|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
Q AVERAGE DAILY UNIT FDIVER LEVEL.OQ+>00 DOCKET NO.COMPLETED GY~.T.Chilson TELEPHONE MONTH AUGUST, 1979 DAY AVERAGE DAILY POWER LEVEL{MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)636 17 642 538 18 19 20 647 6 7 10 11 12 13 15 16 645 547 388 646 22 25 26 28 19 30 31 647 655 55 659 654 653 656 INSTRUCTIONS On this format, list the average daily unit p<>wer level in Mme Net for each day in the rep<>rting month.C>>>t>pute to the nearest whole megawat t.(A>/77 l OPERATING DATA REPORT DOCKET NO.DAyp~sset.S, 1979 COMPLETED IIY V.T.Chilson TELEPHONE'~~3824 OPERATING STATUS 760 700 I.Unit Name: Turke Point Unit No.3 2.Reporting Period: 3.Licensed Thermal Power (MWt): 2200 4.Nameolate Rating (Gross MWe): 5.Design Electrical Rating (Net MWc): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net hIWe): Notes-Uni't No.3 operated at approximately 100%R.P.except for outages of Aug.3 and Aug.8-14, 1979.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
If Any (Net MWe): 10.Reasons For restrictions, If Any: NONE This Month Yr:to-Date Cumuh tive 744.0 45 245.0 625.8-0-2 530.9 97.3 87 214 397 27 738 990 26 250 750 74.0 82.3 74.2 82.3 67.3 79.1 64.1 76.0 2.7 0.4 Januarv 12 1980 ll.Hours In Reporting Period 5 831.0 59 072.6 12.Number Of Hours Reactor Was Critical 2 672.6 13.Reactor Reserve Shutdown Hours 0'94.6 14.Hours Generator On-Line 613.0 15.Unit Reserve Shutdown Hours-0--0-16.Gross Thermal Energy Generated (IIIWH)1 329 137 5 447 449 17.Gross Electrical Energy Generated (MWH)1 704 560 19.Unit Service Factor 43.4 20.Unit Availability Factor 43.4 21.Unit Capacity Factor (Using MDC Net)41.3 22.Unit Capacity Factor (Using DER Net)39.7 23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each}: Sc eduled refuelin maintenance and ins ections-November 15, 1979-25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ('>/77}
UNlT SHUTDO)UNS AND PO)VER REDUCTlONS DOCKETNO.50 250 REPORT MONTi(AUGUST, 1979 Nu.Date~A I tl rl Vl rj Q fV~A J~V)Liccnscc Event Report~~J F~Cause h.Corrcctivc Action to Prcvcnt Rceurrcncc 13 79-08-03 2.7 N/A IA INSTRU (c)Unit was tripped by the reactor pro-tection system during a transient condition caused by temporary loss of power supply to rod position indication system..Corrective action included repairing pressurizer pres-sure controller.(Nuclear system)14 79-08-08 S 128 3 A N/A CB VALVEX Unit was removed from service to repair severe packing leaks on valves located inside containment that could not be isolated.(Nuclear system)F: Forced S: Scheduled Reason: A.Equipment Failure (Explain)B.Maintenance oi Test.C-Refueling D Regulatory Restriction E-Operator Training 4 Uccnsc Exantinalion F-Administrative G Operational Frror (Explain)II Other (Explai>>)Method: l-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-instructions for Preparation of Data Entry Sltects for Licensee Event Repuit (LER)File (NUREG-OI 6I)5 Exhibit I-Sante Source AVERACE DEWILY UNITPOWER LEVEL DOCKET NO.'urkey Posit COMPLETED BY V.T.Chilson TELEPHONE MONTH AUGUST 1979 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 631 494 DAY AVERACE DAILY POWER LEVEL (MWe.Net)636 17 18 637 369 640 20 21 22 631 633 10 13 14 15.16 640 643 645 639 26 28'>9 30 31 08 62 641 642 INSTRUCTIONS On this format.list the average daily unit p>>wer level ill MWe Net for each day in the reporting nu>nth.C>>mputc lo the nearest whole megawatt.I>t/77)
OPERATING STATUS OPERATING DATA REPORT DOCKET NO.M-~'i1 DATE~<t:.8 1979 COMPLETED BY~~1LU.son TELEPHONE KH}53~-3824 Turke Point Unit No.4 2200 760 693 700 666 l.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Namephte Rating (Gross'MWe):
