ML17341A586: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/12/1981
| issue date = 10/12/1981
| title = Monthly Operating Repts for Sept 1981
| title = Monthly Operating Repts for Sept 1981
| author name = CHILSON V T
| author name = Chilson V
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:E AVEIIAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT    Unzt No. 3 DATE Oct 12 1981 COMPLETED IIY        V. T ~ Chi 1 son TELEPHONE        ~305) 552-3666 Se    tember        1981 DAY      AVERAGE DAILYPOWER LEVEL                              DAY      AVERAGE DAILYPOWER LEVEL (hfWe.Nct)                                                  (i>>IWe-Net) 17 IS 19 20 2l 22 23 24
                                                                      ')5 10                                                              26 27 2S I3                                                              29 l4                                                              30 l5 l6 INSTRUCTIONS On this format. list thc average daily unit p>>wcr.le~el in Mme-Net for each day in the,rcp<>rting tn>>nth. C>>mput<< to the nearest whole megawat t.
('r/771 8i iOi2 8ii0200204 05000250:          P'.
PDR ADOCK R                      I  IPDR
 
1
.1
 
OPERATING DATA REPORT DOCKET NO.
DATE  ~Ott. 1        1981
                                                                                        'COMPLETED BY    ~T.      Chllson TELEPHONE  ~~552-3666 OPERATING STATUS Turkey Point      Unit    No. 3                    Notes
: 1. Unit Name'eptember
: 2. Reporting Period:
1981                        Unit No. 3 remained out of seMice due to Steam            "
: 3. Licensed Thermal Power (MWt):                                        Generator Repair Propram
: 4. Nameplate Rating (Gross MWe):                                        (continued from previous
: 5. Design Electrical Rating (Net M We):
month)'.
IfChanges  Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions, lf Any:
This Month                Yr.-to-Date        Cumulative
'l l. Hours In Reporting Period                                720'. 0                6  '551.0        77  336.6
: 12. Number  Of Hours Reactor  Was Critical 1 '459.3          55  760.1
: 13. Reactor Reserve Shutdown Hours                                                    631.0              844.4 14., Hours Generator On-Line                                                      1 385.6.-        53 891.
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH) 980 415      34 69 ttt
: 18. Net Electrical Energy Generated (MWH)                      1 383                    916 408      32 825 89
: 19. Unit Service Factor                                                                      4.2              69.7
: 20. Unit Availability Factor                                                            24.2              69.8
: 21. Unit Capacity Factor (Using MDC Net)                                                21 '              66.0
: 22. Unit Capacity Factor (Using DER Net)                                                    20. 2              61.2
: 23. Unit Forced Outage Rate                                                                49.0                5.1
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
: 25. IfShut Down At End Of Report Period, Estimated Date      of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                          Forecast            Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
('t/77)
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                    DOCKET NO.
UNIT NAMF        Turke Point .Unit No. 3 DATE      Oct. 12 1981 COMPLETED Bp        V.T. Chilson I
CJ Licenscc                  CJ                Cause h. Corrective Vo.          nate                                        Event g CC                                                    Action to Report =                                    Prevent Recurrence 05          81-06-24          720.0      B    4                      HB      HTEXCH      Unzt No. 3 Steam Generator Repaa.r (F)        Program in progress (Continued from previous month)
F: Forced          Reason:                                        Method:                            Exhibit G - Instructions S: Scheduled      A-Equipment Failure (Explain)                  ! -hlanual                        for Preparation of Data B-h(aintenance or Test-                        2-Manual Scram.                    Entry Sheets I'or Licensee C-Refueling                                    3-Automatic Scram.                Event Report (LER) File (NUREG-D-Regulatory Restriction                        4.erin~Exp(ant Continuing        OI 6I )
E-Operator Training'icense Examination          5  Load Reduction F-Administrative                                9  Other      (Explain)
G-Operational Error (Explain)                                                      Exhibit I ~
Sante Source
('I/77)                II Other (Explairt)
 
