| issue date = 03/14/1983
| issue date = 03/14/1983
| title = Safety-related, Solid State Protection Sys Train B,Reactor Trip Breaker Uv Coil Functional Test.
| title = Safety-related, Solid State Protection Sys Train B,Reactor Trip Breaker Uv Coil Functional Test.
| author name = HEATON R S
| author name = Heaton R
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT TECHNICAL DEPARTMENT I&C PROCEDURE APPROVAL COVER SHEET SAFETY RELATED PROCEDURE:
{{#Wiki_filter:SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT TECHNICAL DEPARTMENT I&C                                                     SAFETY RELATED PROCEDURE APPROVAL COVER SHEET PROCEDURE:       lIC..,.18.1.011 SSPS TRAIN"B",REACTOR TRIP BREAKER UV COIL REMARKS:                 FUNCTIONAL TEST SQAE         I&C ENGR.                                 SORC                       GEN .MGR.* APPROVED REV.       SUBMITTED     REVIEWED       APPROVED                         REVIEWED                         SALEM OPS.         DATE 0      jJ j dA7+/--     &~Q~~                :i-"'-~
lIC..,.18.1.011 SSPS TRAIN"B",REACTOR TRIP BREAKER UV COIL REMARKS: FUNCTIONAL TEST
A-,,&-£~                              S:>-z.S-                     1/,/
* SQAE I&C ENGR. SORC GEN .MGR.* APPROVED REV. SUBMITTED REVIEWED APPROVED REVIEWED SALEM OPS. DATE jJ j dA7+/--
                                                                                                              ' /. ') :~-~t
S:>-z.S-...., 0 1/,/ / /y_ °?) .J 5 ' . ')
                                                                                                                        /y_ °?) .J 5 v                                             "/
v "/ *
    ,...----~--~
* 8303160543 830314 ------I PDR ADO K 05 ----c s 000272 PDR --., . .. *-.. . . . . . . .., ... ., .. .
8303160543 830314 PDR ADOcK 05 000272 s                 PDR I
SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C) F"uNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 1.0 PURPOSE 1.1 The purpose of this procedure is to verify the operability of the Reactor Trip Breaker under voltage (UV) coil from SSPS Train B.  
                                              -- ., . .. *- .. .. .. . -:~** . .., ~*- ... ., .. ***.-:-~ .


==2.0 REFERENCES==
SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)
F"uNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 1.0 PURPOSE 1.1  The purpose of this procedure is to verify the operability of the Reactor Trip Breaker under voltage (UV) coil from SSPS Train B.


2.1 Solid State Protection System Manual. 2.2 Wiring Diagrams:
==2.0  REFERENCES==
203688, 222885, 224305 3.0 PRECAUTIONS 3.1 Test conditions must be applied to only Train B. A reactor trip will occur if both trains have a general warning condition.
 
