{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 18, 2014 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
 
February 18, 2014  
 
Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority  
 
1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801  


==SUBJECT:==
==SUBJECT:==
Line 27: Line 21:


==SUMMARY==
==SUMMARY==
FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328  
FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328


==Dear Mr. Shea:==
==Dear Mr. Shea:==


This refers to the meeting conducted near the Sequoyah Nuclear Plant on February 4, 2014.
This refers to the meeting conducted near the Sequoyah Nuclear Plant on February 4, 2014.
The meeting's purpose was to conduct a regulatory performance meeting to discuss the results of the supplemental and follow-up inspections completed on December 13, 2013, and the status of NRC's performance assessment of Sequoyah Nuclear Plant, Units 1 and 2.
The meetings purpose was to conduct a regulatory performance meeting to discuss the results of the supplemental and follow-up inspections completed on December 13, 2013, and the status of NRCs performance assessment of Sequoyah Nuclear Plant, Units 1 and 2.
A list of attendees and a copy of the presentation handout are enclosed.
A list of attendees and a copy of the presentation handout are enclosed.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Pub lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Should you have any questions concerning this meeting, please contact me at (404) 997-4607.
Should you have any questions concerning this meeting, please contact me at (404) 997-4607.
Sincerely,
Sincerely,
/Frank Ehrhardt RA for/
                                              /Frank Ehrhardt RA for/
Jonathan H. Bartley, Chief Reactor Projects Branch 6 Division of Reactor Projects  
Jonathan H. Bartley, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79
 
Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79  


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. NRC Meeting Slides
: 2. NRC Meeting Slides
: 3. TVA Meeting Slides  
: 3. TVA Meeting Slides cc distribution via ListServ
 
cc distribution via ListServ  


___________   SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP     SIGNATURE JDH /RA/ FJE /RA for/     NAME J. Hamman J.Bartley     DATE 02/15/2014 02/18/2014     E-MAIL COPY?    YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO J. Shea 2 Letter to Joseph W. Shea from Jonathan Bartley dated February 18, 2014  
___________               SUNSI REVIEW COMPLETE   FORM 665 ATTACHED OFFICE             RII:DRP         RII:DRP SIGNATURE           JDH /RA/       FJE /RA for/
NAME                   J. Hamman   J.Bartley DATE                   02/15/2014     02/18/2014 E-MAIL COPY?         YES     NO     YES     NO   YES   NO     YES   NO     YES   NO     YES   NO   YES   NO J. Shea                                 2 Letter to Joseph W. Shea from Jonathan Bartley dated February 18, 2014


==SUBJECT:==
==SUBJECT:==
Line 57: Line 47:


==SUMMARY==
==SUMMARY==
FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328  
FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328 Distribution:
 
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource
Distribution
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS  
 
PUBLIC RidsNrrPMSequoyah Resource  
 
Enclosure 1 NRC ATTENDEES
 
W. Jones, Deputy Division Director, DRP, RII J. Bartley, Chief, Reactor Projects Branch 6, DRP, RII J. Heisserer, Senior Construction Inspector, RII W. Deschaine, Resident Inspector, Sequoyah Nuclear Plant Enclosure 1 Enclosure 2 Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2 Enclosure 3 Enclosure 3
 
Enclosure 3
 
Enclosure 3
 
Enclosure 3
 
Enclosure 3
 
Enclosure 3
 
Enclosure 3


Enclosure 3}}
NRC ATTENDEES W. Jones, Deputy Division Director, DRP, RII J. Bartley, Chief, Reactor Projects Branch 6, DRP, RII J. Heisserer, Senior Construction Inspector, RII W. Deschaine, Resident Inspector, Sequoyah Nuclear Plant Enclosure 1
                          }}

Latest revision as of 22:07, 5 February 2020

2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328
ML14049A337
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/18/2014
From: Bartley J
Reactor Projects Region 2 Branch 6
To: James Shea
Tennessee Valley Authority
References
Download: ML14049A337 (31)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 18, 2014 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328

Dear Mr. Shea:

This refers to the meeting conducted near the Sequoyah Nuclear Plant on February 4, 2014.

The meetings purpose was to conduct a regulatory performance meeting to discuss the results of the supplemental and follow-up inspections completed on December 13, 2013, and the status of NRCs performance assessment of Sequoyah Nuclear Plant, Units 1 and 2.

A list of attendees and a copy of the presentation handout are enclosed.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4607.

Sincerely,

/Frank Ehrhardt RA for/

Jonathan H. Bartley, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79

Enclosures:

1. List of Attendees
2. NRC Meeting Slides
3. TVA Meeting Slides cc distribution via ListServ

___________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE JDH /RA/ FJE /RA for/

NAME J. Hamman J.Bartley DATE 02/15/2014 02/18/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 2 Letter to Joseph W. Shea from Jonathan Bartley dated February 18, 2014

SUBJECT:

PUBLIC MEETING

SUMMARY

FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328 Distribution:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource

NRC ATTENDEES W. Jones, Deputy Division Director, DRP, RII J. Bartley, Chief, Reactor Projects Branch 6, DRP, RII J. Heisserer, Senior Construction Inspector, RII W. Deschaine, Resident Inspector, Sequoyah Nuclear Plant Enclosure 1