{{#Wiki_filter:flle C'/l'; consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 7, 1976 US Nuclear Regulatory Commission Mail and Records Section Washington, D. C. 20555 RE: LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
{{#Wiki_filter:consumers flle C'/l';                           Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 7, 1976 US Nuclear Regulatory Commission Mail and Records Section Washington, D. C. 20555 RE: LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear l975. Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 1.9:1
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear
:;::;;71~mber l975.
Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 1.9:1


__
~:_....,:- __ ...........__..,,,___~----............_.__
I .. ,. .-* APPENDIX 0-UNIT Palisades Plant DATE __ . CO'fPLETE B H. R. Vernick " DY _______ _ . " DOCKET N0. __ 5_0_/_2_5_5 __ _ OPERATIKG STATt:S
I APPENDIX 0-
* 1. REPORTING PERIOD: __
* UNIT  Palisades Plant DATE _ _ l_/7_/_7_5~-----
________ THROUGH __ _,_7""-5-=l-=2'-"'3'=1'----------
                                                                                                                      . CO'fPLETE  DYB _H.__  R._Vernick
HOURS IN REPORTl:\G PERIOD: ___
                                    . "                                                                                  DOCKET N0. _ _5_0_/_2_5_5_ __           .*
: 2. CURRENTLY ACTHORIZED POWER LEVEL ('.\tWth).
OPERATIKG STATt:S
2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684 3. LO\\!EST POWER LEVEL TO WlllCH SPECIFICALLY RESTRICTED (IF ANY) (l\!We-NE1'):
* 1. REPORTING PERIOD: _ _~7~5_1_2_0_i_.________ THROUGH _ __,_7""-5-=l-=2'-"'3'=1'----------
__ 6_3_0 ______ -:--.4. REASONS FOR (IF AN.Y): THIS. REPORTING PERIOD S *. HOURS REACTOR WAS CRITICAL.
HOURS IN REPORTl:\G PERIOD: _ _ _~_4_4_..,.--------------------=..,..--
.*.. .' ******. 6. REACTOR RESERVE SHUTDOWN HOURS *.***** 7 .. HOURS GENERATOR ON LINE.* .. .*...******
: 2. CURRENTLY ACTHORIZED POWER LEVEL ('.\tWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684
8 .. \JNJT RESERVE SHUTDOWN HOURS . * .* ******* 9. GROSS THER'.\IAL ENERGY . GENERATED
: 3. LO\\!EST POWER LEVEL TO WlllCH SPECIFICALLY RESTRICTED (IF ANY) (l\!We-NE1'): _ _6_3_0______-:--
('.\tWH) **.*****.************
                        .4. REASONS FOR          ~ESTRICTION (IF AN.Y):
10; GROSS.ELEqRICAL ENERGY 11. -GENERA TEDJ'.\IWII)  
THIS.                                   CUl\IULA TIVE REPORTING PERIOD              YR TO DATE          TO DATE S* . HOURS REACTOR WAS CRITICAL. .*.. .' ******.                                  463.6                5,850.1            16,087
... : .......*.*.******
: 6. REACTOR RESERVE SHUTDOWN HOURS *.*****                                   ;    0                      0                    0
NET ELECTRICAL ENERGY GENERATED
: 7. . HOURS GENERATOR ON LINE.*.. ~ .*...******                                   463.6              . 5.652.7            14.973.8 8.. \JNJT RESERVE SHUTDOWN HOURS . *.* ~ *******                                     0                      0                    0
('.\!\\'II)
: 9. GROSS THER'.\IAL ENERGY .
REACTOR AVAILABILiTY fACTOR (1) .********
GENERATED ('.\tWH) **.*****.************                              537,672                  8,906,400       23-,019~960 10; GROSS.ELEqRICAL ENERGY 154,850                    2,642,400          1,146~650 11.
UNIT A \"AILABILITY FACTOR (2) ..*.********.
                              -GENERA TEDJ'.\IWII) . . . : . . . . . . . * . * . * * * * *
l'NIT C AP.-\Cl1Y FACTOR (3) ..*..*****.****
* NET ELECTRICAL ENERGY GENERATED
l 1 NIT FORCED Ol!TAGE RATE (4) ......****.*
('.\!\\'II)                                                        138,558.                   2;427,933          6,681,638
