| issue date = 07/28/1982
| issue date = 07/28/1982
| title = Forwards Weekly Status Summary of Joint Ebasco & C-E Engineering Verification Task Force for 820719-23
| title = Forwards Weekly Status Summary of Joint Ebasco & C-E Engineering Verification Task Force for 820719-23
| author name = BLODGETT T H
| author name = Blodgett T
| author affiliation = EBASCO SERVICES, INC.
| author affiliation = EBASCO SERVICES, INC.
| addressee name = EISENHUT D G
| addressee name = Eisenhut D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000389
| docket = 05000389
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATINFORMATION DISTRIBUTIO
{{#Wiki_filter:REGULAT    INFORMATION DISTRIBUTIO     'STEM       (RIDS)
'STEM(RIDS)AOCESSION NBR:8?08030296 DOCADA'TE!82/07/28NOTARIZED!
AOCESSION NBR:8?08030296         DOC ADA'TE! 82/07/28    NOTARIZED!     NO        DOCKET FACIL:50 389 St. Lucie Planti Unilt 2i Florida Power            8  Light  Co ~   05000389
NOFACIL:50389St.LuciePlantiUnilt2iFloridaPower8LightCo~'AUTH.NAMEAUTHORAFFILIATION, BLODGETTETOH, EbascoServicesi Inc,(subs,of'Enserch'Corp,)'RBCIP~NAMERECIPIENT AFFILIATION EISENHUTED.G.
  'AUTH. NAME          AUTHOR AFFILIATION, BLODGETTETOH,         Ebasco Servicesi Inc, (subs,     of 'Enserch 'Corp,)
DivisionofLicensing
  'RBCIP ~ NAME        RECIPIENT AFFILIATION EISENHUTED.G.         Division of Licensing


==SUBJECT:==
==SUBJECT:==
ForwardsweeklyIstatussummayof'JointEbasco8,0Eengineering verification taskforcefor82071923.OISTRISUTION CODE:SOOISCOPIESiRECEIVED:LTR
Forwards weekly Istatus summa y of 'Joint Ebasco 8, 0          E engineering verification task force for 820719 23.
'ENCLJSIZE:.TITLE:PSAR/FSAR AMDTSandRelatedCorrespondence NOTES:DOCKET05000389RECIPIENT IDCODE/NAME A/DLICENSNGLICBR¹3LAINTERNAL:
OISTRISUTION CODE: SOOIS COPIES iRECEIVED:LTR 'ENCL                J  SIZE:.
ELD/HDS2IE/DEPEPDS35NRR/DE/CEB 11NRR/DE/GB 28NRR/DE/MEB 18NRR/DE/QAB 21NRR/DE/SEB 25NRR/DHFS/LQB 32NRR/DHFS/PTRB20 NRR/DSI/A'SB 27NRR/DSI/CS8 09NRR/DSI/ItCSB 16NRR/DSI/RAB22NRR/DST/LGB 33RGN2EXTERNAL:
TITLE: PSAR/FSAR AMDTS and Rel ated Corr espondence NOTES:
ACRS41DMB/DSS(AMDTS)LPDR03NSIC05COPIESLTTRENCL10101011112?1111111111111111111?'21010111111RECIPIENT IDCODE/NAME LICBR¹PBCNERSESEY~01IEFILEIE/DEP/EPLB 36NRR/DE/EQB 13NRR/DE/HGEB 30NRR/DE/MTEB 17NRR/DE/SAB 24NRR/DHFS/HFEBOO NRR/DHFS/OLB 34NRR/DSI/AEB26NRR/DSI/OPB 10NRR/DSI/ETSB 12NRR/DSI/PSB19NRRSB23GFILE04/MI8BNL(AMDTS ONLY)FEMA~REPDIV39NRCPDR02NTISCOPIESLTTRENCL1011113333'2?1111111111111111111011111111TOTALNUMBEROFCOPIESREQUIRED:
RECIPIENT        COPIES            RECIPIENT              COPIES ID CODE/NAME       LTTR ENCL      ID CODE/NAME            LTTR ENCL A/D LICENSNG          1      0    LIC BR ¹P BC                1      0 LIC BR ¹3 LA          1      0    NERSES E Y~      0 1      1      1 INTERNAL: ELD/HDS2                1      0    IE FILE                    1      1 IE/DEP EPDS    35    1      1    IE/DEP/EPLB      36        3      3 NRR/DE/CEB     11    1      1    NRR/DE/EQB        13        3      3 NRR/DE/GB       28    2      ?    NRR/DE/HGEB 30            '2      ?
LRTTR58ENCL53 6~p)III Engineering Verification TaskceEbascoServicesIncorporated TwoWorldTradeCenter-15thFloorNewYork,N.Y.10048July28,1982Ltr.No.EVP-100/SL-2 OfficeofNuclearReactorRegulations Attention:
NRR/DE/MEB     18    1      1    NRR/DE/MTEB 17              1      1 NRR/DE/QAB     21          1    NRR/DE/SAB        24        1      1 NRR/DE/SEB     25    1      1    NRR/DHFS/HFEBOO            1      1 NRR/DHFS/LQB 32      1      1    NRR/DHFS/OLB 34            1      1 NRR/DHFS/PTRB20       1      1    NRR/DS I/AEB 26            1      1 NRR/DSI/A'SB 27      1      1    NRR/DSI/OPB 10              1 NRR/DSI/CS8 09        1      1    NRR/DSI/ETSB 12            1      1 NRR/DSI/ItCSB 16      1      1    NRR/DS I/PSB      19              1 NRR/DS I/RAB 22      1      1    NR        RSB    23        1      1 NRR/DST/LGB 33        1      1        G FILE        04        1      1 RGN2                  ?    '2              /MI8              1      0 EXTERNAL: ACRS              41  10    10      BNL(AMDTS ONLY)             1      1 DMB/DSS (AMDTS)      1      1    FEMA~REP DIV 39            1      1 LPDR            03    1      1    NRC PDR          02        1      1 NSIC            05    1      1    NTIS                        1      1 TOTAL NUMBER OF COPIES REQUIRED:       LRTTR  58  ENCL      53
MrDarrellGEisenhut, DirectorDivisionofLicensing USNuclearRegulatory Commission Washington, DC20555


==DearMrEisenhut:==
6
  ~ p ) II I


Re:ST.LUCIEUNITNO.2DOCKETNO.50-389ENGINEERING VERIFICATION PROGRAMWEEKLYSTATUSSUMMARYFORPERIODJULY19-JULY23,1982Attachedforyourinformation istheWeeklyStatusSummaryoftheJointEbascoandCombustion Engineering TaskForcefortheperiodJuly19throughJuly23,1982.Verytrulyyours,THBlodgettJointTaskForceChairmanTHB:ggvAttachment cc:RobertEUhrig,FPLDLChristian, FPLw/attach.
Engineering Verification Task    ce Ebasco Services Incorporated Two World Trade Center  15th Floor New York, N. Y. 10048 July 28,  1982 Ltr. No. EVP-100/SL-2 Office of Nuclear Reactor Regulations Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D C 20555
w/attach.
 
820803029h 820728PDRADOCK05000389IPDR ENGINEERING VERIFICATION PROGRAM-SL2EBASCOTASKFORCEWEEKLYSTATUSSUMMARYFORPERIODJULY19-JULY23,1982Thefollowing activities wereunderwayduringtheperiodJuly19throughJuly23,1982:1-Thelistofeight(8)specifici.temstobeverifiedwasgiventotheEbascoandC-ETaskForceMgrsduringaconference callwiththeEVPCoordinator onJuly19.2-TheEbascoTaskForcehasmovedintoitsquartersonthe15thfloorofEbasco'scorporate officesat2WTC,NewYork,NY.3-Workhasstartedondetermination ofdesigninputsneededforthedesignreviewphaseoftheprogramandestablish-ingitemboundaries.
==Dear Mr Eisenhut:==
4-Theinitialrequestforinformation wastransmitted totheEVPCoordinator onJuly23.
 
C-EENGINEERING VERIFICATION TASKFORCE/St.
Re:   ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS
Lucie2WEEKLYSTATUSSUMMARYJuly19-July23HihlihtsArrangements werecompleted foraseparateWindsorworkfacilitytobeoccupiedbyC-EEngineering TaskForcepersonnel whileassignedtothisprogram.Theofficefacilities, consisting ofthreeofficetrailers, werecompleted andoccupiedduringthisreportperiod.OnMonday,July19,thespecificitemstobeverifiedwereselectedbyFP&Lduringajointtelephone conference betweentheEbascoandC-ETaskForcemanagersandtheFP&Lprogramcoordinator.
 
Uponselection ofverification itemsthefinalstageofrequisitioning qualified C-Etaskforceengineers wasbegunandwillcontinuethroughthenextreportperiod.StatusAC-Eprogramadministrative pro'cedure (EVPProcedure No.1)wascompleted inordertocoordinate activities betweenallparties.AC-Eprogramtechnical procedure willbecompleted duringthenextreportperiod.Component-specific boundarysketchesareinpreparation forreviewataJointTaskForcemeetingonJuly27.Formalrequestsfordesigninputsarebeingpreparedfortransmittal totheprojectteamsthroughtheFP&Lcoordinator.  
==SUMMARY==
~Ot
FOR PERIOD JULY 19  JULY 23, 1982 Attached  for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period July 19 through July 23, 1982.
~~TELEPHONE:CONVERSATION LOGENGINEERING VERIFICATION PROGRAM-SL2WEEKOF07/19/82DATEOFTELECONPARTICIPATING ORGANIZATIONS GENERALSUBJECTOFTELECONPREPAREROFTELECONRECORDJuly19*July19*FPL/C-E/Ebasco FPL/Ebasco Selection ofitemstobeverifiedbyTaskForce;schedulejointmeetingforJuly27.ItemstobeverifiedbyTaskForceEbascoEVPTaskForceMgr.EbascoEVPTaskForceMgr.*(Onerecorforbothtelecons)  
Very  truly yours, T H  Blodgett Joint Task Force  Chairman THB:ggv Attachment cc:   Robert  E  Uhrig, FPL  w/attach.
)0kCbEI'I}}
D  L Christian,    FPL  w/attach.
820803029h 820728 PDR ADOCK  05000389      I PDR
 
ENGINEERING VERIFICATION PROGRAM SL2 EBASCO TASK FORCE WEEKLY STATUS
 
==SUMMARY==
FOR PERIOD JULY 19  JULY 23,     1982 The  following activities were    underway during the period  July 19 through July 23, 1982:
1 The  list of eight (8) specific i.tems to be verified was given to the Ebasco and C-E Task Force Mgrs during a conference call with the EVP Coordinator on July 19.
2 The  Ebasco Task Force has moved    into its quarters  on the 15th  floor of  Ebasco's corporate  offices at 2WTC, New  York, NY.
3 Work  has  started  on determination of design inputs needed for the design review    phase of the program and establish-ing item boundaries.
4 The  initial request for    information was  transmitted to the  EVP  Coordinator on July 23.
 
C-E ENGINEERING VERIFICATION TASK FORCE/St.     Lucie  2 WEEKLY STATUS
 
==SUMMARY==
 
July 19  July 23 Hi hli hts Arrangements were completed for a separate Windsor work facility to be occupied by C-E Engineering Task Force personnel while assigned to this program.
The office facilities, consisting of three office trailers, were completed and occupied during this report period.
On Monday, July 19, the specific items to be verified were selected by FP&L during a joint telephone conference between the Ebasco and C-E Task Force managers and the FP&L program coordinator.
Upon selection of verification items the final stage of requisitioning qualified C-E  task force engineers was begun and will continue through the next report period.
Status A C-E program  administrative pro'cedure (EVP  Procedure No. 1) was completed in order to coordinate activities     between  all parties. A C-E program technical procedure   will be completed during the next report period.
Component-specific boundary sketches are in preparation      for review at a Joint  Task Force meeting on July 27.
Formal requests  for design inputs are being prepared for transmittal to the project  teams through the FP&L  coordinator.
 
t
~O
 
~
  ~                       TELEPHONE:CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM SL2 WEEK OF 07/19/82 DATE OF        PARTICIPATING          GENERAL SUBJECT          PREPARER OF TELECON        ORGANIZATIONS             OF TELECON            TELECON RECORD July 19*   FPL/C-E/Ebasco       Selection of items            Ebasco EVP to be verified by            Task Force Mgr.
Task Force; schedule  joint meeting for July 27.
July 19*    FPL/Ebasco           Items to be verified          Ebasco EVP by Task Force                Task Force Mgr.
    *(One recor  for both telecons)
 
b
    )0 k C
E I 'I}}

Latest revision as of 23:32, 29 October 2019

Forwards Weekly Status Summary of Joint Ebasco & C-E Engineering Verification Task Force for 820719-23
ML17212B774
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/28/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-100-SL-2, NUDOCS 8208030296
Download: ML17212B774 (8)


Text

REGULAT INFORMATION DISTRIBUTIO 'STEM (RIDS)

AOCESSION NBR:8?08030296 DOC ADA'TE! 82/07/28 NOTARIZED! NO DOCKET FACIL:50 389 St. Lucie Planti Unilt 2i Florida Power 8 Light Co ~ 05000389

'AUTH. NAME AUTHOR AFFILIATION, BLODGETTETOH, Ebasco Servicesi Inc, (subs, of 'Enserch 'Corp,)

'RBCIP ~ NAME RECIPIENT AFFILIATION EISENHUTED.G. Division of Licensing

SUBJECT:

Forwards weekly Istatus summa y of 'Joint Ebasco 8, 0 E engineering verification task force for 820719 23.

OISTRISUTION CODE: SOOIS COPIES iRECEIVED:LTR 'ENCL J SIZE:.

TITLE: PSAR/FSAR AMDTS and Rel ated Corr espondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR ¹P BC 1 0 LIC BR ¹3 LA 1 0 NERSES E Y~ 0 1 1 1 INTERNAL: ELD/HDS2 1 0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 3 3 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 3 NRR/DE/GB 28 2  ? NRR/DE/HGEB 30 '2  ?

NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEBOO 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DS I/AEB 26 1 1 NRR/DSI/A'SB 27 1 1 NRR/DSI/OPB 10 1 NRR/DSI/CS8 09 1 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/ItCSB 16 1 1 NRR/DS I/PSB 19 1 NRR/DS I/RAB 22 1 1 NR RSB 23 1 1 NRR/DST/LGB 33 1 1 G FILE 04 1 1 RGN2  ? '2 /MI8 1 0 EXTERNAL: ACRS 41 10 10 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA~REP DIV 39 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LRTTR 58 ENCL 53

6

~ p ) II I

Engineering Verification Task ce Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 July 28, 1982 Ltr. No. EVP-100/SL-2 Office of Nuclear Reactor Regulations Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D C 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD JULY 19 JULY 23, 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period July 19 through July 23, 1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB:ggv Attachment cc: Robert E Uhrig, FPL w/attach.

D L Christian, FPL w/attach.

820803029h 820728 PDR ADOCK 05000389 I PDR

ENGINEERING VERIFICATION PROGRAM SL2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD JULY 19 JULY 23, 1982 The following activities were underway during the period July 19 through July 23, 1982:

1 The list of eight (8) specific i.tems to be verified was given to the Ebasco and C-E Task Force Mgrs during a conference call with the EVP Coordinator on July 19.

2 The Ebasco Task Force has moved into its quarters on the 15th floor of Ebasco's corporate offices at 2WTC, New York, NY.

3 Work has started on determination of design inputs needed for the design review phase of the program and establish-ing item boundaries.

4 The initial request for information was transmitted to the EVP Coordinator on July 23.

C-E ENGINEERING VERIFICATION TASK FORCE/St. Lucie 2 WEEKLY STATUS

SUMMARY

July 19 July 23 Hi hli hts Arrangements were completed for a separate Windsor work facility to be occupied by C-E Engineering Task Force personnel while assigned to this program.

The office facilities, consisting of three office trailers, were completed and occupied during this report period.

On Monday, July 19, the specific items to be verified were selected by FP&L during a joint telephone conference between the Ebasco and C-E Task Force managers and the FP&L program coordinator.

Upon selection of verification items the final stage of requisitioning qualified C-E task force engineers was begun and will continue through the next report period.

Status A C-E program administrative pro'cedure (EVP Procedure No. 1) was completed in order to coordinate activities between all parties. A C-E program technical procedure will be completed during the next report period.

Component-specific boundary sketches are in preparation for review at a Joint Task Force meeting on July 27.

Formal requests for design inputs are being prepared for transmittal to the project teams through the FP&L coordinator.

t

~O

~

~ TELEPHONE:CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM SL2 WEEK OF 07/19/82 DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD July 19* FPL/C-E/Ebasco Selection of items Ebasco EVP to be verified by Task Force Mgr.

Task Force; schedule joint meeting for July 27.

July 19* FPL/Ebasco Items to be verified Ebasco EVP by Task Force Task Force Mgr.

  • (One recor for both telecons)

b

)0 k C

E I 'I