ML17208A904: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/10/1980
| issue date = 08/10/1980
| title = Monthly Operating Repts for Jul 1980
| title = Monthly Operating Repts for Jul 1980
| author name = CHILSON V T
| author name = Chilson V
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AVERAGEDAILYUNITPOWERLEVELDOCKETVOCOMPLETED BYTELEPHONE Lllla=h(ONTHJULY1980DAYAVERAGEDAILYPOWERLEVEL(MWe.Net)
{{#Wiki_filter:AVERAGE DAILYUNIT POWER LEVEL DOCKET VO COMPLETED BY TELEPHONE        Lllla=
I645DAYAVERAGEDAlLYPOWERLEVEL(MWe->%et) 64717IOl3ISl6650647646642570442634637640645l820132495167't2g1930652654654655653651649646638640645INSTRUCTIONS Onthisformat,listtheavera((cdailyunitp>>wer!eve(
h(ONTH            JULY        1980 DAY        AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAlLYPOWER LEVEL (MWe.Net)                                                   (MWe->%et)
inMWe.Netforeachdayintherep<>rtintt n>>>nth.C>>>nputetothenearestwholemegawatt.('>r77j800818031/
I                        645                                  17                      647 650                                  l8                      652 654 20                      654 647                                                          655 646                                                          653 642                                  13                      651 570                                  24                      649 442                                  95                      646 IO                                                              16                      638 634                                  7't                      640 2g l3                        637                                  19                      645 30 IS                        640 l6                        645 INSTRUCTIONS On this format, list the avera((c daily unit p>>wer!eve( in MWe.Net for each day in the rep<>rtintt n>>>nth. C>>>npute to the nearest whole megawat t.
OPERATING DATAREPOR'TOPERATING STATUSTurkePointUnitNo.3760693I.UnitName2.Reporting Period:3.LicensedThermalPower(MWt):4.Nameplate Rating(Grossa(We):5.DesignElectrical Rating(NetMWe):6.Lblaximum Dependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):DOCKETNO.DATEhug~1980COMPLETED BY~~sonTELEPHONE
('>r77 j 80081 8031/
~i~3824Notes-Unit No.3operatedatapprozimately 100%R.P.,ex'ceptforoutageofJuly8-9,1980.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport.GiveReasons:9.Power'Level ToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, lfAny'hisMonthYr.to-DateCumulative 744.737.0-0-16122714716499.1II.HoursInReporting Period12.NumberOfHoursReactorWasCritical13.ReactorReserveShutdownHours-0--0-14.HoursGenerator On-Line4071.6IS.UnitReserveShutdownHours'6.GrossThermalEnergyGenerated (MWH)8797278<'JL19.UnitServiceFactor20.UnitAvailability Factor79.722.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate0.91.424.Shutdowns Scheduled OverNext6MonthsIType.Date.andDurationofEachI:SteamGenerator TubeTnsoection Program-Oct.5-Hov.1,1980.67112.651505.2213.349761.7121.8100265912318528453014819874.174.368.064.8'.525.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
 
ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77)
OPERATING DATA REPOR'T DOCKET NO.
UNITSIIUTDOIVNS ANDPOPOVERREDUCTIONS REPOR.Ih(ONTIIJUI.Y1980a~COhlPLETED UY2-2Nii.Dale~AuLoQ~~<I)Llccf<secEvc>>lRepi)fl)<t4l4J~nouoCauseScCoffel:tive Acliu>>toPieveolRccuffcoce 80-07-087.0N/AHOTORXUnitNo.3wasremovedfromserviceduetolowoillevelinreactorcoolantpumpmotor-No.38.Cor-rectiveactionsincludedaddingoil.(Nuclearsystem)I'ofcedS;Sclicd<<led (I/77)Reasoo:A-EII>>ipo<e>>t Failure(Explain)
                                                                                                                  ~1980 DATE hug COMPLETED BY TELEPHONE
U.hlaiote<uioce orTest~(-Rct'ucli>>I, D.RCII>>lalo<y Rcslrlclloo I:0pcfalo<Tfalologk.Llccosi:I:xJ>>ll>>JI<o>>
                                                                                                            ~~son
I'.Adioioislralive G.Operalio>>al Lrrur(lixplai<i)
                                                                                                            ~i~3824 OPERATING STATUS I. Unit Name                Turke    Point Unit    No. 3               Notes-Unit No. 3 operated            at
II.OII<cf(ExplJ>><)3hletl<od:
: 2. Reporting Period:
I-hlaoual 2.hlaoual Scram.3-Auloo<at
approzimately        100%    R.P.,
<cSerio)<.4-Otl<er(Lxplalo) 4Exl)ibilG-Instructions lofI(cpafalloo olDataEolrySl)eelsI'oiLiccoseeEventRepi)rl(I.ER)File(NURI!G-OI6))ExllibitI-SauteSource 0AVERAGEDAlLYUNITPOWERLEVELDOCKETiVO.50-251Turkey.PointIUI!t.TELEPHONE MONTHJULY1980DAYAVERAGEDAILYPOWERLEVEL!MWeNet)I640DAYAVERAGEDAILYPOWERLEVEL(i'e-Net)642lp649645644644646641641641641636633l8l9202I2223242528647647647642645643638631629629l34636IS635!6638793031631591INSTRUCTIONS Onthisform>>a.listtheaveragedailyunitpower!evel inMWeNetforeachdayi>>thereporting tnonth.Cot>>potetothenearestwhole...egawat!.
: 3. Licensed Thermal Power (MWt):
(olii)
ex'cept    for  outage of July 760 8-9, 1980.
OPERATING DATAREPORTOPERATING STATUSDOCKETNO.DATE4~~~80COMPLETED BY~~hi3.son TELEPHONE
: 4. Nameplate Rating (Gross a(We):
~05552-382ENotes-UnitNo.4operatedatapproximately 100%R.P.,exceptforloadreduction ofJuly30-31,1980.70I.UnitName:TurkevPointUnitNo.42.Reporting Period:a3.LicensedThermaiPower(MWt):4.iVameplate Rating(GrossiPIWe):S.DesignElectrical Rating(iVetMWe):6.iiPIaximum Dependable Capacity(GrossSIWe):7.maximumDependable Capacity(VietMWe):8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted.
: 5. Design Electrical Rating (Net MWe):          693
IfAny(NetMWe):IO.ReasonsForRestrictions, lfAny:'ThisMonthYr.to-DateCumulative 744.060840.05111.044615.93788.116.31.2o42689610947447272.670.56.80.43.0II.HoursInReporting Period12.NumberOfHoursReactorWasCritical744.0l3.ReactorReserveShutdownHours14.HoursGenerator On-LineIS.UnitReserveShutdownHours-0-12.3Ig.NetElectrical EnergyGenerated (MWH)2366113l9.UnitServiceFactor20.UnitAvailability Factor100.022.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate-0-4.Shutdowns Scheduled OverNext6Months(Type,Date,andDurationofEach):Reeinmaintenance andinspections
: 6. Lblaximum Dependable Capacity (Gross MWe):
-Nov.91980-Jan.101981.25.IfShutDownAtEndOfReportPeriod.Estimated DateofStartup.'6.
: 7. Maximum Dependable Capacity (Net MWe):
UnitsInTestStatus(PriortoCommercial Operation):
: 8. If Changes Occur in Capacity Ratings (Items Number  3  Through 7) Since Last Report. Give Reasons:
ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (oj77)
: 9. Power'Level To Which Restricted, If Any (Net MWe):
UNITSIIUTDO)VNS ANI)PO'iVERREI)UCTIONS I)OCKETNO.REPORThlONTIIiVii.l)ateCI~AoIoo.)~C/lLtccnsccEventRepiwt>o4l~Aio~oCauseEr.Corrective ActionloIIcvcntI(ecurlcncc 80-07-30BN/AHAVAI.VEXLoadreduction toperformperiodictestofturbinemainsteamstop,reheatstop,andreheatintercept valves.(Non-nuclear system)II':ForcedS:Scbcdulcil I'>/77)Reason:A.l!quipu)ent Failure(Explain)
: 10. Reasons For Restrictions, lf Any'his Month            Yr. to-Date            Cumulative I I. Hours In Reporting Period                                                                      67  112.6
B.hlaiiileiiance orTest.(-Reflieliilg I)ltegiilaiory Rcslfti;lion I:.Operali)r Trainingk.LtcciiscExainiiialion I"Ad))III)Ist ralIvcGOperation JlL'irI>r(Explain)
: 12. Number    Of Hours Reactor Was Critical                744.                                     51  505.2
IIOilier(Lxplaui) 3Method:I.hla>>ual 2.hlanual Scram.3Ault)IAJtiC SCrani.4.Oilier(llxplain) llxliibit G-Instructions I)rIri'pJrJlii)nolDataI:))trySlieclsI'orl.icensee EvcolReport(LER)File(NUREG.016I)I'xliibll I-SaineSource AVERAGEDAILYUNITPOWERLEVELDOCKETNO.UNITCOMPLETED IIY<-T.ChilsonMONTHJULY1980DAYAVERAGEDAILYPOWERLEVEL(MWe-iVet)
: 13. Reactor Reserve Shutdown Hours                                                                213.3
I767733658791DAYAVERAGEDAILYPOWERLEVEL(il(We.iVe t)790l7l878930796788IOl315l6INSTRUCTIONS 7167897937917337827911334'75163S59303lNOTE:79379779776792793795Aveagedailypowerlevelgreaterthan777NWeduetocoolercondenser coolingwater.Onthisformat.listtheaverailedailyunitpowerlevelinMWe.Netforeachdaytnthereportintt tnonth.Coittpute tothenearestwholeate(Iawat
: 14. Hours Generator On-Line                                737.0              4  071.6              49 761.7 IS. Unit Reserve Shutdown Hours                                                                      121.8