463.6 ; 0 463.6 0 537,672 154,850 138,558. . 62. 3% 62.3%. 21.2%* 0% YR TO DATE 5,850.1 0 . 5.652.7 0 8,906,400 2,642,400 2;427,933 66.8% . . 64. 5%. 40.5% 32.6% CUl\IULA TIVE TO DATE 16,087 0 14.973.8 0 . 6,681,638 9%
: 12. REACTOR AVAILABILiTY fACTOR (1) . * * * * * * * *                          . 62. 3%                  66.8% . --.,..-......,4~5: 9%
..... 2:1% ___ _._2 ...... 7. 9% __
                      . 13. UNIT A \"AILABILITY FACTOR (2) ..*.********.                                62.3%.                 . 64. 5%.   ---~h..... 2:1%
.1% 12. . 13. 14. 15 . . 16. smrTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH): Refueling, 12/20/75, 3 months . . . .
: 14. l'NIT C AP.-\Cl1Y FACTOR (3) . . * . . * * * * * . * * *
* 17. IF Sllt:l" DOWN AT END or.-REPORT PERIOD, ESTl'.\IATED DATE or STARTUP: _3_/_2_9_*
* 21.2%*                  40.5%      _ _ __._2.7.. . 9%
_/_7_6_* --------18. UNITS IN TEST STATCS C. RIOR TO CO'.\l'.\IERCIAL OPERATION)
15 . l 1NIT FORCED Ol!TAGE RATE (4) . . . . . . * * * * .
REPORT THE FOLLOWING: (I)
* 0%                    32.6%      _ _**-~5_4 .1%
A \'AILABILITY FACTOR (2) l?NIT A\'AILABILITY FACTOR .* INITl!\L CRITICALITY INITIAL ELECrRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE HOURS IN REPORTING PERIOD NF.T ELF.CTR IC Al. PO\\TR DATE LAST DATE FORECAST ACHIEVED *.MAX. Dl-.l'ENDABLE CAPACITY X HOURS IN RU'ORTING l'E!{IOL>
                    . 16. smrTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):
FORCED oL:TA(;E llOL:Rs HOURS GENERATOR ON Llt\E-+ FORCED OUTAGE HOURS I. I 6-D* l .* 
Refueling, 12/20/75, 3 months                          .                  . .                       . *
.. !--""! .. . e Plant Statistics for Month of: December*
: 17. IF Sllt:l" DOWN AT END or.- REPORT PERIOD, ESTl'.\IATED DATE or STARTUP: _3_/_2_9_*_/_7_6_*- - - - - - - -
1975 .... Net*Plant Output, Mwhe Gross Generation, Mwhe Station Power, Mwhe -*On Days Generating On Days Not. Generating Reactor Heat Produced, Mwht Hours Critical Hours Generating Capacity Factor Station Power, % of Gross (Days Generating)
: 18. UNITS IN TEST STATCS C. RIOR TO CO'.\l'.\IERCIAL OPERATION) REPORT THE FOLLOWING:
CoJ!.e Ave. Burnup, Mwd/MTU Batch A Ave. Burnup,
DATE LAST      DATE FORECAST      ACHIEVED INITl!\L CRITICALITY INITIAL ELECrRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL (I)    ~EACTOR        A \'AILABILITY FACTOR                                                      x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2)    l?NIT A\'AILABILITY FACTOR                    -~-~-~--~~~~-x100 HOURS IN REPORTING PERIOD NF.T ELF.CTR IC Al. PO\\TR        GF~F.RATED
...... Batch A Lead Bundles, (A-25; A-14, A-1};. A-22, A-44, A-55, A-56, A-47) Batch B_Ave. Burnup, Mwd/MTU .Batch B L::!ad Bundles, Mwd/MTU (B-20, B-17, B-49, B-52) Batch C Ave. Burnup, Mwd/MI'U Batch C Lead Bundles, Mwd/MTU -. ( C-10, C-03, C-02, C-09, C-ll, C-18, C-19, C-12) *Month Year to Date Total to Date .. 138,558 154,850 16,292 1,014 214,467 .20 ,492 . 537,672 *8;906,4Qo 463.6 5,850;1 .. 463.6 . . 5,65i:1 27.2% 10.5% 40.5% 8.1% ,_. . ., . 6 ,881, _638_ .. . 7 ,146 ,650. *465,012 113 ,-902 23,019,960 16,087 14,973.8 2.7.9% 6.5% ll,347.3*
                                                                            *.MAX. Dl-.l'ENDABLE CAPACITY          (~!We-NET) X HOURS IN RU'ORTING l'E!{IOL>
11,102.9 11,716.64
FORCED oL:TA(;E llOL:Rs
.13,093-5 14,194.6 12,900.0 Dates on Line: 1 thru 20 inclusive except plant shutdown at 0738 hours on 12/20 for scheduled outage'. . Availability
                                                                            -~--~~~--'--~~-~-~~-~--~-~-x100 HOURS GENERATOR ON Llt\E-+ FORCED OUTAGE HOURS I. I 6-D* l
(%) Plant Reactor Month 62.3 62.3 *_Year to Date 64.5 66.8. *This number represents the core average burnups calculated by INCA. The corresponding core average burnup calculated from thermal considerations is 11,430.1.
 
