exemption from the technical requirements of Section III.G.2 of Appendix R to the extent that it requires an area-wide automatic fire detection and suppression system.

4.2 Discussion (Fire Area TB-FZ-11D)

This area is bounded by walls, floor and ceiling of reinforced concrete.

However, this portion of the Turbine Building communicates through unprotected openings, with adjoining plant locations that the licensee has identified as separate fire areas. These penetrations are delineated in the licensee's April 3, 1985 report.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3, and 4 and for cold shutdown paths 1, 2, and 3 as described in the above-referenced report.

For a fire in this area both hot and cold shutdown is achieved using shutdown ath 1. All required path 1 shutdown-related circuits are either protected y a 1-hour fire-rated barrier or the licensee has identified an alternate means which is independent of this area to safely shutdown the plant.

The fire load in this location has been calculated to be 12,400BTU/sq.ft.,

which represents a fire severity of less than 10 minutes.

Existing fire protection includes an automatic sprinkler system which protects cables in trays; a water spray system which covers the hydrogen seal oil unit; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee committed to relocate certain shutdown-related cables and to protect others in a 1-hour fire-rated barrier.

The licensee justifies this exemption on the basis of the low fire loading, existing fire protection and proposed modifications.

4.3 Evaluation The technical requirements of Section III.G. are not met in this area because of the absence of area-wide fire detection and suppression systems.Section III.G.3 is not met because a fixed fire detection and suppression system has not been provided for circuits for which an alternate shutdown capability has been provided.

We were concerned that because this area was not protected by an area-wide fire detection and suppression system a fire would damage redundant shutdown systems. However, the fire load is low with combustibles materials generally dispersed. Where concentrated quantities of combustible materials exist, such as in cable trays and the hydrogen seal oil unit, these combustibles are protected by an automatic fire suppression system. Where no concentrated combustibles exist, we expect a fire in those locations to be of initially limited magnitude and extent. Upon discovery by plant operators, the fire brigade would be dispatched and would put out the fire using existing manual fire fighting equipment. If the fire occurred in the cable trays or in the seal oil unit, we expect the fire suppression systems to actuate and control fire spread. Until the arrival of the fire brigade and eventual fire extin-guishment, those required shutdown systems that are vulnerable to fire damage in this area are protected by a 1-hour fire barrier. Therefore, an area-wide fire detection and suppression system is not necessary to provide reasonable assurance that safe shutdown could be achieved and maintained.

4.4 Conclusion Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications, will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licensee's request for exemption from an area-wide fire detection and suppression system in the Turbine Building Basement Floor-South End (Fire Area TB-FZ-IID) should be granted.

5.0 EXEMPTION 4 5.0 Turbine Building Condenser Bay (Fire Area TB-FZ-11E) 5.1 Exemption Requested The licensee requested an exemption from the technical requirements of Section III.G.3 of Appendix R to the extent that it requires a fixed fire detection system in an area for which an alternate shutdown capability has been provided.

5.2 Discussion The area is bounded by reinforced concrete walls, floor and ceiling. However, this portion of the Turbine Building communicates, through unprotected openings, with other plant locations that the licensee has identified as separate fire areas.

This fire area contains electrical circuits for hot shutdown paths 1, 2, 3 and 4 and for cold shutdown paths 1, 2, and 3 as defined in the licensee's April 3, 1985 report. For a fire in this area, hot and cold shutdown is achieved using shutdown path 1. For those required shutdown path 1 systems that are located in this area and may be damaged by a fire, the licensee has provided an alternate capability that is physically and electrically independent of this fire area.

The fire load in this location has been calculated to be 8,100 BTU/sq. ft.,

which represents a fire severity of less than 7 minutes.

Existing fire protection includes an automatic sprinkler system located throughout the condenser bay; portable fire extinguishers and manual hose stations. In the April 3, 1985 report, the licensee committed to reroute certain shutdown-related circuits outside of this fire area.

The licensee justified the exemption on the bases of the low fire load, the existing fire protection, the proposed modifications and the ability to safely shut down the plant if a fire should occur in this area.

5.3 Evaluation The technical requirements of Section III.G.3 are not met in this area because of the absence of a fire detection systems.

We were concerned that if a fire should occur, products.of combustion would spread into adjoining fire areas and damage systems that would be necessary to safely shut down the plant. However, the fire load in this location is low. Combustible materials are dispersed throughout the area. We, therefore, expect a potential fire to develop slowly with initially low heat buildup and smoke generation. Upon discovery of the fire, the plant fire brigade would respond and extinguish it using manual fire fighting equipment. If the fire increased in intensity prior to the arrival of the brigade, we expect the automatic sprinkler system to actuate to control the fire, to limit room temperature rise and to protect the shutdown systems that may be threatened.

If redundant shutdown systems were damaged within this lQcation, an alternate shutdown capability exists that is outside this fire area. Because some-of the walls and the ceiling contain unprotected openings we expect somezsmoke to propagate into adjoining fire areas. But because of the automati'c sprinkler system in this area and the low fire loading, we conclude that the amount of smoke would not represent a significant threat to shutdown systems in the adjoining fire area. We, therefore, conclude that the absence bf a smoke detector system in this area has no safety significance.

5.4 Conclusion Based on our evaluation, we conclude that the licensee's alternate fire protection configuration with the proposed modifications will achieve an acceptable level of fire protection equivalent to that required by Sections III.G.2 and III.G.3. Therefore, the licenees request for exemption from a fire detection system in the Turbine Building Condenser Bay (Fire Area TB-FZ-11E) should be granted.

6.0 DISCUSSION OF EXEMPTIONS REQUESTED BUT NOT NEEDED The licensee has requested the following exemptions from the need to protect the electrical circuitry from the technical requirements of Section III.G of Appendix R. We conclude that these exemptions are not needed as evaluated below:

1. Exemption request from the requirements to protect the reactor scram system circuitry in the Fire Zone RB-FZ-lE elevation 23 feet.

Evaluation The licensee stated that all reactor scram circuitry is contained in conduit except for the back-up valve circuitry and that there are no electrical system circuits contained within the reactor scram conduits. The design of the reactor scram system is fail-safe, deenergize to scram. The effects of fire on the reactor scram circuits in conduit would be to interrupt power and initiate a scram. No modifications are deemed necessary because the protection of the reactor scram equipment will not enhance the safe-shutdown capability.

Based on the design of the reactor scram system, the staff agrees with the licensee that the modifications to protect the scram system circuitry in the conduits are not needed. As this is the accepted staff position, that after the reactor scram during control room evacuation, it is not required to protect the scram system circuitry from spurious operation, the above exemption is not needed.

2. Exemption request from the requirements to provide 1-hour fire barriers for electrical circuits associated with the "C" battery room ventilation system in the Fire Area OB-FA-6B.