4 AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
Unit  No      4 Oct. 12, 1981 COMPLETED BY V.T. Chilson TELEPHONE MONTH      Se    tember, 1981 DAY      AVERAGE DAILYPOWER LEVEL                                DAY        AVERAGE DA1LY POWER LEVEL (M We-Net )                                                  (MWe-Net)
I                        661                                    17                  663 663                                    18 604 661                                    19 342 664                                                        662 20 666                                  21 667 661                                  22                    669 661                                    23 669 665                                                        673 663                                  25                    679'82 661 10                                                                26 662                                                        683 662                                  28 680 662                                                        678 13                                                                29 678 14 661                                  30 15 661 664                                            NOTE:      Average daily power 16 level greater than 646 MWe due to cooler condenser cooling water.
INSTRUCTIONS On this for)r)at, list the average daily unit power level, in MWe-Net for each day in the reporting month. Compote to the nearest whole n)egawat t.
('1 /771
 
OPERATING DATA REPORT DOCKET NO.
DATE
                                                                                                  'COMPLETED BY TELEPHONE
                                                                                                                      ~~
V.T. Chilson
                                                                                                                      ~305 55 -3666 1981 OPERATING STATUS
: 1. Unit Name.
Turkey Point Unit No.                          4                  Notes
: 2. Reporting Period:
September 1981                                            Unit No. 4 operated at 2200                    approximately 100X R.P.
: 3. Licensed Thermal Power (MWt):
except    for    outage of
: 4. Nameplate Rating (Gross MWe):                                                        October 18-19, 1981.
: 5. Design Electrical Rating (Net MWe):
80
: 6. Maximum Dependable Capacity (Gross MWe}:
7 .Mxa imum De p endable Ca p acit y(Net M We:              )
: 8. If Changes'Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted.                  If'Any (Net MWe):
: 10. Reasons For Restrictions,  lf  Any:
This Month            Yr.-to-Date          Cumulative
: 11. Hours In Reporting Period                                                720.0            6  551.0          71 064.0
: 12. Number  Of Hours'Reactor  Was          Critical                        ,711. 4          5  935.4          52 948.2
: 13. Reactor Reserve Shutdown Hours 166.6
: 14. Hours Generator On-Line                                                                          4                127.6
: 15. Unit Reserve Shutdown Hours                                                                                31.2
: 16. Gross Thermal Energy Ge'nerated (MWH)                                  1 555 100          12 763 999          107 145 354
: 17. Gross Electrical Energy Generated (MWH)                                  495 200          4 081 344          34 054 517
: 18. Net Electrical Energy Generated (MWH)                                                      3 876 482          32 260 502
: 19. Unit Service Factor                                                        98. 6              i89. 3              71.9
: 20. Unit Availability Factor
                                                                                                    '89. 3              72.0
: 21. Unit Capacity Factor (Using MDC Net)                                        98.2                88.8              70.5
'22. Unit Capacity Factor (Using DER Net)                                                            '85. 4              65.5
: 23. Unit Forced Outage, Rate                                                                        3.8                3.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration                    of Each):
Scheduled      refuelin maintenance,                          and  ins ection Oct.        25  Dec.      26, 1981
: 25. If Shut Down At End'Of Report Period, Fstimated Date                    of Startup:
: 26. Units ln Test Status (Prior to Commercial Operation):                                      Forecast            Achieved INIT!AL CRITICALITY INITIAL ELECTRICITY'OMMERCIAL OPERATION
(')/77 )
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                  DOCKET NO.
urke Poin t Uni t No. 4 DATF      Oct. 12 19 1 I
Lice nscc                                  Cause  & Corrective Dale                                        Event                                          Action to Rcport =                                    Prcvcnt Recurrence
                                              ~ Ch 12          81-10-18          10. 1.      B                          HB        VALVOP    Unit  was removed from        service to (D) repair instrument air leaks on both pressurizer spray control valves.
Corrective actions'ncluded re-torquing valve operator flange bolts.
(Nuclear system) 3                              4 F: Forced          Reason:                                          Method:                          Exhibit G ~ Instructions S: Scheduled        A-Equipment Failure (Explain)                    l hlanual                        for Preparation of Data B-Maintenance oi Test .                          2.Manual Scram.                  Entry Sheets for Licensee C-Refueling                                      3-Automatic Scrag).              Event Report (LER) File lNUREG-D.Regulatory Restriction                        4.~t;~~t~t) Continuing 5-Load Reduction OI 6I )
E.Operator Training'icense Examination F-Ad mi nist rat ive                            9-Other (Explain)            5 G.Operational Error (Explain)                                                    Exhibit I ~
Sante Source H-Other (Explain)
 
