ML15061A401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/04/2015
| issue date = 03/04/2015
| title = 2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan)
| title = 2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan)
| author name = Burritt A L
| author name = Burritt A
| author affiliation = NRC/RGN-I/DRP/PB2
| author affiliation = NRC/RGN-I/DRP/PB2
| addressee name = Coyle L
| addressee name = Coyle L
Line 9: Line 9:
| docket = 05000247, 05000286
| docket = 05000247, 05000286
| license number = DPR-026, DPR-064
| license number = DPR-026, DPR-064
| contact person = Burritt A L
| contact person = Burritt A
| case reference number = FOIA/PA-2016-0148
| case reference number = FOIA/PA-2016-0148
| document report number = IR 2014001
| document report number = IR 2014001
Line 15: Line 15:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000247/2014001]]
See also: [[see also::IR 05000247/2014001]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::March 4, 2015]]
                        NUCLEAR REGULATORY COMMISSION
 
                                          REGION I
Mr. Larry Coyle Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
                              2100 RENAISSANCE BLVD., SUITE 100
 
                                KING OF PRUSSIA, PA 19406-2713
SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND 05000286/2014001)
                                        March 4, 2015
 
Mr. Larry Coyle
==Dear Mr. Coyle:==
Site Vice President
Entergy Nuclear Operations, Inc.
Indian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 10511-0249
SUBJECT:         ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR
                GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND
                05000286/2014001)
Dear Mr. Coyle:
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-
cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection
results and enforcement actions from January 1, 2014 through December 31, 2014. This letter
informs you of the NRCs assessment of your facility during this period and its plans for future
inspections at your facility.
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that
preserved public health and safety and met all cornerstone objectives. The NRC determined
the performance at Indian Point Units 2 and 3 during the most recent quarter was within the
Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix
because all inspection findings had very low (i.e., Green) safety significance, and all PIs
indicated that your performance was within the nominal, expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the last nine months of the inspection plan are tentative and may be
revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will
perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage
Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and
Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides
the inspection plan to allow for the resolution of any scheduling conflicts and personnel
availability issues. The NRC will contact you as soon as possible to discuss changes to the
inspection plan should circumstances warrant any changes. This inspection plan does not
include security-related inspections, which will be sent via separate, non-publicly available
correspondence.


The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).
L. Coyle                                            2
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules
of Practice, a copy of this letter will be available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records component of NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Please contact me at (610)337-5069 with any questions you have regarding this letter.
                                                Sincerely,
                                                    /RA/
                                                Arthur L. Burritt, Chief
                                                Reactor Projects Branch 2
                                                Division of Reactor Projects
Docket Nos. 50-247 and 50-286
License Nos. DPR-26 and DPR-64
Enclosure:      Indian Point 2 & 3 Inspection/Activity Plan
cc w/encl:      Distribution via ListServ


Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform inspection procedure (IP) 60855, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," IP 92702, "Follow-up on Corrective Actions for Violations," and Temporary Instruction 2516-001, "Review of License Renewal Activities." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610)337-5069 with any questions you have regarding this letter.


Sincerely,/RA/ Arthur L. Burritt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64
ML15061A401
                                                  Non-Sensitive                                Publicly Available
      SUNSI Review
                                                  Sensitive                                    Non-Publicly Available
OFFICE          RI/DRP                  RI/DRP
NAME            TSetzer/TCS              ABurritt/ALB
DATE            02/23/15                03/02/15
                                               
