{{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL DOCKET VO COMPLETED BY TELEPHONE Lllla=h(ONTH JULY 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 645 DAY AVERAGE DAlLY POWER LEVEL (MWe->%et) 647 17 IO l3 IS l6 650 647 646 642 570 442 634 637 640 645 l8 20 13 24 95 16 7't 2g 19 30 652 654 654 655 653 651 649 646 638 640 645 INSTRUCTIONS On this format, list the avera((c daily unit p>>wer!eve(in MWe.Net for each day in the rep<>rtintt n>>>nth.C>>>npute to the nearest whole megawat t.('>r77 j 80081 8031/
{{#Wiki_filter:AVERAGE DAILYUNIT POWER LEVEL DOCKET VO COMPLETED BY TELEPHONE         Lllla=
OPERATING DATA REPOR'T OPERATING STATUS Turke Point Unit No.3 760 693 I.Unit Name 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross a(We): 5.Design Electrical Rating (Net MWe): 6.Lblaximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): DOCKET NO.DATE hug~1980 COMPLETED BY~~son TELEPHONE~i~3824 Notes-Unit No.3 operated at approzimately 100%R.P., ex'cept for outage of July 8-9, 1980.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power'Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any'his Month Yr.to-Date Cumulative 744.737.0-0-1 612 271 47 164 99.1 I I.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours-0--0-14.Hours Generator On-Line 4 071.6 IS.Unit Reserve Shutdown Hours'6.Gross Thermal Energy Generated (MWH)8 797 278<'JL 19.Unit Service Factor 20.Unit Availability Factor 79.7 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 0.9 1.4 24.Shutdowns Scheduled Over Next 6 Months IType.Date.and Duration of Each I: Steam Generator Tube Tnsoection Program-Oct.5-Hov.1, 1980.67 112.6 51 505.2 213.3 49 761.7 121.8 100 265 912 31 852 845 30 148 198 74.1 74.3 68.0 64.8'.5 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
h(ONTH             JULY         1980 DAY       AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAlLYPOWER LEVEL (MWe.Net)                                                   (MWe->%et)
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I'>/77)
I                        645                                  17                      647 650                                 l8                      652 654 20                      654 647                                                           655 646                                                           653 642                                 13                      651 570                                 24                      649 442                                 95                       646 IO                                                              16                       638 634                                  7't                     640 2g l3                        637                                  19                       645 30 IS                        640 l6                        645 INSTRUCTIONS On this format, list the avera((c daily unit p>>wer!eve( in MWe.Net for each day in the rep<>rtintt n>>>nth. C>>>npute to the nearest whole megawat t.
UNIT SIIUTDOIVNS AND POPOVER REDUCTIONS REPOR.I h(ONTII JUI.Y 1980 a~COhlPLETED UY 2-2 Nii.Dale~A u L o Q~~<I)Llccf<sec Evc>>l Repi)fl)<t 4l 4J~n o u o Cause Sc Coffel:tive Acliu>>to Pieveol Rccuffcoce 80-07-08 7.0 N/A HOTORX Unit No.3 was removed from service due to low oil level in reactor coolant pump motor-No.38.Cor-rective actions included adding oil.(Nuclear system)I'ofced S;Sclicd<<led (I/77)Reasoo: A-EII>>ipo<e>>t Failure (Explain)U.hlaiote<uioce or Test~(-Rct'ucli>>I, D.RCII>>lalo<y Rcslrlclloo I: 0pcfalo<Tfalolog k.Llccosi: I:xJ>>ll>>JI<o>>
('>r77 j 80081 8031/
I'.Adioioislralive G.Operalio>>al Lrrur (lixplai<i)
 
