ML19210B027: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:t Missi      ccxsfNuusta                                    i U.S. NUCLEAR mEcut4 Tony                                  fo 2.g4 NRC Popu 195 *                                                                                                                                '''' * ***"
J i:. m            .                                                                                TERIAL k
* NRC DISTRIBUTIONFROM:                                    een PART 50 DOCKET MA cartcPoccuuENT                          11/30/77 j
Met Ed                                                  -
i ITO:                  R.      ,J. Reid                                                    Reading, Pa.                    19603                OATE aECEivt3
                                                                                                                                                                                                    }
                                                                                                                                                    ,7,ng,77 J. G. Hervein                                        NuM8EM cP COP'E5 *ECElvt3 I
l f**CP                            f tNPUT PoPM d ET*EM C NcTomtZED                                                                                        ;
f p6QQ                            ]
LiukP t ED                                                      j I      dmlGIN AL                                                                                                                                                                                      f CCOPY                                                                                    '
ENCbOSURE                      Consists of recently issued,                                        ;
I OASCRIPT1CN i
revised                PaDER Section 401 Certification in accordance with DfI-1 Environmental Tech Specs!                                                  '
Section 5.6.2.4, in order that the thermat component of the DfI discharge will meet Pennsylvania Water Quality Criteria. . .
1p          4p                                                                                                J i
l l
PLANT 'WE _
* THREE MILE ISLAND UNIT # 1                                                                                                ( ggcL                                                    i Jcm 12/12/77                                                                                    E!P/IRCN'tENTAL                                                      i
        ;                                                                                FOR ACTION /INFORMATION
                                                                                                      '                  ASSIGNED AD:
y,        .tecer (e n)                                      t q3rr v                                                                            {
4                                                                                                                                                                        .
i            3 RANCH CHIEF:                                                                        i l t g e e - r, re, 10                                            A36//O F lgnJ3CM CHIEF
* t I            een rcP VA*fAGTP:                                                                    I 1
I            r'c    Acct-                                                                        i I I oo0 JECT '4ANAGER:                                1 e
I ILIC. ASST:                                          i                                              i          9. UARLESS i l                                                  4 f8                                                                              INTERNAL OlSTRIBUTICN                                      J            l SITE SAFETY &
or_23* s'(s*rys i y                              .
I eve-eye eA;;-v                                                                    J          lENVIRON ANALYSIS I *meeC0
        & ere_ i-W                                      l i o v a~eny                                                                                M cENTON gMcLLER
[tvoc ptR
                                ~
I l CCUROCDFR g                                i t me noov_3                                !            leot-cuy-rta
[/
            /t nee, T Ce /1 )                            i t i e i-sn e I I *? COL *T9
                                                                                                                                                        } l i irrt gey -ecM I I ENGINEER *NG                                1 I                ener b GCSSICK 3 STAF?                              $ l ry c,w-                                                                                  i lERNsT i t i i u vuttro l l unenAr                                                I neco;-+:G 7EACTORS # 9ALLA?S                  tver-7:.gr co y I lvree                                        I t e -uyr -T I
t 6 c-ev in i
l i43:;                                                      oswy-cy-                                                                      I t F 1 anm
                                                            )                                            t/4          e-ersm'*                          I          is'-      *-CH          _
1
_l                                                i I cuac l
4 I I          OE2C*09 SAFE *Y                                                                  I ig g.pt-;;~              ,    3 I t FAE3
[lcon*vc?vrrx-vrNT l                                              l 1 ages                                      1 i ?tTLER I
                                                                                                                                                                      ':--r        1521YS-:
i irentuct-                                    I e        ':0 V AX                                                                        i fI . cStf!':S                                  t i 9052 TOC"Y M '7'ves                                        Virnt:xER
                ! Iunre*ni                                    i i enCr IA Nc AcoGN
* igr 75 2 i i                                                            I '' '.12  '! ?
i .rrtTe i e                                            I I
[>*                    -
                / u- _-- re e**
                                                                ' I AT C !                                    i 1 1A zerGra e      t i I estTT4rt                                  e      s I t                                            l
                                                                            ,r - 2 : = e.                                                                      l          CONTPCL**
a
                                                                        , EXTERNAL OfS~RISUT;CN                                                                1
                                                                              -  -g.      RML.                        .
j
                    / uroHAeftsbtEEvW f                            i                                              i i i
77344 7 ::                                          i '
I i i
F/ 's :                                                                                                                                    ]
i      4    seg y  >- ux:    u---) I t TO ACRS
                    /                        .. . GGR'? 8                                                        . ,
79
                                      ,, =...,
Nac .c..
 