Evaluation The licensee stated that the ventilation of the "C" battery room is not required for a minimum of 38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> after a loss of ventilation, and that-the adequate ventilation can be achieved for this battery room by manually opening the battery room door and dampers D-l and D-2 and D-4 in the ventilition duct-work.

Based on the above, as the ventilation of the "C" battery room is not needed for 38-hours and the alternate ventilation can be provided after this period, the staff concludes that an exemption request from the requirements to provide 1-hour barriers from the electrical circuits associated with "C" battery room is not needed.

3. Exemption request from the requirements to protect the reactor recircu-lation valve circuits in the Fire Zones OR-FZ-8A and RC.

Evaluation The licensee stated that all five reactor recirculation loops are open durinq normal power operation and that out of five, four are required to be open per Technical Specifications. Assuming one spurious actuation, three reactor recirculation loops will remain open. For hot shutdown, none of these valves are required. For cold shutdown, the licensee has committed to protect the circuitry of loop "E" recirculation discharge valve to prevent bypassing the reactor when using shutdown pumps. The controls of the valve are provided at the local shutdown panel.

Based on the above, as the recirculation loops are not needed during hot shutdown and that the circuitry for one valve required for cold shutdown is protected, the above exemption is not needed.

7.0 FIRE AREA BOUNDARIES 7.1 Discussion In the April 3, 1985 report, the licensee described the non-fire-rated walls and floor/ceilings which bounded certain fire areas. The licensee stated that a number of these fire area boundaries contain unprotected openings such as stairways, hatchways and pipe penetrations. We have expressed our concerns to the licensee that, because of these openings, a fire might spread from one area to the next and damage systems that are needed to achieve and maintain safe-shutdown conditions. We stated that where a fire area was protected by an automatic fire suppression system, we did not expect fire to spread through these openinas into adjoining locations. Therefore, in areas protected by an automatic fire suppression system, the presence of unprotected openings in walls and floor/ceilings and negligible safety significance. We also stated that in those areas where fire could spread into adjoining locations but safe-shutdown could still be achieved, the presence of unprotected openings had no safety significance. We defined this situation to be thpse areas where the adjacent fire area(s) contains no required shutdown related equipment or where the nearest shutdown related system is more than 50 feet horizontally from any unprotected opening in the walls or ceiling that define those a eas.

For all other areas we recommended that the licensee protect the openings to prevent fire spread. The licensee committed to seal such'uiprotected openings with at least 6 inches of a fire-rated silicon foam. Where the use of such foam would not be viable, such as at open stairways or hatchways, the licensee committed to install an automatic sprinkler system to protect the opening that conforms to the appropriate sections of NFPA standard

No. 13. These commitments were by letter dated October 9, 1985. Because these commitments provide us with reasonable assurance that fire will not spread into adjoining plant fire areas, we find them acceptable.

7.3 Conclusion Based on our evaluation, we conclude that the licensee's justification for the adequacy of fire area boundaries with proposed modifications is acceptable.

8.0 SAFE SHUTDOWN CAPABILITY By letter dated October 26, 1983, we provided a Safety Evaluation Report (SER) concerning the proposed alternate shutdown capability at Oyster Creek in the event of a fire in the control room and cable spreading areas. In that SER, we concluded that the proposed design was acceptable and in accordance with the requirements of Appendix R to 10 CFR Part 50, Section III.G.3 and III.L.

Subsequent to the SER, Generic Letter 83-33 was issued which provided clarifi-cations of the staff interpretation of certain requirements of Appendix R including alternate shutdown capability.

Due to the scope and complexity of the licensee's originally proposed modifications and due to the generic clarification letter, the licensee reevaluated its original conceptual design and concluded that the previous submittal regarding the alternate shutdown panel design went beyond the Appendix R requirements and that a considerable amount of the proposed work was unnecessary. The licensee, in a meeting with the staff on January 22, 1985, discussed the new proposed alternate shutdown panel design and indicated that the proposed changes would not require any additional schedular exemption to accomplish Appendix R implementation.

By letter dated April 3, 1985, the licensee submitted the revised Fire Hazard Analysis Report and Section III.G Safe Shutdown Evaluation describing the means by which safe shutdown can be achieved in the event of fire and the proposed modifications to Oyster Creek to meet the requirements of Anpendix R, Items III.G.3 and III.L.

The licensee's revised safe shutdown analysis for a fire event has demonstrated that adequate redundancy and/or alternate safe shutdown methods exist for those systems required to effect hot or cold shutdown utilizing the alternate shutdown methods.

8.1 Systems Used For Post-Fire Safe Shutdown 8.1.1 Systems Required For Safe Shutdown Safe shutdown of the reactor is initially performed by insertion of -ontrol rods from the control room. Insertion can also be accomplished by tripping the reactor protection system motor generator set from outside the control room.

Decay heat removal is accomplished by natural circulation of reactor coolant through one of the two isolation condensers. The heat is dissipated to the atmosphere by steam formed on the shell side of the isolation condenser which is supplied with water from the condensate storage tank or as a backup from the fire water system. Primary system pressure and cooldown rate is controlled by cycling the condensate return valve of the isolation condenser.

Primary coolant inventory is maintained by the Control Rod Drive (CRD) hydraulic pump which makes up for any leakage or shrinkage during reactor shutdown. Makeup water for the reactor vessel and the isolation condenser is not immediately required after reactor scram. Main Steam Isolation Valves (MSIV) are closed from the control room to avoid inventory loss. These valves can be closed from outside the control room. Reactor feedwater pumps and reactor recirculatinn pumps will trip upon loss of offsite power or they will be tripped from the control room to prevent floodino of the isolation condenser on hich condensate flow. These pumps can also be tripped from outside the control room. The high flow trip function is blocked upon transfer of control to the remote shutdown panel.

Cold shutdown conditions can be achieved and maintained by the use of the shutdown cooling system along with its support systems: Reactor Building Closed Cooling Water (RRCCW) System and Service Water System.

8.1.2 Areas Where Alternate Safe Shutdown Is Required The licensee has determined the need for alternate safe shutdown capability in the event of fire in the cable spreading room, control room, upper cable spreading room and cable bridge tunnel where redundant safe shutdown equipment and cabling cannot meet the requirements of Appendix R Section III.G.2. The licensee has provided alternate safe shutdown capability independent of cabling and equipment in these control and cable spreading rooms.

8.1.3 Remaining Plant Areas The licensee stated that all other areas of the plant not required to have an alternate safe shutdown will comply with the requirements of Section III.G.2 of Appendix R, unless an exemption request has been approved by the staff.