I I.OII<cf (Expl J>><)3 hletl<od: I-hlaoual 2.hlaoual Scram.3-Auloo<at
OPERATING DATA REPOR'T DOCKET NO.
<c Serio)<.4-Otl<er (Lxplalo)4 Exl)ibil G-Instructions lof I (cpafalloo ol Data Eolry Sl)eels I'oi Liccosee Event Repi)rl (I.ER)File (NURI!G-OI6))Ex l lib it I-Saute Source 0 AVERAGE DAlLY UNIT POWER LEVEL DOCKET iVO.50-251 Turkey.Point IUI!t.TELEPHONE MONTH JULY 1980 DAY AVERAGE DAILY POWER LEVEL!MWe Net)I 640 DAY AVERAGE DAILY POWER LEVEL (i'e-Net)642 lp 649 645 644 644 646 641 641 641 641 636 633 l8 l9 20 2I 22 23 24 25 28 647 647 647 642 645 643 638 631 629 629 l3 4 636 IS 635!6 638 79 30 31 631 591 INSTRUCTIONS On this form>>a.list the average daily unit power!evel in MWe Net for each day i>>the reporting tnonth.Cot>>pote to the nearest whole...egawat!.(o lii)
                                                                                                                  ~1980 DATE hug COMPLETED BY TELEPHONE
OPERATING DATA REPORT OPERATING STATUS DOCKET NO.DATE 4~~~80 COMPLETED BY~~hi3.son TELEPHONE~05 552-382E Notes-Unit No.4 operated at approximately 100%R.P., except for load reduction of July 30-31, 1980.7 0 I.Unit Name: Turkev Point Unit No.4 2.Reporting Period: a 3.Licensed Thermai Power (MWt): 4.iVameplate Rating (Gross iPIWe): S.Design Electrical Rating (iVet MWe): 6.iiPIaximum Dependable Capacity (Gross SIWe): 7.maximum Dependable Capacity (Viet MWe): 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
                                                                                                            ~~son
If Any (Net MWe): IO.Reasons For Restrictions, lf Any: 'This Month Yr.to-Date Cumulative 744.0 60 840.0 5 111.0 44 615.9 3 788.1 1 6.31.2 o 4 26 896 109 474 472 72.6 70.5 6.8 0.4 3.0 I I.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 744.0 l3.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line IS.Unit Reserve Shutdown Hours-0-12.3 Ig.Net Electrical Energy Generated (MWH)2 366 113 l9.Unit Service Factor 20.Unit Availability Factor 100.0 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate-0-4.Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Re e in maintenance and inspections
                                                                                                            ~i~3824 OPERATING STATUS I. Unit Name                Turke     Point Unit     No. 3               Notes-Unit No. 3 operated            at
-Nov.9 1980-Jan.10 1981.25.If Shut Down At End Of Report Period.Estimated Date of Startup.'6.
: 2. Reporting Period:
Units In Test Status (Prior to Commercial Operation):
approzimately        100%    R.P.,
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (o j77)
: 3. Licensed Thermal Power (MWt):
UNIT SIIUTDO)VNS ANI)PO'iVER REI)UCTIONS I)OCKET NO.REPORT hlONTII iVii.l)ate CI~A o I o o.)~C/l Ltccnscc Event Repiwt>o 4l~A i o~o Cause Er.Corrective Action lo I Icvcnt I(ecurlcncc 80-07-30 B N/A HA VAI.VEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.(Non-nuclear system)I I': Forced S: Scbcdulcil I'>/77)Reason: A.l!quipu)ent Failure (Explain)B.hlaiiileiiance or Test.(-Reflieliilg I)ltegiilaiory Rcslfti;lion I:.Operali)r Training k.Ltcciisc Exainiiialion I"Ad))III)Ist ralIvc G Operation Jl L'irI>r (Explain)I I Oilier (Lxplaui)3 Method: I.hla>>ual 2.hlanual Scram.3 Ault)IAJtiC SCrani.4.Oilier (llxplain) llxliibit G-Instructions I)r I ri'pJr Jlii)n ol Data I:))try Sliecls I'or l.icensee Evcol Report (LER)File (NUREG.016I)I'xliibll I-Saine Source AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT COMPLETED IIY<-T.Chilson MONTH JULY 1980 DAY AVERAGE DAILY POWER LEVEL (MWe-iVet)
ex'cept    for  outage of July 760 8-9, 1980.
I 767 733 658 791 DAY AVERAGE DAILY POWER LEVEL (il(We.iVe t)790 l7 l8 789 30 796 788 IO l3 15 l6 INSTRUCTIONS 716 789 793 791 733 782 791 13 34'75 16 3S 59 30 3l NOTE: 793 797 797 7 6 792 793 795 Ave age daily power level greater than 777 NWe due to cooler condenser cooling water.On this format.list the averaile daily unit power level in MWe.Net for each day tn the reportintt tnonth.Coittpute to the nearest whole ate(Iawat t.
: 4. Nameplate Rating (Gross a(We):
'0 0 OPERATING DATA REPORT OPERATING STATUS l.Unit Name: St.Lucie Unit No.1 2.Reporting Period: 3.Licensed Thermal Power (MW:): 2560 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 2 6.tglaximum Dependable Capacity (Gross agWe): 7.Maximum Dependable Capacity (Net MWe): 850 822 777 DOCKET NO.DATE~~80 COMPLETED BY~~~son TELEPHONE~~~3824 Notes-Unit operated at approxiataeely 100%R.P.,'ezcept for load reduction of July 2-3, 1980.8.If Changes Occur in Capacity Ratings (Items ltlumber 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
: 5. Design Electrical Rating (Net MWe):          693
If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 744.0 13.Reactor Reserve Shutdown Hours-0-14.Hours Generator On.Line IS.Unit Reserve Shutdown Hours it.Grata Electrical Energy Generated (gtWH)18.Net Electrical Energy Generated (MWH)579 531 19.Unit Service Factor 100.0 20.Unit Availability Factor 100.0 21.Unit Capacity Factor (Using MDC Net)100.2 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 i4Ionths(Type.
: 6. Lblaximum Dependable Capacity (Gross MWe):
Date, and Duration of Yr.-to-Date
: 7. Maximum Dependable Capacity (Net MWe):
'11.0 3 280.2-0-25 2 395 835 62.4 62.4 60.3 58.4 13.2 ch)e Cumulative 3I 655.0 24 789.9 129.5 24 8.32.0 18 844 750 17 723 731 75.9 76.0 72.1 69.8 6.5 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
: 8. If Changes Occur in Capacity Ratings (Items Number  3  Through 7) Since Last Report. Give Reasons:
Forecast Achieved INITIAL CRITICALITY IN ITIA L ELECTRICITY COMMERCIAL OPERATION UNIT SIIUTI)0'IVNS AND POIVER RE!)(ICTIONS l)OCKET NO.UNIT NAhIE St.Lucie 0 I.No.l*Ni).l)alc r)IA Q Llcc))sec Event Rcport>Cause Ec Curreclive Action lo Prevent Recurrc>>ce 10 80-07-02-G-N/A FILTER Load reduction Lo approximately 50%R.F.to clean condensate pun)p suction st:rainers..(Non-nuclear system)I': I o)ced S: Scl)cduled Reason: A-L'Iluipment Failure (Explain)It hlaintenance nr Test~C-Ref)li)t', l).)let,ulatory Restriction I.Opelalol' ran))l)g 8c License I:xan)u)i)lion
: 9. Power'Level To Which Restricted, If Any (Net MWe):
'F.Administrative G.Ot>erational E)rur (Expl>>in)Il Oll)er t Explain)hlelhod: I 4lanual 2 h4nual Sera)n.3 Au)on>atic Sera>>).4 Oll)cf (Lxplau))4 I.xl)ibit G-Instructions II)r I rcpafall)nl ol Data Lnlry Sl)cuts for Licensee Event Report (I.ER)File (NUR-EG f>I)Exl)ibil I-Sa)nc Source P.O.BOX 5291GO,'IAiiII, FL 33152 FLOAIOA POWER 5 LIGHT COMPANY August 10, 1980 Office oz Management Information and Program Controls U.S.Nuclear Regulatory Commission Washington, D.C.20555 Gentlemen:
: 10. Reasons For Restrictions, lf Any'his Month             Yr. to-Date           Cumulative I I. Hours In Reporting Period                                                                      67  112.6
Attached are the July, 1980, Ope ating Summary Reports zor Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.1.Very truly yours, A.D.Schmidt.Vice President Power Resources VTC/DDC cc: Nr.James P.0"Reilly Robert Lowenstein, Esquire PBOPLB...SBRVI'VG P"=C~LB  
: 12. Number   Of Hours Reactor Was Critical               744.                                      51  505.2
: 13. Reactor Reserve Shutdown Hours                                                               213.3
: 14. Hours Generator On-Line                               737.0              4 071.6             49 761.7 IS. Unit Reserve Shutdown Hours                                                                       121.8
'6. Gross Thermal Energy Generated (MWH)             1 612 271              8 797 278           100 265 912
                                                                  <'JL                                 31 852 845 47    164                                30 148 198
: 19. Unit Service Factor                                                                                     74.1
: 20. Unit Availability Factor                                 99.1                  79.7                   74.3 68.0
: 22. Unit Capacity Factor (Using DER Net)                                                                   64.8
: 23. Unit Forced Outage Rate                                   0.9                   1.4                           '.5
: 24. Shutdowns Scheduled Over Next 6 Months IType. Date. and Duration of Each I:
Steam Generator Tube Tnsoection Program Oct. 5 Hov. 1,                           1980.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                        Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 )
 