0 h
 
II"'
Oct. 12, 1981 COMPLETED BY        >- T. Chi 1 son TELEPHONE MONTH        Se      tetttber      1981 DAY      AVERAGE DAILYPOWER LEVEL                                DAY      AVERAGE DAILYPOWER LEVEL (MWc-Net 3                                                    (MWe.Net )
768                                    I7 76(3                                    IS I9 777                                    20 776 775                                    22 779                                    23 45 IO                                                                26 28 99 I4                                                                30 IS 16                                                                          NOTE: Average            daily power level greater than 777 NWe due    to cooler condenser cooling water.
INSTRUCTIONS On this forn>at.'list the average daily unit power Icvt.'I in MNe-Net for each day in thc reporting tnonth. Contputc to the nearest whole mcgawat t.
(~)/77)
 
0 I
 
OPERATING DATA REPORT DOCKET NO.
COMPLETED BY TELEPHONE
                                                                                                      ~~i OATj Oc~.. DO, 1981
                                                                                                      ~30    ~-3666 OPERATING STATUS
: l. Unit Name:            St. Lucie    Unit  No. 1                    Notes Septem er,                                    Unit dpera't:ed at approxi-
: 2. Reporting Period:                                                    mately 100% RP        until
: 3. Licensed Thermal Power (MWt):                                        Sept. 8, 1981.
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
802 822
: 7. Maximum De p cndable Ca p acit y(Nct hIWe:)
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level Tn Which Restricted. If Any (Net hIWe):
: 10. Reasons For Restrictions, If Any:
This Month          Yr.-to.Date            Cumulative
: 11. Hours ln Reporting Period                                  720.0          6 '551.0              41 8Z9.0
'12. Number Of Hours Reactor Was Critical                      172 1          5  883.8              34  309.1
: 13. Reactor Reserve Shutdown Hours                              75.9                75: 9'              205.3
: 14. Hours Generator On-Line                                    172.1              882.3              33 513.4
: 15. Unit Reserve Shutdown Hours                                  0.0                0.0                  39.3
: 16. Gross Thermal Energy Ge'nerated (MWH)                      438 971      14 947 870              82 196 018
: 17. Gross Electrical Energy Generated (MWH)                    140 810        4 881 580            26 691 440
: 18. Net Electrical Energy Generated (hIWH)                    128 871        4 614 030            25 141 516
: 19. Unit Service Factor                                        23.9                89. 8                  80.0
: 20. Unit Availability Factor                                    23.9                89.8                  80.1
: 21. Unit Capacity Factor (Using MDC Net)                        23.0                90.6                  77.3
: 22. Unit Capacity Factor (Using DER Net)                        22.3                87.8'.7                74.9
: 23. Unit Forced Outage Rate                                    30.6                                        5.1
: 24. Shutdowns Scheduled Over Next 6 hlonths (Type, Date. and Duration of Each):
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:      November 15        1981
: 26. Units In Test Status (Prior to Commercial Operation):                      Forecast              Achieved IN ITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (1t/771
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                      DOCKET NO.
UN!T NAME      S t. Lucie Unit No. 1 DATE    Oct. 12  1981 REPORT MONTH  Sept. 1981 c I Liccn sec                                    Cause &, Correct ive Date                      l/I                Event                                            Action to J
Report =                                    Prevent Recurrence 05        81-10-08          75.9      A                                      GENERA      Unit trip caused by electric gener-(D)        ator protection system due to a fault on "C" phase winding.
Corrective actions included minor insulation repair, (Non-nuclear system) 06      81-10-11  S    472 0        C                              RC        FUELXX    Scheduled  refueling, maintenance, and inspections.
(Nuclear and non-nuclear systems)
F: Forced        Reason:                                            Method:                            Exhibit G - Instructions S: Schedu!ed      A.Equipment Failure (Explain)                      ! .Manual                          for Preparation of Data B.h>>a!ntenance or Test-                            2.Manual Scram.                    Entry Sheets for Licensee C-Refueling                                        3-Autontatic Scram.                Event Report (LER) File (NUREG.
D-Regulatory Restriction                          4-Qt>>m(Explain)-    Continuing      OI 6I )
E-Operator Training &. Liccnsc Exainination        5-Load Reduction F-Administ rat ivc                                  9-Other (Explain)              5 G.Operational Error (Explain)                                                          Exhibit I - Sante Source
('>/77)              l>>.Other (Explairr)
 
