{{#Wiki_filter:CATEGORY 1 REGULA Y'INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9711140275 DOC.DATE: 97/10/31 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULA     Y 'INFORMATION DISTRIBUTIO         SYSTEM (RIDS)
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NM4E AUTHOR AFFILIATION WALDEN,J.V.
ACCESSION NBR:9711140275           DOC.DATE: 97/10/31 NOTARIZED: NO                     DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                     G   05000244 AUTH. NM4E           AUTHOR AFFILIATION WALDEN,J.V.           Rochester Gas 8 Electric Corp.
Rochester Gas 8 Electric Corp.WIDAY,J.A.
WIDAY,J.A.           Rochester Gas S Electric Corp.
Rochester Gas S Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
RECIP.NAME           RECIPIENT AFFILIATION VISSING,G.S.


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Oct 1997 for RE Ginna Nuclear Power Plant.W/971111 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
Monthly operating rept       for Oct   1997   for RE Ginna Nuclear Power Plant.W/971111       ltr.
05000244 G RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN1 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME VISSING,G.
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR         ENCL       SIZE:
FILE.CENTE 01 OC/b COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D 0 U E NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: Monthly Operating Report (per Tech Specs)
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 I I Il a I
NOTES:License Exp date       in   accordance with 10CFR2,2.109(9/19/72).               05000244 G
(~e~t Zs~nsirZZ j iIIiiiIii AND>'rizjyiz zsiizisia~iz~u/Zl~iizszzz 5TATE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N Y.14649-0001 TELEPHONE AREA CODE Tld 546.2700 November 11, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy ST Vissing Project Directorate I-1 Washington, DC 20555  
RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL          ID CODE/NAME        LTTR ENCL PD1-1 PD                 1      1      VISSING,G.                1    1 INTERNAL: AEOD/SPD/RRAB               1      1      FILE.CENTE      01        1    1 NRR/DRPM/PECB             1     1       OC/b                     1     1 RGN1                      1     1 EXTERNAL: LITCO BRYCE,J H             1     1       NOAC                      1     1 NRC PDR                  1     1 D
0 U
E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
I I
Il a I
 
(~
e j
~
t Zs~nsirZZ     iIIiiiIii AND
        >'rizjyiz       zsiizisia
        ~                                                                                                     5TATE iz~u/Zl     ~iizszzz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N Y. 14649-0001 TELEPHONE AREA CODE Tld   546.2700 November 11, 1997 US   Nuclear Regulatory Commission Document                   Control Desk Attn:                         Guy ST Vissing Project Directorate I-1 Washington,                     DC 20555


==Subject:==
==Subject:==
Monthly Report for October, 1997 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244  
Monthly Report for October, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244


==Dear Mr.Vissing:==
==Dear Mr.                 Vissing:==
Pursuant to Ginna Improved Technical Specifications Section 5'', attached is the monthly operating status report for Ginna Station for the month of October, 1997'ery truly ours, s h A.Wi ant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments W&'97iii40275 97i03i P DR ADOCK'50O0244 R PDR ll!llll!ill!
IIIlllIllllllllllllll flI