/ i I I i I t* 
                            .e Plant Statistics for Month of:                December* 1975 ....
.. -* APPENDIX C .. * . ::j,, . ' DOCKET NO. 50-2 55' *.
                                                          *Month    Year to Date          Total to Date Net*Plant Output, Mwhe                                  138,558     :2,4~7,933                    .6 ,881, _638_ ..
* UNIT Palisades Plant DATE l/y_/_7 6 __ COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH December 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY {.M\Vc-net)
Gross Generation, Mwhe                                154,850      2,6~2,4ob-                  . 7,146 ,650.
.. DAY (MWe-net) 1 484 17*. . 480 2 268* 18 4 1 / 3 -24J: . .19' 4 4 241 20. 10 5 235 21 6* 237 *22 7 237 23 s 240 24 .. .... -:-9 237 25 10 235 . 26 11* 250 27. 12 *. 259 *28 13 261. 29. ,-14 266 30 1"5 264 31 16 421 . . . DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in M\Vc-net for each day in the reporting month. Compute to the nearest whole megawatt.  
Station Power, Mwhe -                                                                                                  i
*These figures will be used to plot a gr;,iph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the rcstrktcd power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the aprJarent anomaly. 1. J 6-C* l . . .* . .. ,,,.,..*.
          *On Days Generating On Days Not. Generating 16,292 1,014 214,467
: I
                                                                        .20 ,492 .
*
                                                                                                      *465,012 113 ,-902       II Reactor Heat Produced, Mwht                            537,672    *8;906,4Qo                  23,019,960           iI t*
.I :.... * ,. l j NO. 10 ..=.:*-,,
Hours Critical                                                463.6        5,850;1                    16,087 Hours Generating                                          .. 463.6 .    . 5,65i:1                    14,973.8 Capacity Factor                                                27.2%          40.5%                        2.7.9%
...........
                                                                                                                    /
_.,, __ ..... . ..-...-.... .----..--------------------.._....., ____ ...._-..,._
Station Power,   % of Gross                                  10.5%            8.1%                          6.5%
\ TYPE F*FORCED DURATIPN DATE S*SCHEDULED (HOU.RS) 751220 s 280.4 ' : . *' . ,. . .. APPENDIX E UNIT SHUTDOWNS REPORT MONTH December 1975 ' METHOD OF SHUTTING DOWN REASON (1) THE REACTOR (2) c 3 .. ., .. . -: .. . \ .. -., .. .. .. . . . .. , . DOCKET NO. 50-255 UNIT NAME Palisades-Plant DATE 1/7176 COMPLETED l3Y H. *R. Vernick. . CORR.ECTIVE ACTIONS/COMMENTS While coming down 'in power for the outage, there was a Reactor Protective System flow trip. ; . '\ \ (l) REASON (2) METHOD . A**EQUIPMENT FAlLURE'(EXPLAlN)
(Days Generating)
I-MANUAL B* MAINT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E-*OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATI VE G-Ol'ERATIONAL ERROR (EXPLAIN)
CoJ!.e Ave. Burnup, Mwd/MTU                                                                            ll,347.3*
H-OTliER (EXPLAIN)  
Batch A Ave. Burnup,      Mwd/}lmJ<~**                                                                 11,102.9 Batch A Lead Bundles, lV!i~/MTU                                                                        11,716.64 (A-25; A-14, A-1};. A-22, A-44, A-55, A-56, A-47)
..
Batch B_Ave. Burnup,      Mwd/MTU                                                                    .13,093-5
.Batch B L::!ad Bundles, Mwd/MTU                                                                        14,194.6 (B-20, B-17, B-49, B-52)
Batch C Ave. Burnup, Mwd/MI'U Batch C Lead Bundles, Mwd/MTU                                                                          12,900.0
    -. ( C-10, C-03, C-02, C-09, C-ll, C-18, C-19, C-12)
Dates on Line: 1 thru 20 inclusive except plant shutdown at 0738 hours on 12/20 for scheduled outage'. .
Availability (%)                                          Month              *_Year to Date Plant                                            62.3                      64.5 Reactor                                          62.3                      66.8.
*This number represents the core average burnups calculated by INCA. The corresponding core average burnup calculated from thermal considerations is 11,430.1.
 