                                                                      /fMd                              Jk      eil              ._          ; - ,- .s .2,,I
    .                                            a~      . m    wws,s n
                                                ,'q.:::..
METROPOLITAN EDISON COMPANY TELEPHONE 215 - 929 2001 PCST OFFICE BOX 542  REACING. PENNSY LV ANT A 19603
:Icvember 30, 1977
                                                                                                                    -[_I        R GQL lcL6                                ,s ,
: a. e ,~ u
                                                                                                                          , . o Q
: k. '[r/\
8                            'O Director of :Iuclear Reacter Regulation Reid , Chie f                                                                    o , tw%
Q' Attn: R . 'd.                                                                                              $'
f',
g4 Cperating Reacters Branch Nc. k                                                          ,
U. S. Nuclear Regulatory Cc==ission                                                        (f(
            '4ashingten , D.C . 2C555
                                                                                                          'x
                                                                                                            \/ f                        N U
 
==Dear Sir:==
 
                                ''hree Mile Island :iuclear Statien Unit 1 (TMI-1)
Operating License DPR-50 Decket :To. 50-289 In accordance with TMI-1 Environmental Technical Specificatien Section 5.6.2.h (Item 2, cencerning changes made in, or preposed for pe: rits and/
cr licenses), enclosed please find the recently issued, revised Pa:'ER Section LCl Certificatien.
PaDER has issued this certificatien in order that the thermal component of the TMI discharge would meet Pennsylvania '4ater Quality Criteria. ~4e therefore esticate that no adverse envirennental impact vill be experienced thrcugh cc=pliance with this certification.
              'de trust this submittal to be satisfactcry; hcVever, should ycu have any questions , please contact me.
                                                                          ~'nce ely l/
: u.      F. Herbein Vice President JGH:RAL: as Incicsure 1564 275 773460102
 
G3,0 0/5.0,        g ( . c5 "" "
6} .OOO9.ooco          3_cc      GJT I cc      R/qK
                                                                                            \ _ -.
                                                                                .I r e
                                                                                \CC      YQ              .*
I- 4 G--- & 9 &
                                                                                $CC      Chrono Roo:a 1002 Health & Welfare Building Earrisburg, Pennsylvania 17120 bl
* b (717) 787-9665                                          _
November 9, 1977 EPA Application PA0009310 Mr. Bruce P. Smith                                    Metropolitan Edison Conpany Permits Branch                                        Three Mile Isinnd Nuclear Station U.S. Environ =antal Protection Agency                Londonderry Township Sinth and Walnut Streets                              Q M7 p County Philadelphia, Pe=: 2yl :nia .19106                            .
 
==Dear Hr. Snith:==
The Cmsealth of Pennsylvania hereby certifies to the fo11cving and thus invalidates all past certifications:                                                            .
12/29/76 and 5/20/77 respectively
: 1.      The Amend =ents Mos. 1 and 2 issued for the Untional Pollutant Discharge EINf 9stion System Pemit for                .
subject discharger vere forwarded to the Co=aonwealth of ?cnnsylvania pursuant to the provisions of Section 401 of the Federal Water Pollution Control Act Amendments of 1972.
2.
The effluent li=itations and other limitations, and conitoring requirements as proposed in the tentative permit emend =ents subnitted for cur review:
n.
Assure that the applicant vill comply with applicable effluent linftations under Section 301 or 302, standards of performance under Section 306, or prohibition, effluent standards, or pre-treatment standards under Section 307 of the LTCA Amendmento of 1972 vhars they arm presently applicable; b.
Shall beccme a condition of a Federal EPDES permit pursuant to Section 402 of tha Pk'FCA Anendments.
: 3. This certification is subject to the fo11cvin;; cocditionn:
a.
Thst the Pernittee complies with Pennsylvania's Clean Strenns Lav.                                                  .
2270204 b.
That ths Permittee complies with Industrial Vasts Permita
                  '        nnd 2272202, and Severaga Pemit 2275419 issued by tha Department of Enviro == ental Rascurces.
DI                4 f  T'in dh1.
D 1" ?I 1564 276
 