UNIT SIIUTDOIVNS AND POPOVER REDUCTIONS REPOR.I h(ONTII JUI.Y      1980                    COhlPLETED UY a~          2-  2 L
o Q  ~
t Llccf<sec                                        Cause    Sc Coffel:tive Nii.
4l  4J      o u Dale                      ~ A Evc>>l        ~ n                                        Acliu>> to u
Repi)fl )<                o                      Pieveol Rccuffcoce
                                                ~  <I) 80-07-08            7.0                              N/A                    HOTORX      Unit No. 3  was removed from                service due to low  oil level in            reactor coolant  pump  motor        -No. 38. Cor-rective actions included adding                  oil.
(Nuclear system) 3                                  4 I 'ofced          Reasoo:                                                  hletl<od:                            Exl)ibil G - Instructions S; Sclicd<<led      A-EII>>ipo<e>>t Failure (Explain)                          I-hlaoual                            lof I (cpafalloo ol Data U.hlaiote<uioce or Test ~                                2.hlaoual Scram.                     Eolry Sl)eels I'oi Liccosee
( -Rct'ucli>>I,                                          3-Auloo<at <c Serio)<.                Event Repi)rl (I.ER) File (NURI!G-D.RCII>>lalo<y Rcslrlclloo                                4-Otl<er (Lxplalo)                   OI6))
I: 0pcfalo< Tfalolog k. Llccosi: I:xJ>>ll>>JI<o>>
I'.Adioioislralive G.Operalio>>al Lrrur (lixplai<i)                                                               Ex l lib it I - Saute  Source (I/77)                I I.OII<cf (Expl J>><)
 