8.1.4 Alternate Safe Shutdown System The alternate safe shutdown system required for the control room and cable spreading areas utilizes existing plant systems and equipment of shutdown train B as outlined in Section 8.1.1 and a new renmote shutdown panel located

in the switchqear room. Transfer switches permit isolation and transfer of controls and status indication of selected components from the control room to the remote shutdown and local panels. In the alternate position, the control and instrument circuits are connected to new fuses after they are isolated from the control room and cable spreadinq areas.

The control loaic circuits of the isolation condenser valves will be modified and cables rerouted to allow control of the isolation condenser from the remote shutdown panel and to prevent spurious opening of the vent valves. Power and control logic circuits of the Electromatic Relief Valves (EMRV) and cleanup system isolation valves will also be modified and cable rerouted/protected to prevent spurious opening of these valves. Since the instrument air compressors are not loaded on the diesel, air-operated valves required for shutdown will be provided with accumulators to provide a minimum of six open-close cycles and local air cylinders will be maintained in accessible locations for any additional requirements. The existing plant design and modifications assure availability of eouipment essential for achieving safe shutdown assuming loss of offsite power in the event of a fire.

8.2 Evaluation 8.2.1 Performance Goals The performance goals for post fire safe shutdown for reactivity control, reactor coolant makeup, reactor coolant pressure control and decay heat will be met by using the existing mechanical systems and equipment listed in Section 8.1.1. The control of these functions can be accomplished using the new remote shutdown panel or the control room denending on the fire location.

Direct indication of process variables including the reactor vessel level, reactor pressure and isolation condenser level is provided at the remote shutdown panel. Makeup tank level indication is available at a local indicator. Diagnostic monitoring of CRD hydraulic system, shutdown cooling system, condensate transfer system, RBCCW System and Service Water System is available at local panels.

Other than the station batteries, no other support functions are immediately necessary for achievinq hot shutdown. The diesel generators, RRCCW system, service water system and ventilation of switchgear room and battery rooms will be available to provide necessary support functions for the alternate shutdown system.

8.2.2 72-Hour Requirement The licensee stated that the plant is capable of being placed in cold' shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with either onsite or offsite power available.

8.2.3 Repairs No repairs are planned by the licensee to comply with Appendix R post-fire safe shutdown requirements.

8.2.4 Associated Circuits And Isolation The licensee conducted a review of the present electrical systems to determine the plant's capability to meet the associated circuit criteria as stated in Appendix R relating to safe shutdown and concluded that the existing electrical installation with some additional equipment modifications would satisfy these criteria.

8.2.4.1 Common Power Source The licensee indicated that all instruments and power circuits will be provided with coordinated protection by either circuit breakers or fuses.

8.2.4.2 Common Enclosure Associated circuits that share a common enclosure with those required for safe shutdown will be provided proper interrupting devices (breakers, fuses, etc.). Where interruption of associated circuits is not possible, shutdown circuits will be protected by physical separation or fire barrier.

8.2.4.3 Spurious Signals The devices whose inadvertent operation by spurious signals could affect safe shutdown have been identified as shutdown circuits and are included in the separation analysis. The licensee will provide isolation and transfer switches for all shutdown circuits as needed to prevent spurious operation.

The licensee has also provided for trippinq of the core spray pump outside the control room to prevent flooding the steam lines of the isolation condenser. To avoid spurious operation, the breakers of the main steam line drain valves on the reactor side of the MSJV will be opened after plant startup. The only high/low pressure interface identified is the interface between the reactor coolant and shutdown coolant systems. The shutdown cooling system is designed to withstand reactor operating pressure.

8.2.5 Safe Shutdown Procedures And Manpower The licensee will revise existing safe shutdown procedures to incorporate the above described safe shutdown method. The personnel available, as outlined in the licensee's submittal of April 3, 1985 will include ten people, five of whom are designated for plant shutdown. The remaining five are available to resoond to any fire. The manpower commitment is considered adequate.

8.3 Conclusion We have reviewed the licensee's proposed alternate safe shutdown capability for Oyster Creek in accordance with Appendix R criteria. Based onthat review, we conclude that the performance goals for accomplishing safe shutdown in the event of a fire, i.e., reactivity control, inventory control, decay heat removal, pressure control, process monitoring and support functions are met by the prooosed alternate safe shutdown facility. Therefore, we conclude that the requirements of Appendix R, Sections III.G.3 and IITL are satisfied.

- 17 -

9.0

SUMMARY

AND CONCLUSIONS Based on our evaluation, the licensee's request for exemption in the followinq areas should be qranted:

I . Reactor Building Elevation 51 feet (Fire Area RB-FZ-lD)

2. Reactor Building Elevation 23 feet (Fire Area RB-FZ-IE) (1 of 2 exemptions)
3. Reactor Building Elevation (-)19 feet (Fire Area RB-FZ-IF)
4. Turbine Building Lube Oil Area (Fire Area TB-FZ-IIB)
5. Turbine Building Basement Floor South End (Fire Area TR-FZ-IID)
6. Turbine Buildinq Condenser Bay (Fire Area TB-FZ-IIE)
7. Turbine Building Basement & Mezzanine (Fire Ara TB-FZ-IIH)
8. Office Building -480V Switchgear Room (Fire Area OB-FA-6E) (1 of 2 exemptions)

Based on our evaluation, we conclude that the exemptions requested for the following areas are not needed:

9. Reactor Building Elevation 23 feet (Fire Area RB-FZ-lE) (1 of 2 exemptions)
10. Office Building -480V Switchgear Room (Fire Area OB-FA-68) (1 of 2 exemptions)
11. Office Building - MG Set Room (Fire Area OR-FA-8A) 12/13. Office Building - Battery & Electrical Tray Room (Fire Area OR-FZ-8C0 (2 exemptions)

Based on our evaluation, we also conclude that the proposed design for alternate safe shutdown capability at Oyster Creek is acceptable and that appropriate technical specifications on the minimum open-close cycles for the accumulators and accessibility of local air cylinders to be provided for air-operated valves required for safe shutdown, in Section 8.1.4 of the Safety Evaluation, be submitted before restart from this outaqe.

Principal Contributors: D. Kubicki, and R. Goel.

Dated: March 24, 1986

4 I It June 25, 1990 Docket No. 50-219 Mr. E. E. Fitzpatrick Vice President and Director Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731

Dear Mr. Fitzpatrick:

SUBJECT:

EXEMPTION FROM CERTAIN TECHNICAL REQUIREMENTS CONTAINED IN SECTION III.G OF APPENDIX R TO 10 CFR PART 50 (TAC NO. 62229)

The Commission has issued exemptions from certain technical requirements contained In Section III.G of Appendix R to 10 CFR Part 50 for specific areas of the Oyster Creek Nuclear Generating Station in response to your letter of August 25, 1986.