eember 9, 1977    -      2 NPDES PA0009920 ~                                                                                                          '
S tropolitan Edwon Coepany D ]fuj hih' @h eo diah['
: c. The following effluent limitations should be i= posed:
: 1. Discharge 101 - Effluent of sewags treat =ent facilities Total phosphorus shall not exceed 2 mg/l on an avarage basis, nor 4 =g/l at any ti=e.
: 2. Discharge 001 - Combined Mechanical Draf t Cooling Tower            s Blevdown.
: a. The paraittee shall at all ti=as maintain in good working order and operate the Mechanical Draft Cooling Towers (MDCT's) as efficiently as possible so as to mini ~'ze te=perature differential between n=hient river te=perature and the te=perature of the discharge; provided, however, the MDCT's nay be shot down when in the judgment of the responsibla TMIKS personnel a co=bination of at=espheric conditions and river te=perature may aviac which causes the vaste water to be heated an it passes through the MDCT's or ice for..ation is observed to occur within the MDCI's.        -
: b. The te=peraturn of the discharge shall never e=ceed a esxi=u:s of 870 7, creept vb the a=bient river te=perature erceeds 870 7, in which case, the discharge te=peraturo shall not exceed the ambient river te=perature; the te=perature of the discharge shall not change by r> ore than 50 F during any one hocr period.
A=bientriverte=peratureisthete=perat-$reoftheriver upstream of the heated vaste discharge. The a=bient temperaturgssa=pling point should be unaffected by any sources of vaste heat. The te=perature of the intale water vill be considered as a=bient river temperature ao long as the intnie vnter is unaffected by THI's or any othar nearby bested water discharge.
: c. The folicnring temperature ifnitations shall never be excaedad:
: 1. During the period Nove=ber 1 through April 30. the te=perature of the discharge sh11 not exceed 120 7 above ambient river te=perature.
: 2. During the pet:isd May 1 thhough October 31, tha te=perature of the discharge shall not e=ceed 70 7 above a:2bient river te=peratura.
1564 277
 
UPDES PA0009920                                          Novembar 9,1977 Metropolitan Edison Cocpsny qu?N          '
g  i            j(du          ,
Ojud  '
: 3. During plant cooldown operations the temperature of the discharge shall not exceed 120 7 above a=hient river teeperature.
: d. At no ti=e shall the discharge exceed the rate of 150 million Eallens per day.
: a. The Chief of the operations Section of the Harrisburg Regional Office of ths Bureau of Water Quality Management shall ba advised by telephone within 24 hours when tha 10CT's are shut
                              'down for reasons other than those specified in condition 2(a) above and a;;ai= vhen tever operation in resumed; shall be notified within 24 hours when the discharge limitations specified in paragraph 2(c) above are exceeded and again when the discharge is in complianca with such limitaticas;.
and shall be notified, at least thirty (30) days in advance, whenever possible of all scheduled plant cooldown operations.
: f. Within two years af ter both nuclear reactor units are in co=ercial operation, the Metropolitan-Edison Company vill collect and submit to the Depart =ent of Environmental Resources strean data which accurately defines the thermal ple- or zone of i= pact from the TMINS heated vasta discharga. As a mini =us, thernal pluse mapping data collected to meet the Unclear Regulatory Cc=sission's require =ents sh;11 be submitted to the Pennsylvania Depart =ent of Environ = ental Resources,
: g. ThatthaTermitteesubmittothofannsylvania' Depart =entof Enviren= ental Resourcas within ninaty (90) days of issuance of A=endnent Mo.1.to the NPDES permit, an application for a new Pennsylvants Vater Quality Management pernit for the facilities associated with the thar.al component of discharge 001.
: 4.      We cartify that tha final effluent limitations containad herein and in the attachad UPDES par =1t, to the extent that they are not incon-          -
sistent with the linitations herein, are thosa effluent limitations which are required to achievs tha federally approved water quality criteria for the receiving stress. 'We also certify that tha co=plianca schedula therain in reasonable. Wa do not cartify that the applicant for an ITDES per=it is now in ecupliance with our effluent limitations or per=it requirements established pursuant to the Clasn Stremas Law,
                            ~
Act of June 22, 1937. P.L. 1987, na amended, 35 P.S. 691.1 or that such sourca in discharging in compliance with the terns or conditions of a stata permit. Nor do ve certify that by attaMn3 the intarin standards contained in the NPDES par =it that auch cource sill be in cosp1 h ne with tha afor-mentioned clean Stresma Lav sna ths Rules 1564 278
                  /                  ,
 