Therefore, it is extremely important that the doors to only-one train at a time are open, to preclude the introduction of tsst conditions into both trains. 3.2 *Test conditions may be applied to one train using its built-in testers, while the opposite train is used to maintain the plant protection and provide data to the tiplexers.
2.1 Solid State Protection System Manual.
If in the process of testing, malfunctions are detected, they can be isolated by carefully following the procedures in Section 6 of the Solid State Protection Manual. 3.3 This procedure must be completed in the sequence given to ensure successful completion.
2.2 Wiring Diagrams:                               203688, 222885, 224305 3.0 PRECAUTIONS 3.1 Test conditions must be applied to only Train B. A reactor trip will occur if both trains have a general warning condition. Therefore, it is extremely important that the doors to only-one train at a time are open, to preclude the introduction of tsst conditions into both trains.
4.0 LIMITATIONS AND ACTIONS 4.1 If, at any time during the performance of this test, there any reason to suspect that the test equipment being used may'* not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a standard.
3.2 *Test conditions may be applied to one train using its built-in testers, while the opposite train is used to maintain the plant protection and provide data to the demul-tiplexers. If in the process of testing, malfunctions are detected, they can be isolated by carefully following the procedures in Section 6 of the Solid State Protection Manual.
This shall be done prior to taking any other corrective action. 4.2 If, during the performance of this test, the "As Found" data. does not meet the requirements of the specified accuracy, the Job. Supervisor shall be notified immediately and IC-14.1.001 shall be performed.
3.3 This procedure must be completed in the sequence given to ensure successful completion.
lIC-18.1.011 1 Rev. 0 .,--.. -":'" __ .... ,,.... ... ,., ........ -. ---
4.0 LIMITATIONS AND ACTIONS 4.1 If, at any time during the performance of this test, there ~R any reason to suspect that the test equipment being used may'*
SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C) FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 4.0 LIMITATIONS AND ACTIONS (continued) 4.3 If, during the performance of this procedure, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately.
not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a standard. This shall be done prior to taking any other corrective action.
Exceptions to the required indication, due to plant conditions at the time of the test, may be made by the Job Supervisor.
4.2 If, during the performance of this test, the "As Found" data.
Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.
does not meet the requirements of the specified accuracy, the Job. Supervisor shall be notified immediately and IC-14.1.001 shall be performed.
4.4 An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective action taken. 5.0 TEST EQUIPMENT None Required 6.0 PREREQUISITES 6.1 The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 7.6. Supervisor 6.2 The Senior Shift Supervisor/Shift Supervisor has qranted permission to perform this procedure.
lIC-18.1.011                                                                     1     Rev. 0
Senior Shift Supervisor/shift Supervisor Date/Time 6.3 The Control Operator is aware of *all of the alarms and indications that will result from the performance of this procedure.
                      .,-- - ":'" __.... ,,.... ... ,.,........-. --- *~-* ~-**-*******
Control Operator 6.4 Quality Control shall be present for the performance of this procedure.
 
QC Engineer Date/Time aIC-18.1.011 2 Rev. 0 l . . -**--*.*.**\o--.-
SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)
....  
FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 4.0               LIMITATIONS AND ACTIONS                                                             (continued) 4.3               If, during the performance of this procedure, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately.                                                                               Exceptions to the required indication, due to plant conditions at the time of the test, may be made by the Job Supervisor. Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.
....  
4.4               An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective action taken.
****-*.-***  
5.0               TEST EQUIPMENT None Required 6.0               PREREQUISITES 6.1               The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 7.6.
-***:-*1*-.-*  
Supervisor 6.2               The Senior Shift Supervisor/Shift Supervisor has qranted permission to perform this procedure.
**; *****-**--***.*  
Senior Shift Supervisor/shift Supervisor                                                                                                             Date/Time 6.3               The Control Operator is aware of *all of the alarms and indications that will result from the performance of this procedure.
.... ,.. . ... -
Control Operator 6.4               Quality Control shall be present for the performance of this procedure.
... :***-**-****  
QC Engineer                                                                                                               Date/Time aIC-18.1.011                                                                                                             2                                                                           Rev. 0 l
.. . . * .
. . -**-- *.*.**\o--.-....---::,_~~-~q--.*-...~"'-.*.-,:-.**~.,..,.....~~------*-r--**-* ****-*.-*** - ***:-*1*-.-* .**:*-,,,~:**-*. **; *****-**--***.* ....,.. . ... - ;:**~*- ... :***-**-**** ..       . . *.
* SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C) FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 7.0 SYSTEM LINE-UP 7.1 The following conditions must be established and/or verified by the Control Operator.
                                                                                                                                                                                                            ~
7.1.1 Reactor Trip Bypass Breaker A is open and in the Racked Out position.
 
