| issue date = 09/06/1980
| issue date = 09/06/1980
| title = Monthly Operating Repts for Aug 1980
| title = Monthly Operating Repts for Aug 1980
| author name = CHILSON V T
| author name = Chilson V
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 12:27, 18 June 2019

Monthly Operating Repts for Aug 1980
ML17340A184
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/06/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A993 List:
References
NUDOCS 8009170281
Download: ML17340A184 (14)


Text

AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.COMPLETED IIY'T~Chilson t9aSl=MONTH AUGUST i 1980 DAY AVERAGE DAlLY POWER LEVEL (M We.Net}I 643 639 DAY AVERAGE DAlLY POWER LEVEL (MWe.Ãet)653 17 18 647 10 12 I3 IS 16 INSTRUCTlONS 637 64 503 664 658 655 658 656 656 656 649 656 20 21 22 24 25 16 17 28 o9 30 31 NOTE: 653 647 652 657 652 642 643,.644 648 Average daily power level greater than 646 MWe due to cooler condenser cooling water.On this format.list the aveta8e daily unit power Ie>eI in MWe.Net for each day in the rep<>rtin8 tn>>nth.C>>n>pute to the nearest whole megawat t.(ol77)

OPERATING DATA REPORT DOCKET NO.DA~~S~e.980 COMPLETED BY 2L3~31Q.son TEI.EPHONE

+~~2-3824 OPERATING STATUS Turke Point Unit No.3 760 693 680 1.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design EIcctrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWc): Notes-Unit No.3 operated at approximately 100X R.P., except for outage of Aug.6-7, 1980 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7}Since Last Report, Give Reasons: Maximum De endable Ca acit Gross MVe has been rerated to the most restricted seasonal conditions (summer)experienced.

Maximum Dependable Capacity (Net MWe)has been rerated accordingly.

9.Power Level To Which Restricted.

If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr.-to-Date Cumulative 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Nct)D.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 4 979.7 744.0 4&09.4 737.9 10 410 368 1 613 090 3 275 415 3 104 278 503 570 478 174 82.1 99.2 82.1 99.2 82.1 9.5 6.1.3 0.8 (Type.Date.and Duration of Each):-Oct.5-Nov.1 19&0.52 249.2 213.4 50 499.6 121.8 101 879 002 32 356 415 30 626 372 74.4 74.6 70.2'5.1 2.5 25.If Shut Down At End Of Report Period, Estimated Date of Startup 26.Units ln Test Status (Prior to Commercial Operation>:

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (i>(77)

UNIT SHUTDOWNS AND POIVER REDUIONS DOCKET NO.80 N<<.I)at>>El CL t-Q c 5L'~C~C/l Liccnscc Event Report~ce 0<<Vl rn Cr s~C~Q Cr Cause&Corrective Action lo Prevent Rccurrcncc 16 80-08-06 6.1 B N/A CB MOTOR X Unit No.3 was removed from service due to low oil level in reactor coolant pump motor No.3C.Cor-rective actions included adding oil.(Nuclear System)I I': F<<reed S: Sch>>du!cd Reason: A.Equipment Failure (Explain)B.Maintenance or Test-C-Refueling D.R>>gulatory Restriction L'.Operator Training&Liccnsc Examination F-Administrative G-Operational Error (Explain)II Other (Explain)3 Method: I.Manual 2.Manual Scram.3-Automatic Scrant.4.Other (Explain)4 Exhibit G-Instructions for Preparation ol Data Entry Shccts for Licensee Event Report (LER)Fil>>(NUREC.OI6()Exhibit I-Same Sour>>>>

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50 251 COMPI.ETED IIY V-T~ChilSOn MONTH AUGUST 1980 DAY AVERAGE DAlLY POWER LEVEL (h)We.Net)

I 633 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)639 17 634 10 13 15 16 635 630 633 640 644 645 644 640 641 640 19 20 21 22 25 26 28'79 30 31 635 634 635 636 638 640 642 634 630 6 2 636 INSTRUC11ONS Qn this format.list the average daily unit piiwer le~pl in MWe.Net for each day tn the reportin8 inonth.Crnnpute to the nearest whole rnegawat t.(ril77)

OPERATING DATA REPORT DOCKET NO..'iQ=~DATE~~980 COMPLETED BY 2LX.~~son TELEPHONE~F52-3824 OPERATING STATUS 646 I UdtN.Turke Point Unit No.4 2.Reporting Period: 3.Licensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net M We): e 7.Maximum Dependable Capacity (Net MWe): Notes-Unit No.4 operated at approximately 100K R.P.S.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit (Gross MRe)has been rerated to the most restricted seasonal conditions summer ex erieaced.Maximum De endable Ca acit Net MMe has been rerated accordingly.

9.Power Level To Which Restricted.

If Any (Net MWe): 10.Reasons For Restrictions, lf Any: NONE TMa Month Yr..to.Date Cumulative 744.0 4 532nl-0--166.6 4 627.3 31.2 90 848 116 1 633 024 28 900 833 70.8 70.9 69.0 64.1 3.0"I I.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 12.3 15.Unit Reserve Shutdown Hours 12.3 16.Gross Thermal Energy Generated (MWH)9 629 136 la.Grass Eleerrirnl Energy Generereg (grlyHl~4282 2 997 355 n e-slssss-19.Unit Service Factor 75.9 20.Unit Availability Factor 100.0 76.1 21.Unit Capacity Factor (Using MDC Net)98.6 75.1~~.Unit Capacity Factor (Using DER Net)92.0 70.0 23.Unit Forced Outage Rate-0-0.3 24.Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each): maintenance and ins ections>>Nov.9 1980-Jan.10, 1981.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 2&.Units ln Test Status l Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION Ig>/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTII AUGUST, 1980 t TELEPH0>K+30%t S52-~l)alc C t$~z 0 rl Vl r3 Q gr, I CO c o Z gee~CA Liccoscc Event Report>2<0 V'a IA cn'Cr C ILI Q 0 Cause h Corrective Action to Prcvcnt Recurrcocc N 0 N I F: Forced S: Scl>edulcd

('J/77)Reason: A.Equipment Failure (Explain)II hlaintenance or Test C.Refueling.

D.Regulatory Restriction L.Operator Training Ec Liccosc Examination F Administrative G Operational Error (Fxplain)II Other (Explain)3 hlethod: I.Manual 2.Manual Scram.3.Autotoatic Scraol.4ther (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Evcot Report (LER)File (NUREG.016I)Exhibit I-Salllc Sollrcc AVERAGE DAILY UNIT POWER LEVEL COMPLETED IIY V.T.Chilson DAY AVERAGE DAILY POWER LEVEL (MWe.Net)7 794 796 777 77 792 791 790 791 10 798 797 718 126 DAY 17 18 19 20 95 26 37<<2$>9 30 AVERAGE DAILY POWER LEVEL (MWe.Net)673 787 786 725'83 782 757 759 781 779 780 15 16 INSTRUCTIONS 255 394 31 NOTE: 749 Average daily power level greater than 777 MNe due to cooler condenser cooling water.On this format.list the avcral(c daily unit p>>wcr le~el in MIVe Nct for each day in the rep>>rtin>t n>>>nth.C>>rnpute to thc nearest whole megawatt.(o(77)

OPERATING STATUS OPERATING DATA REPORT DOCKET NO.'HL3Zi DATE R@~~980-COMPLETED BY T.Chilson TELEPHONE 552-3824 St.Lucie Unit No.1 2560 850 802 I.Unit Name 2.Reporting Period: 3., Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe}: S.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross M We): 7.Maximum Dependable Capacity (Net MWe): Notes-Unit operated at approximately 100X R.P., except for outages of Aug.14, 14-15, and 16-18, 1980, and reduced load operation of Aug.14-18, 1980.8.If Changes Occur in Ca pacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.