We have reviewed GPU Nuclear Corporation's (GPUN) request and the supporting technical information. We agree with GPUN and In each case we have concluded that the requested exemption Is valid and should be granted. Our Safety Evaluation regarding this matter is enclosed.

This exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely, Ortginal signed by Alexander W. Dromerick, Senior Project Manager Project Directorate 1-4 Division of Reactor Projects - I/I1 Office of Nuclear Reactor Regulation

Enclosures:

1. Exemption
2. Safety Evaluation cc w/enclosures:

See next page I, DISTRIBUTION ocKet-File.. S. Norris NOC NRC & Local PDRs A. Dromerick

.r-, Plant File OGC T. Hurley/F. Miraglia(12GIS) J. Partlow(120G1)

C. Rossi(1IE4) B. Boger (4)(PI-137)

(14A2)

E. Jordan (MNBB 3302) G. Hill ACRS(1O) GPA/PA V'4 OC/LFMB John Stolz SNow t,i.*r--- J Sto'

-/17/90 5-h 2/90 it/90 DOCUMENT NAME: TAV 62229

4 I I Mr. E. E. Fitzpatrick Oyster Creek Nuclear Oyster Creek Nuclear Generating Station Generating Station ccl Ernest L. Blake Jr. Resident Inspector Show, Pittman, 0otts and Trowbridge /o U.S. NRC 2300 N Street, tN Post Office Box 445 Washington, D.C. 20037 Forked River, New Jersey 08731 J.B. Liberman, Esquire Commissiuner Bishop, Libermmn, Cook, et al. New Jersey Department of Energy 1155 Avenue of the Americas 101 Commerce Street New York, New York 10036 Newark, New Jersey 071C2 Kent Tosch, Chief Regional Administrator, Region I New Jersey Department of Environmental U.S. Nuclear Regulatory Commission Protection 475 Allendale Road Bureau of Nuclear Engineering King of Prussia, Pennsylvania 19406 CN 415 Trenton, New Jersey 08625 BWR Licensing Manager GPU Nuclear Corporation I Upper Pond Road Parsippany, New Jersey 07054 Mayor Lacey Township 88 West Lacey Road Forked River, New Jersey 08732 Licensing Hanager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.

P. 0. Box 388 Forked River, flew Jersey 08731

U11111U b~iILj) NULLtAI( KLUULAIURY WUMMI!)IUt1 In the Matter of (GPU NUCLEAR CORPORATION AND Docket No. 50-219 JERSEY CENTRAL POWER & LIGHT COMPANY)

(Oyster Creek Nuclear Generating Station)

EXE4PTION I.

The GPU Nuclear Corporation and Jersey Central Power & Light Company (GPUN/the licensee) are the holders of Provisional Operating License No.

DPR-16, which authorizes operation of the Oyster Creek Nuclear Generating Station, (the facility) at steady state reactor core power levels not In excess of 1930 megawatts thermal. The license provides, among other things, that Oyster Creek Nuclear Generating Station is subject to all rules, regulations, and Orders of the Commission now or hereafter in effect.

The plant is a boiling water reactor (BWR) located at the licensee's site in Ocean County, New Jersey.

II.

On November 19, 1980, the NRC published a revised Code of Federal Regulations, Section 10 CFR 50.48 and a new Appendix R to 10 CFR Part 50

%o regarding fire protection features of nuclear power plants. The revised 10400 Section 50.48 and Appendix R became effective on February 17, 1981.Section III of Appendix R contains fifteen (15) subsections, lettered A through 0, oo0 each of which specifies requirements for a particular aspect of the fire 04 protection features at a nuclear power plant. One of these fifteen 10 ocr 00 subsections, III.G, is the subject of this exemption request. Specifically,Section III.G requires that the plant have fire protection of shutdown capability.

MII.

By letter dated August 25, 1986, the licensee requested exemptions from certain technical requirements of Section 111.G of Appendix R to 10 CFR Part 50 for specific areas of the plant. The specific exemptions requested are as follows:

1. An exemption is requested from the requirement of Section 111.G.2 for not providing area wide automatic fire suppression in Fire Zone RB-FZ-1D, Elevation 51 feet.
2. An exemption is requested from the requirement of Section 111.G.2 for not providing area wide automatic fire suppression in Fire Zone RB-FZ-1E, Elevation 23 feet.
3. For the Fire Zone RB-FZ-1E, elevation 23 feet, a second exemption is requested from the requirement of Section 111.G.2 for not providing specific protection for the reactor scram system circuitry in the fire zone.
4. For the Fire Zone RB-FZ-1E, elevation 23 feet, a third exemption is requested from the requirement of Section 11I.G.2 for not providing either additional separation from insitu combustibles or protection for CRD Hydraulic System Bypass Valve V-15-30.
5. For the Fire Zone RB-FZ-1E, elevation 23 feet, a fourth exemption is requested from the requirement of Section 111.G.2 for not providing a one-hour fire barrier for drywell penetration box P-13.
6. An exemption is requested from the requirement of Section 11I.G.2 for not providing area wide automatic suppression In Fire Zone RB-FX-1F, elevation (-19) feet.
7. For Fire Zone RB-FZ-1F, elevation (-19) feet, a second exemption is requested from the requirement of Section 11I.G.2 for not providing either additional separation from insitu combustibles or protection for core spray system valve Y-20-1.
8. An exemption is requested from the requirement of Section III.G.2 for not providing a 3-hour rated fire barrier for the portion of circuit 14-25 that is located in Fire Zone TF-FZ-18 Turbine Lube Oil Storage, Pumping and Purification Areas.
9. An exemption is requested from the requirements of Section 111.G.2 and 11I.G.3 for not providing automatic fire detection in Fire Zone TB-FZ-I1D.
10. An exemption is requested from the requirement of Section III.G.3 for not providing automatic fire detection in Fire Zone TB-FZ-11E.
11. An exemption is requested from the requirement of Section III.6.2 for not providing a 3-hour fire barrier for Train "AO electrical power system circuit 14-22.
12. An exemption has been requested from the requirement of Section III.G.2 for not providing automatic fire suppression for the corridor area of new Fire Zone 08-FZ-6B, which has been created out of the Fire Area O8-FA-6.
13. An exemption has been requested from the requirement of Section 111.G.2 for not providing that at least one safe shutdown path needed to maintain hot shutdown is free of fire damage without any repair. The exemption is requested to allow minor repairs outside of Fire Area 08-FZ-6A-480 Volt Switchgear Room to provide the required hot shutdown capability for the new Fire Zone OB-FZ-6 created out of Fire Area OB-FA-6.
14. An exemption has been requested from the requirements of Section 111.G.2 for not providing automatic fire detection in Fire Zone O8-FZ-8A Motor Generator Set Room.
15. For the Fire Zone O8-FZ-BA, a second exemption is requested from the requirement of Section III.G.2 for not providing specific protection for the reactor recirculation valve circuits contained in this fire zone,
16. An exemption is requested from the requirements of Section t1I.G.2 for not providing specific protection to reactor scram circuits located in Fire Zone 0B-FZ-8C-Battery Room, Tunnel and Electrical Tray Room, elevation 35 feet.
17. For the Fire Zone 08-FZ-8C, a second exemption is requested from the provisions of Section III.G.2 for not providing specific protection to the reactor recirculation valve circuits contained in this fire zone.