Page 1 of 2                                                                              Indian Point
03/02/2015    15:16:39                                                        Inspection / Activity Plan
Report 22
                                                                                01/01/2015 - 06/30/2016
  Unit          Planned Dates                                                                                                      No. of Staff
Number          Start    End      Inspection Activity                                                          Title                on Site
                                    5/11EXAM      - U3 INITIAL OL EXAM                                                                      5
      3    04/13/2015  04/17/2015      U01908              FY15-IP3 INITIAL OPERATOR LICENSING EXAM
      3    05/11/2015  05/15/2015      U01908              FY15-IP3 INITIAL OPERATOR LICENSING EXAM
                                    71124        - RETS                                                                                    1
  2, 3    02/09/2015  02/13/2015  IP 71124.05            Radiation Monitoring Instrumentation
  2, 3    02/09/2015  02/13/2015  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment
                                    71124        - HP                                                                                      1
      3    03/02/2015  03/06/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls
      3    03/02/2015  03/06/2015  IP 71124.02            Occupational ALARA Planning and Controls
                                    7111108P      - U3 INSERVICE INSPECTION                                                                  1
      3    03/09/2015  03/20/2015  IP 7111108P            Inservice Inspection Activities - PWR
                                    71152        - GROUNDWATER MONITORING                                                                  5
  2        05/04/2015  05/07/2015  IP 71152                Problem Identification and Resolution
                                    71124        - HP                                                                                      1
  2, 3    05/07/2015  05/13/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls
  2, 3    05/07/2015  05/13/2015  IP 71124.02            Occupational ALARA Planning and Controls
                                    7111107T      - TRIENNIAL HEAT SINK                                                                      1
  2, 3    07/06/2015  07/10/2015  IP 7111107T            Heat Sink Performance
                                    CDBI          - COMPONENT DESIGN BASIS INSPECTION                                                        8
  2, 3    07/20/2015  07/24/2015  IP 7111121              Component Design Bases Inspection
  2, 3    08/03/2015  08/07/2015  IP 7111121              Component Design Bases Inspection
  2, 3    08/17/2015  08/21/2015  IP 7111121              Component Design Bases Inspection
                                    7111111B      - IP3 REQUAL INSP W/ P/F RESULTS                                                          2
      3    09/21/2015  09/25/2015  IP 7111111B            Licensed Operator Requalification Program
                                    71124        - HP                                                                                      1
  2, 3    08/10/2015  08/14/2015  IP 71124.04            Occupational Dose Assessment
  2, 3    08/10/2015  08/14/2015  IP 71124.05            Radiation Monitoring Instrumentation
  2, 3    08/10/2015  08/14/2015  IP 71151                Performance Indicator Verification
                                    EP            - EP PROGRAM INSPECTION                                                                    1
  2, 3    08/17/2015  08/21/2015  IP 7111402              Alert and Notification System Testing
  2, 3    08/17/2015  08/21/2015  IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
  2, 3    08/17/2015  08/21/2015  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
                                              This report does not include INPO and OUTAGE activities.
                                                This report shows only on-site and announced inspection procedures.                Enclosure


===Enclosure:===
Page 2 of 2                                                                              Indian Point
Indian Point 2 & 3 Inspection/Activity Plan cc w/encl: Distribution via ListServ
03/02/2015    15:16:39                                                        Inspection / Activity Plan
Report 22
                                                                                01/01/2015 - 06/30/2016
  Unit          Planned Dates                                                                                                                                    No. of Staff
Number          Start      End    Inspection Activity                                                            Title                                          on Site
                                    ISFSI        - ISFSI LOADING INSPECTION                                                                                              2
  2, 3    08/17/2015  08/21/2015  IP 60855                Operation Of An ISFSI
  2        08/17/2015  08/21/2015  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants
                                    2516-001      - TI 2516-001 U3 LR COMMITMENTS INSPECTION                                                                              1
      3    11/16/2015  11/20/2015  IP 2516/001            Review of License Renewal Activities
                                    71124.08      - RADWASTE                                                                                                              1
  2, 3    11/16/2015  11/20/2015  IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
                                    71152B        - PI&R - BIENNIAL                                                                                                      4
  2, 3     11/30/2015  12/04/2015  IP 71152B              Problem Identification and Resolution
  2, 3    12/14/2015  12/18/2015  IP 71152B              Problem Identification and Resolution
                                    71124        - HP                                                                                                                    1
  2        03/07/2016  03/11/2016  IP 71124.01            Radiological Hazard Assessment and Exposure Controls
  2        03/07/2016  03/11/2016  IP 71124.02            Occupational ALARA Planning and Controls
                                    ISI          - U2 INSERVICE INSPECTION                                                                                              1
  2        03/14/2016  03/25/2016  IP 7111108P            Inservice Inspection Activities - PWR
                                    EP            - EP EXERCISE EVALUATION                                                                                                4
  2, 3    06/27/2016  07/01/2016  IP 7111401              Exercise Evaluation
                                    TRI FI        - TRIENNIAL FIRE PROTECTION                                                                                            4
  2, 3    05/23/2016  05/27/2016  IP 7111105T            Fire Protection [Triennial]
  2, 3    06/06/2016  06/10/2016  IP 7111105T            Fire Protection [Triennial]
                                    71124.07      - REMP                                                                                                                  1
  2, 3    06/20/2016  06/24/2016  IP 71124.07            Radiological Environmental Monitoring Program
                                              This report does not include INPO and OUTAGE activities.
                                                This report shows only on-site and announced inspection procedures.                                            Enclosure
}}
}}

Latest revision as of 14:44, 31 October 2019

2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan)
ML15061A401
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/04/2015
From: Arthur Burritt
Reactor Projects Branch 2
To: Coyle L
Entergy Nuclear Operations
Burritt A
References
FOIA/PA-2016-0148 IR 2014001
Download: ML15061A401 (5)


See also: IR 05000247/2014001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100

KING OF PRUSSIA, PA 19406-2713

March 4, 2015

Mr. Larry Coyle

Site Vice President

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR

GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND

05000286/2014001)

Dear Mr. Coyle:

On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-

cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The

NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection

results and enforcement actions from January 1, 2014 through December 31, 2014. This letter

informs you of the NRCs assessment of your facility during this period and its plans for future

inspections at your facility.