5.Design Electrical Rating (Net MWe): 6~Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): Notes-Unit Ho.4 operated at approximately 100%R.P.except for outages of Aug.3 5, and 22-28, 1979.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr..to.Date Cumulative 52.800.0 744.0 5 831.0 38 161.3 597.8 138.8 36 538.1 75 508 933 1 265 822 24 110 688 22 828 968 366 376 69.2 78.1 69.2 78.1 2.3.0 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15: Unit Reserve Shutdown Hours-0--0-16.Gross Thermal Energy Generated (MWH)7 369 066 18.Net Electrical Energy Generated (MWH)2 144 263 19.Unit Service Factor 2D.Unit Availability Factor 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 21.9 5.1 24.Shutdowns Scheduled Over Next 6 Months (Type, Dale, and Duration of Each): Steam Generator Tube Inspection Pro ram.-October 14-November 11 1979 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS REPOR f hjONTII AUGUST 1979 Page 1 of 2 DOCKET NO 50-251 COMPLETED BY Nu.Dale PI rj V Q J~C/l Licensee Event Report~Cause&.Corrcctivc Action to Prcvcltt Rccurt'cltcc 12 79-08-03 P 4,5 3 N/A ZZZZZZ Unit was tripped due to spurious signal from reactor protection system during a periodic surveillance test.(Nuclear system)13 79-08-05 P 9.2 N/A, ZZZZZZ Unit was tripped by the turbine pro-tection system during a periodic surveillance test when the turbine trip relatch device did not reset pro'perly.
Corrective actions in-cluded repairing the relatch linkage.(Non-nuclear system)14 79-08-22 P 148.0 N/A CB HOTORX Unit was removed from service due to excessive vibration of reactor cool-ant.pump shaft.Corrective actions included replacing failed motor bear-ing and repairing oil leak.(Non-I F: Forced S: Scheduled ('>I>7)Reason: A.Equipment Failure (Explain)B.Mainlcnancc or Test.('-Refueling D.Regulatory Restriction E-Operator Training&.License Examination F-Administrative G.Operational Error (Explain)I I.Other (Explain)hicthod: I-hianual 2.hlanual Scram.3-Automat tc Scram.4-Other (Explain)Exhibit G-Instructions for Preparation ol'Data Entry Sheets lor Licensee Event Rcport (LER)File (NUREG-OI 6I)Exhibit I-Sattte Source
UNIT SIIU fDOWNS AND POWER REDUCTIONS
'DOCKETNO 50-251 REPORT MONTH AUGUST 1979 Page 2 of 2 No.Date C TS~K a-gV'~t C4,~CO Licenscc Event Rcport>C EJ c IA C Q Q Cause A Corrective Action to Prevent Rccurrcncc 15 79-08-28 1.7.A N/A HH ZZZZZZ Unit was tripped by steam genera"..or No.48 level protection system whi'le increasing load after the unit was returned to service.{Non-nuclear system)I F: Forced S: Scheduled Reason: A-Equipment Failure (Explain)II Maintenance or Test-C.Refueling D-Regulatory Restrictiun E Operator Training&License Exantination F.Administrative G.Operational Error (Explain)II.Other (Explain)3 Method: I-Manual 2-blanual Scram.3-Autotnatic Scrant.4.Other (Explain)4 Exhibit G-Instructions for Preparation ol'Data Entry Sheets for Licensee Event Report (LER)File (NUREG-OI6I)Exhibit I-Same Source AVERAGE DAILY UNIT POWER LEVEL*COMPLETED IIY V.T.Chilson TELEPHONE MONTH AUGUST 1979 DAY AVERAGE DAILY POWER LEVEL{M We-Net)793 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)l7 38 4 793 91 786 l8 l9 20 2]22 78 782 781 85 10 I3 l4 IS l6 INSTRUCTIONS 771 790 789 785 768 2S 26 28'9 ,30 NOTE: 783 785 782 774 Average daily power level greater than 777 NNe due to cooler condenser cooling water.On this format.list the average daily unit power level in Mme.Net for each day ht the reporting>nonth.Compute to the nearest whole m gawatt..I')!77 1 OPERATING DATA REPORT OPERATING STATUS 850 822 1.Unit Name't..Lucie Unit No.1 2.Reporting Period: 3.Licensed Thermal Power (MWt): 2560 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): DOCKET NO.~Se t.8 1979 COMPLETED BY~'g.lson TELEPHONE~Q~-3824 Notes-Unit operated at approximately 100%R.P.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any: NONE-This Month Yr..to.Date Cumulative
- I I.12.13.14.15.16.17.18.19.20 21 23.23 615.0 19 005.8 831.0 4 218.2 118.5 18 351."2 3 992.0 21.0-0-44 016 485 9 798 337 3 165 120 14 272 070 13 419 122 2 976 284 77.7 68.5 77.8 68.5 3.1 63.6'70.9 6.1 4.7 s.79-13 and 79-14-Se tember 23-October 8, 1979 Hours In Reporting Period Number Of Hours Reactor Was Critical-744~0 Reactor Reserve Shutdown Hours-0--0 Hours Generator On.Line 744.0 Unit Reserve Shutdown Hours~,-0-Gross Thermal Energy Generated (MWH)1 897 496 Gross Electrical Energy Generated (MWH)614 590 Net Electrical Energy Generated (MWH)581 473 Unit Service Factor 100.0 Unit Availability Factor'00.0 Unit Capacity Factor (Using DER Net)97.5 Unit Forced Outage Rate-0-Shutdowns Scheduled Over Next 6 Months (Type..Date.