OPERATING DATA REPORT COMPLETED BY: DOCKET NO: 50-244 November 11 1997 John V.Walden TELEPHONE (716)771 3588 Notes 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: October 1997 3.Licensed Thermal Power (MWI): 1520 4.Nameplate Rating (Gross MWe): 517 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Ca pacity (Gross MWe): 490 7.Maximum Dependable Ca pacity (Net MWe): 480 8.If Changes Occur in Capacity Rating (Items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted.
5'    ',
If Any (Net MWe: 10.Reason For Restrictions, If An: This Month Yr.-to-Date Cumulative-11.Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Reactor Reserve Shutdovm Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit SeNice Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)745.0 469.0 0.0 468.7 0.0 687980.0 234504.0 222957.0 62.9 62.9 62.3 63.7 0.0 7296.0 7020.0 0.0 7019.7 0.0 10586628.0 3605561.0 3432693.0 96.2 98.0 100.1 0.0 244848.0 196934.3 1687.6*193946.2 8.5*276462898.0 91715870.0 87078559.8 79.2 79.2 76.6 76.7 5.6 24.Shutdowns Scheduled Over Next6Months(Type, DateandDurationof Each): Refuelin outa e started October 20 1997.Scheduled duration is 23 da s.25.If Shutdown At End of Report Period, Estimate Date of Startup: 26..Units in Test Status (Prior to Commercial Operation):
Pursuant to Ginna Improved Technical Specifications Section attached is the monthly operating status report for Ginna Station for the month of October, 1997
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION'UMUlATIVE TOTAL COMMENCING JANUARY 1, 1975"CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 Ji Il I A J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: November 11 1997 COMPLETED BY: TELEPHONE:
                                                                'ery  truly      ours, s  h A. Wi ant Manager xc:        U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
John V.Walden 16 771-3588 MONTH October 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY.POWER LEVEL (MWe-Net)492 17.452 2.492 18.447 3.492 19.439 492 20.169 5.492 21.-10 6.491 22.-10 7.492 23.492 24.9.492 25.10.491 26.12.492 491 27.28.13.483 29.14.488 475 468 30.31.16: 462 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.Compute to the nearest whole megawatt.
Project Directorate I-1 Washington, D.C. 20555 U. S.            Nuclear Regulatory Commission Region              I 475          Allendale Road King of Prussia, PA                19406                      W&'
DOCKET NO: 50-244 UNIT: R.E.GINNA NUCLEAR POWER PLANT r DAT:-ovember 1 1997.i COMPLETED BY: John V.Walden, UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October 1997 No.Date Type Duration (hours)Reason'ethod of shuting down reactors Licensee Event Report¹System Code4 Component Code'ause&Corrective Action to Prevent Recurrence 10/20/97.276.3 C 1 F: Forced S: Scheduled 2 Reason: A-Equipment (Explain)B-Maintenance or Test C-Refueling D-Regulatory E-Operator Training&Lecensee Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: 1-Manual 2-Manual Scram..3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)5 Exhibit 1-Same Source (V I NARRATIVE  
U.S.              NRC  Ginna Senior Resident Inspector Attachments 97iii40275 '50O0244            97i03i P DR          ADOCK PDR                              ll!llll!ill!
R                                                                                              flI IIIlllIllllllllllllll
 
OPERATING DATA REPORT DOCKET NO: 50-244 November 11 1997 COMPLETED BY:
John V. Walden TELEPHONE (716) 771 3588
: 1. Unit Name:             R.E. GINNA NUCLEAR POWER PLANT                 Notes
: 2. Reporting Period:               October 1997
: 3. Licensed Thermal Power (MWI):                         1520
: 4. Nameplate Rating (Gross MWe):                           517
: 5. Design Electric Rating (Net MWe):                     470
: 6. Maximum Dependable Ca pacity (Gross MWe):             490
: 7. Maximum Dependable Ca pacity (Net MWe):               480
: 8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
: 9. Power Level to Which Restricted. IfAny (Net   MWe:
: 10. Reason For Restrictions, IfAn:
This Month       Yr.-to-Date             Cumulative-
: 11. Hours in Reported Period                                 745.0              7296.0                244848.0
: 12. Number   of hours Reactor Was Critical                   469.0              7020.0                196934.3
: 13. Reactor Reserve Shutdovm Hours                             0.0                  0.0                  1687.6 *
: 14. Hours Generator On-line                                   468.7              7019.7                193946.2
: 15. Unit Reserve Shutdown Hours                                 0.0                  0.0                    8.5 *
: 16. Gross Thermal Energy Generated (MWH)                 687980.0          10586628.0              276462898.0
: 17. Gross Electrical Energy Generated (MWH)               234504.0          3605561.0              91715870.0
: 18. Net Electrical Energy Generated (MWH)                 222957.0          3432693.0              87078559.8
: 19. Unit SeNice Factor (%)                                     62.9                                        79.2
: 20. Unit Availability Factor (%)                               62.9                96.2                    79.2
: 21. Unit Capacity Factor (using MDC Net) (%)                   62.3                98.0                    76.6
: 22. Unit Capacity Factor (using DER Net) (%)                   63.7                100.1                    76.7
: 23. Unit Forced Outage Rate (%)                                 0.0                 0.0                     5.6
: 24. Shutdowns Scheduled Over Next6Months(Type, DateandDurationof Each):
Refuelin outa e started October 20 1997. Scheduled duration is 23 da s.
: 25. If Shutdown At End of Report Period, Estimate Date of Startup:
26.. Units in Test Status (Prior to Commercial Operation):               Forcast                 Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMUlATIVETOTAL COMMENCING JANUARY 1,                   1975 "CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
 
