| issue date = 03/31/1996
| issue date = 03/31/1996
| title = Monthly Operating Rept for Mar 1996 for Re Ginna Nuclear Power Plant.W/960405 Ltr
| title = Monthly Operating Rept for Mar 1996 for Re Ginna Nuclear Power Plant.W/960405 Ltr
| author name = WALDEN J V, WIDAY J A
| author name = Walden J, Widay J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGUDRTOk-INFORMATION DISTRIBUTION
{{#Wiki_filter:CATEGORY 1 REGUDRTOk - INFORMATION     DISTRIBUTION %STEM (RIDE)
%STEM (RIDE)E'l~DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
E   'l ~
Rochester Gas&Electric Corp.WIDAY,J.A.
DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                     G 05000244 AUTH. NAME               AUTHOR AFFILIATION WALDEN,J.V.             Rochester Gas & Electric Corp.
Rochester Gas a Electric Corp.RECIP.NAME RECIPIENT AFFILIATION
WIDAY,J.A.               Rochester Gas a Electric Corp.
RECIP.NAME               RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Mo rating rept for Mar 1996 for Gina Station./960405 1 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2;109(9/19/72).
Mo                 rating rept for     Mar 1996     for Gina Station.
'05000244 E RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL LITCO BRYCE i J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A LE C TER.0 RGNl NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D N NOTE TO ALL"R1DS" RECIPIENTS:
                  /960405   1 DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR           ENCL       SIZE:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKI ROOM OWPN SD-S(EXT, 415"2083)TO ELIMINATE YOUR NAME PROM DISTRIBUTION LISTS POR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 76RK/HATE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TELt'PHONC ARcA cooc 710 546.2700 GINNA STATION April 5, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date         in accordance with 10CFR2,2;109(9/19/72).               '05000244 E RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME          LTTR ENCL PD1-1 PD                     1    1      JOHNSON,A                1    1 INTERNAL: AEOD/SPD/RRAB                 1              LE  C  TER  .0      1    1 NRR/DRPM/PECB               1    1      RGNl                      1    1 EXTERNAL   LITCO BRYCE i J H           1     1     NOAC                     1   1 NRC PDR                      1     1 D
N NOTE TO     ALL "R1DS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKI ROOM OWPN     SD-S(EXT, 415"2083) TO ELIMINATE YOUR NAME PROM DISTRIBUTION LISTS POR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR                 9   ENCL       9
 
76RK
                                                                                      / HATE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELt'PHONC ARcA cooc 710 546.2700 GINNA STATION April 5, 1996 US Nuclear Regulatory Commission Document   Control Desk Washington,   DC 20555


==Subject:==
==Subject:==
Monthly Report for March, 1996 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244  
Monthly Report for March, 1996 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear  Sir:==
 
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1996.
Very  truly yours, s  h A. Wida lant  Manager JAW:tjn li.00"8 Attachments c:  Mr. Thomas T. Martin    NRC  (1)
Vwoea<0077 960SSX PDR  ADQCK 05000244',
R                PDR
 
OPERATING DATA REPORT 50-244 ri 5 1996 COMPLETED BY:
John V. Walden TELEPHO    (716) 771 3588
: 1. Unit Name:              R.E. GINNA NUCLEAR POWER PLANT              Notes
: 2. Reporting Period:            March 1996
: 3. Licensed Thermal Power (MWI):                        1520
: 4. Nameplate Rating (Gross MWe):                          517
: 5. Design Electric Rating (Net MWe):                      470
: 6. Maximum Dependabte Capacity (Gross MWe):              490
: 7. Maximum Dependabte Capacity (Net MWe):                470
: 8. It Changes Occur in Capadty Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
: 9. Power Level to Which Restricted, If Any (Net MWe:
: 10. Reason For Restrtctions, If An  .
This Month        Yr.-to.Date              Cumulative-
: 11. Hours in Reported Period                                744.0              2184.0                  230952.0
: 12. Number of hours Reactor Was Critica                    662.5                2102.5                185769.6
: 13. Reactor Reserve Shutdovm Hours                            0.0                  0.0                  1687.6
: 14. Hours Generator On-line                                659.8              2099.8                          '82848.5
: 15. Unit Reserve Shutdown Hours                              0.0                  0.0                      8.5
: 16. Gross Thermal Energy Generated (MWH)                947615.0            3068799.0              259932107.0
: 17. Gross Electrical Energy Generated (MWH)            322337.0            1044176.0                86106676.0
: 18. Net Electrical Energy Generated (MWH)              306413.0            992756.0                81740568.0
: 19. Unit Service Factor (%)                                  88.7                  96.1                    79.2
: 20. Unit Availability Factor (%)                            88.7                  96.1                    79.2
: 21. Unit Capacity Factor (using MDC Net) (%)                87.6                  96.7                    76.4
: 22. Unit Capacity Factor (using DER Net) (%)                87.6                  96.7                    76.4
: 23. Unit Forced Outage Rate (%)                              11.3                  3.9                      5.5
: 24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Refuelin and Maintenance Start 4/01/96 Duration 58 da
: 25. It Shutdown At End of Report Period, Estimate Date of Startup:
: 26. Units in Test Status (Prior to Commercial OperaVon):                Force st                Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTAL COMMENCING JANUARY 1,                1975
** CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
 