                                                                          ~yAlllg~
a FLORIOA POWER II LIGHT COMPANY October 12, 1981 Office of  Management Xnformati;on and Program Controls U. S. Nuclear Regulatory. Commission Washington, D. C. 20555 Gentlemen:
Re:  Turkey Point Units  3 6 4 St. Lucie 'Unit  1 Docket Nos. 50-250, 251, and 335 Attached are the September, 1981, Operating Summary Reports            for Turkey Point Units Nos. 3 and'      and St. Lucie Unit No. l.
Very  truly  yours, J.W. Williams,  Jr.
Director Nuclear Energy VTC/mbd cc:  Mr. -James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE
 
==SUMMARY==
OF OPERATXNG EXPERXENCE DOCKET NO.      50-250 Turkey Point Unit No. 3 DATE      October 12, 1981 COMPLETED BY    . V.T..Chilson TELEPHONE      (305) 552-3666 REPORT MONTH      Se  tember 1981 Unit No. 3 remained out of service due to Steam Generator Repair Program. Refer to "Unit Shutdowns and Power Reductions" section of September, 1981 Operating Status Report for additional information.
Major Safety-related maintenance    activities  performed during the month  included:
Inspections and requirements of IE      Bulletins and NUREG-0578 are continuing.
Florida Power a .Light Company commitments for NRUEG-0578  implementation are continuing. Refer.
to correspondence 'between FPL and NRC for additional information.
Steam Generator Repair Program in progress.
Decontamination of Steam .Generator Nos. 3A, 3B, and 3C in progress.
 
i5 II 4 II II
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50 253 Turkey...Paint UNIT    Unit  No. 4 DATE    October 12, 1981 COMPLETED BY TELEPHONE            5  2- 6 REPORT MONTH    Se  tember 1981 Unit No. 4 operated at approximately 100% R.P. except for outage of October 18-19, 1981. Refer to "Unit Shutdowns and Power Reductions" section'of September, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included;.
Inspections and requirements of IE Bulletins and NUREG-0578  in progress.
Florida  Power  6 Light  Company commitments  for  NUREG-0578 implementation are continuing;      Refer to correspondence between FPL and    NRC for additional information.
 
e 0 ~ .
f
'I
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.      50-335 St.'Lucie Unit  No. 1 DATE      October 12, 1981 COMPLETED BY    '.T. Chilson TELEPHONE      (305) 552-3666 REPORT MONTH    September  1981 r
Unit operated at approximately 100% R.P. until September 8; 1981.
Refer to "Unit Shutdowns and Power Reductions" section of September, 1981, Operating Status Report for additional information.
Major Safety-related maintenance      activities  performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578  in progress.
Florida  Power  &  Light  Company commitments  for NUREG-0578 implementation are continuing.        Refer to correspondence between FPL and    NRC for additional information.
f Removed  reactor vessel closure head, transferred fuel to spent fuel pool, and inspected reactor vessel internals.
                                    'I Inservice Inspection i''rogress.
 
  /
f P
0 S
j}}

Latest revision as of 22:56, 3 February 2020

Monthly Operating Repts for Sept 1981
ML17341A586
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 10/12/1981
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17341A585 List:
References
NUDOCS 8110200204
Download: ML17341A586 (20)


Text

E AVEIIAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT Unzt No. 3 DATE Oct 12 1981 COMPLETED IIY V. T ~ Chi 1 son TELEPHONE ~305) 552-3666 Se tember 1981 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (hfWe.Nct) (i>>IWe-Net) 17 IS 19 20 2l 22 23 24

')5 10 26 27 2S I3 29 l4 30 l5 l6 INSTRUCTIONS On this format. list thc average daily unit p>>wcr.le~el in Mme-Net for each day in the,rcp<>rting tn>>nth. C>>mput<< to the nearest whole megawat t.

('r/771 8i iOi2 8ii0200204 05000250: P'.

PDR ADOCK R I IPDR

1

.1

OPERATING DATA REPORT DOCKET NO.

DATE ~Ott. 1 1981

'COMPLETED BY ~T. Chllson TELEPHONE ~~552-3666 OPERATING STATUS Turkey Point Unit No. 3 Notes

1. Unit Name'eptember
2. Reporting Period:

1981 Unit No. 3 remained out of seMice due to Steam "

3. Licensed Thermal Power (MWt): Generator Repair Propram
4. Nameplate Rating (Gross MWe): (continued from previous
5. Design Electrical Rating (Net M We):

month)'.

IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, lf Any:

This Month Yr.-to-Date Cumulative

'l l. Hours In Reporting Period 720'. 0 6 '551.0 77 336.6

12. Number Of Hours Reactor Was Critical 1 '459.3 55 760.1
13. Reactor Reserve Shutdown Hours 631.0 844.4 14., Hours Generator On-Line 1 385.6.- 53 891.
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 980 415 34 69 ttt
18. Net Electrical Energy Generated (MWH) 1 383 916 408 32 825 89
19. Unit Service Factor 4.2 69.7
20. Unit Availability Factor 24.2 69.8
21. Unit Capacity Factor (Using MDC Net) 21 ' 66.0
22. Unit Capacity Factor (Using DER Net) 20. 2 61.2
23. Unit Forced Outage Rate 49.0 5.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

('t/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAMF Turke Point .Unit No. 3 DATE Oct. 12 1981 COMPLETED Bp V.T. Chilson I

CJ Licenscc CJ Cause h. Corrective Vo. nate Event g CC Action to Report = Prevent Recurrence 05 81-06-24 720.0 B 4 HB HTEXCH Unzt No. 3 Steam Generator Repaa.r (F) Program in progress (Continued from previous month)

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain)  ! -hlanual for Preparation of Data B-h(aintenance or Test- 2-Manual Scram. Entry Sheets I'or Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4.erin~Exp(ant Continuing OI 6I )

E-Operator Training'icense Examination 5 Load Reduction F-Administrative 9 Other (Explain)

G-Operational Error (Explain) Exhibit I ~

Sante Source

('I/77) II Other (Explairt)

4 AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

Unit No 4 Oct. 12, 1981 COMPLETED BY V.T. Chilson TELEPHONE MONTH Se tember, 1981 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DA1LY POWER LEVEL (M We-Net ) (MWe-Net)

I 661 17 663 663 18 604 661 19 342 664 662 20 666 21 667 661 22 669 661 23 669 665 673 663 25 679'82 661 10 26 662 683 662 28 680 662 678 13 29 678 14 661 30 15 661 664 NOTE: Average daily power 16 level greater than 646 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this for)r)at, list the average daily unit power level, in MWe-Net for each day in the reporting month. Compote to the nearest whole n)egawat t.

('1 /771

OPERATING DATA REPORT DOCKET NO.

DATE

'COMPLETED BY TELEPHONE

~~

V.T. Chilson

~305 55 -3666 1981 OPERATING STATUS

1. Unit Name.

Turkey Point Unit No. 4 Notes

2. Reporting Period:

September 1981 Unit No. 4 operated at 2200 approximately 100X R.P.

3. Licensed Thermal Power (MWt):

except for outage of

4. Nameplate Rating (Gross MWe): October 18-19, 1981.
5. Design Electrical Rating (Net MWe):

80

6. Maximum Dependable Capacity (Gross MWe}:

7 .Mxa imum De p endable Ca p acit y(Net M We: )

8. If Changes'Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If'Any (Net MWe):
10. Reasons For Restrictions, lf Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 720.0 6 551.0 71 064.0
12. Number Of Hours'Reactor Was Critical ,711. 4 5 935.4 52 948.2
13. Reactor Reserve Shutdown Hours 166.6
14. Hours Generator On-Line 4 127.6
15. Unit Reserve Shutdown Hours 31.2
16. Gross Thermal Energy Ge'nerated (MWH) 1 555 100 12 763 999 107 145 354
17. Gross Electrical Energy Generated (MWH) 495 200 4 081 344 34 054 517
18. Net Electrical Energy Generated (MWH) 3 876 482 32 260 502
19. Unit Service Factor 98. 6 i89. 3 71.9
20. Unit Availability Factor

'89. 3 72.0

21. Unit Capacity Factor (Using MDC Net) 98.2 88.8 70.5

'22. Unit Capacity Factor (Using DER Net) '85. 4 65.5

23. Unit Forced Outage, Rate 3.8 3.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Scheduled refuelin maintenance, and ins ection Oct. 25 Dec. 26, 1981

25. If Shut Down At End'Of Report Period, Fstimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INIT!AL CRITICALITY INITIAL ELECTRICITY'OMMERCIAL OPERATION

(')/77 )

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

urke Poin t Uni t No. 4 DATF Oct. 12 19 1 I

Lice nscc Cause & Corrective Dale Event Action to Rcport = Prcvcnt Recurrence

~ Ch 12 81-10-18 10. 1. B HB VALVOP Unit was removed from service to (D) repair instrument air leaks on both pressurizer spray control valves.

Corrective actions'ncluded re-torquing valve operator flange bolts.

(Nuclear system) 3 4 F: Forced Reason: Method: Exhibit G ~ Instructions S: Scheduled A-Equipment Failure (Explain) l hlanual for Preparation of Data B-Maintenance oi Test . 2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scrag). Event Report (LER) File lNUREG-D.Regulatory Restriction 4.~t;~~t~t) Continuing 5-Load Reduction OI 6I )

E.Operator Training'icense Examination F-Ad mi nist rat ive 9-Other (Explain) 5 G.Operational Error (Explain) Exhibit I ~

Sante Source H-Other (Explain)

0 h

II"'

Oct. 12, 1981 COMPLETED BY >- T. Chi 1 son TELEPHONE MONTH Se tetttber 1981 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWc-Net 3 (MWe.Net )

768 I7 76(3 IS I9 777 20 776 775 22 779 23 45 IO 26 28 99 I4 30 IS 16 NOTE: Average daily power level greater than 777 NWe due to cooler condenser cooling water.

INSTRUCTIONS On this forn>at.'list the average daily unit power Icvt.'I in MNe-Net for each day in thc reporting tnonth. Contputc to the nearest whole mcgawat t.

(~)/77)

0 I

OPERATING DATA REPORT DOCKET NO.

COMPLETED BY TELEPHONE

~~i OATj Oc~.. DO, 1981

~30 ~-3666 OPERATING STATUS

l. Unit Name: St. Lucie Unit No. 1 Notes Septem er, Unit dpera't:ed at approxi-
2. Reporting Period: mately 100% RP until
3. Licensed Thermal Power (MWt): Sept. 8, 1981.
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

802 822

7. Maximum De p cndable Ca p acit y(Nct hIWe:)
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level Tn Which Restricted. If Any (Net hIWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to.Date Cumulative

11. Hours ln Reporting Period 720.0 6 '551.0 41 8Z9.0

'12. Number Of Hours Reactor Was Critical 172 1 5 883.8 34 309.1

13. Reactor Reserve Shutdown Hours 75.9 75: 9' 205.3
14. Hours Generator On-Line 172.1 882.3 33 513.4
15. Unit Reserve Shutdown Hours 0.0 0.0 39.3
16. Gross Thermal Energy Ge'nerated (MWH) 438 971 14 947 870 82 196 018
17. Gross Electrical Energy Generated (MWH) 140 810 4 881 580 26 691 440
18. Net Electrical Energy Generated (hIWH) 128 871 4 614 030 25 141 516
19. Unit Service Factor 23.9 89. 8 80.0
20. Unit Availability Factor 23.9 89.8 80.1
21. Unit Capacity Factor (Using MDC Net) 23.0 90.6 77.3
22. Unit Capacity Factor (Using DER Net) 22.3 87.8'.7 74.9
23. Unit Forced Outage Rate 30.6 5.1
24. Shutdowns Scheduled Over Next 6 hlonths (Type, Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: November 15 1981
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved IN ITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (1t/771

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UN!T NAME S t. Lucie Unit No. 1 DATE Oct. 12 1981 REPORT MONTH Sept. 1981 c I Liccn sec Cause &, Correct ive Date l/I Event Action to J

Report = Prevent Recurrence 05 81-10-08 75.9 A GENERA Unit trip caused by electric gener-(D) ator protection system due to a fault on "C" phase winding.

Corrective actions included minor insulation repair, (Non-nuclear system) 06 81-10-11 S 472 0 C RC FUELXX Scheduled refueling, maintenance, and inspections.

(Nuclear and non-nuclear systems)

F: Forced Reason: Method: Exhibit G - Instructions S: Schedu!ed A.Equipment Failure (Explain)  ! .Manual for Preparation of Data B.h>>a!ntenance or Test- 2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Autontatic Scram. Event Report (LER) File (NUREG.

D-Regulatory Restriction 4-Qt>>m(Explain)- Continuing OI 6I )

E-Operator Training &. Liccnsc Exainination 5-Load Reduction F-Administ rat ivc 9-Other (Explain) 5 G.Operational Error (Explain) Exhibit I - Sante Source

('>/77) l>>.Other (Explairr)

~yAlllg~

a FLORIOA POWER II LIGHT COMPANY October 12, 1981 Office of Management Xnformati;on and Program Controls U. S. Nuclear Regulatory. Commission Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 6 4 St. Lucie 'Unit 1 Docket Nos. 50-250, 251, and 335 Attached are the September, 1981, Operating Summary Reports for Turkey Point Units Nos. 3 and' and St. Lucie Unit No. l.

Very truly yours, J.W. Williams, Jr.

Director Nuclear Energy VTC/mbd cc: Mr. -James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE

SUMMARY

OF OPERATXNG EXPERXENCE DOCKET NO. 50-250 Turkey Point Unit No. 3 DATE October 12, 1981 COMPLETED BY . V.T..Chilson TELEPHONE (305) 552-3666 REPORT MONTH Se tember 1981 Unit No. 3 remained out of service due to Steam Generator Repair Program. Refer to "Unit Shutdowns and Power Reductions" section of September, 1981 Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power a .Light Company commitments for NRUEG-0578 implementation are continuing. Refer.

to correspondence 'between FPL and NRC for additional information.

Steam Generator Repair Program in progress.

Decontamination of Steam .Generator Nos. 3A, 3B, and 3C in progress.

i5 II 4 II II

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 253 Turkey...Paint UNIT Unit No. 4 DATE October 12, 1981 COMPLETED BY TELEPHONE 5 2- 6 REPORT MONTH Se tember 1981 Unit No. 4 operated at approximately 100% R.P. except for outage of October 18-19, 1981. Refer to "Unit Shutdowns and Power Reductions" section'of September, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included;.

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing; Refer to correspondence between FPL and NRC for additional information.

e 0 ~ .

f

'I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 St.'Lucie Unit No. 1 DATE October 12, 1981 COMPLETED BY '.T. Chilson TELEPHONE (305) 552-3666 REPORT MONTH September 1981 r

Unit operated at approximately 100% R.P. until September 8; 1981.

Refer to "Unit Shutdowns and Power Reductions" section of September, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

f Removed reactor vessel closure head, transferred fuel to spent fuel pool, and inspected reactor vessel internals.

'I Inservice Inspection irogress.

/

f P

0 S

j