Ji I Il A
J
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE:   November 11   1997 COMPLETED BY:
John V. Walden TELEPHONE:      16   771-3588 MONTH   October   1997 DAY AVERAGE   DAILY POWER LEVEL             DAY AVERAGE DAILY. POWER LEVEL (MWe-Net)                                    (MWe-Net) 492                         17.               452
: 2.             492                           18.               447
: 3.             492                           19.               439 492                           20.               169
: 5.             492                           21.               -10
: 6.             491                           22.               -10
: 7.             492                           23.
492                           24.
: 9.             492                           25.
: 10.           491                           26.
492                          27.
: 12.           491                           28.
: 13.           483                           29.
: 14.           475                           30.
488            468                          31.
16:           462 INSTRUCTIONS On this format, list the average daily unit power level in       MWe-Net   for each day   in reporting month. Compute to the nearest whole       megawatt.
 
DOCKET NO: 50-244 UNIT: R.E. GINNA NUCLEAR POWER PLANT r DAT:-     ovember 1   1997 .i COMPLETED BY:
John V. Walden, UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October 1997 No. Date     Type Duration         Reason'ethod       of     Licensee System Code'ause Component              & Corrective Action to (hours)                    shuting down    Event    Code4                        Prevent Recurrence reactors        Report  ¹ 10/20/97.             276.3         C 1
F: Forced                 2 S: Scheduled             Reason:                       3                          4 A-Equipment (Explain)         Method:                    Exhibit G - Instructions B-Maintenance or Test         1-Manual                  for Preparation of Data C-Refueling                   2-Manual Scram..          Entry Sheets for D-Regulatory                 3-Automatic Scram.        Licensee Event Report E-Operator Training &         4-Other (Explain)          (LER) File (NUREG-Lecensee Examination                                     0161)
F-Administrative G-Operational Error (Explain)
H-Other (Explain) 5 Exhibit 1- Same Source
 
(V I
 
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Qinna Nuclear Power Plant DATE: COMPLETED BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Qinna Nuclear Power Plant DATE:   November 11  1997 COMPLETED BY:       v John V. Walden TELEPHONE:    16 771-3588 MONTH   October 1997 The unit operated at full power from October 1, 1997 to October 12, 1997. Power was reduced from October 12, 1997 to October 20, 1997 due to end of fuel cycle coast down. The unit was shutdown on October 20, 1997 for refueling and maintenance.
John V.Walden 16 771-3588 November 11 1997 v MONTH October 1997 The unit operated at full power from October 1, 1997 to October 12, 1997.Power was reduced from October 12, 1997 to October 20, 1997 due to end of fuel cycle coast down.The unit was shutdown on October 20, 1997 for refueling and maintenance.
 
0.~I P}}
0 . ~ I P}}

Latest revision as of 16:55, 29 October 2019

Monthly Operating Rept for Oct 1997 for Re Ginna Nuclear Power Plant.W/971111 Ltr
ML17264B094
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1997
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9711140275
Download: ML17264B094 (11)


Text

CATEGORY 1 REGULA Y 'INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9711140275 DOC.DATE: 97/10/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NM4E AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas 8 Electric Corp.

WIDAY,J.A. Rochester Gas S Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Monthly operating rept for Oct 1997 for RE Ginna Nuclear Power Plant.W/971111 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 G

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSING,G. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE.CENTE 01 1 1 NRR/DRPM/PECB 1 1 OC/b 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 U

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I I

Il a I

(~

e j

~

t Zs~nsirZZ iIIiiiIii AND

>'rizjyiz zsiizisia

~ 5TATE iz~u/Zl ~iizszzz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N Y. 14649-0001 TELEPHONE AREA CODE Tld 546.2700 November 11, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy ST Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for October, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

5' ',

Pursuant to Ginna Improved Technical Specifications Section attached is the monthly operating status report for Ginna Station for the month of October, 1997

'ery truly ours, s h A. Wi ant Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 W&'

U.S. NRC Ginna Senior Resident Inspector Attachments 97iii40275 '50O0244 97i03i P DR ADOCK PDR ll!llll!ill!

R flI IIIlllIllllllllllllll

OPERATING DATA REPORT DOCKET NO: 50-244 November 11 1997 COMPLETED BY:

John V. Walden TELEPHONE (716) 771 3588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes
2. Reporting Period: October 1997
3. Licensed Thermal Power (MWI): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Ca pacity (Gross MWe): 490
7. Maximum Dependable Ca pacity (Net MWe): 480
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted. IfAny (Net MWe:
10. Reason For Restrictions, IfAn:

This Month Yr.-to-Date Cumulative-

11. Hours in Reported Period 745.0 7296.0 244848.0
12. Number of hours Reactor Was Critical 469.0 7020.0 196934.3
13. Reactor Reserve Shutdovm Hours 0.0 0.0 1687.6 *
14. Hours Generator On-line 468.7 7019.7 193946.2
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
16. Gross Thermal Energy Generated (MWH) 687980.0 10586628.0 276462898.0
17. Gross Electrical Energy Generated (MWH) 234504.0 3605561.0 91715870.0
18. Net Electrical Energy Generated (MWH) 222957.0 3432693.0 87078559.8
19. Unit SeNice Factor (%) 62.9 79.2
20. Unit Availability Factor (%) 62.9 96.2 79.2
21. Unit Capacity Factor (using MDC Net) (%) 62.3 98.0 76.6
22. Unit Capacity Factor (using DER Net) (%) 63.7 100.1 76.7
23. Unit Forced Outage Rate (%) 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next6Months(Type, DateandDurationof Each):

Refuelin outa e started October 20 1997. Scheduled duration is 23 da s.

25. If Shutdown At End of Report Period, Estimate Date of Startup:

26.. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMUlATIVETOTAL COMMENCING JANUARY 1, 1975 "CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

Ji I Il A

J

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: November 11 1997 COMPLETED BY:

John V. Walden TELEPHONE: 16 771-3588 MONTH October 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY. POWER LEVEL (MWe-Net) (MWe-Net) 492 17. 452

2. 492 18. 447
3. 492 19. 439 492 20. 169
5. 492 21. -10
6. 491 22. -10
7. 492 23.

492 24.

9. 492 25.
10. 491 26.

492 27.

12. 491 28.
13. 483 29.
14. 475 30.

488 468 31.

16: 462 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO: 50-244 UNIT: R.E. GINNA NUCLEAR POWER PLANT r DAT:- ovember 1 1997 .i COMPLETED BY:

John V. Walden, UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October 1997 No. Date Type Duration Reason'ethod of Licensee System Code'ause Component & Corrective Action to (hours) shuting down Event Code4 Prevent Recurrence reactors Report ¹ 10/20/97. 276.3 C 1

F: Forced 2 S: Scheduled Reason: 3 4 A-Equipment (Explain) Method: Exhibit G - Instructions B-Maintenance or Test 1-Manual for Preparation of Data C-Refueling 2-Manual Scram.. Entry Sheets for D-Regulatory 3-Automatic Scram. Licensee Event Report E-Operator Training & 4-Other (Explain) (LER) File (NUREG-Lecensee Examination 0161)

F-Administrative G-Operational Error (Explain)

H-Other (Explain) 5 Exhibit 1- Same Source

(V I

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Qinna Nuclear Power Plant DATE: November 11 1997 COMPLETED BY: v John V. Walden TELEPHONE: 16 771-3588 MONTH October 1997 The unit operated at full power from October 1, 1997 to October 12, 1997. Power was reduced from October 12, 1997 to October 20, 1997 due to end of fuel cycle coast down. The unit was shutdown on October 20, 1997 for refueling and maintenance.