Forwards LER 89-015.Util Did Not Verbally Rept Event to NRC within 4-h Time Frame.Shift Manager Erred in Overlooking Notification Requirement
ML17285A540
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/08/1989
From: Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17285A541 List:
References
NUDOCS 8906140252
Download: ML17285A540 (2)


Text

AC CELE P" TED D1SRBt 'Tl ON DEMONSTRATION SYZTEk REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8906140252 DOC.DATE: 89/06/08 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION POWERS,C;M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Forwards LER 89-015.Util did not verbally report event to within 4-h time frame.

NRC W/8 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), ncident Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DS P 2 2 DEDRO 1 1 IRM/DCTS/DAB 1 1 NRR/DEST/ADE 8H 1 1 NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 'NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11" 1 1 NR~R PB 10 2 2 NUDOCS-ABSTRACT 1 1 ~R~GPILE 02 1 1 RES/DSIR/EIB 1 1 %ES7'D RAB 1 1 RGN5 FILE 01 1 1 EXTERNAL: EG&G WILLIAMS,S 4 4 FORD BLDG HOY,A 1 1 L ST LOBBY WARD 1 1 LPDR 1 1 R NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHY,G.A 1 1 I NAZE TO ALL "RIDS" RECIPIERIS'?EASE HELP US K) REDUCE TVBTE! 02iTACI'IHE txx:UKWZ COVZROL D~MK, ROOM Pi-37 (EXi . 20079) 'IO ELXMZNMZ YOUR NME FBCH DZSTRIBVIIGN LISTS FOR DOCUMEÃIS YOU DON'T NEZDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 43 ENCL 42

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 June 8, 1989 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

NUCLEAR PLANT NO. 2 LICENSEE EVENT REPORT NO.89-015

Dear Sir:

Transmitted herewith is Licensee Event Report No.89-015 for the WNP-2 Plant.

This report is submitted in response to the report requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.

It should be noted that this event was not verbally reported to the NRC within the four-hour time frame required by 10CFR50.72 (the event time was 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> on Hay 12, 1989). The Shift Hanager erred in overlooking the verbal notification requirement. During subsequent review of this event, it was discovered that the four-hour report had not been made. Accordingly, the NRC was verbally notified of the event on Hay 12, 1989 at 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />.

Ver truly ou C.l . Powers (H/D 927H)

WN -2 Plant Hanager CHP: 1 g

Enclosure:

Licensee Event Report No.89-015 cc: Hr. John B. Hartin, NRC - Region V Hr. C.J. Bosted, NRC Site (lV'D 901A)

INPO Records Center - Atlanta, GA Hs. Dottie Sherman, ANI Hr. D.L. Williams, BPA (Yv'D 399) 89061402=2 8~0608 PIER ADtiCK 0..000397 C, PDC