G. ~
                          ~    'VERAGE DAILY UNIT POWER  LEVEL DOCKET NO:  50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE:      ril  5  1996 COMPLETED BY:
John Walden TELEPHONE:  7 6  771-3588 MONTH      March  1996 DAY AVERAGE    DAILY POWER LEVEL              DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                  (MWe-Net) 477                            17.          473 477                            18.          474
: 3.            477                            19.          473 4 ~            476                            20.          474
: 5.            477                            21.          473 6              476                            22.
                                                      '75
      ~
: 7.            362                            23.
24 25.
: 10.                                            26.          475 100                            27.          476
: 12.            426                            28.          475
: 13.            472                            29.          475 14  ~          473                            30.          476
: 15.            473                            31.          473
: 16.            473 INSTRUCTIONS On    this format,    list    the average    daily unit    power  .level in MWe-Net    for each  day  in reporting    month. Compute  to the nearest whole megawatt.
 
DOCKI:.T NO.
UNll NAhfl:    R E. CilNNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS                            I)A Il'-
CohfPLI'.1 I'.D BY ohn V. Walden REPORT hfONTH +arch                        ql:LIIPIIO      . (716) 771-3588              r Pl Pl            0                                C C      c 0      Licensee        Ew          0 ul                  Cause L Corrective 0          0                    0          C Ho.            Date                                  0    Event              0      0 D                          Action to 0 0      0                                            Q 0                Report              0      E 0                  Prevent Recurrence O~            0 4rl C            II        Vl Q O
0 Ct 3-7-96              84.2                      96-002            KE                "B" Condenser            Circulating Water ump  tripoed causing a Secondary system transient.
The Reactor was manually scramed due to Turbine Operatin Limits being exceeded. See LER  96-002        for    more    details.
l                      2                                                3 F: Forced              Reason:                                          hfcthod:                                Exhibit  G - Instructions S:    Scheduled        A-Equipment Failure (Explain)                    I-hfanual                              for Preparation of Data I3-hfaintenancc or Test                          2-hfanual Scram.                        Entry Sheets for Liccnscc C-Refueling                                      3-Automatic Scram.                      Event Rcport (LER) File (NUREG-D-Regulatory Restriction                        4-Other {Explain)                      0161)
E-Operator Training Bc Liccnsc Examination F-Administrative G-Operational Error (Explain)
Rtv. 4/85 4949          II-Other (Explain)                                                                      Exhibit I - Same Source


==Dear Sir:==
NARRATIVE  
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1996.Very truly yours, s h A.Wida lant Manager li.00"8 JAW:tjn Attachments c: Mr.Thomas T.Martin NRC (1)Vwoea<0077 960SSX PDR ADQCK 05000244', R PDR OPERATING DATA REPORT COMPLETED BY: ri 5 1996 50-244 John V.Walden TELEPHO (716)771 3588 Notes 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: March 1996 3.Licensed Thermal Power (MWI): 1520 4.Nameplate Rating (Gross MWe): 517 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependabte Capacity (Gross MWe): 490 7.Maximum Dependabte Capacity (Net MWe): 470 8.It Changes Occur in Capadty Rating (Items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted, If Any (Net MWe: 10.Reason For Restrtctions, If An.This Month Yr.-to.Date Cumulative-11.Hours in Reported Period 12.Number of hours Reactor Was Critica 13.Reactor Reserve Shutdovm Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)744.0 662.5 0.0 659.8 0.0 947615.0 322337.0 306413.0 88.7 88.7 87.6 87.6 11.3 2184.0 2102.5 0.0 2099.8 0.0 3068799.0 1044176.0 992756.0 96.1 96.1 96.7 96.7 3.9 230952.0 185769.6 1687.6'82848.5 8.5 259932107.0 86106676.0 81740568.0 79.2 79.2 76.4 76.4 5.5 24.Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin and Maintenance Start 4/01/96 Duration 58 da 25.It Shutdown At End of Report Period, Estimate Date of Startup: 26.Units in Test Status (Prior to Commercial OperaVon):
Force st Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION'UMULATIVE TOTAL COMMENCING JANUARY 1, 1975**CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 G.~~'VERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: ril 5 1996 COMPLETED BY: John Walden TELEPHONE:
7 6 771-3588 MONTH March 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)477 17.473 477 18.474 3.477 19.473 4~476 20.474 5.477 21.473 6~476 22.7.362 23.24'75 25.10.26.475 12.13.100 426 472 27.28.29.476 475 475 14~15.473 473 30.31.476 473 16.473 INSTRUCTIONS On this format, list the average daily unit power.level in MWe-Net for each day in reporting month.Compute to the nearest whole megawatt.
DOCKI:.T NO.UNll NAhfl: R E.CilNNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS I)A Il'-CohfPLI'.1 I'.D BY ohn V.Walden REPORT hfONTH+arch ql:LIIPIIO
.(716)771-3588 r Ho.Date 0 0 O~Pl C 0 0 0 Pl 0 c 0 0 0 0 4rl C 0 Ct Licensee Event Report II Ew 0 0 0 Vl Q C 0 ul 0 C Q D E 0 O Cause L Corrective Action to Prevent Recurrence 3-7-96 84.2 96-002 KE"B" Condenser Circulating Water ump tripoed causing a Secondary system transient.
The Reactor was manually scramed due to Turbine Operatin Limits being exceeded.See LER 96-002 for more details.l F: Forced S: Scheduled Rtv.4/85 4949 2 Reason: A-Equipment Failure (Explain)I3-hfaintenancc or Test C-Refueling D-Regulatory Restriction E-Operator Training Bc Liccnsc Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)3 hfcthod: I-hfanual 2-hfanual Scram.3-Automatic Scram.4-Other{Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Liccnscc Event Rcport (LER)File (NUREG-0161)Exhibit I-Same Source NARRATIVE  


==SUMMARY==
==SUMMARY==
OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Qinna Nuclear Power Plant DATE: A'l 5 19 COMPLETED BY: John Walden TELEPHONE:
OP OPERATING EXPERIENCE DOCKET NO:   50-244 UNIT: R.E. Qinna Nuclear Power Plant DATE: A   'l 5 19 COMPLETED BY:
716 1-3588 MONTH March 1996 A forced outage occurred on March 7, 1996 due to the trip of the"B" Condenser Circulating Water Pump.A manual reactor scram was initiated to prevent potential damage to the main turbine (see LER 96-002).The unit was placed on-line on March 11, 1996 and ran at full power for the remainder of the month.The average power for the month excluding the forced outage was 96%}}
John Walden TELEPHONE:   716     1-3588 MONTH   March   1996 A forced outage occurred on March 7,   1996 due to the   trip of the "B" Condenser Circulating Water Pump. A manual reactor scram was initiated to prevent potential damage to the main turbine (see LER 96-002). The unit was placed on-line on March 11, 1996 and ran at full   power for the remainder of the month.       The average power for the month excluding the forced outage was 96%}}

Latest revision as of 18:07, 29 October 2019

Monthly Operating Rept for Mar 1996 for Re Ginna Nuclear Power Plant.W/960405 Ltr
ML17264A442
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1996
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9604110077
Download: ML17264A442 (6)


Text

CATEGORY 1 REGUDRTOk - INFORMATION DISTRIBUTION %STEM (RIDE)

E 'l ~

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas a Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mo rating rept for Mar 1996 for Gina Station.

/960405 1 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2;109(9/19/72). '05000244 E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 LE C TER .0 1 1 NRR/DRPM/PECB 1 1 RGNl 1 1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "R1DS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKI ROOM OWPN SD-S(EXT, 415"2083) TO ELIMINATE YOUR NAME PROM DISTRIBUTION LISTS POR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

76RK

/ HATE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELt'PHONC ARcA cooc 710 546.2700 GINNA STATION April 5, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1996 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1996.

Very truly yours, s h A. Wida lant Manager JAW:tjn li.00"8 Attachments c: Mr. Thomas T. Martin NRC (1)

Vwoea<0077 960SSX PDR ADQCK 05000244',

R PDR

OPERATING DATA REPORT 50-244 ri 5 1996 COMPLETED BY:

John V. Walden TELEPHO (716) 771 3588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: March 1996
3. Licensed Thermal Power (MWI): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependabte Capacity (Gross MWe): 490
7. Maximum Dependabte Capacity (Net MWe): 470
8. It Changes Occur in Capadty Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrtctions, If An .

This Month Yr.-to.Date Cumulative-

11. Hours in Reported Period 744.0 2184.0 230952.0
12. Number of hours Reactor Was Critica 662.5 2102.5 185769.6
13. Reactor Reserve Shutdovm Hours 0.0 0.0 1687.6
14. Hours Generator On-line 659.8 2099.8 '82848.5
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5
16. Gross Thermal Energy Generated (MWH) 947615.0 3068799.0 259932107.0
17. Gross Electrical Energy Generated (MWH) 322337.0 1044176.0 86106676.0
18. Net Electrical Energy Generated (MWH) 306413.0 992756.0 81740568.0
19. Unit Service Factor (%) 88.7 96.1 79.2
20. Unit Availability Factor (%) 88.7 96.1 79.2
21. Unit Capacity Factor (using MDC Net) (%) 87.6 96.7 76.4
22. Unit Capacity Factor (using DER Net) (%) 87.6 96.7 76.4
23. Unit Forced Outage Rate (%) 11.3 3.9 5.5
24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance Start 4/01/96 Duration 58 da

25. It Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial OperaVon): Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

G. ~

~ 'VERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: ril 5 1996 COMPLETED BY:

John Walden TELEPHONE: 7 6 771-3588 MONTH March 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 477 17. 473 477 18. 474

3. 477 19. 473 4 ~ 476 20. 474
5. 477 21. 473 6 476 22.

'75

~

7. 362 23.

24 25.

10. 26. 475 100 27. 476
12. 426 28. 475
13. 472 29. 475 14 ~ 473 30. 476
15. 473 31. 473
16. 473 INSTRUCTIONS On this format, list the average daily unit power .level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKI:.T NO.

UNll NAhfl: R E. CilNNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS I)A Il'-

CohfPLI'.1 I'.D BY ohn V. Walden REPORT hfONTH +arch ql:LIIPIIO . (716) 771-3588 r Pl Pl 0 C C c 0 Licensee Ew 0 ul Cause L Corrective 0 0 0 C Ho. Date 0 Event 0 0 D Action to 0 0 0 Q 0 Report 0 E 0 Prevent Recurrence O~ 0 4rl C II Vl Q O

0 Ct 3-7-96 84.2 96-002 KE "B" Condenser Circulating Water ump tripoed causing a Secondary system transient.

The Reactor was manually scramed due to Turbine Operatin Limits being exceeded. See LER 96-002 for more details.

l 2 3 F: Forced Reason: hfcthod: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-hfanual for Preparation of Data I3-hfaintenancc or Test 2-hfanual Scram. Entry Sheets for Liccnscc C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NUREG-D-Regulatory Restriction 4-Other {Explain) 0161)

E-Operator Training Bc Liccnsc Examination F-Administrative G-Operational Error (Explain)

Rtv. 4/85 4949 II-Other (Explain) Exhibit I - Same Source

NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Qinna Nuclear Power Plant DATE: A 'l 5 19 COMPLETED BY:

John Walden TELEPHONE: 716 1-3588 MONTH March 1996 A forced outage occurred on March 7, 1996 due to the trip of the "B" Condenser Circulating Water Pump. A manual reactor scram was initiated to prevent potential damage to the main turbine (see LER 96-002). The unit was placed on-line on March 11, 1996 and ran at full power for the remainder of the month. The average power for the month excluding the forced outage was 96%