The staff has reviewed the licensee's request and the supporting technical information contained in the licensee's August 25, 1986 letter, in a Safety Evaluation, dated June 25, 1990 . For the reasons set out in that evaluation, the staff agrees with GPU Nuclear Corporation and in each case we have concluded that the requested exemptions are valid and should be granted.

IV.

Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12.

this exemption is authorized by law, will not present an undue risk to the

public health and safety, and is ;onsistent with the common defense and security. The Commission has further determined that special circumstances, as set forth in 10 CFR 50.12(a)(2)(il), are present Justifying the exemption, namely that the application of the regulation in the particular circumstances.

Is not necessary to achieve the underlying purpose of the rule. The under-lying purpose of this rule Is to provide the plant with fire protection of shutdown capability. As a result of the staff's review, the staff concludes that because modifications assure that safe shutdown will occur for each affected fire zone, strict compliance of the rule is not necessary to achieve fire protection shutdown capability. Accordingly, the Commission hereby grants an exemption as described In Section III above from the requirements of Section III.G of Appendix R to 10 CFR Part 50.

Pursuant to 10 CFR 51.32, the Commission has determined that the granting of this exemption will have no significant impact on the environment (S5 FR 25752).

This exemption is effective upon issuance.

FOR THE NUCLEAR REGULATORY COPIiSSION Division of Reactor ecs - 1/Il Office of Kuclear Reactor Regulation Dated at Rockville, Maryland this 25th day of June , 1990.

V I'NIILUSIAIL

{ *NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20655 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR EXEMPTIONS FROM SPECIFIC TECHNICAL REQUIREMENTS OF APPENDIX R TO 10 CFR PART 50 GPU NUCLEAR CORPORATION AND JERSEY CENTRAL POWER & LIGHT COMPANY OYSTER CREEK NUCLEAR GENERATING STATION POCKET NO. 50-219 1.0 Introduction By letter dated August 25, 1986, GPU Nuclear Corporation (the licensee) re-quested exemptions with support ng justification from certain of the technical requirements of Section III.G of Appendix R to 10 CFR Part 50 for specific areas of the plant.

The staff's evaluation of the requested exemptions based on its review of the supporting justification is given below:

2.0 Fire Zone RB-FZ-ID. Elevation 51 Feet 2.1 Exemption Requested An exemption is requested from the requirement of Section III.G.2 for not providing area wide automatic fire suppression in the fire zone.

2.1.1 Evaluation Modifications provided to protect safe shutdown capability located in this fire zone include:

o Relocating selected electrical circuits In conduit within the zone.

o Providing selected electrical circuits run in conduits with one-hour fire rated barriers.

o Relocating selected electrical circuits outside this fire zone.

  • Assuring that all manual actions required for hot and cold shutdown due to fire in this zone will be accomplished from outside this zone and are not affected by a fire in this zone.

o Installation of water curtain sprinklers and open heat deluge water spray systems to protect open hatch and stairway penetrations through floors.

In addition to the modifications listed above several other mitigating factors are available in this zone which preclude the need for area wide automatic fire suppression in the zone. These factors are:

a Fire loading in the zone Is low with approximately 12,600 BTU per square foot, consisting primarily of cable insulation, and corresponds to a fire severity of about 10 minutes as measured on the ASTH C-119 time/temperature curve.

0 Automatic ftire detection capability which alarms locally and In the control room and which covers approximately 90% of the zone with all combustibles (cable trays) protected.

' Two automatic open-head water spray deluge systems are installed to protect the cable trays and the open equipment hatch and open stairwell.

ach system is controlled by Its own cross-zoned automatic ionization fire detection system. Standpipe and hose station and portable extinguishers for manual fire fighting capability supplement the automatic fire suppression capability.

2.1.2 Conclusion Based on the above evaluation, we conclude that any fire in Fire Zone RB-FZ-1D, elevation 51 feet, will be promptly detected and extinguished, and that automatic fire suppression need not be expanded to provide coverage for the entire zone. We, therefore, conclude that this requested exemption should be granted.

3.0 Fire Zone RB FZ-1E. Elevation 23 Feet 3.1 Exemption Requested An exemption Is requested from the requirement of Section ;II.G.2 for not providing area wide automatic fire suppression in this fire zone.

3.1.1 Evaluation Modifications provided for protection of safe shutdown capability and other mitigating factors in this fire zone, are the same as those described for Fire Zone RB.FZ-1D, elevation 51 feet, in Section 2.1.1 above, except that the fire loading (while still low) is approximately 20,000 BTU per square foot and corresponds to a fire severity of about 15 minutes as measured on the ASTh.

E-119 time/temperature curve.

3.1.2 Conclusion For the same reason outlined In Section 2.1.2 above, we conclude that this requested exemption should be granted.

3.2 Exemption Requested For the Fire Zone RB-FZ-IE, elevation 23 feet, a second exemption is requested from the requirement of Section I11.G.2 for not providing specific protection for the reactor scram system circuitry in this fire zone.

a W3-3.2.1 Evaluation In addition to the modifications provided for protection of safe shutdown capability for this fire zone, the following conditions apply specifically to the reactor scram system circuitry.

1. All reactor scram circuitry is contained In conduit except for the backup scram valve circuitry.
2. There are no external system circuits contained within the reactor scram conduits.
3. Reactor scram circuits are normally energized until reactor scram is desired. At this time, power is interrupted and the scram discharge volume (SOV) vent and drain pilot valves, the scram pilot air valves, and the backup scram pilot valves are deenergized to scram the reactor.
4. To achieve a reactor scram either the scram pilot air valves or the backup scram pilot valves are required to be deenergized.
5. The effects of fire on the reactor scram circuits in conduit would be to interrupt power and Initiate a scram.

3.2.2 Conclusion For all of the reasons given above, we conclude that additional protection is not required for the reactor scram system circuitry and that the requested exemption should be granted.

3.3 Exemption Requested For the Fire Zone RB-FZ-1E, elevation 23 feet, a third exemption is requested from the requirement of Section 111.G.2 for not providing either additional separation from insitu combustibles or protection for CRD Hydraulic System Bypass Valve V-15-30.