: t.
'6. Gross Thermal Energy Generated (MWH)             1 612 271              8 797 278            100 265 912
'00 OPERATING DATAREPORTOPERATING STATUSl.UnitName:St.LucieUnitNo.12.Reporting Period:3.LicensedThermalPower(MW:):25604.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NetMWe):26.tglaximum Dependable Capacity(GrossagWe):7.MaximumDependable Capacity(NetMWe):850822777DOCKETNO.DATE~~80COMPLETED BY~~~sonTELEPHONE
                                                                  <'JL                                31 852 845 47    164                                30 148 198
~~~3824Notes-Unitoperatedatapproxiataeely 100%R.P.,'ezceptforloadreduction ofJuly2-3,1980.8.IfChangesOccurinCapacityRatings(Itemsltlumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted.
: 19. Unit Service Factor                                                                                    74.1
IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonth11.HoursInReporting Period12.NumberOfHoursReactorWasCritical744.013.ReactorReserveShutdownHours-0-14.HoursGenerator On.LineIS.UnitReserveShutdownHoursit.GrataElectrical EnergyGenerated (gtWH)18.NetElectrical EnergyGenerated (MWH)57953119.UnitServiceFactor100.020.UnitAvailability Factor100.021.UnitCapacityFactor(UsingMDCNet)100.222.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6i4Ionths(Type.
: 20. Unit Availability Factor                                  99.1                  79.7                  74.3 68.0
Date,andDurationofYr.-to-Date
: 22. Unit Capacity Factor (Using DER Net)                                                                   64.8
'11.03280.2-0-25239583562.462.460.358.413.2ch)eCumulative 3I655.024789.9129.5248.32.0188447501772373175.976.072.169.86.525.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
: 23. Unit Forced Outage Rate                                    0.9                    1.4                          '.5
ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION UNITSIIUTI)0'IVNS ANDPOIVERRE!)(ICTIONS l)OCKETNO.UNITNAhIESt.Lucie0I.No.l*Ni).l)alcr)IAQLlcc))sec EventRcport>CauseEcCurreclive ActionloPreventRecurrc>>ce 1080-07-02-G-N/AFILTERLoadreduction Loapproximately 50%R.F.tocleancondensate pun)psuctionst:rainers..
: 24. Shutdowns Scheduled Over Next 6 Months IType. Date. and Duration of Each I:
(Non-nuclear system)I':Io)cedS:Scl)cduled Reason:A-L'Iluipment Failure(Explain)
Steam Generator Tube Tnsoection Program Oct. 5 Hov. 1,                           1980.
Ithlaintenance nrTest~C-Ref)li)t',l).)let,ulatory Restriction I.Opelalol' ran))l)g8cLicenseI:xan)u)i)lion
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
'F.Administrative G.Ot>erational E)rur(Expl>>in)
: 26. Units In Test Status (Prior to Commercial Operation):                         Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 )
IlOll)ertExplain)hlelhod:I4lanual2h4nualSera)n.3Au)on>atic Sera>>).4Oll)cf(Lxplau))
 
4I.xl)ibit G-Instructions II)rIrcpafall)nl olDataLnlrySl)cutsforLicenseeEventReport(I.ER)File(NUR-EGf>I)Exl)ibilI-Sa)ncSource P.O.BOX5291GO,'IAiiII, FL33152FLOAIOAPOWER5LIGHTCOMPANYAugust10,1980OfficeozManagement Information andProgramControlsU.S.NuclearRegulatory Commission Washington, D.C.20555Gentlemen:
UNIT SIIUTDOIVNS AND POPOVER REDUCTIONS REPOR.I h(ONTII JUI.Y      1980                    COhlPLETED UY a~         2-   2 L
AttachedaretheJuly,1980,OpeatingSummaryReportszorTurkeyPointUnitNos.3and4andSt.LucieUnitNo.1.Verytrulyyours,A.D.Schmidt.VicePresident PowerResources VTC/DDCcc:Nr.JamesP.0"ReillyRobertLowenstein, EsquirePBOPLB...
o Q  ~
SBRVI'VGP"=C~LB SUMMARYOFOPERATiNG EXPERiENCE DOCKETNO'0-250UNITTurkeyPointUnitNo.3DATEAugust10,1980COMPLETED BYV.T..ChilsonREPORTMONTHJULY,1980TELEPHONE (305)552-3824UnitNo.3operatedatapproximately 100%R.P.,exceptforoutageof.July8-9,1980.Referto"UnitShutdowns andPowerReductions" sectionofJuly,1980,Operating StatusReport=oradditional infor-mation.MajorSaety-related maintenance activities performed duringthemonthincluded:
t Llccf<sec                                        Cause    Sc Coffel:tive Nii.
inspections'nd reauirements of'EBulletins andNUREG-0578 are'ontinuing.
4l  4J      o u Dale                      ~ A Evc>>l        ~ n                                        Acliu>> to u
FloridaPower6LightCompanycommitments forNUREG-0578 implementation arecontinuing.
Repi)fl )<                o                      Pieveol Rccuffcoce
Refertocorrespondence betweenFPLandNRCforad-ditionalinformation.
                                                ~  <I) 80-07-08            7.0                              N/A                    HOTORX      Unit No. 3  was removed from                service due to low  oil level in            reactor coolant  pump  motor        -No. 38. Cor-rective actions included adding                  oil.
SUMMARYOFOPERATlViG EXPERIENCE DOCKETNO.50-251UNITTurkeyPointUnitNo.4DATEAuust10,1980COMPLETED BYV.T.ChilsonREPORTi~!ONTHJULY,1980TELEPHONE (305)552-3824Unit,No.4operatedatapproximately 100%R.P.,exceptforloadreduction ofJuly30-31,1980.Referto"Unit.Shutdowns andPowerReductions" sectionoftheJuly,1980,Operating StatusReportforadditional infor-mation.MajorSafety-related maintenance activities performed duringthemonthincluded:
(Nuclear system) 3                                  4 I 'ofced          Reasoo:                                                  hletl<od:                            Exl)ibil G - Instructions S; Sclicd<<led     A-EII>>ipo<e>>t Failure (Explain)                         I-hlaoual                            lof I (cpafalloo ol Data U.hlaiote<uioce or Test ~                               2.hlaoual Scram.                      Eolry Sl)eels I'oi Liccosee
inspections andrequirements foZEBulletins andNUREG-0578 inprogress.
( -Rct'ucli>>I,                                           3-Auloo<at <c Serio)<.               Event Repi)rl (I.ER) File (NURI!G-D.RCII>>lalo<y Rcslrlclloo                               4-Otl<er (Lxplalo)                    OI6))
Florida,Power&LightCompanycommitments forNUREG-0578 implementation arecontinuing.
I: 0pcfalo< Tfalolog k. Llccosi: I:xJ>>ll>>JI<o>>
Refertocorrespondence betweenFPLandNRCforad-ditionalinformation.
I'.Adioioislralive G.Operalio>>al Lrrur (lixplai<i)                                                               Ex l lib it I - Saute  Source (I/77)                I I.OII<cf (Expl J>><)
SUMMARYOFOPERATiNG EXPERiENCE DOCKETNO.50-335UNiTSt.LucieUnitNo.1DATEA'uust10,.1980COMPLETED BYV.T.Chilsc~nTELEPHONE (305)552-3824REPORTMONTHJULY1980Unitoperatedatapproximately 100%R.P.,exceptforloadrec;uction ofJuly2-3,1980.Referto"UnitShutdowns andPowerReductioris" sectionoftheJuly,1980,Operating StatusReportforadditional inf'ormation.
 
MajorSafety-related maintenance activities peformedduingthemonthincluded:
0      AVERAGE DAlLY UNIT POWER LEVEL DOCKET iVO. 50        251 Turkey. Point IUI!t .
inspections andreauirements ofiEBulletins andNUREG-0578 arecontinuing.
TELEPHONE MONTH            JULY        1980 DAY        AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER LEVEL
FloridaPower&LightCom.-.,any commitments forNUREG-0578 implementation arecontinuing:
                        !MWe Net)                                                   (i'e-Net )
Refertocorrespondence betweenFPLandNRCforad-ditionalinformation.
I                       640                                                        642 649                                l8                      647 645                                l9                      647 644                                20                      647 644                                2I                      642 646                                22 641                                23                      645 641                                24                      643 641                                25                      638 lp                        641                                                        631 636                                                        629 633                                28                      629 l3                            4                              79                      631 636                                30 IS                        635                                31                      591
!6                        638 INSTRUCTIONS On this form>>a. list the average daily unit power!evel in MWe Net for each day i>> the reporting tnonth. Cot>>pote to the nearest whole ...egawat!.
(o lii)
 
OPERATING DATA REPORT DOCKET NO.
DATE  4~~~80 COMPLETED BY     ~~hi3.son TELEPHONE     ~05      552-382E OPERATING STATUS Turkev Point Unit No. 4                      Notes-  Unit    No. 4 operated        at I. Unit Name:                                                            approximately        100% R.P.,
: 2. Reporting Period:                   a except    for  load reduction
: 3. Licensed Thermai Power (MWt):                                         of July 30-31, 1980.
: 4. iVameplate Rating (Gross iPIWe):             7 0 S. Design Electrical Rating (iVet MWe):
: 6. iiPIaximum Dependable Capacity (Gross SIWe):
: 7. maximum Dependable Capacity (Viet MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):
IO. Reasons For Restrictions, lf Any:
This Month            Yr. to-Date          Cumulative I I. Hours In Reporting Period                              744. 0            5  111.0              60 840.0
: 12. Number    Of Hours Reactor    Was Critical              744.0              3  788.1            44 615.9 l3. Reactor    Reserve Shutdown Hours                                                                      1  6.
: 14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours                                                  12.3                    31.2 o  4 Ig. Net Electrical Energy Generated (MWH)                   474 472            2  366 113            26 896 109 l9. Unit Service Factor
: 20. Unit Availability Factor                                100.0                  72.6                    70.5
: 22. Unit Capacity Factor (Using DER Net)                                                                     6  .8
: 23. Unit Forced Outage Rate                                                        0.4                    3.0
: 4. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Re e in          maintenance and inspections  Nov. 9 1980  Jan.                         10  1981.