0      AVERAGE DAlLY UNIT POWER LEVEL DOCKET iVO. 50        251 Turkey. Point IUI!t .
TELEPHONE MONTH            JULY        1980 DAY        AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER LEVEL
                        !MWe Net)                                                   (i'e-Net )
I                       640                                                        642 649                                l8                      647 645                                l9                      647 644                                20                      647 644                                2I                      642 646                                22 641                                23                      645 641                                24                      643 641                                25                      638 lp                        641                                                        631 636                                                        629 633                                28                      629 l3                            4                              79                      631 636                                30 IS                        635                                31                      591
!6                        638 INSTRUCTIONS On this form>>a. list the average daily unit power!evel in MWe Net for each day i>> the reporting tnonth. Cot>>pote to the nearest whole ...egawat!.
(o lii)
 
OPERATING DATA REPORT DOCKET NO.
DATE  4~~~80 COMPLETED BY      ~~hi3.son TELEPHONE      ~05      552-382E OPERATING STATUS Turkev Point Unit No. 4                      Notes-  Unit    No. 4 operated        at I. Unit Name:                                                            approximately        100%  R.P.,
: 2. Reporting Period:                    a except    for  load reduction
: 3. Licensed Thermai Power (MWt):                                          of July 30-31, 1980.
: 4. iVameplate Rating (Gross iPIWe):              7 0 S. Design Electrical Rating (iVet MWe):
: 6. iiPIaximum Dependable Capacity (Gross SIWe):
: 7. maximum Dependable Capacity (Viet MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):
IO. Reasons For Restrictions, lf Any:
                      '
This Month            Yr. to-Date          Cumulative I I. Hours In Reporting Period                              744. 0            5  111.0              60 840.0
: 12. Number     Of Hours Reactor    Was Critical              744.0              3   788.1            44 615.9 l3. Reactor    Reserve Shutdown Hours                                                                      1  6.
: 14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours                                                  12.3                   31.2 o   4 Ig. Net Electrical Energy Generated (MWH)                    474 472           2  366 113            26 896 109 l9. Unit Service Factor
: 20. Unit Availability Factor                                100.0                  72.6                   70.5
: 22. Unit Capacity Factor (Using DER Net)                                                                    6 .8
: 23. Unit Forced Outage Rate                                                        0.4                     3.0
: 4. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Re e in          maintenance and inspections  Nov. 9 1980  Jan.                         10  1981.
: 25. If Shut Down At End Of Report Period. Estimated Date of    Startup.'6.
Units In Test Status (Prior to Commercial Operation):                      Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (o j77)
 
I)OCKET NO.
UNIT SIIUTDO)VNS ANI) PO'iVER REI)UCTIONS REPORT hlONTII I
i CI      o                                                              Cause    Er. Corrective o    .)       Ltccnscc    o  4l      o ~
iVii.        l)ate                      ~ A                    Event      ~ A                                        Action lo o                    Repiwt >                                        I Icvcnt I(ecurlcncc o
                                                    ~ C/l 80-07-30                        B                      N/A        HA        VAI.VEX    Load  reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system)
I                                                                          3 I': Forced        Reason:                                                Method:                              llxliibitG - Instructions S: Scbcdulcil      A.l!quipu)ent Failure (Explain)                          I.hla>>ual                            I )r I ri'pJr Jlii)n ol Data B.hlaiiileiiance or Test .                             2.hlanual Scram.                      I:))try Sliecls I'or l.icensee
( -Reflieliilg                                          3 Ault)IAJtiC SCrani.                  Evcol Report (LER) File (NUREG.
I) ltegiilaiory Rcslfti;lion                            4.Oilier (llxplain)                  016I )
I:.Operali)r Training k. Ltcciisc Exainiiialion I "Ad))III)IstralIvc G Operation Jl L'irI>r (Explain)                                                              I'xliibll I - Saine  Source I'>/77)                I I Oilier (Lxplaui)
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT COMPLETED IIY        <- T. Chilson MONTH                JULY        1980 DAY        AVERAGE DAILYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL (MWe-iVet)                                                    (il(We.iVe t )
I                       767                                    l7                      790 733                                    l8 658                                                            789 791                                  30 796                                                            788 13 716                                  34 789                                  '75                      793 IO                                                              16                        797 793                                                            797 3S                        7  6 l3                        791                                  59                        792 733                                  30                      793 15                        782                                  3l                        795 l6                        791                                  NOTE:       Ave age        daily power level greater than 777 NWe due            to cooler condenser cooling water.
INSTRUCTIONS On this format. list the averaile daily unit power level in MWe.Net for each day tn the reportintt tnonth. Coittpute to the nearest whole ate(Iawat t.
 