1rDES PA03099.?O                                      November 9,1977 Metropolitan T,dison Co:pany and Regulations therou= der. By certifying the finnt effluent standards and the schedula for compliance to be contained in the NPDES pernit, va do not vaiva our ri:;bt to prosecute eithar civilly or criminally all past, preser.t and future violations of our Clean Strea=s Lav and      ,
the Rulaa and Regulaticus thereunder. Nor do ve vaiva our right to modify final effluent require =ents as is necessary to comply with Pennsylvania Law.
: 5. This certification by the Depart =ent may be appealed to the Environ-mental Ees_-ing Board, First Floor A-nn, Blackstone Building, 112 Markat Street, Harrisburg, PA (717) 737-3433, by any aggrieved person purauant to tha Act of Decenber 3,1970, P.L. 834, 71 Pa. Stat.
Anno. E510-1 et seq. and the Adninistrativa Agency Law ' the Act of J",13, l?45, ?.L.1383, ce := ended 71 Pa. Stat. A~.- e. 01710.1 et req. Appeals cnst be filed with the Envirowntal Hearing Ecard within thirry (30) days of' service of this certification unless the appropriate statute provides a different tine period. Copies of the appeal form and the Department's regulatier.s governing practies and procedura before the Board =ay be obtaised from the Doard.
Very truly yours,                            ,
                                          & h.Q $?)J .            }}}.&^ t af Frederick A. Harrocco, Chief Planning Secti.~a Earrisbur2 Ecgional Office FAM: key cc: Metropolitan Edison Co=pany DkS h?i$E
        ~
1564 7N    -}}

Latest revision as of 13:31, 22 February 2020

Forwards FA Marrocco 771109 Ltr Submitting PA Section 401 Certification Per TMI-1 Ets.Certification Issued to Bring Thermal Component of TMI Discharge in Compliance W/Pa Water Quality Criteria
ML19210B027
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/30/1977
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
GQL-1646, NUDOCS 7911010763
Download: ML19210B027 (6)


Text

t Missi ccxsfNuusta i U.S. NUCLEAR mEcut4 Tony fo 2.g4 NRC Popu 195 * ' * ***"

J i:. m . TERIAL k

  • NRC DISTRIBUTIONFROM: een PART 50 DOCKET MA cartcPoccuuENT 11/30/77 j

Met Ed -

i ITO: R. ,J. Reid Reading, Pa. 19603 OATE aECEivt3

}

,7,ng,77 J. G. Hervein NuM8EM cP COP'E5 *ECElvt3 I

l f**CP f tNPUT PoPM d ET*EM C NcTomtZED  ;

f p6QQ ]

LiukP t ED j I dmlGIN AL f CCOPY '

ENCbOSURE Consists of recently issued,  ;

I OASCRIPT1CN i

revised PaDER Section 401 Certification in accordance with DfI-1 Environmental Tech Specs! '

Section 5.6.2.4, in order that the thermat component of the DfI discharge will meet Pennsylvania Water Quality Criteria. . .