7.1.2 Safeguard actions which are being blocked by virtue of having been RESET from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present. The Safeguara actions involved are: 1. Containment
SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)
FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 7.0 SYSTEM LINE-UP 7.1 The following conditions must be established and/or verified by the Control Operator.
7.1.1 Reactor Trip Bypass Breaker A is open and in the Racked Out position.
7.1.2 Safeguard actions which are being blocked by virtue of having been RESET from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present. The Safeguara actions involved are:
: 1. Containment Spr~y
: 2. Phase A Isolation
: 2. Phase A Isolation
: 3. Phase B Isolation
: 3. Phase B Isolation
: 4. Feedwater Isolation
: 4. Feedwater Isolation
: 5. Containment Ventilation Isolation from Safety Injection signal Control Operator 8.0 INSTRUCTIONS 8.1 Verify the following Solid State Protection System Warnings Lamps are 8.1.1 General Warning Lamp -Train A 8.1.2 General Warning Lamp -Train B 8.2 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF. 8.2.l General Warning Lamp Train A 8.2.2 General Warning Lamp -Train B 8.3 Record UV Coil Voltage Meter Reading. Required 43 VDC +/- 2 VDC (when shutdown 0 VDC +/- 2 VDC) As Found 8.4 On the Output Relay Test Panel, place the Mode Selector Switch in the Test position
: 5. Containment Ventilation Isolation from Safety Injection signal Control Operator 8.0 INSTRUCTIONS                                               INITIP..LS 8.1 Verify the following Solid State Protection System Warnings Lamps are Off~
* 8.5 Verify the Operate Lamp is not lit. lIC-18.1.011 3 INITIP..LS Rev. 0
8.1.1   General Warning Lamp - Train A 8.1.2   General Warning Lamp - Train B 8.2 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.
*
8.2.l   General Warning Lamp   Train A 8.2.2   General Warning Lamp - Train B 8.3 Record UV Coil Voltage Meter Reading.
* SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C) FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 8.0 INSTRUCTIONS (continued) 8.6 Verify the General Warning Lamp is lit. 8.7 On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.
Required 43 VDC +/- 2 VDC (when shutdown 0 VDC +/- 2 VDC)     As Found 8.4 On the Output Relay Test Panel, place the Mode Selector Switch in the Test position *
8.8 Verify Reactor Trip Breaker B is CLOSED (if Reactor Trip Breaker is open have the Control Operator CLOSE Reactor Trip Breaker B) 8.9 Omit steps 8.10, 8.18 and 8.19 if Reactor is tripped. Tripped ------Operational  
* 8.5 Verify the Operate Lamp is not lit.
-------8.10 Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the is in position and its light is illuminated.
lIC-18.1.011                       3                           Rev. 0
INITIALS ***********************************************************************
 
CAUTION Reactor By-pass Breaker B must remain energized for the duration of the testing, otherwise a Reactor Trip will occur. ***********************************************************************
SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)
8.11 At the LOGIC TEST Panel place the LOGIC A Test Switch in Position 7. (Pressurizer High Pressure Trip). 8.12 In the MANUAL INPUT FUNCTION TEST portion of the LOGIC TEST PANEL, depress and hold any TWO pushbuttons.
FUNCTIONAL TEST
8.13 At the Control Board, verify that Reactor Trip Breaker B is OPEN. 8.14 Verify the UV COIL VOLTAGE meter.indicates approximately 0 VDC. 8.15 Release the pushbuttons depressed in Step* 8.12. 8.16 Place the LOGIC A Test Switch in the OFF position.
* 8.0 SSPS Train B, Reactor Trip Breaker UV Coil INSTRUCTIONS (continued)                                 INITIALS 8.6 Verify the General Warning Lamp is lit.
8.17 Have the Control Operator close the Reactor Trip Breaker B. 8.18 Have the Control Operator OPEN Reactor By-pass Breaker B. lIC-18.1.011 4 Rev. 0
8.7 On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.
* SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C) FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 8.0 INSTRUCTIONS (continued) 8.19 Have the Control Operator rack Out Reactor By-pass Breaker B. 8.20 Verify that the general warning test LED for SSPS Train B is extinguished in both Train A and Train B. 8.21 Have the Control Operator reinstate the FLUX TRIP MANUAL Blocks from Control Board. NOTE INITIALS The pushbutton must be pushed even when BEZEL block light is lit. (NO blocks can be applied if their permissives are not present, therefore, only those permitted will be set.) 8.21.1 Block Source Range -Train B pushed. 8.21.2 Block Intermediate Range -Train B pushed. 8.21.3 Block Power Range -Train B pushed. ***********************************************************************
8.8 Verify Reactor Trip Breaker B is CLOSED (if Reactor Trip Breaker is open have the Control Operator CLOSE Reactor Trip Breaker B) 8.9 Omit steps 8.10, 8.18 and 8.19 if Reactor is tripped.
CAUTION The Flux Trip Manual Blocks must be reinstated prior to placing the input error inhibit switch in the normal position.  
Tripped                   Operational 8.10 Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the break~r is in Op~rate position and its light is illuminated.
* ***********************************************************************
* CAUTION Reactor By-pass Breaker B must remain energized for the duration of the m~nual testing, otherwise a Reactor Trip will occur.
8.22 Place the MODE Selector switch in the OPERATE position.
8.11 At the LOGIC TEST Panel place the LOGIC A Test Switch in Position 7.   (Pressurizer High Pressure Trip).
8.12 In the MANUAL INPUT FUNCTION TEST portion of the LOGIC TEST PANEL, depress and hold any TWO pushbuttons.
8.13 At the Control Board, verify that Reactor Trip Breaker B is OPEN.
8.14 Verify the UV COIL VOLTAGE meter.indicates approximately 0 VDC.
8.15 Release the pushbuttons depressed in Step* 8.12.
8.16 Place the LOGIC A Test Switch in the OFF position.
8.17 Have the Control Operator close the Reactor Trip Breaker B.
8.18 Have the Control Operator OPEN Reactor By-pass Breaker B.
lIC-18.1.011                         4                         Rev. 0
 
SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)
FUNCTIONAL TEST
* 8.0 SSPS Train B, Reactor Trip Breaker UV Coil INSTRUCTIONS (continued)                                 INITIALS 8.19 Have the Control Operator rack Out Reactor By-pass Breaker B.
8.20 Verify that the general warning test LED for SSPS Train B is extinguished in both Train A and Train B.
8.21 Have the Control Operator reinstate the FLUX TRIP MANUAL Blocks from th~ Control Board.
NOTE The pushbutton must be pushed even when BEZEL block light is lit. (NO blocks can be applied if their permissives are not present, therefore, only those permitted will be set.)
8.21.1 Block Source Range - Train B pushed.
8.21.2 Block Intermediate Range - Train B pushed.
8.21.3 Block Power Range - Train B pushed.
CAUTION The Flux Trip Manual Blocks must be reinstated prior to placing the input error inhibit switch in the normal position.
* 8.22 Place the MODE Selector switch in the OPERATE position.
8.23 Actuate the following MANUAL BLOCKS using the pushbuttons on the Control Board. No blocks can be applied if their permissives are not present; therefore, only those permitted will be set.
8.23 Actuate the following MANUAL BLOCKS using the pushbuttons on the Control Board. No blocks can be applied if their permissives are not present; therefore, only those permitted will be set.
* 8.23.1 Pressurizer Safety Injection
* 8.23.1 Pressurizer Safety Injection
* Steamline Pressure Safety Injection.
* 8.23.~ Steamline Pressure Safety Injection.
lIC-18.1.011 5 Rev. 0
lIC-18.1.011                       5                           Rev. 0
* SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C) FUN.CTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil .. 8.0 INSTRUCTIONS (continued)
 
SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)
FUN.CTIONAL TEST
* 8.0 SSPS Train B, Reactor Trip Breaker UV Coil INSTRUCTIONS (continued)
NOTE INITIALS Safeguard actions which are being blocked by virtue of having been
NOTE INITIALS Safeguard actions which are being blocked by virtue of having been
* RESET from the Control Bezels will be re-initiated at this time if necessary logic signal is present. The safeguards actions involved are: a. Containment Spray b. Phase A Isolation
* RESET from the Control Bezels will be re-initiated at this time if necessary logic signal is present. The safeguards actions involved are:
: c. Phase B Isolation
: a.           Containment Spray
: d. Feedwater Isolation
: b.           Phase A Isolation
: e. Containment Ventilat.ion Isolation frorq Safety Injection Signal. Inform the Control Operator of this condition.
: c.           Phase B Isolation
: d.           Feedwater Isolation
: e.           Containment Ventilat.ion Isolation frorq Safety Injection Signal.
Inform the Control Operator of this condition.
Control Operator 8.24 Place the Input ERROR Inhibit switch in the NORMAL position.
Control Operator 8.24 Place the Input ERROR Inhibit switch in the NORMAL position.
8.25 Have the Control Operator reset all unwanted safeguards actions which were re-initiated as a result of this test. 8.26 If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short 2 and 6 on TDl and have the Control Operator depress S.I. Reset for Train.B. Remove jumper. Senior Shift Supervisor  
8.25 Have the Control Operator reset all unwanted safeguards actions which were re-initiated as a result of this test.
/Shift Supervi.sor 9.0 SYSTEM RETURN TO NORMAL 9.1 The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal. Senior Shift Supervisor/Shift Supervisor 1 I c-1 *9
8.26 If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short terminal~
2 and 6 on TDl and have the Control Operator depress S.I. Reset for Train.B.
Remove jumper.
Senior Shift Supervisor /Shift Supervi.sor 9.0     SYSTEM RETURN TO NORMAL 9.1       The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal.
Senior Shift Supervisor/Shift Supervisor 1 I c-1 *9
* 1
* 1
* o 11 6 Rev. 0  
* o 11                                                             6                                                             Rev. 0
*-* ----****:-*-*-:----
                        **~-*------------ *-* --- - ~--- ****:-*-*-:---- -** . --.--......
-** .. --.--...... ..
                                                                            ~-            *-***~:--* *~- . ---**---~-:-***~:- ... -*- **- . . .
... -*-**-...
 