The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that

preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Indian Point Units 2 and 3 during the most recent quarter was within the

Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix

because all inspection findings had very low (i.e., Green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the last nine months of the inspection plan are tentative and may be

revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will

perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage

Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and

Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides

the inspection plan to allow for the resolution of any scheduling conflicts and personnel

availability issues. The NRC will contact you as soon as possible to discuss changes to the

inspection plan should circumstances warrant any changes. This inspection plan does not

include security-related inspections, which will be sent via separate, non-publicly available

correspondence.

L. Coyle 2

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules

of Practice, a copy of this letter will be available electronically for public inspection in the NRC

Public Document Room or from the Publicly Available Records component of NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Please contact me at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos. 50-247 and 50-286

License Nos. DPR-26 and DPR-64

Enclosure: Indian Point 2 & 3 Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML15061A401

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME TSetzer/TCS ABurritt/ALB

DATE 02/23/15 03/02/15

Page 1 of 2 Indian Point

03/02/2015 15:16:39 Inspection / Activity Plan

Report 22

01/01/2015 - 06/30/2016

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

5/11EXAM - U3 INITIAL OL EXAM 5

3 04/13/2015 04/17/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

3 05/11/2015 05/15/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

71124 - RETS 1

2, 3 02/09/2015 02/13/2015 IP 71124.05 Radiation Monitoring Instrumentation

2, 3 02/09/2015 02/13/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

71124 - HP 1

3 03/02/2015 03/06/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

3 03/02/2015 03/06/2015 IP 71124.02 Occupational ALARA Planning and Controls

7111108P - U3 INSERVICE INSPECTION 1

3 03/09/2015 03/20/2015 IP 7111108P Inservice Inspection Activities - PWR

71152 - GROUNDWATER MONITORING 5

2 05/04/2015 05/07/2015 IP 71152 Problem Identification and Resolution

71124 - HP 1

2, 3 05/07/2015 05/13/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

2, 3 05/07/2015 05/13/2015 IP 71124.02 Occupational ALARA Planning and Controls

7111107T - TRIENNIAL HEAT SINK 1

2, 3 07/06/2015 07/10/2015 IP 7111107T Heat Sink Performance

CDBI - COMPONENT DESIGN BASIS INSPECTION 8

2, 3 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection

2, 3 08/03/2015 08/07/2015 IP 7111121 Component Design Bases Inspection

2, 3 08/17/2015 08/21/2015 IP 7111121 Component Design Bases Inspection

7111111B - IP3 REQUAL INSP W/ P/F RESULTS 2

3 09/21/2015 09/25/2015 IP 7111111B Licensed Operator Requalification Program

71124 - HP 1

2, 3 08/10/2015 08/14/2015 IP 71124.04 Occupational Dose Assessment

2, 3 08/10/2015 08/14/2015 IP 71124.05 Radiation Monitoring Instrumentation

2, 3 08/10/2015 08/14/2015 IP 71151 Performance Indicator Verification

EP - EP PROGRAM INSPECTION 1

2, 3 08/17/2015 08/21/2015 IP 7111402 Alert and Notification System Testing

2, 3 08/17/2015 08/21/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

2, 3 08/17/2015 08/21/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Indian Point

03/02/2015 15:16:39 Inspection / Activity Plan

Report 22

01/01/2015 - 06/30/2016

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

ISFSI - ISFSI LOADING INSPECTION 2

2, 3 08/17/2015 08/21/2015 IP 60855 Operation Of An ISFSI

2 08/17/2015 08/21/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

2516-001 - TI 2516-001 U3 LR COMMITMENTS INSPECTION 1

3 11/16/2015 11/20/2015 IP 2516/001 Review of License Renewal Activities

71124.08 - RADWASTE 1

2, 3 11/16/2015 11/20/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71152B - PI&R - BIENNIAL 4

2, 3 11/30/2015 12/04/2015 IP 71152B Problem Identification and Resolution

2, 3 12/14/2015 12/18/2015 IP 71152B Problem Identification and Resolution

71124 - HP 1

2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls

ISI - U2 INSERVICE INSPECTION 1

2 03/14/2016 03/25/2016 IP 7111108P Inservice Inspection Activities - PWR

EP - EP EXERCISE EVALUATION 4

2, 3 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation

TRI FI - TRIENNIAL FIRE PROTECTION 4

2, 3 05/23/2016 05/27/2016 IP 7111105T Fire Protection [Triennial]

2, 3 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]

71124.07 - REMP 1

2, 3 06/20/2016 06/24/2016 IP 71124.07 Radiological Environmental Monitoring Program

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure