ML17285A540: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/08/1989
| issue date = 06/08/1989
| title = Forwards LER 89-015.Util Did Not Verbally Rept Event to NRC within 4-h Time Frame.Shift Manager Erred in Overlooking Notification Requirement
| title = Forwards LER 89-015.Util Did Not Verbally Rept Event to NRC within 4-h Time Frame.Shift Manager Erred in Overlooking Notification Requirement
| author name = POWERS C M
| author name = Powers C
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AC CELE P" TED D1SRBt'Tl ON DEMONSTRATION SYZTEk REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8906140252 DOC.DATE: 89/06/08 NOTARIZED:
{{#Wiki_filter:AC CELE P" TED       D1SRBt 'Tl ON                     DEMONSTRATION             SYZTEk REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION POWERS,C;M.
ACCESSION NBR:8906140252                       DOC.DATE: 89/06/08   NOTARIZED: NO           DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public                   Powe   05000397 AUTH. NAME         AUTHOR                 AFFILIATION POWERS,C;M.         Washington Public Power Supply System RECIP.NAME         RECIPIENT AFFILIATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Forwards LER 89-015.Util did not verbally report event to NRC within 4-h time frame.W/8 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), ncident Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 PD5 PD 1 1 COPIES LTTR ENCL 1 1 INTERNAL: ACRS MICHELSON ACRS WYLIE AEOD/DSP/TPAB DEDRO NRR/DEST/ADE 8H NRR/DEST/CEB 8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11" NUDOCS-ABSTRACT RES/DSIR/EIB RGN5 FILE 01 EXTERNAL: EG&G WILLIAMS,S L ST LOBBY WARD NRC PDR NSIC MURPHY,G.A 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 4 1 1 1 1 1 1 ACRS MOELLER AEOD/DOA AEOD/ROAB/DS P IRM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB 9H NRR/DEST/PSB 8D'NRR/DEST/SGB 8D NRR/DLPQ/PEB 10 NR~R PB 10~R~GPILE 02%ES7'D RAB FORD BLDG HOY,A LPDR NSIC MAYS,G'2 1 1 2 2 1 1 1 0 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 R I NAZE TO ALL"RIDS" RECIPIERIS'?EASE HELP US K)REDUCE TVBTE!02iTACI'IHE txx:UKWZ COVZROL D~MK, ROOM Pi-37 (EXi.20079)'IO ELXMZNMZ YOUR NME FBCH DZSTRIBVIIGN LISTS FOR DOCUMEÃIS YOU DON'T NEZDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 43 ENCL 42 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 June 8, 1989 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555  
Forwards LER     89-015.Util did not verbally report event to within 4-h time frame.
NRC W/8       ltr.
DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR                           ENCL     SIZE:
TITLE: 50.73/50.9 Licensee Event Report (LER),                       ncident Rpt, etc.
NOTES:
RECIPIENT                         COPIES          RECIPIENT          COPIES ID CODE/NAME                     LTTR ENCL     ID CODE/NAME     LTTR ENCL PD5 LA                                1     1   PD5 PD                 1   1 SAMWORTH,R                            1     1 INTERNAL: ACRS MICHELSON                         1    1    ACRS MOELLER                2 ACRS WYLIE                           1    1    AEOD/DOA                1    1 AEOD/DSP/TPAB                         1    1    AEOD/ROAB/DS P          2    2 DEDRO                                 1    1    IRM/DCTS/DAB            1    1 NRR/DEST/ADE 8H                       1    1    NRR/DEST/ADS    7E    1    0 NRR/DEST/CEB 8H                      1    1    NRR/DEST/ESB    8D    1    1 NRR/DEST/ICSB 7                      1    1    NRR/DEST/MEB    9H    1   1 NRR/DEST/MTB 9H                      1    1    NRR/DEST/PSB    8D     1    1 NRR/DEST/RSB 8E                      1    1  'NRR/DEST/SGB    8D     1    1 NRR/DLPQ/HFB 10                      1    1    NRR/DLPQ/PEB     10     1    1 NRR/DOEA/EAB 11"                      1    1    NR~R         PB 10     2    2 NUDOCS-ABSTRACT                      1    1  ~R~GPILE           02     1    1 RES/DSIR/EIB                          1    1    %ES7'D     RAB         1    1 RGN5    FILE 01                      1    1 EXTERNAL: EG&G WILLIAMS,S                        4    4    FORD BLDG HOY,A         1   1 L ST LOBBY WARD                      1     1   LPDR                    1   1             R NRC PDR                              1     1   NSIC MAYS,G            1   1 NSIC MURPHY,G.A                      1     1                                               I NAZE TO ALL "RIDS" RECIPIERIS'?EASE HELP US K) REDUCE TVBTE! 02iTACI'IHE txx:UKWZ COVZROL D~MK, ROOM Pi-37 (EXi . 20079) 'IO ELXMZNMZ YOUR NME FBCH DZSTRIBVIIGN LISTS FOR DOCUMEÃIS YOU DON'T NEZDf TOTAL NUMBER OF COPIES REQUIRED: LTTR                     43   ENCL   42
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No.     50-397 June 8, 1989 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 LICENSEE EVENT REPORT NO.89-015  
NUCLEAR PLANT NO. 2 LICENSEE EVENT REPORT NO.       89-015
 
==Dear  Sir:==


==Dear Sir:==
Transmitted herewith is Licensee Event Report No. 89-015 for the WNP-2 Plant.
Transmitted herewith is Licensee Event Report No.89-015 for the WNP-2 Plant.This report is submitted in response to the report requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.
This report is submitted in response to the report requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.
It should be noted that this event was not verbally reported to the NRC within the four-hour time frame required by 10CFR50.72 (the event time was 0315 hours on Hay 12, 1989).The Shift Hanager erred in overlooking the verbal notification requirement.
It should be noted that this event was not verbally reported to the NRC within the four-hour time frame required by 10CFR50.72 (the event time was 0315 hours on Hay 12,         1989). The Shift Hanager       erred in overlooking the verbal notification requirement. During subsequent review of this event, it was discovered that the four-hour report had not been made. Accordingly, the NRC was verbally notified of the event on Hay 12, 1989 at 1205 hours.
During subsequent review of this event, it was discovered that the four-hour report had not been made.Accordingly, the NRC was verbally notified of the event on Hay 12, 1989 at 1205 hours.Ver truly ou C.l.Powers (H/D 927H)WN-2 Plant Hanager CHP: 1 g  
Ver   truly   ou C.l . Powers (H/D 927H)
WN -2 Plant Hanager CHP: 1 g


==Enclosure:==
==Enclosure:==


Licensee Event Report No.89-015 cc: Hr.John B.Hartin, NRC-Region V Hr.C.J.Bosted, NRC Site (lV'D 901A)INPO Records Center-Atlanta, GA Hs.Dottie Sherman, ANI Hr.D.L.Williams, BPA (Yv'D 399)89061402=2 8~0608 PIER ADtiCK 0..000397 C, PDC}}
Licensee Event Report No. 89-015 cc:   Hr. John B. Hartin, NRC - Region V Hr. C.J. Bosted, NRC Site (lV'D 901A)
INPO Records Center -   Atlanta,   GA Hs. Dottie Sherman,   ANI Hr. D.L. Williams,     BPA (Yv'D 399) 89061402=2 8~0608 PIER   ADtiCK 0..000397 C,                   PDC}}

Latest revision as of 08:01, 4 February 2020

Forwards LER 89-015.Util Did Not Verbally Rept Event to NRC within 4-h Time Frame.Shift Manager Erred in Overlooking Notification Requirement
ML17285A540
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/08/1989
From: Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17285A541 List:
References
NUDOCS 8906140252
Download: ML17285A540 (2)


Text

AC CELE P" TED D1SRBt 'Tl ON DEMONSTRATION SYZTEk REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8906140252 DOC.DATE: 89/06/08 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION POWERS,C;M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Forwards LER 89-015.Util did not verbally report event to within 4-h time frame.

NRC W/8 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), ncident Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DS P 2 2 DEDRO 1 1 IRM/DCTS/DAB 1 1 NRR/DEST/ADE 8H 1 1 NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 'NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11" 1 1 NR~R PB 10 2 2 NUDOCS-ABSTRACT 1 1 ~R~GPILE 02 1 1 RES/DSIR/EIB 1 1 %ES7'D RAB 1 1 RGN5 FILE 01 1 1 EXTERNAL: EG&G WILLIAMS,S 4 4 FORD BLDG HOY,A 1 1 L ST LOBBY WARD 1 1 LPDR 1 1 R NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHY,G.A 1 1 I NAZE TO ALL "RIDS" RECIPIERIS'?EASE HELP US K) REDUCE TVBTE! 02iTACI'IHE txx:UKWZ COVZROL D~MK, ROOM Pi-37 (EXi . 20079) 'IO ELXMZNMZ YOUR NME FBCH DZSTRIBVIIGN LISTS FOR DOCUMEÃIS YOU DON'T NEZDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 43 ENCL 42

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 June 8, 1989 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

NUCLEAR PLANT NO. 2 LICENSEE EVENT REPORT NO.89-015

Dear Sir:

Transmitted herewith is Licensee Event Report No.89-015 for the WNP-2 Plant.

This report is submitted in response to the report requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.

It should be noted that this event was not verbally reported to the NRC within the four-hour time frame required by 10CFR50.72 (the event time was 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> on Hay 12, 1989). The Shift Hanager erred in overlooking the verbal notification requirement. During subsequent review of this event, it was discovered that the four-hour report had not been made. Accordingly, the NRC was verbally notified of the event on Hay 12, 1989 at 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />.

Ver truly ou C.l . Powers (H/D 927H)

WN -2 Plant Hanager CHP: 1 g

Enclosure:

Licensee Event Report No.89-015 cc: Hr. John B. Hartin, NRC - Region V Hr. C.J. Bosted, NRC Site (lV'D 901A)

INPO Records Center - Atlanta, GA Hs. Dottie Sherman, ANI Hr. D.L. Williams, BPA (Yv'D 399) 89061402=2 8~0608 PIER ADtiCK 0..000397 C, PDC