3.3.1 Evaluation In addition to the modifications provided for the protection of safe shutdown capability for this zone, the following conditions apply specifically to the CRO Hydraulic System Bypass Valve V-1S-30.

Valve V-15-30 will be manually opened to provide a flow path for coolant makeup to the vessel with loss of offsIte power. Makeup to the vessel is not required until 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 24 minutes after scram based on the vessel inventory analysis. Fusing of this valve as a result of a fire such that the valve cannot be operated is not considered a credible event because of the low fire loading in this zone, and the pipes connected to the valve being filled with water which provides ample heat sink capability to protect the valves.

In addition the principle combustible (cable Insulation) is protected by automatic fixed water spray deluge system, and the valve is physically located within the spray area of the cable tray deluge system (approximately 6 feet below the trays and 1 foot to the side).

a 3.3.2 Conclusion Since a fire in this fire zone would not be of significant magnitude, the duration of the fire will be short due to automatic extinguishment or extinguishment by the plant fire brigade. The valve is located within the spray area of a deluge system and the heat conduction to the water filled piping will provide cooling of the valve. The valve is not required to operate for almost 31 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> after the fire. Therefore manual operation of the valve is considered to be achievable without the addition of any further protection.

We therefore conclude that this exemption should be granted.

3.4 Exemption Requested For the Fire Zone RB-FZ-1E, elevation 23 feet, a fourth exemption is requested from the requirement of Section 111.G.2 for not providing a one-hour fire barrier for drywell penetration box P-13.

3.4.1 Evaluation In addition to the modifications provided for the protection of safe shutdown capability for this zone, the following conditions apply specifically to the drywell penetration box P-13.

1. The only portion of the EfRV circuits located In this fire zone which could potentially be subjected to spurious operation due to a hot short Is contained Inside the penetration box. (A short to ground will not cause spurious actuation). A tire cannot be initiated Inside the penetration boxes as the result of electrical fault protective devices.
2. The penetration box is located approximately five (5) feet below the bottom of the fire zone ctiling. Fire detection utilized to actuate the cable tray deluge water spray systems is located on the ceiling in the area of the penetration box (area-wide Ionization detection is provided In the fire zone). Therefore afire in the zone will be detected and alarmed prior to any significant heat buildup at the elevation of the penetration box.
3. The penetration box Is effectively within the spray pattern of the existing automatic cable tray deluge water spray system. The water spray will provide cooling and prevent the propagation of fire from outside into the penetration box.

A fire in this zone would not be of significant magnitude, and the duration of the fire will be short due to self extinguishment, extinguishment by the deluge system, or extinguishment by the plant fire brigade. Consequently the general heat buildup in the ared due to the fire will be limited. The addition of fire barriers to the cables (not in conduit) could cause damage to the cables due to

the inability to add adequate cable supports because of severe space limitations. The box Is located within the spray area of the cable tray deluge system which will further limit any heat buildup inside the penetration box. Since a fire Initiated inside the penetration box is not a credible event and since the effects on the penetration box due to an outside fire will be limited by the low fire loading and water spray system, the addition of a fire barrier will not increase the level of lire protection safety above that provided by existing fire protectiott features in order to achieve safe shutdown.

3.4.2 Conclusion For all of the reasons cited In the evaluation above, we conclude that this exemption should be granted.

4.0 FieZone RB-FZ.IF. Elevation. (:) .;19 fet 4.1 Exemption Reqguested An exemption Is requested from the requirement of Section III.G.2 for not providing area wide automatic suppression in this fire zone.

4.1.1 Evaluation The fire loading In this zone is negligible, consisting primarily of cable insulation at about 1500 STU per square foot. This corresponds to a fire severity of about two minutes as measured on the ASTM E-119 time/temperature curve. Auttnlatic fire detection capability, which alarms locally and in the control room, is located In this fire zone. Portable extinguishers and hose stations are provide for manual fire fighting operations.

A fire In this zone would not be of significant size or duration and would not compromise the one-hour fire rated barriers provided for protection of the safe shutdown ccmponents. In addition, the automatic fire detection available in this fire zone is expected to alert the fire brigade to the onset of fire in the zone so that prompt manual suppression of any fire in the zone can be accomplished.

4.1.2 Conclusion For all of the reasons listed in the evaluation above, we conclude that automatic fire suppression throughout this zone is not required and therefore, this requested exemption should be granted.

4.2 Exemption Requested For the Fire Zone RB-FZ-IF, elevation (-19) feet. a second exemption Is requested from the requirement of Section IIJ.G.2 for not providing either additional separation from insitu combustibles or protection for core spray system valve V-20-1.

8-6 4.2.1 Evaluation In addition to the conditions described above in Section 4.1.1 for this fire zone, the following conditions apply specifically to valve V-20-I in the core spray system.

Manual action required for hot and cold shutdown for a fire in this zone will be accomplished outside of the fire zone except for opening valve V-20-1.

This valve, located in Room RB-FZ-1F3 (North-West corner of room in the same fire zone) must be opened following a fire in RB-FZ-1F3 but only within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 24 minutes after scram to complete the alignment of the condensate storage tank to the core spray pump NZO1B. Other manual actions will not be affected by a fire In this zone.

Fusing of this valve by heat from a fire in this zone resulting in the valve becoming inoperable is considered not credible because of (1) the low fuel loading in the zone, (2) the provision of automatic fire detection and manual fire suppression capability, and (3) the heat sink capability of the water filled piping connected to the valve.

4.2.2 Conclusion Based on the above evaluation, we conclude that the provision of additional protection for this valve will not significantly enhance fire protection in this zone and, therefore, we recommend that this requested exemption be granted.

5.0 Fire Zone TF-FZ-11B - Turbine Lube Oil Storage, Pumping and Purification Areas 5.1 Exemption Requested An exemption is requested from the requirement of Section III.G.2 for not providing a 3-hour rated fire barrier for the portion of circuit 14-25 that is located in this fire zone.

5.2 Evaluation A pull pit beneath the floor of a corridor in the turbine building contains circuit 14-25. The floor and walls of this pull pit are of sand, and all electrical cables routed through the pit are run in conduits. Physical separation of the pit, and therefore circuit 14-25, from TB-FZ-11B, consists of (1) an aluminum cover plate bolted in place near the bottom of the floor slab penetration, (2) six inch minimum depth RTY foam floor penetration seal, and (3) a steel plate cover at the top of the floor slab, flush with the floor slab.

