Forwards LER 89-015.Util Did Not Verbally Rept Event to NRC within 4-h Time Frame.Shift Manager Erred in Overlooking Notification Requirement
Date released: 06/27/2018 Download: ML17285A541


LER 89-015-00:on 890512,three-quarter-inch High Point Vent Line Failed During Performance of HPCS Sys Operability Procedure.Caused by Reverse Bending Fatigue Caused by Vibration.Design Change Implemented
ML17285A542
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/08/1989
From: Arbuckle J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
Download: ML17285A542 (4)
Forwards LER 89-015.Util Did Not Verbally Rept Event to NRC within 4-h Time Frame.Shift Manager Erred in Overlooking Notification Requirement
ML17285A540
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/08/1989
From: Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17285A540 (2)