'0 0 OPERATING DATA REPORT DOCKET NO.
DATE COMPLETED BY
                                                                                                          ~~80
                                                                                                          ~~~son TELEPHONE    ~~~3824 OPERATING STATUS St. Lucie Unit No.         1                  Notes - Unit operated at
: l. Unit Name:
approxiataeely 100% R.P.,
: 2. Reporting Period:                                                      'ezcept for load reduction
: 3. Licensed Thermal Power (MW:):               2560 850 of July 2-3, 1980.
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):              2
: 6. tglaximum Dependable Capacity (Gross agWe):            822
: 7. Maximum Dependable Capacity (Net MWe):                777
: 8. If Changes Occur in Capacity Ratings (Items ltlumber 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Yr.-to-Date            Cumulative
: 11. Hours In Reporting Period                                                  '11.0              3I 655.0
: 12. Number Of Hours Reactor Was      Critical              744.0              3  280.2             24 789.9
: 13. Reactor Reserve Shutdown Hours                                                              129.5
: 14. Hours Generator On. Line                                                                        24      8.
IS. Unit Reserve Shutdown Hours                                                                            32.0 it. Grata Electrical Energy Generated (gtWH)                                           25        18 844 750
: 18. Net Electrical Energy Generated (MWH)                  579 531            2 395 835            17 723 731
: 19. Unit Service Factor                                    100. 0                   62.4                  75.9
: 20. Unit Availability Factor                             100.0                     62.4                  76.0
: 21. Unit Capacity Factor (Using MDC Net)                 100.2                     60.3                  72.1
: 22. Unit Capacity Factor (Using DER Net)                                           58.4                  69.8
: 23. Unit Forced Outage Rate                                                         13. 2                  6.5
: 24. Shutdowns Scheduled Over Next 6 i4Ionths(Type. Date, and Duration of     ch)  e
: 25. If Shut Down At End Of Report Period, Estimated Date     of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                        Forecast              Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
 
UNIT SIIUTI)0'IVNS AND POIVER RE!)(ICTIONS                  l)OCKET NO.
UNIT NAhIE        St. Lucie 0 I . No.l
* r)
Llcc))sec                                    Cause    Ec Curreclive Ni).           l)alc                          IA Event                                            Action lo Q
Rcport >                                    Prevent Recurrc>>ce 10          80-07-02            -G-                                N/A              FILTER    Load  reduction      Lo  approximately 50%  R.F . to clean condensate            pun)p suction st:rainers..         (Non-nuclear system) 4 I':  I o)ced          Reason:                                                hlelhod:                            I.xl)ibit G - Instructions S: Scl)cduled          A-L'Iluipment Failure (Explain)                       I 4lanual                          II)r I rcpafall)nl ol Data It hlaintenance nr Test ~                              2 h4nual Sera)n.                   Lnlry Sl)cuts for Licensee C-Ref) li)t',                                          3 Au)on>atic Sera>>).                Event Report (I.ER) File (NUR-l).)let,ulatory Restriction                            4 Oll)cf (Lxplau))                  EG f> I )
I .Opelalol' ran))l)g 8c License I:xan)u)i)lion
                      'F.Administrative G.Ot>erational E)rur (Expl>>in)                                                             Exl)ibil I - Sa)nc Source Il Oll)er t Explain)
 
P.O. BOX 5291GO,'IAiiII, FL 33152 FLOAIOA POWER 5 LIGHT COMPANY August 10, 1980 Office oz Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the July, 1980, Ope ating Summary Reports zor Turkey Point Unit Nos. 3 and   4 and St. Lucie Unit No. 1.
Very truly yours, A. D. Schmidt.
Vice President Power Resources VTC/DDC cc:   Nr. James P. 0"Reilly Robert Lowenstein, Esquire PBOPLB... SBRVI'VG P"=C~LB


==SUMMARY==
==SUMMARY==
OF OPERATiNG EXPERiENCE DOCKET NO'0-250 UNIT Turkey Point Unit No.3 DATE August 10, 1980 COMPLETED BY V.T..Chilson REPORT MONTH JULY, 1980 TELEPHONE (305)552-3824 Unit No.3 operated at approximately 100%R.P., except for outage of.July 8-9, 1980.Refer to"Unit Shutdowns and Power Reductions" section of July, 1980, Operating Status Report=or additional infor-mation.Major Sa ety-related maintenance activities performed during the month included: inspections'nd reauirements of'E Bulletins and NUREG-0578 are'ontinuing.
OF OPERATiNG EXPERiENCE DOCKET NO   '0   250 Turkey Point UNIT    Unit No. 3 DATE   August 10, 1980 COMPLETED BY   V. T.. Chilson TELEPHONE   (305) 552-3824 REPORT MONTH      JULY, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of     .
Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.
July 8-9, 1980. Refer to "Unit Shutdowns and Power Reductions" section of July, 1980, Operating Status Report =or additional infor-mation.
Refer to correspondence between FPL and NRC for ad-ditional information.  
Major Sa ety-related maintenance activities performed during the   month included:
inspections'nd reauirements of'E Bulletins and NUREG-0578   are'ontinuing.
Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.