1p 4p J i

l l

PLANT 'WE _

  • THREE MILE ISLAND UNIT # 1 ( ggcL i Jcm 12/12/77 E!P/IRCN'tENTAL i
FOR ACTION /INFORMATION

' ASSIGNED AD:

y, .tecer (e n) t q3rr v {

4 .

i 3 RANCH CHIEF: i l t g e e - r, re, 10 A36//O F lgnJ3CM CHIEF

  • t I een rcP VA*fAGTP: I 1

I r'c Acct- i I I oo0 JECT '4ANAGER: 1 e

I ILIC. ASST: i i 9. UARLESS i l 4 f8 INTERNAL OlSTRIBUTICN J l SITE SAFETY &

or_23* s'(s*rys i y .

I eve-eye eA;;-v J lENVIRON ANALYSIS I *meeC0

& ere_ i-W l i o v a~eny M cENTON gMcLLER

[tvoc ptR

~

I l CCUROCDFR g i t me noov_3  ! leot-cuy-rta

[/

/t nee, T Ce /1 ) i t i e i-sn e I I *? COL *T9

} l i irrt gey -ecM I I ENGINEER *NG 1 I ener b GCSSICK 3 STAF? $ l ry c,w- i lERNsT i t i i u vuttro l l unenAr I neco;-+:G 7EACTORS # 9ALLA?S tver-7:.gr co y I lvree I t e -uyr -T I

t 6 c-ev in i

l i43:; oswy-cy- I t F 1 anm

) t/4 e-ersm'* I is'- *-CH _

1

_l i I cuac l

4 I I OE2C*09 SAFE *Y I ig g.pt-;;~ , 3 I t FAE3

[lcon*vc?vrrx-vrNT l l 1 ages 1 i ?tTLER I

':--r 1521YS-:

i irentuct- I e ':0 V AX i fI . cStf!':S t i 9052 TOC"Y M '7'ves Virnt:xER

! Iunre*ni i i enCr IA Nc AcoGN

  • igr 75 2 i i I '.12 '! ?

i .rrtTe i e I I

[>* -

/ u- _-- re e**

' I AT C ! i 1 1A zerGra e t i I estTT4rt e s I t l

,r - 2 : = e. l CONTPCL**

a

, EXTERNAL OfS~RISUT;CN 1

- -g. RML. .

j

/ uroHAeftsbtEEvW f i i i i

77344 7 :: i '

I i i

F/ 's : ]

i 4 seg y >- ux: u---) I t TO ACRS

/ .. . GGR'? 8 . ,

79

,, =...,

Nac .c..

/fMd Jk eil ._  ; - ,- .s .2,,I

. a~ . m wws,s n

,'q.:::..

METROPOLITAN EDISON COMPANY TELEPHONE 215 - 929 2001 PCST OFFICE BOX 542 REACING. PENNSY LV ANT A 19603

Icvember 30, 1977

-[_I R GQL lcL6 ,s ,

a. e ,~ u

, . o Q

k. '[r/\

8 'O Director of :Iuclear Reacter Regulation Reid , Chie f o , tw%

Q' Attn: R . 'd. $'

f',

g4 Cperating Reacters Branch Nc. k ,

U. S. Nuclear Regulatory Cc==ission (f(

'4ashingten , D.C . 2C555

'x

\/ f N U

Dear Sir:

hree Mile Island :iuclear Statien Unit 1 (TMI-1)

Operating License DPR-50 Decket :To. 50-289 In accordance with TMI-1 Environmental Technical Specificatien Section 5.6.2.h (Item 2, cencerning changes made in, or preposed for pe: rits and/

cr licenses), enclosed please find the recently issued, revised Pa:'ER Section LCl Certificatien.

PaDER has issued this certificatien in order that the thermal component of the TMI discharge would meet Pennsylvania '4ater Quality Criteria. ~4e therefore esticate that no adverse envirennental impact vill be experienced thrcugh cc=pliance with this certification.

'de trust this submittal to be satisfactcry; hcVever, should ycu have any questions , please contact me.