: 25. If Shut Down At End Of Report Period. Estimated Date of    Startup.'6.
Units In Test Status (Prior to Commercial Operation):                       Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (o j77)
 
I)OCKET NO.
UNIT SIIUTDO)VNS ANI) PO'iVER REI)UCTIONS REPORT hlONTII I
i CI      o                                                              Cause    Er. Corrective o    .)       Ltccnscc    o  4l      o ~
iVii.         l)ate                      ~ A                    Event      ~ A                                        Action lo o                    Repiwt >                                       I Icvcnt I(ecurlcncc o
                                                    ~ C/l 80-07-30                        B                      N/A        HA        VAI.VEX    Load  reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system)
I                                                                          3 I': Forced        Reason:                                                Method:                              llxliibitG - Instructions S: Scbcdulcil     A.l!quipu)ent Failure (Explain)                         I.hla>>ual                            I )r I ri'pJr Jlii)n ol Data B.hlaiiileiiance or Test .                              2.hlanual Scram.                       I:))try Sliecls I'or l.icensee
( -Reflieliilg                                          3 Ault)IAJtiC SCrani.                 Evcol Report (LER) File (NUREG.
I) ltegiilaiory Rcslfti;lion                            4.Oilier (llxplain)                  016I )
I:.Operali)r Training k. Ltcciisc Exainiiialion I "Ad))III)IstralIvc G Operation Jl L'irI>r (Explain)                                                              I'xliibll I - Saine  Source I'>/77)                I I Oilier (Lxplaui)
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT COMPLETED IIY        <- T. Chilson MONTH                JULY        1980 DAY        AVERAGE DAILYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL (MWe-iVet)                                                   (il(We.iVe t )
I                        767                                    l7                      790 733                                    l8 658                                                            789 791                                  30 796                                                            788 13 716                                  34 789                                  '75                      793 IO                                                              16                        797 793                                                            797 3S                        7   6 l3                        791                                  59                        792 733                                  30                      793 15                        782                                  3l                        795 l6                        791                                  NOTE:       Ave age        daily power level greater than 777 NWe due            to cooler condenser cooling water.
INSTRUCTIONS On this format. list the averaile daily unit power level in MWe.Net for each day tn the reportintt tnonth. Coittpute to the nearest whole ate(Iawat t.
 
'0 0 OPERATING DATA REPORT DOCKET NO.
DATE COMPLETED BY
                                                                                                          ~~80
                                                                                                          ~~~son TELEPHONE    ~~~3824 OPERATING STATUS St. Lucie Unit No.         1                  Notes - Unit operated at
: l. Unit Name:
approxiataeely 100% R.P.,
: 2. Reporting Period:                                                      'ezcept for load reduction
: 3. Licensed Thermal Power (MW:):                2560 850 of July 2-3, 1980.
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):              2
: 6. tglaximum Dependable Capacity (Gross agWe):            822
: 7. Maximum Dependable Capacity (Net MWe):                777
: 8. If Changes Occur in Capacity Ratings (Items ltlumber 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Yr.-to-Date            Cumulative
: 11. Hours In Reporting Period                                                  '11.0              3I 655.0
: 12. Number Of Hours Reactor Was      Critical              744.0              3  280.2            24 789.9
: 13. Reactor Reserve Shutdown Hours                                                              129.5
: 14. Hours Generator On. Line                                                                        24      8.
IS. Unit Reserve Shutdown Hours                                                                            32.0 it. Grata Electrical Energy Generated (gtWH)                                           25        18 844 750
: 18. Net Electrical Energy Generated (MWH)                   579 531            2 395 835            17 723 731
: 19. Unit Service Factor                                    100. 0                    62.4                  75.9
: 20. Unit Availability Factor                              100.0                    62.4                  76.0
: 21. Unit Capacity Factor (Using MDC Net)                 100.2                    60.3                  72.1