SALEM GBNEP..ATING STATION TECHNICAL DEPARTMENT (I&C) FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 10.0 REMARKS w.o. I.O. ------------11 .. 0 COMPLETION 11.l Completed bv
SALEM GBNEP..ATING STATION TECHNICAL DEPARTMENT (I&C)
__ 11.2 Verified bv QC Enqineer DRte Time 11.3 Approved by
FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 10.0 REMARKS                   w.o. ------                   I.O.
__ lIC-18.1.011 END OF PROCEDURE FINAL PAGE 7 .. ... .  
11 .. 0 COMPLETION 11.l Completed bv
........ * -. Rev. 0 -*.-. .. -* -.. ,. . .. .. .. ... . .. **-. ---}}
                            ---=T~e-c~h-n~1~c-a-n-----~------~D~a~t-e~---=T~i-m_e                                        __
11.2 Verified bv---,,""='"-=--..--------------=:--:-~~~--=:-T-~~
QC Enqineer                                         DRte                             Time 11.3 Approved by
                            -~S~u-p_e_r_v_1~s-o-r~-------------=D~a~t-e-_~----=T~i-m_e                                    __
END OF PROCEDURE FINAL PAGE lIC-18.1.011                                 7                                                           Rev. 0
                                      ... . ~.*.*.~ ........*..-.     - *.- . ~ .. -* -.. ,. . .. .. .. ... ... **- .}}

Latest revision as of 08:47, 3 February 2020

Safety-related, Solid State Protection Sys Train B,Reactor Trip Breaker Uv Coil Functional Test.
ML18087A732
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/14/1983
From: Heaton R
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1IC-18.1.011, NUDOCS 8303160543
Download: ML18087A732 (8)


Text

SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT TECHNICAL DEPARTMENT I&C SAFETY RELATED PROCEDURE APPROVAL COVER SHEET PROCEDURE: lIC..,.18.1.011 SSPS TRAIN"B",REACTOR TRIP BREAKER UV COIL REMARKS: FUNCTIONAL TEST SQAE I&C ENGR. SORC GEN .MGR.* APPROVED REV. SUBMITTED REVIEWED APPROVED REVIEWED SALEM OPS. DATE 0 jJ j dA7+/-- &~Q~~ :i-"'-~

A-,,&-£~ S:>-z.S- 1/,/

' /. ') :~-~t

/y_ °?) .J 5 v "/

,...----~--~

8303160543 830314 PDR ADOcK 05 000272 s PDR I

-- ., . .. *- .. .. .. . -:~** . .., ~*- ... ., .. ***.-:-~ .

SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)

F"uNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 1.0 PURPOSE 1.1 The purpose of this procedure is to verify the operability of the Reactor Trip Breaker under voltage (UV) coil from SSPS Train B.

2.0 REFERENCES

2.1 Solid State Protection System Manual.

2.2 Wiring Diagrams: 203688, 222885, 224305 3.0 PRECAUTIONS 3.1 Test conditions must be applied to only Train B. A reactor trip will occur if both trains have a general warning condition. Therefore, it is extremely important that the doors to only-one train at a time are open, to preclude the introduction of tsst conditions into both trains.

