MONTHYEARIR 07200043/20234012024-02-0505 February 2024 Public-Big Rock Point (Brp) Independent Spent Fuel Storage Installation (ISFSI) - NRC Security Inspection Report 07200043/2023401 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) 2024-02-05
[Table view] |
Text
HOLTEC KPS Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 - Fax (856) 797-0900 DECOMMISSIONING www.holtecinternational.com I NTERNAT I ONAL January 25, 2022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 and 72-15 Pilgrim Nuclear Power Station Renewed Facility License No. DPR-35 NRC Docket Nos. 50-293 and 72-1044 Indian Point Nuclear Generating Units 1, 2 and 3 Docket Nos. 50-3, 50-247, 50-286 and 72-051 Provisional Operating License No. DPR-5 Renewed Facility Operating License Nos. DPR-26 and DPR-64 Palisades Nuclear Plant Docket Nos. 50-255 and 72-007 Renewed Facility Operating License No. DPR-20 Big Rock Point Docket Nos. 50-155 and 72-043 License No. DPR-6
SUBJECT:
Changes to Site Organization This letter serves to notify NRC of a change to Holtec Decommissioning Internationals (HDI) organizational structure at the above-captioned sites. Specifically, HDI is no longer contracting with its subsidiary Comprehensive Decommissioning International, LLC (CDI) to serve as decommissioning general contractor. Instead, HDI is absorbing CDIs resources and will directly employ site personnel to perform day-to-day decommissioning and site maintenance work. This restructuring does not affect the scope, cost, or schedule for decommissioning, nor does it change the personnel who will execute that scope or the resources available to complete it. The change moves licensed activities directly into the licensed operators organization and results in more streamlined and direct oversight and control of project execution.
Page 1 of 3 HDI-OC-22-006 HDI-IPEC-22-011 HDI-PIL-22-005
HOLTEC KPS Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 - Fax (856) 797-0900 DECOMMISSIONING www.holtecinternational.com I NTERNAT I ONAL The site organizational structure will apply at Palisades and Big Rock Point following the proposed transfer of operational authority from the incumbent operator Entergy Nuclear Operations, Inc. (ENOI) to HDI. HDI and ENOI have supplemented their December 23, 2020 license transfer application for Palisades and Big Rock Point to reflect the new organizational structure (ML22021B670).
This organizational change does not affect the lines of communications between NRC Staff and HDI personnel at the site or corporate level.
There are no regulatory commitments contained within this letter.
If you should require any further information, please contact me at (856) 797-0900, x3578 or via email at j.fleming@holtec.com.
Sincerely, Digitally signed by Jean A.
Jean A. Fleming Fleming Date: 2022.01.25 14:58:24 -05'00' Jean A. Fleming Vice President, Regulatory & Environmental Affairs Holtec Decommissioning International, LLC cc:
Regional Administrator, NRC Region I Regional Administrator, NRC Region III NRC Senior Project Manager, NMSS Oyster Creek NRC Senior Project Manager, NMSS Pilgrim NRC Senior Project Manager, NMSS Indian Point Units 1, 2 & 3 Senior Project Manager, NRR/DORL Palisades Nuclear Plant NRC Region I Lead Inspector NRC Region I Lead Inspector, Oyster Creek NRC Region I Lead Inspector, Pilgrim NRC Region I Lead Inspector, Indian Point Units 1, 2 & 3 NRC Senior Resident Inspector, Palisades Nuclear Plant NRC Project Manager, Big Rock Point Assistant Commissioner, Air Quality, Energy and Sustainability, NJ DEP Assistant Director Radiation Protection Element, NJ Bureau of Nuclear Engineering Page 2 of 3 HDI-OC-22-006 HDI-IPEC-22-011 HDI-PIL-22-005
HOLTEC KPS Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 - Fax (856) 797-0900 DECOMMISSIONING www.holtecinternational.com I NTERNAT I ONAL Commonwealth of Massachusetts, Department of Public Health Commonwealth of Massachusetts, Department of Environmental Protection Commonwealth of Massachusetts, Director, Massachusetts Emergency Management Agency New York State Department of Public Service New York State Liaison Officer Designee, NYSERDA State of Michigan Page 3 of 3 HDI-OC-22-006 HDI-IPEC-22-011 HDI-PIL-22-005