ML17264A882: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/30/1997
| issue date = 04/30/1997
| title = Monthly Operating Rept for Apr 1997 for Ginna Nuclear Power Plant.W/970507 Ltr
| title = Monthly Operating Rept for Apr 1997 for Ginna Nuclear Power Plant.W/970507 Ltr
| author name = WALDEN J V, WIDAY J A
| author name = Walden J, Widay J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = VISSING G S
| addressee name = Vissing G
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244

Revision as of 02:14, 19 June 2019

Monthly Operating Rept for Apr 1997 for Ginna Nuclear Power Plant.W/970507 Ltr
ML17264A882
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1997
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9705130098
Download: ML17264A882 (11)


Text

CATEGORY 1 REGULATG1 INFORMATION DISTRIBUTION TEM (RIDS)ACCESSL6N fHBR:9709130098 DOC.DATE: 97/04/30 NOTARIZED:

NO.DOCKET ft FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas&Electric Corp.WIDAY,J.A.

Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

Document Control Branch (Document Contxol Desk)

SUBJECT:

Monthly operating rept for Apr 1997 for Ginna Nuclear Power Plant.W/970507 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2;2.109(9/19/72).

05000244 Q RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN1 COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 VISSING G.1 1-E CENTER 01 1 1 OC/DB'A;tmD 1 1 COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D U'OTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

(pilll IiBIYIE'i I IIIiiiiiz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TCLCPHONC*RE*COOE 7ld 546.2700 May 7, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for March, 1997 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

Pursuant to Qiana Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1997.Very truly yours, a.d s h A.Wi lant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14C7)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments

/]~7 9705130098 9'70430 PDR ADOCK 05000244 R PDR'V!lV!lV!ill!IV.FVlflllV S-*I'\L OPERATING DATA REPORT COMPLETED BY Ma 7 1997 50-244 John V.Walden TELEPHONE (716)771Q588 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: 'ril 1997 3.Licensed Thermal Power (MWI): 1520 4.Nameplate Rating (Gross MWe): 517 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Capacity (Gross MWe): 490 7.Maximum Dependable Capacity (Net MWe): 480 8.If Changes Occur ln Capacity Rating (Items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted, If Any (Net MWe): 10.Reason For Restrictions, If An: This Month Yr.-to-Date Cumulative**

11, Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)719.0 719.0 0.0 719.0 0.0 1090818.0 373401.0 355839.0 100.0 100.0 103.1 103.1 0.0 2879.0 2879.0 0.0 2879.0 0.0 4364821.0 1494789.0 1424246.0 100.0 100.0 103.1 103.1 0.0 240431.0 192793.3 1687.6*189805.5 8.5*270241091.0 89605098.0 85070112.8 78.9 78.9 76.3 76.3 5.7 24.Shutdowns Scheduled Over Next6 Months(Type, Date and Duration of Each): 'herefuelin andmaintenanceouta eisscheduledforOctober20 1997.The lanneddurationis22da s.25.If Shutdown At End of Report Period, Estimate Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):

Force st Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975'*CUMUlATIVE TOTAL COMMENCING NOVEMBER 8.1969 0 w1 E AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plan&DATE: Ma 7 1997 COMPLETED BY: TELEPHONE:

John Walden 716 771-3588 MONTH A ril 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)494 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)496 494 18.495 496 19.495 4.496 20.495 5.496 496 496 22.496 495 23.496 495 24.495 495 25.495 10.495 26.495 496 27.495 12.496 28.495 13.496 29.495 496 30.495 15.495 31.495 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.Compute to the nearest whole megawatt.

DOCKET NO: 50-244 UNIT: R.E.GINNA NUCLEAR POWER PLA T A E: a 7 1997 COMPLETED BY: John Walden, UNIT SHUTDOWN AND POWER REDUCTIONS No.Date Type Duration (hours)Reason'ethod of shuting down reactors'icensee Event Report 0 System Code'omponent Code'ause&Corrective Action to Prevent Recurrence 1 F: Forced S: Scheduled 2 Reason: A-Equipment (Explain)8-Maintenance or Test C-Refueling D-Regulatory E-Operator Training&Lecensee Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: 1-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)5 Exhibit 1-Same Source

/

'~~~-4-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: Ma 7 1997 MONTH A ril 1997 COMPLETED BY: TELEPHONE:

John Walden 16 771-3588 The unit operated at full power for the entire month of April.The average power level was 99.8%