==SUMMARY==
==SUMMARY==
OF OPERATlViG EXPERIENCE DOCKET NO.50-251 UNIT Turkey Point Unit No.4 DATE Au ust 10, 1980 COMPLETED BY V.T.Chilson REPORT i~!ONTH JULY, 1980 TELEPHONE (305)552-3824 Unit, No.4 operated at approximately 100%R.P., except for load reduction of July 30-31, 1980.Refer to"Unit.Shutdowns and Power Reductions" section of the July, 1980, Operating Status Report for additional infor-mation.Major Safety-related maintenance activities performed during the month included: inspections and requirements fo ZE Bulletins and NUREG-0578 in progress.Florida, Power&Light Company commitments for NUREG-0578 implementation are continuing.
OF OPERATlViG EXPERIENCE DOCKET NO.     50 251 Turkey Point UNIT      Unit No. 4 DATE     Au ust 10, 1980 COMPLETED BY     V. T. Chilson TELEPHONE      (305) 552-3824 REPORT i~!ONTH     JULY, 1980 Unit, No. 4 operated at approximately 100% R.P., except for load reduction of July 30-31, 1980. Refer to "Unit. Shutdowns and Power Reductions" section of the July,   1980, Operating Status Report for additional infor-mation.
Refer to correspondence between FPL and NRC for ad-ditional information.  
Major Safety-related maintenance     activities performed during the month included:
inspections and requirements   fo ZE Bulletins and NUREG-0578 in progress.
Florida, Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.


==SUMMARY==
==SUMMARY==
OF OPERATiNG EXPERiENCE DOCKET NO.50-335 UNiT St.Lucie Unit No.1 DATE A'u ust 10,.1980 COMPLETED BY V.T.Chilsc~n TELEPHONE (305)552-3824 REPORT MONTH JULY 1980 Unit operated at approximately 100%R.P., except for load rec;uction of July 2-3, 1980.Refer to"Unit Shutdowns and Power Reductioris" section of the July, 1980, Operating Status Report for additional inf'ormation.
OF OPERATiNG EXPERiENCE DOCKET NO. 50 - 335 St. Lucie UNiT      Unit No. 1 DATE     A'u ust 10,   .1980 COMPLETED BY         V. T. Chilsc~n TELEPHONE       (305) 552- 3824 REPORT MONTH       JULY 1980 Unit operated at approximately 100% R.P., except for load rec;uction of July 2-3, 1980. Refer to "Unit Shutdowns and Power Reductioris"           section of the July, 1980, Operating Status Report for       additional   inf'ormation.
Major Safety-related maintenance activities pe formed du ing the month included: inspections and reauirements of iE Bulletins and NUREG-0578 are continuing.
Major Safety-related maintenance activities pe formed du ing the month included:
Florida Power&Light Com.-.,any commitments for NUREG-0578 implementation are continuing:
inspections and reauirements of iE Bulletins and NUREG-0578 are continuing.
Refer to correspondence between FPL and NRC for ad-ditional information.  
Florida Power & Light Com.-.,any commitments for NUREG-0578 implementation are continuing:       Refer to correspondence   between FPL and   NRC for ad-ditional information.
 
!}}
!}}

Revision as of 00:16, 30 October 2019

Monthly Operating Repts for Jul 1980
ML17208A904
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 08/10/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A903 List:
References
NUDOCS 8008180391
Download: ML17208A904 (15)


Text

AVERAGE DAILYUNIT POWER LEVEL DOCKET VO COMPLETED BY TELEPHONE Lllla=

h(ONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net) (MWe->%et)

I 645 17 647 650 l8 652 654 20 654 647 655 646 653 642 13 651 570 24 649 442 95 646 IO 16 638 634 7't 640 2g l3 637 19 645 30 IS 640 l6 645 INSTRUCTIONS On this format, list the avera((c daily unit p>>wer!eve( in MWe.Net for each day in the rep<>rtintt n>>>nth. C>>>npute to the nearest whole megawat t.

('>r77 j 80081 8031/

OPERATING DATA REPOR'T DOCKET NO.

~1980 DATE hug COMPLETED BY TELEPHONE

~~son

~i~3824 OPERATING STATUS I. Unit Name Turke Point Unit No. 3 Notes-Unit No. 3 operated at

2. Reporting Period:

approzimately 100% R.P.,

3. Licensed Thermal Power (MWt):

ex'cept for outage of July 760 8-9, 1980.

4. Nameplate Rating (Gross a(We):
5. Design Electrical Rating (Net MWe): 693
6. Lblaximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power'Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, lf Any'his Month Yr. to-Date Cumulative I I. Hours In Reporting Period 67 112.6
12. Number Of Hours Reactor Was Critical 744. 51 505.2
13. Reactor Reserve Shutdown Hours 213.3
14. Hours Generator On-Line 737.0 4 071.6 49 761.7 IS. Unit Reserve Shutdown Hours 121.8

'6. Gross Thermal Energy Generated (MWH) 1 612 271 8 797 278 100 265 912

<'JL 31 852 845 47 164 30 148 198

19. Unit Service Factor 74.1
20. Unit Availability Factor 99.1 79.7 74.3 68.0
22. Unit Capacity Factor (Using DER Net) 64.8
23. Unit Forced Outage Rate 0.9 1.4 '.5
24. Shutdowns Scheduled Over Next 6 Months IType. Date. and Duration of Each I:

Steam Generator Tube Tnsoection Program Oct. 5 Hov. 1, 1980.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 )

UNIT SIIUTDOIVNS AND POPOVER REDUCTIONS REPOR.I h(ONTII JUI.Y 1980 COhlPLETED UY a~ 2- 2 L

o Q ~

t Llccf<sec Cause Sc Coffel:tive Nii.