3.2 *Test conditions may be applied to one train using its built-in testers, while the opposite train is used to maintain the plant protection and provide data to the demul-tiplexers. If in the process of testing, malfunctions are detected, they can be isolated by carefully following the procedures in Section 6 of the Solid State Protection Manual.

3.3 This procedure must be completed in the sequence given to ensure successful completion.

4.0 LIMITATIONS AND ACTIONS 4.1 If, at any time during the performance of this test, there ~R any reason to suspect that the test equipment being used may'*

not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a standard. This shall be done prior to taking any other corrective action.

4.2 If, during the performance of this test, the "As Found" data.

does not meet the requirements of the specified accuracy, the Job. Supervisor shall be notified immediately and IC-14.1.001 shall be performed.

lIC-18.1.011 1 Rev. 0

.,-- - ":'" __.... ,,.... ... ,.,........-. --- *~-* ~-**-*******

SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)

FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 4.0 LIMITATIONS AND ACTIONS (continued) 4.3 If, during the performance of this procedure, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately. Exceptions to the required indication, due to plant conditions at the time of the test, may be made by the Job Supervisor. Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.

4.4 An entry will be made in the Remarks section of this procedure indicating any deficiency and the corrective action taken.

5.0 TEST EQUIPMENT None Required 6.0 PREREQUISITES 6.1 The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 7.6.

Supervisor 6.2 The Senior Shift Supervisor/Shift Supervisor has qranted permission to perform this procedure.

Senior Shift Supervisor/shift Supervisor Date/Time 6.3 The Control Operator is aware of *all of the alarms and indications that will result from the performance of this procedure.

Control Operator 6.4 Quality Control shall be present for the performance of this procedure.

QC Engineer Date/Time aIC-18.1.011 2 Rev. 0 l

. . -**-- *.*.**\o--.-....---::,_~~-~q--.*-...~"'-.*.-,:-.**~.,..,.....~~------*-r--**-* ****-*.-*** - ***:-*1*-.-* .**:*-,,,~:**-*. **; *****-**--***.* ....,.. . ... - ;:**~*- ... :***-**-**** .. . . *.

~

SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)

FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 7.0 SYSTEM LINE-UP 7.1 The following conditions must be established and/or verified by the Control Operator.

7.1.1 Reactor Trip Bypass Breaker A is open and in the Racked Out position.

7.1.2 Safeguard actions which are being blocked by virtue of having been RESET from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present. The Safeguara actions involved are:

1. Containment Spr~y
2. Phase A Isolation
3. Phase B Isolation
4. Feedwater Isolation
5. Containment Ventilation Isolation from Safety Injection signal Control Operator 8.0 INSTRUCTIONS INITIP..LS 8.1 Verify the following Solid State Protection System Warnings Lamps are Off~

8.1.1 General Warning Lamp - Train A 8.1.2 General Warning Lamp - Train B 8.2 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.

8.2.l General Warning Lamp Train A 8.2.2 General Warning Lamp - Train B 8.3 Record UV Coil Voltage Meter Reading.

Required 43 VDC +/- 2 VDC (when shutdown 0 VDC +/- 2 VDC) As Found 8.4 On the Output Relay Test Panel, place the Mode Selector Switch in the Test position *

  • 8.5 Verify the Operate Lamp is not lit.

lIC-18.1.011 3 Rev. 0

SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)

FUNCTIONAL TEST

  • 8.0 SSPS Train B, Reactor Trip Breaker UV Coil INSTRUCTIONS (continued) INITIALS 8.6 Verify the General Warning Lamp is lit.

8.7 On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.

8.8 Verify Reactor Trip Breaker B is CLOSED (if Reactor Trip Breaker is open have the Control Operator CLOSE Reactor Trip Breaker B) 8.9 Omit steps 8.10, 8.18 and 8.19 if Reactor is tripped.

Tripped Operational 8.10 Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the break~r is in Op~rate position and its light is illuminated.

  • CAUTION Reactor By-pass Breaker B must remain energized for the duration of the m~nual testing, otherwise a Reactor Trip will occur.