and Duration of Each): Outa e to erform ins ections re uired by TE Bulletin No 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I'i/77) r~IL LL~UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTII AUGUST 1979 DOCKET NO.COMPLETED BY V<<L.Date L o o El~Lll g Licensee Event RepLlrt sr 4/CP L/1 Cr Cause&Corrective Action to Prcvcnt Recurrence NONE F: Forced S: Schcdulctl ILIt77)Reason: A-Equipment Failure (Explain)B.hlaintenancc or Test~C-Refueling D.Regul at ory Rest riot ion E.Operator Training&LICCLtsc Examhlatlon F.Administrative.
G.Operational Error (Explain)II OthCr (EXpiaiLL)
Method: I-Manual 2.Manual Scram.3-Automatic Scram.4.Other (Explain)4 Exhibit G~Instructions for Preparation of Data Entry Shccts I'or Licensee Event Report (LER)File (NUREG-OI 6I)Exhibit I-Sante Source P.O.SOX 529100, MIAMI, FL 33152~it!Illy~I~I~Pi~i,., x~FLORIOA POWER 4 LIGHT COMPANY September 8, 1979 Office of Management.
Znformation and Program Controls U.S.Nuclear.Regulatory Commission Washington, D.C.20555 Gentlemen:
Attached are the August, 1979, Operating Summary Reports for Turkey Point Unit Nos,.3 and.4 and St,.Lucie Unit No.l.Very truly yours, D.Schmidt Vice President Power Resources VTC/DDC cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire PEOPLE~~~SERVING PEOPL-"
SU OF OPERATING EM'ERiENC DOCKET NO.50-250 Turkey Point, UNIT Unit No.3 DATE Se t.8 1979'OMPLETED BY V.T.Chil son'TELEPHONE, 305)552-3824~REPORT MONTH'UGUST;1979 0 Unit operated at.approximately 100~R.P.except for outages of August, 3 and August 8-14, 1979.Refer to"Unit Shutdowns and Power Reductions" secti'on of the August,, 1979, Operating Status.Report for additional information., Major Safe'ty-related maintenance activities performed during the month ,included:
Repairing valve packing leaks on valves located inside containment.
SUi&Y OF OPERATlNG EXPER ENC DOCKET NO.50-251 Turkey Point.UNZT Unit No.4 DATE Sept.8, 1979 COMPLETED BY hilson REPORT MONTH AUGUST 1979 TELEPHONE (305)552-3824 Unit operated.at approximately 100%R.P;except for outages of August 3, 5, and 22-Z8, 1979.Refer to"Unit Shutdowns and Power Reductions" section of the.August, 1979Operating Status Report for additional operation.
Major Safety-related maintenance activities performed during the month included: Replaced.failed motor bearing on reactor coolant pump'motor No.4A.Repaired oil leak on reactor coolant pump motor No..'4A.
SUMlt'0 P POCKET NO.'0-335 St.Lucie Unit No.1 DATE Se t.8, 1979 REPORT MONTH AUGUST, 1979 COMPLETED BX'.T.Chilson TELEPHONE (305)552-3824 I'nit operated.at approximately 100%R;P.No Major Safety-related.
maintenance was performed during the month.