Based on the separation of this pull pit from the remainder of the Fire Zone TB-FZ-1IB by the minimum 6-inches of RTV foam; the lack of combustibles in the pit; all cables routed in conduits; negligible fuel loading in the area above the pit; limited access to the pit because of high radiation levels and consequent low probability for an exposure fire due to transient combustibles; and the fact that all conduits enter and leave the pit through the sand walls

- fire is considered not to be a credible event in this pull pit. Therefore, further fire protection modifications or additional protection for circuit 14.25 in the pull pit is not required.

5.3 Conclusion Based upon the above evaluation, we conclude that further fire protection modifications or additional protection for circuit 14-25 in the pull pit in Fire Zone TB-FZ-1SB is not required and this requested exemption should be granted.

6.0 Fire Zone TB-FZ-1ID 6.1 Exemption Requested An exemption Is requested from the requirements of Section III.G.2 and IIt.G.3 for not providing automatic fire detection in this zone.

6.2 Evaluation Selected "B" train safe shutdown circuits have been relocated and/or protected by one-hour rated fire barriers. Manual actions required for hot and cold shutdown due to a fire in this zone will be accomplished outside of this zone and will not be affected by any fire in this zone. In addition, the fire loading In this zone is low (about 22,000 BTU per square foot) and corresponds to a fire severity of about 16 minutes as measured on the ASTM E-119 time/temperature curve. This low fuel loading consists primarily of cable insulation, lubricating and hydrogen seal oil, and transient combustibles.

Fire protection provided in this fire zone consists of an area wide automatic sprinkler system and a localized automatic sprinkler system installed to protect the hydrogen seal oil units. Both of these sprinkler systems alarm in the control room and thus function also as a fire alarm system, although not as an early warning detection system.

6.3 Conclusion Based upon the above evaluation, we conclude that any fire that might occur will not be of significant magnitude or duration, and that it will be promptly extinguished by one of the two automatic sprinkler systems installed in this fire zone. In addition, when the sprinklers operate, an alarm will sound in the control room, promptly alerting the fire brigade who will respond for any manual fire fighting or salvage operations that remain. For the above reasons we conclude that the addition of a zone wide fire detection system will not provide significantly more fire protection than what is already available, and therefore, the requested exemption should be granted.

7.0 Fire Zone TB-FZ-IIE 7.1 Exemption Requested An exemption is requested from the requirement of Section III.G.3 for not providing autcmatic fire detection in this zone.

7.2 Evaluation The fire loading in this zone consists of electrical cable insulation in trays and minor amounts of lubrication oil in pumps. The fire loading is low (approximately 8,000 BTU per square foot) and corresponds to a fire severity of about 7 minutes as measured on the ASTM E-119 time/temperature curve. In addition, an automatic closed head sprinkler system protects all areas west of columns Line F and includes all cable trays. Operation of the sprinkler system alarms in the control room which serves the function of an automatic detection system. Such alarm will promptly alert the fire brigade for performing any residual fire fighting operations.

7.3 Conclusion Based upon the above evaluation, we conclude that any fire that might occur will not be of significant magnitude or duration. Also, any such fire will be promptly extinguished by operation of the automatic sprinkler systems. If for soue reason, the automatic sprinklers are able only to control the fire but not achieve extinguishment, the fire brigade, having been alerted as a result of alarm in the control room from the sprinkler system, will be able to achieve prompt extinguishment. Therefore, we conclude that the addition of zone wide fire detection capability will not provide significantly more fire protection than what has already been provided and, therefore, the requested exemption should be granted.

8.0 Fire Zone.TB*TZ.114 -.8ase'ent.and.ezzanineSoutheast End 8.1 Exeqump*iog ested An exemption Is requested from the requirement of Section III.G.2 for not providing a 3-hour fire rated barrier for Train "A"electrical power system circuit 14.22.

8,2 Evalution The Train WA electrical power system circuit 14-22 cables in this fire zone are located in a pull pit located beneath the basement floor. It is similar to the pit described in Section 5 above. All of the cables in the pull pit are routed in electrical conduit. The pit has been filled with sand to provide the conduits with a minimum cover of six-inches. Thus, there are no exposed combustibles in the pull pit. A steel plate flush with the zone floor covers the entrance to the pull pit.

8.3 Conclusion We conclude from the above evaluation that the lack of exposed cowbustibles in the pull pit, the fact that the electrical cables for the Train "A" electrical power system circuit 14-22 are routed in conduits, and the fact that these conduits have a minimum cover of 6-inches of sand and the steel plate cover to the pull pit, provide protectiorn at least equivalent to a three-hour fire rated barrier. Therefore, the provision of a 3-hour rated fire barrier between the cables in the pull pit and the remainder of Fire Zone TB-FZ-11H would not provide significantly more fire protection than what Is already available. Therefore, this requested exemption should be granted.

9.0 F*re Area 06-FA 480 Volt Switchgear Room 9.1 Exetion Requested An exemption has been requested from the requirement of Section III.G.2 for not providing automatic fire suppression for the corridor area of new Fire Zone OB-FZ-68, which has been created out of the Fire Area OB-FA-6.

9.1.1 Evaluation This requested exemption has already been accepted by the staff. It was discussed and evaluated In Section 2.0-2.4 of our safety evaluation that was transmitted to the licensee by ?IRC letter dated March 24, 1986.

9.2 Exemption-Requested An exemption has been requested from the requirement of Section III.G.2 for not providing that at least one safe shutdown path needed to maintain hot shutdown is free of fire damage without any repair. The exemption Is requested to allow minor repairs outside of this zone to provide the required hot shutdown capability for the new Fire Zone OB-FZ-6A created out of Fire Area OB-FA-6.

9.2.1 Evaluation The licensee stated that the 480V switchgear room, Fire Area 0B-FA-6, will be modified to create two separate Fire Zones, OB-FZ-6A and 6-B. Fire Zone OB-FZ-6A and 6B will contain the Bus 480V USS 1A2 and the redundant Bus 48QV USS 1B2 respectively. For a fire in Fire Zone OB-FZ-6A, the licensee will use hot shutdown path 1 which, In turn, requires the Bus USS 1B2 to power the needed equipment for the hot shutdown path. The proposed design incorporates a cable tie between the buses. Consequently a fire Induced fault in the bus cable tie in Fire Zone OB-FZ-6A can result in loss of the Bus USS 1B2 and, therefore, comprise the hot shutdown capability for the Fire Zone OB-FZ-6A.

Therefore, the licensee has proposed the following operator actions in the sequence described below outside the Fire Zone OB-FZ-6A to restore the Eus USS 182 and thereby ensure hot shutdown capability for the Fire Zone OB-FZ-6A.

(1) Veenergize the Bus USS 1B2 locally in the Fire Zone OB-FZ-6B.

(2) In the control room, trip the feeder breaker at 4160 switchgear IC feeding the Bus USS 1A2.

(3) Disconnect the cable bus tie which Is directly bolted to the bus bars in USS IB2 In the Fire Zone OB-FZ-6B.

(4) Reenergize the Bus USS 182.

In their telephone conversations with us on February 16 and 20, 1989, the licensee stated that the above manual actions will require 20 minutes to complete and that they will be performed itmrediately after a fire in Fire Zone OB-FZ-6A. The licensee further stated that the plant areas where the manual acttors have to be performed will be easily accessible and will not involve any transient through the affected Fire Zone OB-FZ-6A.

In their submittal, the licensee examined the impact of temporary unavailability of hot shutdown equipment in Fire Zone OB-FZ-6A resulting from short term loss of the Bus USS 1B2 which powers these equipment. These are "BO 480V switchgear HVAC supply andexhaust fans, reactor coolant makeup CRD pump INC08B, A/B battery room exhaust fan and static charger and MG set B. The licensee determined that reactor coolant makeup (because of available vessel water Inventory) and the battery room exhaust fan will net be needed for at least 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after scram by which time the Bus USS IB2 would have been restored ano the above components powered by the bus; and the static charger and MG set B will not be needed for quite some time after scram since the DC loads supplied by the 125 VDC Distribution Center B can be powered from the station batteries alone for a time period well in excess of the time required to restore the Bus USS 1B2. The licensee further determtirned that since the rajority of the electrical loads in the Zone OB-FZ-6B are powered by the Bus USS 162 the loss of the bus will result in significant reduction in heat output In the zone and consequently the need for the 480Y switchgear supply and exhaust fans will not arise for a time period well in excess of the time required to restore the Bus USS 182 and power the fans.

9.2.2 Conclusion Based on the above, we find that the identified operator actions (1) involve only one minor hot shutdown repair, namely, disconnecting the cable bus tie,

12) can be completed well before an unrecoverable reactor condition occurs,
3) do not involve any transit through the fire affected zone, and (4) do not require any offsite components or tools. For the above reasons, we have determined that with the completion of all the identified operator actions Including the minor repair in a timely manner, there is reasonable assurance that hot shutdown can be achieved and maintained following a fire In Fire Zone OB-FZ-GA. Therefore, the requested exemption for performing the identified hot shutdown repair should be granted.

10.0 Fir one OB-FZ-8A .Hotor-enerator.Set Room 10.1 Exmption Reguested An exemption has been requested from the requirements of Section TTI.G.2 for not providing automatic fire detection in this fire zone.

10.1.1 Evaluation The zone Is protected by an automatic fire suppression system (autcmatic sprinkler) which also serves as an automatic fire detection system (although not providing an early warning), since actuation of the system alarms in the control room. Such system actuation and automatic alarm will result in promptly alerting the plant fire brigade for performing any required fire fighting actions. In addition, the combustible fuel loading in the area is low and corresponds to a fire severity of about 35 minutes as measured on the ASTM E-119 time/temperature curve. Also, the licensee has rerouted some circuits within this fire zone in conduits and has rerouted other circuits out of the zone to assure that at least one train of safe shutdown circuits within the zone will not be damaged by any fire that may occur in this zone.

10.1.2 Conclusion Based on the above evaluation, we conclude that any fire which might occur in Fire Zone OB-FZ-SA will be relatively small and will be controlled by the automatic sprikler system. Since operation of the sprinkler system will alarm in the control room, we expect prompt notification of, and response by, the fire brigade for arsy required manual fire fighting activities. Therefore, the installation of a separate automatic fire detection system would not provide a significant Increase in fire protection for this fire zone and the requested exemption should be granted.

10.2 Exemption-Resuested For the Fire Zone OB-FZ-8A, a second exemption is requested from the requirement of Section III.G.2 for not providing specific protection for the reactor recirculation valve circuits contained in this fire zone.

10.2.1 Evaluation In addition to the information given above in Section 10.1.1 for this fire zone, the following information addresses the issue of protecting the reactor recirculation valve circuits.

A. There are a total of five (5) recirculation loops located in two fire zones (OB-FZ-8A and OB-FZ-8C). All five loops are open during normal power optration.

B. The Oyster Creek Technical Specificatiors require four (4) loops to be open during normal power operation.

.1 C. Two (2) recirculation loops are required to be open to provide natural circulation through the core for safe shutdown.

D. Assuming fire damage to the valve for one recirculation loop, three (3) loops will remain open to provide natural circulation cooling of the core for safe shutdown.

10.2.2 Conclusion Based on the evaluations in Sections 10.1.1 and 10.2.1 above, we conclude that any fire which might occur In Fire Zone OB-FZ-BA will not damage more than one reactor recirculation loop valve circuit. Since the remaining three open recirculation loops provide sufficient natural coolant circulation through the core to achieve and maintain safe shutdown, the requested exemption should be granted.

11.0 Fire Elevation 35*

Zone OoEZ.8C...BatteryRoom.

.... . Tunnel.and.Electricl.Tray.Room 11.1 Exf1ptoLnR!3sted An exemption is requested from the requirements of Section 11I.G.2 for not providing specific protection to reactor scram circuits located in this fire zone.

11.1.1 Evaluation The licensee has identified the battery room ventilation system modifications, instrument modifications and electrical modifications to assure safe shutdown capability for this zore. The licensee further stated that all manual actions for hot and cold shutdown will be accomplished from outside of this fire zone and will not be affected by a fire In this zone. Additionally, the licensee provided the following Justification to support this exemption request:

A. All reactor scram circuitry is contained In conduit except for the backup scram valve circuitry.

B. There are no external system circuits contained within the reactor scram conduits.

C. Reactor scram circuits are normally energized until a reactor scram Is desired. At this time, power Is interrupted and the scram discharge volume (SDV) vent and drain pilot valves, scram pilot air valves and the backup scram pilot valves are deenergized to scram the reactor.

D. To achieve a reactor scram either the scram pilot air valves or the backup scram pilot valves are required to be deenergized.

E. The effects of fire on the reactor scram circuits in conduit would be to Interrupt power and initiate a scram.

11.1.2 Conclusion Based on the above evaluation we conclude that the licensee's Justification for this requested exemption is valid and that it should be granted.

11.2 Exemption Requested For the Fire Zone OB-FZ-8C, a second exemption Is requested from the provisions of Section II1.G.2 for not providing specific protection to the reactor recirculation valve circuits contained in this fire zone.

11.2.1 Evaluation The situation for the reactor recirculation valve circuits located in this zone is similar to that described in Section 10.2.1 for the reactor recirculation valve circuits located in Fire Zone OB-FZ-8A and the same technical reasons which support that exemption request apply here also.

11.2.2 Conclusion Based on the above, we conclude that this requested exemption should be granted.

Dated: June 25. 1990 Principal Contributor: D. Notley