~'nce ely l/

u. F. Herbein Vice President JGH:RAL: as Incicsure 1564 275 773460102

G3,0 0/5.0, g ( . c5 "" "

6} .OOO9.ooco 3_cc GJT I cc R/qK

\ _ -.

.I r e

\CC YQ .*

I- 4 G--- & 9 &

$CC Chrono Roo:a 1002 Health & Welfare Building Earrisburg, Pennsylvania 17120 bl

  • b (717) 787-9665 _

November 9, 1977 EPA Application PA0009310 Mr. Bruce P. Smith Metropolitan Edison Conpany Permits Branch Three Mile Isinnd Nuclear Station U.S. Environ =antal Protection Agency Londonderry Township Sinth and Walnut Streets Q M7 p County Philadelphia, Pe=: 2yl :nia .19106 .

Dear Hr. Snith:

The Cmsealth of Pennsylvania hereby certifies to the fo11cving and thus invalidates all past certifications: .

12/29/76 and 5/20/77 respectively

1. The Amend =ents Mos. 1 and 2 issued for the Untional Pollutant Discharge EINf 9stion System Pemit for .

subject discharger vere forwarded to the Co=aonwealth of ?cnnsylvania pursuant to the provisions of Section 401 of the Federal Water Pollution Control Act Amendments of 1972.

2.

The effluent li=itations and other limitations, and conitoring requirements as proposed in the tentative permit emend =ents subnitted for cur review:

n.

Assure that the applicant vill comply with applicable effluent linftations under Section 301 or 302, standards of performance under Section 306, or prohibition, effluent standards, or pre-treatment standards under Section 307 of the LTCA Amendmento of 1972 vhars they arm presently applicable; b.

Shall beccme a condition of a Federal EPDES permit pursuant to Section 402 of tha Pk'FCA Anendments.

3. This certification is subject to the fo11cvin;; cocditionn:

a.

Thst the Pernittee complies with Pennsylvania's Clean Strenns Lav. .

2270204 b.

That ths Permittee complies with Industrial Vasts Permita

' nnd 2272202, and Severaga Pemit 2275419 issued by tha Department of Enviro == ental Rascurces.

DI 4 f T'in dh1.

D 1" ?I 1564 276

eember 9, 1977 - 2 NPDES PA0009920 ~ '

S tropolitan Edwon Coepany D ]fuj hih' @h eo diah['

c. The following effluent limitations should be i= posed:
1. Discharge 101 - Effluent of sewags treat =ent facilities Total phosphorus shall not exceed 2 mg/l on an avarage basis, nor 4 =g/l at any ti=e.
2. Discharge 001 - Combined Mechanical Draf t Cooling Tower s Blevdown.
a. The paraittee shall at all ti=as maintain in good working order and operate the Mechanical Draft Cooling Towers (MDCT's) as efficiently as possible so as to mini ~'ze te=perature differential between n=hient river te=perature and the te=perature of the discharge; provided, however, the MDCT's nay be shot down when in the judgment of the responsibla TMIKS personnel a co=bination of at=espheric conditions and river te=perature may aviac which causes the vaste water to be heated an it passes through the MDCT's or ice for..ation is observed to occur within the MDCI's. -
b. The te=peraturn of the discharge shall never e=ceed a esxi=u:s of 870 7, creept vb the a=bient river te=perature erceeds 870 7, in which case, the discharge te=peraturo shall not exceed the ambient river te=perature; the te=perature of the discharge shall not change by r> ore than 50 F during any one hocr period.

A=bientriverte=peratureisthete=perat-$reoftheriver upstream of the heated vaste discharge. The a=bient temperaturgssa=pling point should be unaffected by any sources of vaste heat. The te=perature of the intale water vill be considered as a=bient river temperature ao long as the intnie vnter is unaffected by THI's or any othar nearby bested water discharge.

c. The folicnring temperature ifnitations shall never be excaedad:
1. During the period Nove=ber 1 through April 30. the te=perature of the discharge sh11 not exceed 120 7 above ambient river te=perature.
2. During the pet:isd May 1 thhough October 31, tha te=perature of the discharge shall not e=ceed 70 7 above a:2bient river te=peratura.