APPENDIX C
                                                                                                .. * .         ::j,,
DOCKET NO.             50- 255' *.
* UNIT      Palisades Plant DATE        l/y_/_76_ _
COMPLETED BY                  H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH        December 1975 AVERAGE DAILY POWER LEVEL                              AVERAGE DAILY POWER LEVEL DAY                  {.M\Vc-net)                  .. DAY                    (MWe-net) 1                      484                          17*.                 . 480 2                      268*                         18                      4    1
                                                                /
3                      -24J:    .                   .19'                    4 4                      241                          20.                       10 5                      235                            21 6*                    237                          *22 7                      237                            23 s                    240                            24  ..               .... -:-                                . .
:  ~:
9                      237                            25 10                      235                        . 26 11*                    250                            27.
12                  *. 259                          *28 13 ,-                  261.                           29.
14                      266                          30 1"5                    264                          31
                                                                        ~ .. .
16                      421 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in M\Vc-net for each day in the reporting month.
Compute to the nearest whole megawatt.
  *These figures will be used to plot a gr;,iph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the rcstrktcd power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the aprJarent anomaly.
I
* I
: 1. J6-C* l
 
                                                                                                                                      !~::'\
                                                                                                                                                                                                                                                ..=.:*-,,
                  .....,.2~*-***W~'r~txMilleilGrd~**~r2*rw1-..*******>n..-............_.,,__...,.,~m_..*-*~*u***1~::.....~**-.--.1,,        ...-...-..... - - - - . . - - - - - - - - - - - - - - - - - - - - . . _ . . . . . ,____...._-..,._
.I
                                                                                                                                                                                                                                            -~
                                                                                            \
                                                                                                                                                                                                                                                                .**  \
                                                                                                                                                                                                                                                                    . 't I
I APPENDIX E                                                                DOCKET NO. 50-255                              ~          !
r.
UNIT SHUTDOWNS                                                                  UNIT NAME Palisades- Plant 1/7176 DATE Vernick.
                                                                                                                                                                                                                                                                      \
COMPLETED l3Y H. *R.
REPORT MONTH                          December 1975 TYPE METHOD OF F*FORCED                  DURATIPN                                                  SHUTTING DOWN NO.          DATE                S*SCHEDULED                      (HOU.RS)          REASON (1)                        THE REACTOR (2)                                CORR.ECTIVE ACTIONS/COMMENTS 10          751220                          s                      280.4                    c                                      3                        While coming down 'in power for the
                                                          '                                                                                                                  sch~duled outage, there was a Reactor
                                                                                                                                                      ..                    Protective System flow trip.
                                                                                                                                                                            . '\
                                                                                                                                                                                  \
(l) REASON                                                (2) METHOD .
                                                                                                                                    ..                                          A**EQUIPMENT FAlLURE'(EXPLAlN)                            I-MANUAL B* MAINT. OR TEST                                        2-MANUAL
                                                                                                              .                                                                  C- REFUELING                                                  SCRAM
                                                                                      .                        \
D-REGULATORY RESTRICTION E-*OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATI VE 3-AUTOMATIC SCRAM e.
G-Ol'ERATIONAL ERROR
    ,.                                                                                                                                                                                        (EXPLAIN)
                                                                                                                  ..                                                           H-OTliER (EXPLAIN)


==SUMMARY==
==SUMMARY==
:
:
* The unit operated at . 45% tl;Lis month until. December 16, .:1975 when power was increased to 80%. Load :i;-emained at 80%.until the unit came-off the line.for a scheduled refueling on December 20, 1975-t * . ,. ** .. .** \ t . ' I I ! r. \ . . . e .}}
* The unit operated at . 45% tl;Lis month until. December 16, .:1975 when power was increased to 80%.
Load :i;-emained at 80%.until the unit came- off the line.for a scheduled refueling on December 20, 1975-l j                                                                                                                                . ,.
t *}}

Latest revision as of 21:36, 22 February 2020

Monthly Effluent Report for December 1975
ML18347A830
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/07/1976
From: Vernick H
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A830 (5)


Text

consumers flle C'/l'; Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 7, 1976 US Nuclear Regulatory Commission Mail and Records Section Washington, D. C. 20555 RE: LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear

71~mber l975.

Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 1.9:1

~:_....,:- __ ...........__..,,,___~----............_.__

I APPENDIX 0-

  • UNIT Palisades Plant DATE _ _ l_/7_/_7_5~-----

. CO'fPLETE DYB _H.__ R._Vernick

. " DOCKET N0. _ _5_0_/_2_5_5_ __ .*

OPERATIKG STATt:S

  • 1. REPORTING PERIOD: _ _~7~5_1_2_0_i_.________ THROUGH _ __,_7""-5-=l-=2'-"'3'=1'----------

HOURS IN REPORTl:\G PERIOD: _ _ _~_4_4_..,.--------------------=..,..--

2. CURRENTLY ACTHORIZED POWER LEVEL ('.\tWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684
3. LO\\!EST POWER LEVEL TO WlllCH SPECIFICALLY RESTRICTED (IF ANY) (l\!We-NE1'): _ _6_3_0______-:--

.4. REASONS FOR ~ESTRICTION (IF AN.Y):

THIS. CUl\IULA TIVE REPORTING PERIOD YR TO DATE TO DATE S* . HOURS REACTOR WAS CRITICAL. .*.. .' ******. 463.6 5,850.1 16,087

6. REACTOR RESERVE SHUTDOWN HOURS *.*****  ; 0 0 0
7. . HOURS GENERATOR ON LINE.*.. ~ .*...****** 463.6 . 5.652.7 14.973.8 8.. \JNJT RESERVE SHUTDOWN HOURS . *.* ~ ******* 0 0 0
9. GROSS THER'.\IAL ENERGY .

GENERATED ('.\tWH) **.*****.************ 537,672 8,906,400 23-,019~960 10; GROSS.ELEqRICAL ENERGY 154,850 2,642,400 1,146~650 11.

-GENERA TEDJ'.\IWII) . . . : . . . . . . . * . * . * * * * *

  • NET ELECTRICAL ENERGY GENERATED

('.\!\\'II) 138,558. 2;427,933 6,681,638

12. REACTOR AVAILABILiTY fACTOR (1) . * * * * * * * * . 62. 3% 66.8% . --.,..-......,4~5: 9%

. 13. UNIT A \"AILABILITY FACTOR (2) ..*.********. 62.3%. . 64. 5%. ---~h..... 2:1%

14. l'NIT C AP.-\Cl1Y FACTOR (3) . . * . . * * * * * . * * *
  • 21.2%* 40.5% _ _ __._2.7.. . 9%

15 . l 1NIT FORCED Ol!TAGE RATE (4) . . . . . . * * * * .

  • 0% 32.6% _ _**-~5_4 .1%

. 16. smrTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):

Refueling, 12/20/75, 3 months . . . . *

17. IF Sllt:l" DOWN AT END or.- REPORT PERIOD, ESTl'.\IATED DATE or STARTUP: _3_/_2_9_*_/_7_6_*- - - - - - - -
18. UNITS IN TEST STATCS C. RIOR TO CO'.\l'.\IERCIAL OPERATION) REPORT THE FOLLOWING:

DATE LAST DATE FORECAST ACHIEVED INITl!\L CRITICALITY INITIAL ELECrRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL (I) ~EACTOR A \'AILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) l?NIT A\'AILABILITY FACTOR -~-~-~--~~~~-x100 HOURS IN REPORTING PERIOD NF.T ELF.CTR IC Al. PO\\TR GF~F.RATED

  • .MAX. Dl-.l'ENDABLE CAPACITY (~!We-NET) X HOURS IN RU'ORTING l'E!{IOL>

FORCED oL:TA(;E llOL:Rs

-~--~~~--'--~~-~-~~-~--~-~-x100 HOURS GENERATOR ON Llt\E-+ FORCED OUTAGE HOURS I. I 6-D* l

.e Plant Statistics for Month of: December* 1975 ....

  • Month Year to Date Total to Date Net*Plant Output, Mwhe 138,558 :2,4~7,933 .6 ,881, _638_ ..

Gross Generation, Mwhe 154,850 2,6~2,4ob- . 7,146 ,650.

Station Power, Mwhe - i

  • On Days Generating On Days Not. Generating 16,292 1,014 214,467

.20 ,492 .

  • 465,012 113 ,-902 II Reactor Heat Produced, Mwht 537,672 *8;906,4Qo 23,019,960 iI t*

Hours Critical 463.6 5,850;1 16,087 Hours Generating .. 463.6 . . 5,65i:1 14,973.8 Capacity Factor 27.2% 40.5% 2.7.9%

/

Station Power,  % of Gross 10.5% 8.1% 6.5%

(Days Generating)

CoJ!.e Ave. Burnup, Mwd/MTU ll,347.3*

Batch A Ave. Burnup, Mwd/}lmJ<~** 11,102.9 Batch A Lead Bundles, lV!i~/MTU 11,716.64 (A-25; A-14, A-1};. A-22, A-44, A-55, A-56, A-47)

Batch B_Ave. Burnup, Mwd/MTU .13,093-5

.Batch B L::!ad Bundles, Mwd/MTU 14,194.6 (B-20, B-17, B-49, B-52)

Batch C Ave. Burnup, Mwd/MI'U Batch C Lead Bundles, Mwd/MTU 12,900.0

-. ( C-10, C-03, C-02, C-09, C-ll, C-18, C-19, C-12)

Dates on Line: 1 thru 20 inclusive except plant shutdown at 0738 hours0.00854 days <br />0.205 hours <br />0.00122 weeks <br />2.80809e-4 months <br /> on 12/20 for scheduled outage'. .

Availability (%) Month *_Year to Date Plant 62.3 64.5 Reactor 62.3 66.8.

  • This number represents the core average burnups calculated by INCA. The corresponding core average burnup calculated from thermal considerations is 11,430.1.

APPENDIX C

.. * .  ::j,,

DOCKET NO. 50- 255' *.

  • UNIT Palisades Plant DATE l/y_/_76_ _

COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH December 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY {.M\Vc-net) .. DAY (MWe-net) 1 484 17*. . 480 2 268* 18 4 1

/

3 -24J: . .19' 4 4 241 20. 10 5 235 21 6* 237 *22 7 237 23 s 240 24 .. .... -:- . .

~:

9 237 25 10 235 . 26 11* 250 27.

12 *. 259 *28 13 ,- 261. 29.

14 266 30 1"5 264 31

~ .. .

16 421 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in M\Vc-net for each day in the reporting month.

Compute to the nearest whole megawatt.

  • These figures will be used to plot a gr;,iph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the rcstrktcd power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the aprJarent anomaly.

I

  • I
1. J6-C* l

!~::'\

..=.:*-,,

.....,.2~*-***W~'r~txMilleilGrd~**~r2*rw1-..*******>n..-............_.,,__...,.,~m_..*-*~*u***1~::.....~**-.--.1,, ...-...-..... - - - - . . - - - - - - - - - - - - - - - - - - - - . . _ . . . . . ,____...._-..,._

.I

-~

\

.** \

. 't I

I APPENDIX E DOCKET NO. 50-255 ~  !

r.

UNIT SHUTDOWNS UNIT NAME Palisades- Plant 1/7176 DATE Vernick.

\

COMPLETED l3Y H. *R.

REPORT MONTH December 1975 TYPE METHOD OF F*FORCED DURATIPN SHUTTING DOWN NO. DATE S*SCHEDULED (HOU.RS) REASON (1) THE REACTOR (2) CORR.ECTIVE ACTIONS/COMMENTS 10 751220 s 280.4 c 3 While coming down 'in power for the

' sch~duled outage, there was a Reactor

.. Protective System flow trip.

. '\

\

(l) REASON (2) METHOD .

.. A**EQUIPMENT FAlLURE'(EXPLAlN) I-MANUAL B* MAINT. OR TEST 2-MANUAL

. C- REFUELING SCRAM

. \

D-REGULATORY RESTRICTION E-*OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATI VE 3-AUTOMATIC SCRAM e.

G-Ol'ERATIONAL ERROR

,. (EXPLAIN)

.. H-OTliER (EXPLAIN)

SUMMARY

  • The unit operated at . 45% tl;Lis month until. December 16, .:1975 when power was increased to 80%.

Load :i;-emained at 80%.until the unit came- off the line.for a scheduled refueling on December 20, 1975-l j . ,.

t *