4l 4J o u Dale ~ A Evc>>l ~ n Acliu>> to u

Repi)fl )< o Pieveol Rccuffcoce

~ <I) 80-07-08 7.0 N/A HOTORX Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor -No. 38. Cor-rective actions included adding oil.

(Nuclear system) 3 4 I 'ofced Reasoo: hletl<od: Exl)ibil G - Instructions S; Sclicd<<led A-EII>>ipo<e>>t Failure (Explain) I-hlaoual lof I (cpafalloo ol Data U.hlaiote<uioce or Test ~ 2.hlaoual Scram. Eolry Sl)eels I'oi Liccosee

( -Rct'ucli>>I, 3-Auloo<at <c Serio)<. Event Repi)rl (I.ER) File (NURI!G-D.RCII>>lalo<y Rcslrlclloo 4-Otl<er (Lxplalo) OI6))

I: 0pcfalo< Tfalolog k. Llccosi: I:xJ>>ll>>JI<o>>

I'.Adioioislralive G.Operalio>>al Lrrur (lixplai<i) Ex l lib it I - Saute Source (I/77) I I.OII<cf (Expl J>><)

0 AVERAGE DAlLY UNIT POWER LEVEL DOCKET iVO. 50 251 Turkey. Point IUI!t .

TELEPHONE MONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL

!MWe Net) (i'e-Net )

I 640 642 649 l8 647 645 l9 647 644 20 647 644 2I 642 646 22 641 23 645 641 24 643 641 25 638 lp 641 631 636 629 633 28 629 l3 4 79 631 636 30 IS 635 31 591

!6 638 INSTRUCTIONS On this form>>a. list the average daily unit power!evel in MWe Net for each day i>> the reporting tnonth. Cot>>pote to the nearest whole ...egawat!.

(o lii)

OPERATING DATA REPORT DOCKET NO.

DATE 4~~~80 COMPLETED BY ~~hi3.son TELEPHONE ~05 552-382E OPERATING STATUS Turkev Point Unit No. 4 Notes- Unit No. 4 operated at I. Unit Name: approximately 100% R.P.,

2. Reporting Period: a except for load reduction
3. Licensed Thermai Power (MWt): of July 30-31, 1980.
4. iVameplate Rating (Gross iPIWe): 7 0 S. Design Electrical Rating (iVet MWe):
6. iiPIaximum Dependable Capacity (Gross SIWe):
7. maximum Dependable Capacity (Viet MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):

IO. Reasons For Restrictions, lf Any:

'

This Month Yr. to-Date Cumulative I I. Hours In Reporting Period 744. 0 5 111.0 60 840.0

12. Number Of Hours Reactor Was Critical 744.0 3 788.1 44 615.9 l3. Reactor Reserve Shutdown Hours 1 6.
14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours 12.3 31.2 o 4 Ig. Net Electrical Energy Generated (MWH) 474 472 2 366 113 26 896 109 l9. Unit Service Factor
20. Unit Availability Factor 100.0 72.6 70.5
22. Unit Capacity Factor (Using DER Net) 6 .8
23. Unit Forced Outage Rate 0.4 3.0
4. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Re e in maintenance and inspections Nov. 9 1980 Jan. 10 1981.

25. If Shut Down At End Of Report Period. Estimated Date of Startup.'6.

Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (o j77)

I)OCKET NO.

UNIT SIIUTDO)VNS ANI) PO'iVER REI)UCTIONS REPORT hlONTII I

i CI o Cause Er. Corrective o .) Ltccnscc o 4l o ~

iVii. l)ate ~ A Event ~ A Action lo o Repiwt > I Icvcnt I(ecurlcncc o

~ C/l 80-07-30 B N/A HA VAI.VEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system)

I 3 I': Forced Reason: Method: llxliibitG - Instructions S: Scbcdulcil A.l!quipu)ent Failure (Explain) I.hla>>ual I )r I ri'pJr Jlii)n ol Data B.hlaiiileiiance or Test . 2.hlanual Scram. I:))try Sliecls I'or l.icensee

( -Reflieliilg 3 Ault)IAJtiC SCrani. Evcol Report (LER) File (NUREG.

I) ltegiilaiory Rcslfti;lion 4.Oilier (llxplain) 016I )

I:.Operali)r Training k. Ltcciisc Exainiiialion I "Ad))III)IstralIvc G Operation Jl L'irI>r (Explain) I'xliibll I - Saine Source I'>/77) I I Oilier (Lxplaui)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT COMPLETED IIY <- T. Chilson MONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-iVet) (il(We.iVe t )

I 767 l7 790 733 l8 658 789 791 30 796 788 13 716 34 789 '75 793 IO 16 797 793 797 3S 7 6 l3 791 59 792 733 30 793 15 782 3l 795 l6 791 NOTE: Ave age daily power level greater than 777 NWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the averaile daily unit power level in MWe.Net for each day tn the reportintt tnonth. Coittpute to the nearest whole ate(Iawat t.