: 22. Unit Capacity Factor (Using DER Net)                                           58.4                  69.8
: 23. Unit Forced Outage Rate                                                        13. 2                  6.5
: 24. Shutdowns Scheduled Over Next 6 i4Ionths(Type. Date, and Duration of    ch) e
: 25. If Shut Down At End Of Report Period, Estimated Date    of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                        Forecast              Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
 
UNIT SIIUTI)0'IVNS AND POIVER RE!)(ICTIONS                  l)OCKET NO.
UNIT NAhIE        St. Lucie 0  I . No.l r)
Llcc))sec                                    Cause    Ec Curreclive Ni).          l)alc                          IA Event                                            Action lo Q
Rcport >                                     Prevent Recurrc>>ce 10          80-07-02            -G-                                N/A              FILTER    Load  reduction      Lo  approximately 50%  R.F . to clean condensate            pun)p suction st:rainers..         (Non-nuclear system) 4 I':  I o)ced          Reason:                                                hlelhod:                            I.xl)ibit G - Instructions S: Scl)cduled          A-L'Iluipment Failure (Explain)                        I 4lanual                          II)r I rcpafall)nl ol Data It hlaintenance nr Test ~                              2 h4nual Sera)n.                   Lnlry Sl)cuts for Licensee C-Ref) li)t',                                          3 Au)on>atic Sera>>).                Event Report (I.ER) File (NUR-l).)let,ulatory Restriction                            4 Oll)cf (Lxplau))                  EG f> I )
I .Opelalol' ran))l)g 8c License I:xan)u)i)lion
                      'F.Administrative G.Ot>erational E)rur (Expl>>in)                                                            Exl)ibil I - Sa)nc Source Il Oll)er t Explain)
 
P.O. BOX 5291GO,'IAiiII, FL 33152 FLOAIOA POWER 5 LIGHT COMPANY August 10, 1980 Office  oz Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the July, 1980,  Ope  ating Summary Reports zor Turkey Point Unit Nos. 3 and  4 and St. Lucie Unit No. 1.
Very  truly yours, A. D. Schmidt.
Vice President Power Resources VTC/DDC cc:  Nr. James P. 0"Reilly Robert Lowenstein, Esquire PBOPLB... SBRVI'VG P"=C~LB
 
==SUMMARY==
OF OPERATiNG EXPERiENCE DOCKET NO  '0   250 Turkey Point UNIT    Unit  No. 3 DATE    August 10, 1980 COMPLETED BY    V. T.. Chilson TELEPHONE    (305) 552-3824 REPORT MONTH      JULY, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of    .
July 8-9, 1980. Refer to "Unit Shutdowns and Power Reductions" section of July, 1980, Operating Status Report =or additional infor-mation.
Major  Sa ety-related maintenance activities performed during the    month included:
inspections'nd reauirements of'E Bulletins and NUREG-0578   are'ontinuing.
Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
 
==SUMMARY==
OF OPERATlViG EXPERIENCE DOCKET NO.     50 251 Turkey Point UNIT      Unit No. 4 DATE      Au ust 10, 1980 COMPLETED BY      V. T. Chilson TELEPHONE      (305) 552-3824 REPORT i~!ONTH    JULY, 1980 Unit, No. 4 operated at approximately 100% R.P., except for load reduction of July 30-31, 1980. Refer to "Unit. Shutdowns and Power Reductions" section of the July,   1980, Operating Status Report for additional infor-mation.
Major Safety-related maintenance     activities performed during the month included:
inspections and requirements  fo  ZE Bulletins and NUREG-0578 in progress.
Florida, Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
 
==SUMMARY==
OF OPERATiNG EXPERiENCE DOCKET NO. 50 - 335 St. Lucie UNiT      Unit No. 1 DATE      A'u ust 10,   .1980 COMPLETED BY        V. T. Chilsc~n TELEPHONE      (305) 552- 3824 REPORT MONTH      JULY  1980 Unit operated at approximately 100% R.P., except for load rec;uction of July 2-3, 1980. Refer to "Unit Shutdowns and Power Reductioris"           section of the July, 1980, Operating Status Report for        additional  inf'ormation.
Major Safety-related maintenance activities pe formed du ing the month included:
inspections and reauirements of iE Bulletins and NUREG-0578 are continuing.
Florida  Power &  Light Com.-.,any commitments  for NUREG-0578  implementation are continuing:        Refer to correspondence  between FPL and    NRC  for ad-ditional information.
 
!}}
!}}

Latest revision as of 15:06, 4 February 2020

Monthly Operating Repts for Jul 1980
ML17208A904
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 08/10/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A903 List:
References
NUDOCS 8008180391
Download: ML17208A904 (15)


Text

AVERAGE DAILYUNIT POWER LEVEL DOCKET VO COMPLETED BY TELEPHONE Lllla=

h(ONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net) (MWe->%et)

I 645 17 647 650 l8 652 654 20 654 647 655 646 653 642 13 651 570 24 649 442 95 646 IO 16 638 634 7't 640 2g l3 637 19 645 30 IS 640 l6 645 INSTRUCTIONS On this format, list the avera((c daily unit p>>wer!eve( in MWe.Net for each day in the rep<>rtintt n>>>nth. C>>>npute to the nearest whole megawat t.

('>r77 j 80081 8031/

OPERATING DATA REPOR'T DOCKET NO.

~1980 DATE hug COMPLETED BY TELEPHONE

~~son

~i~3824 OPERATING STATUS I. Unit Name Turke Point Unit No. 3 Notes-Unit No. 3 operated at

2. Reporting Period:

approzimately 100% R.P.,

3. Licensed Thermal Power (MWt):

ex'cept for outage of July 760 8-9, 1980.

4. Nameplate Rating (Gross a(We):
5. Design Electrical Rating (Net MWe): 693
6. Lblaximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power'Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, lf Any'his Month Yr. to-Date Cumulative I I. Hours In Reporting Period 67 112.6
12. Number Of Hours Reactor Was Critical 744. 51 505.2
13. Reactor Reserve Shutdown Hours 213.3
14. Hours Generator On-Line 737.0 4 071.6 49 761.7 IS. Unit Reserve Shutdown Hours 121.8

'6. Gross Thermal Energy Generated (MWH) 1 612 271 8 797 278 100 265 912

<'JL 31 852 845 47 164 30 148 198

19. Unit Service Factor 74.1
20. Unit Availability Factor 99.1 79.7 74.3 68.0
22. Unit Capacity Factor (Using DER Net) 64.8
23. Unit Forced Outage Rate 0.9 1.4 '.5
24. Shutdowns Scheduled Over Next 6 Months IType. Date. and Duration of Each I:

Steam Generator Tube Tnsoection Program Oct. 5 Hov. 1, 1980.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 )

UNIT SIIUTDOIVNS AND POPOVER REDUCTIONS REPOR.I h(ONTII JUI.Y 1980 COhlPLETED UY a~ 2- 2 L

o Q ~

t Llccf<sec Cause Sc Coffel:tive Nii.

4l 4J o u Dale ~ A Evc>>l ~ n Acliu>> to u

Repi)fl )< o Pieveol Rccuffcoce

~ <I) 80-07-08 7.0 N/A HOTORX Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor -No. 38. Cor-rective actions included adding oil.

(Nuclear system) 3 4 I 'ofced Reasoo: hletl<od: Exl)ibil G - Instructions S; Sclicd<<led A-EII>>ipo<e>>t Failure (Explain) I-hlaoual lof I (cpafalloo ol Data U.hlaiote<uioce or Test ~ 2.hlaoual Scram. Eolry Sl)eels I'oi Liccosee

( -Rct'ucli>>I, 3-Auloo<at <c Serio)<. Event Repi)rl (I.ER) File (NURI!G-D.RCII>>lalo<y Rcslrlclloo 4-Otl<er (Lxplalo) OI6))

I: 0pcfalo< Tfalolog k. Llccosi: I:xJ>>ll>>JI<o>>

I'.Adioioislralive G.Operalio>>al Lrrur (lixplai<i) Ex l lib it I - Saute Source (I/77) I I.OII<cf (Expl J>><)

0 AVERAGE DAlLY UNIT POWER LEVEL DOCKET iVO. 50 251 Turkey. Point IUI!t .

TELEPHONE MONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL

!MWe Net) (i'e-Net )

I 640 642 649 l8 647 645 l9 647 644 20 647 644 2I 642 646 22 641 23 645 641 24 643 641 25 638 lp 641 631 636 629 633 28 629 l3 4 79 631 636 30 IS 635 31 591

!6 638 INSTRUCTIONS On this form>>a. list the average daily unit power!evel in MWe Net for each day i>> the reporting tnonth. Cot>>pote to the nearest whole ...egawat!.

(o lii)

OPERATING DATA REPORT DOCKET NO.

DATE 4~~~80 COMPLETED BY ~~hi3.son TELEPHONE ~05 552-382E OPERATING STATUS Turkev Point Unit No. 4 Notes- Unit No. 4 operated at I. Unit Name: approximately 100% R.P.,

2. Reporting Period: a except for load reduction
3. Licensed Thermai Power (MWt): of July 30-31, 1980.
4. iVameplate Rating (Gross iPIWe): 7 0 S. Design Electrical Rating (iVet MWe):
6. iiPIaximum Dependable Capacity (Gross SIWe):
7. maximum Dependable Capacity (Viet MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):

IO. Reasons For Restrictions, lf Any:

This Month Yr. to-Date Cumulative I I. Hours In Reporting Period 744. 0 5 111.0 60 840.0

12. Number Of Hours Reactor Was Critical 744.0 3 788.1 44 615.9 l3. Reactor Reserve Shutdown Hours 1 6.
14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours 12.3 31.2 o 4 Ig. Net Electrical Energy Generated (MWH) 474 472 2 366 113 26 896 109 l9. Unit Service Factor
20. Unit Availability Factor 100.0 72.6 70.5
22. Unit Capacity Factor (Using DER Net) 6 .8
23. Unit Forced Outage Rate 0.4 3.0
4. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Re e in maintenance and inspections Nov. 9 1980 Jan. 10 1981.

25. If Shut Down At End Of Report Period. Estimated Date of Startup.'6.

Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (o j77)

I)OCKET NO.

UNIT SIIUTDO)VNS ANI) PO'iVER REI)UCTIONS REPORT hlONTII I

i CI o Cause Er. Corrective o .) Ltccnscc o 4l o ~

iVii. l)ate ~ A Event ~ A Action lo o Repiwt > I Icvcnt I(ecurlcncc o

~ C/l 80-07-30 B N/A HA VAI.VEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system)

I 3 I': Forced Reason: Method: llxliibitG - Instructions S: Scbcdulcil A.l!quipu)ent Failure (Explain) I.hla>>ual I )r I ri'pJr Jlii)n ol Data B.hlaiiileiiance or Test . 2.hlanual Scram. I:))try Sliecls I'or l.icensee

( -Reflieliilg 3 Ault)IAJtiC SCrani. Evcol Report (LER) File (NUREG.

I) ltegiilaiory Rcslfti;lion 4.Oilier (llxplain) 016I )

I:.Operali)r Training k. Ltcciisc Exainiiialion I "Ad))III)IstralIvc G Operation Jl L'irI>r (Explain) I'xliibll I - Saine Source I'>/77) I I Oilier (Lxplaui)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT COMPLETED IIY <- T. Chilson MONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-iVet) (il(We.iVe t )

I 767 l7 790 733 l8 658 789 791 30 796 788 13 716 34 789 '75 793 IO 16 797 793 797 3S 7 6 l3 791 59 792 733 30 793 15 782 3l 795 l6 791 NOTE: Ave age daily power level greater than 777 NWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the averaile daily unit power level in MWe.Net for each day tn the reportintt tnonth. Coittpute to the nearest whole ate(Iawat t.

'0 0 OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY

~~80

~~~son TELEPHONE ~~~3824 OPERATING STATUS St. Lucie Unit No. 1 Notes - Unit operated at

l. Unit Name:

approxiataeely 100% R.P.,

2. Reporting Period: 'ezcept for load reduction
3. Licensed Thermal Power (MW:): 2560 850 of July 2-3, 1980.
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 2
6. tglaximum Dependable Capacity (Gross agWe): 822
7. Maximum Dependable Capacity (Net MWe): 777
8. If Changes Occur in Capacity Ratings (Items ltlumber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period '11.0 3I 655.0
12. Number Of Hours Reactor Was Critical 744.0 3 280.2 24 789.9
13. Reactor Reserve Shutdown Hours 129.5
14. Hours Generator On. Line 24 8.

IS. Unit Reserve Shutdown Hours 32.0 it. Grata Electrical Energy Generated (gtWH) 25 18 844 750

18. Net Electrical Energy Generated (MWH) 579 531 2 395 835 17 723 731
19. Unit Service Factor 100. 0 62.4 75.9
20. Unit Availability Factor 100.0 62.4 76.0
21. Unit Capacity Factor (Using MDC Net) 100.2 60.3 72.1
22. Unit Capacity Factor (Using DER Net) 58.4 69.8
23. Unit Forced Outage Rate 13. 2 6.5
24. Shutdowns Scheduled Over Next 6 i4Ionths(Type. Date, and Duration of ch) e
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SIIUTI)0'IVNS AND POIVER RE!)(ICTIONS l)OCKET NO.

UNIT NAhIE St. Lucie 0 I . No.l r)

Llcc))sec Cause Ec Curreclive Ni). l)alc IA Event Action lo Q

Rcport > Prevent Recurrc>>ce 10 80-07-02 -G- N/A FILTER Load reduction Lo approximately 50% R.F . to clean condensate pun)p suction st:rainers.. (Non-nuclear system) 4 I': I o)ced Reason: hlelhod: I.xl)ibit G - Instructions S: Scl)cduled A-L'Iluipment Failure (Explain) I 4lanual II)r I rcpafall)nl ol Data It hlaintenance nr Test ~ 2 h4nual Sera)n. Lnlry Sl)cuts for Licensee C-Ref) li)t', 3 Au)on>atic Sera>>). Event Report (I.ER) File (NUR-l).)let,ulatory Restriction 4 Oll)cf (Lxplau)) EG f> I )

I .Opelalol' ran))l)g 8c License I:xan)u)i)lion

'F.Administrative G.Ot>erational E)rur (Expl>>in) Exl)ibil I - Sa)nc Source Il Oll)er t Explain)

P.O. BOX 5291GO,'IAiiII, FL 33152 FLOAIOA POWER 5 LIGHT COMPANY August 10, 1980 Office oz Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the July, 1980, Ope ating Summary Reports zor Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.

Very truly yours, A. D. Schmidt.

Vice President Power Resources VTC/DDC cc: Nr. James P. 0"Reilly Robert Lowenstein, Esquire PBOPLB... SBRVI'VG P"=C~LB

SUMMARY

OF OPERATiNG EXPERiENCE DOCKET NO '0 250 Turkey Point UNIT Unit No. 3 DATE August 10, 1980 COMPLETED BY V. T.. Chilson TELEPHONE (305) 552-3824 REPORT MONTH JULY, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of .

July 8-9, 1980. Refer to "Unit Shutdowns and Power Reductions" section of July, 1980, Operating Status Report =or additional infor-mation.

Major Sa ety-related maintenance activities performed during the month included:

inspections'nd reauirements of'E Bulletins and NUREG-0578 are'ontinuing.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATlViG EXPERIENCE DOCKET NO. 50 251 Turkey Point UNIT Unit No. 4 DATE Au ust 10, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT i~!ONTH JULY, 1980 Unit, No. 4 operated at approximately 100% R.P., except for load reduction of July 30-31, 1980. Refer to "Unit. Shutdowns and Power Reductions" section of the July, 1980, Operating Status Report for additional infor-mation.

Major Safety-related maintenance activities performed during the month included:

inspections and requirements fo ZE Bulletins and NUREG-0578 in progress.

Florida, Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATiNG EXPERiENCE DOCKET NO. 50 - 335 St. Lucie UNiT Unit No. 1 DATE A'u ust 10, .1980 COMPLETED BY V. T. Chilsc~n TELEPHONE (305) 552- 3824 REPORT MONTH JULY 1980 Unit operated at approximately 100% R.P., except for load rec;uction of July 2-3, 1980. Refer to "Unit Shutdowns and Power Reductioris" section of the July, 1980, Operating Status Report for additional inf'ormation.

Major Safety-related maintenance activities pe formed du ing the month included:

inspections and reauirements of iE Bulletins and NUREG-0578 are continuing.

Florida Power & Light Com.-.,any commitments for NUREG-0578 implementation are continuing: Refer to correspondence between FPL and NRC for ad-ditional information.

!