1564 277

UPDES PA0009920 Novembar 9,1977 Metropolitan Edison Cocpsny qu?N '

g i j(du ,

Ojud '

3. During plant cooldown operations the temperature of the discharge shall not exceed 120 7 above a=hient river teeperature.
d. At no ti=e shall the discharge exceed the rate of 150 million Eallens per day.
a. The Chief of the operations Section of the Harrisburg Regional Office of ths Bureau of Water Quality Management shall ba advised by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when tha 10CT's are shut

'down for reasons other than those specified in condition 2(a) above and a;;ai= vhen tever operation in resumed; shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the discharge limitations specified in paragraph 2(c) above are exceeded and again when the discharge is in complianca with such limitaticas;.

and shall be notified, at least thirty (30) days in advance, whenever possible of all scheduled plant cooldown operations.

f. Within two years af ter both nuclear reactor units are in co=ercial operation, the Metropolitan-Edison Company vill collect and submit to the Depart =ent of Environmental Resources strean data which accurately defines the thermal ple- or zone of i= pact from the TMINS heated vasta discharga. As a mini =us, thernal pluse mapping data collected to meet the Unclear Regulatory Cc=sission's require =ents sh;11 be submitted to the Pennsylvania Depart =ent of Environ = ental Resources,
g. ThatthaTermitteesubmittothofannsylvania' Depart =entof Enviren= ental Resourcas within ninaty (90) days of issuance of A=endnent Mo.1.to the NPDES permit, an application for a new Pennsylvants Vater Quality Management pernit for the facilities associated with the thar.al component of discharge 001.
4. We cartify that tha final effluent limitations containad herein and in the attachad UPDES par =1t, to the extent that they are not incon- -

sistent with the linitations herein, are thosa effluent limitations which are required to achievs tha federally approved water quality criteria for the receiving stress. 'We also certify that tha co=plianca schedula therain in reasonable. Wa do not cartify that the applicant for an ITDES per=it is now in ecupliance with our effluent limitations or per=it requirements established pursuant to the Clasn Stremas Law,

~

Act of June 22, 1937. P.L. 1987, na amended, 35 P.S. 691.1 or that such sourca in discharging in compliance with the terns or conditions of a stata permit. Nor do ve certify that by attaMn3 the intarin standards contained in the NPDES par =it that auch cource sill be in cosp1 h ne with tha afor-mentioned clean Stresma Lav sna ths Rules 1564 278

/ ,

1rDES PA03099.?O November 9,1977 Metropolitan T,dison Co:pany and Regulations therou= der. By certifying the finnt effluent standards and the schedula for compliance to be contained in the NPDES pernit, va do not vaiva our ri:;bt to prosecute eithar civilly or criminally all past, preser.t and future violations of our Clean Strea=s Lav and ,

the Rulaa and Regulaticus thereunder. Nor do ve vaiva our right to modify final effluent require =ents as is necessary to comply with Pennsylvania Law.

5. This certification by the Depart =ent may be appealed to the Environ-mental Ees_-ing Board, First Floor A-nn, Blackstone Building, 112 Markat Street, Harrisburg, PA (717) 737-3433, by any aggrieved person purauant to tha Act of Decenber 3,1970, P.L. 834, 71 Pa. Stat.

Anno. E510-1 et seq. and the Adninistrativa Agency Law ' the Act of J",13, l?45, ?.L.1383, ce := ended 71 Pa. Stat. A~.- e. 01710.1 et req. Appeals cnst be filed with the Envirowntal Hearing Ecard within thirry (30) days of' service of this certification unless the appropriate statute provides a different tine period. Copies of the appeal form and the Department's regulatier.s governing practies and procedura before the Board =ay be obtaised from the Doard.

Very truly yours, ,

& h.Q $?)J .}.&^ t af Frederick A. Harrocco, Chief Planning Secti.~a Earrisbur2 Ecgional Office FAM: key cc: Metropolitan Edison Co=pany DkS h?i$E

       ~

1564 7N -}}