8.11 At the LOGIC TEST Panel place the LOGIC A Test Switch in Position 7. (Pressurizer High Pressure Trip).

8.12 In the MANUAL INPUT FUNCTION TEST portion of the LOGIC TEST PANEL, depress and hold any TWO pushbuttons.

8.13 At the Control Board, verify that Reactor Trip Breaker B is OPEN.

8.14 Verify the UV COIL VOLTAGE meter.indicates approximately 0 VDC.

8.15 Release the pushbuttons depressed in Step* 8.12.

8.16 Place the LOGIC A Test Switch in the OFF position.

8.17 Have the Control Operator close the Reactor Trip Breaker B.

8.18 Have the Control Operator OPEN Reactor By-pass Breaker B.

lIC-18.1.011 4 Rev. 0

SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)

FUNCTIONAL TEST

  • 8.0 SSPS Train B, Reactor Trip Breaker UV Coil INSTRUCTIONS (continued) INITIALS 8.19 Have the Control Operator rack Out Reactor By-pass Breaker B.

8.20 Verify that the general warning test LED for SSPS Train B is extinguished in both Train A and Train B.

8.21 Have the Control Operator reinstate the FLUX TRIP MANUAL Blocks from th~ Control Board.

NOTE The pushbutton must be pushed even when BEZEL block light is lit. (NO blocks can be applied if their permissives are not present, therefore, only those permitted will be set.)

8.21.1 Block Source Range - Train B pushed.

8.21.2 Block Intermediate Range - Train B pushed.

8.21.3 Block Power Range - Train B pushed.

CAUTION The Flux Trip Manual Blocks must be reinstated prior to placing the input error inhibit switch in the normal position.

  • 8.22 Place the MODE Selector switch in the OPERATE position.

8.23 Actuate the following MANUAL BLOCKS using the pushbuttons on the Control Board. No blocks can be applied if their permissives are not present; therefore, only those permitted will be set.

  • 8.23.1 Pressurizer Safety Injection
  • 8.23.~ Steamline Pressure Safety Injection.

lIC-18.1.011 5 Rev. 0

SALEM GENERATING STATION TECHNICAL DEPARTMENT (I&C)

FUN.CTIONAL TEST

  • 8.0 SSPS Train B, Reactor Trip Breaker UV Coil INSTRUCTIONS (continued)

NOTE INITIALS Safeguard actions which are being blocked by virtue of having been

  • RESET from the Control Bezels will be re-initiated at this time if necessary logic signal is present. The safeguards actions involved are:
a. Containment Spray
b. Phase A Isolation
c. Phase B Isolation
d. Feedwater Isolation
e. Containment Ventilat.ion Isolation frorq Safety Injection Signal.

Inform the Control Operator of this condition.

Control Operator 8.24 Place the Input ERROR Inhibit switch in the NORMAL position.

8.25 Have the Control Operator reset all unwanted safeguards actions which were re-initiated as a result of this test.

8.26 If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short terminal~

2 and 6 on TDl and have the Control Operator depress S.I. Reset for Train.B.

Remove jumper.

Senior Shift Supervisor /Shift Supervi.sor 9.0 SYSTEM RETURN TO NORMAL 9.1 The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal.

Senior Shift Supervisor/Shift Supervisor 1 I c-1 *9

  • 1
  • o 11 6 Rev. 0
    • ~-*------------ *-* --- - ~--- ****:-*-*-:---- -** . --.--......

~- *-***~:--* *~- . ---**---~-:-***~:- ... -*- **- . . .

SALEM GBNEP..ATING STATION TECHNICAL DEPARTMENT (I&C)

FUNCTIONAL TEST SSPS Train B, Reactor Trip Breaker UV Coil 10.0 REMARKS w.o. ------ I.O.

11 .. 0 COMPLETION 11.l Completed bv

---=T~e-c~h-n~1~c-a-n-----~------~D~a~t-e~---=T~i-m_e __

11.2 Verified bv---,,""='"-=--..--------------=:--:-~~~--=:-T-~~

QC Enqineer DRte Time 11.3 Approved by

-~S~u-p_e_r_v_1~s-o-r~-------------=D~a~t-e-_~----=T~i-m_e __

END OF PROCEDURE FINAL PAGE lIC-18.1.011 7 Rev. 0

... . ~.*.*.~ ........*..-. - *.- . ~ .. -* -.. ,. . .. .. .. ... ... **- .