'0 0 OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY

~~80

~~~son TELEPHONE ~~~3824 OPERATING STATUS St. Lucie Unit No. 1 Notes - Unit operated at

l. Unit Name:

approxiataeely 100% R.P.,

2. Reporting Period: 'ezcept for load reduction
3. Licensed Thermal Power (MW:): 2560 850 of July 2-3, 1980.
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 2
6. tglaximum Dependable Capacity (Gross agWe): 822
7. Maximum Dependable Capacity (Net MWe): 777
8. If Changes Occur in Capacity Ratings (Items ltlumber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period '11.0 3I 655.0
12. Number Of Hours Reactor Was Critical 744.0 3 280.2 24 789.9
13. Reactor Reserve Shutdown Hours 129.5
14. Hours Generator On. Line 24 8.

IS. Unit Reserve Shutdown Hours 32.0 it. Grata Electrical Energy Generated (gtWH) 25 18 844 750

18. Net Electrical Energy Generated (MWH) 579 531 2 395 835 17 723 731
19. Unit Service Factor 100. 0 62.4 75.9
20. Unit Availability Factor 100.0 62.4 76.0
21. Unit Capacity Factor (Using MDC Net) 100.2 60.3 72.1
22. Unit Capacity Factor (Using DER Net) 58.4 69.8
23. Unit Forced Outage Rate 13. 2 6.5
24. Shutdowns Scheduled Over Next 6 i4Ionths(Type. Date, and Duration of ch) e
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SIIUTI)0'IVNS AND POIVER RE!)(ICTIONS l)OCKET NO.

UNIT NAhIE St. Lucie 0 I . No.l

  • r)

Llcc))sec Cause Ec Curreclive Ni). l)alc IA Event Action lo Q

Rcport > Prevent Recurrc>>ce 10 80-07-02 -G- N/A FILTER Load reduction Lo approximately 50% R.F . to clean condensate pun)p suction st:rainers.. (Non-nuclear system) 4 I': I o)ced Reason: hlelhod: I.xl)ibit G - Instructions S: Scl)cduled A-L'Iluipment Failure (Explain) I 4lanual II)r I rcpafall)nl ol Data It hlaintenance nr Test ~ 2 h4nual Sera)n. Lnlry Sl)cuts for Licensee C-Ref) li)t', 3 Au)on>atic Sera>>). Event Report (I.ER) File (NUR-l).)let,ulatory Restriction 4 Oll)cf (Lxplau)) EG f> I )

I .Opelalol' ran))l)g 8c License I:xan)u)i)lion

'F.Administrative G.Ot>erational E)rur (Expl>>in) Exl)ibil I - Sa)nc Source Il Oll)er t Explain)

P.O. BOX 5291GO,'IAiiII, FL 33152 FLOAIOA POWER 5 LIGHT COMPANY August 10, 1980 Office oz Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the July, 1980, Ope ating Summary Reports zor Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.

Very truly yours, A. D. Schmidt.

Vice President Power Resources VTC/DDC cc: Nr. James P. 0"Reilly Robert Lowenstein, Esquire PBOPLB... SBRVI'VG P"=C~LB

SUMMARY

OF OPERATiNG EXPERiENCE DOCKET NO '0 250 Turkey Point UNIT Unit No. 3 DATE August 10, 1980 COMPLETED BY V. T.. Chilson TELEPHONE (305) 552-3824 REPORT MONTH JULY, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of .

July 8-9, 1980. Refer to "Unit Shutdowns and Power Reductions" section of July, 1980, Operating Status Report =or additional infor-mation.

Major Sa ety-related maintenance activities performed during the month included:

inspections'nd reauirements of'E Bulletins and NUREG-0578 are'ontinuing.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATlViG EXPERIENCE DOCKET NO. 50 251 Turkey Point UNIT Unit No. 4 DATE Au ust 10, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT i~!ONTH JULY, 1980 Unit, No. 4 operated at approximately 100% R.P., except for load reduction of July 30-31, 1980. Refer to "Unit. Shutdowns and Power Reductions" section of the July, 1980, Operating Status Report for additional infor-mation.

Major Safety-related maintenance activities performed during the month included:

inspections and requirements fo ZE Bulletins and NUREG-0578 in progress.

Florida, Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATiNG EXPERiENCE DOCKET NO. 50 - 335 St. Lucie UNiT Unit No. 1 DATE A'u ust 10, .1980 COMPLETED BY V. T. Chilsc~n TELEPHONE (305) 552- 3824 REPORT MONTH JULY 1980 Unit operated at approximately 100% R.P., except for load rec;uction of July 2-3, 1980. Refer to "Unit Shutdowns and Power Reductioris" section of the July, 1980, Operating Status Report for additional inf'ormation.

Major Safety-related maintenance activities pe formed du ing the month included:

inspections and reauirements of iE Bulletins and NUREG-0578 are continuing.

Florida Power & Light Com.-.,any commitments for NUREG-0578 implementation are continuing: Refer to correspondence between FPL and NRC for ad-ditional information.

!