If Any (Net MWe): IO.Reasons For Restrictions, lf Any: This Month 744.0 Yr..to-Date 5 855.0 I I.Hours In Reporting Period l3.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line IS.Unit Reserve Shutdown Hours I 7.Gross Electrical Energy Generated (MWH)IS.Net Electrical Energy Generated (MWH)l9.Unit Service Factor 20.Unit Availability Factor 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate Z4.Shutdowns Scheduled Over Next 6 Months{Ty 4 2-0-3 889.7 72.0-0-701.4 7.3 7.3 3 101 490 551 240 519 201 2 915 036 66.4 94.3 8.8 64.1 62.1 87.0-0-pe, Date.and Duration of Each): Cumulative 32 399.0.2 129.5 24 719.7 39.3 1 395 990 18 242 932 76.3 76.4 72.5 70.2'.4 25.If Shut Down At End Of Report Period, Estimated Date of Startup: '6.Units In Test Status I Prior to Commercial Operation):

N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COhtMERCIAL OPERATION Page 1 of 2 80 UNIT SHUTDOWNS AND POWER REDUCTIONS 552-3824 DOCKET NO.iW!l-No.l Vo.Date CS A I I Vl rj Q A c~P Q~co g Liccn sec Event Report>C+Q cn Cr c EI C lh Cl E t" O Cr Cause Ec Corrective Actiun lo Prcvcnt Recurrcncc 80-08-14 S 10.7 N/A TRANSP Unit was removed from service to isolate main power transformer No.1B to repair oil leak.Cor-rective actions included installing new bushing.(Non-nuclear system)12 80-08-14 B N/A TRANSP Load was limited to the capacity of main transformer No.1A.(Non-nuclear system)13 80-08-14 7.3 N/A TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No.1B.(Non-nuclear system)I F: I'orccd S: Scheduled Reason: A.Equipment Failure (Explain)B.hIaintenance oi Test-C.Refueling D-Regulatory Restriction L-Operator Training Ec Liccnsc Examination F.Adminis t ra tive G-Operational Error (Fxplain)II.Other (Explain)3 hiethod: I-Manual 2 hlanual Scratn.3-Autotnalic Scram.4-Other (Explain)Exhibit G-Instructions I'or Preparation of Data Entry Sheets I'or Licensee Event Report (LER)File (NUREG.OI6 I)5 Exhibit I~Satne Source Page 2 of 2 80 UNIT SIIUTDOWNS AND POWER REDUCTIONS

.RL=335-UNIT NAME COMPLETED BY TELEPIIONE 305 552-382 No.l Nii.Date El 0-W~t C~-L a Q AK O~r>~A J I 0~C/l Liccoscc Event Rcport-" C<II'J cn G~J 2 Q Q Cause k Corrective Action lo Prevent Recurrcncc 14 80-08-17 24.6 B N/A EG TRANSP Unit was removed from service to install new bushing and return main power transformer No.1B to service.(Non-nuclear system)I': Forced S: Scheduled ('>/77)Rcasolt: A Equipment Failure (Explain)8 Maintenance or Test~C.Refueling D Regulatory Restriction E Operator Training 8c Liccnsc Examination F.Administrative

., G Operational Error (Fxplain)II.Other (Explaitt) hlethod: I-hianual 2 hlanual Scram.3-Automatic Scram.4 Other (Explain)Exhibit G-Instructions for Preparation oi'Data Entry Sheets I'or Licensee Event Report (LER)File (NUREG-OI6I)Exhibit I-Sante SourlY.

P.O.3OX 529100, MIAMI, FL 33152 FLORIOA POWER 4 LIGHT COMPANY September 6, 1980 Office of Management Information and Program Controls U.S.Regulatory Commission washington, D.C.20555 Gentlemen:

Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, D.chmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire e P'SER"ING P=QP'

.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Se t.6 1980 COMPLETED BY V..T.Chilson REPORT MONTH AUGUST, 1980 TELEPHONE (305)552-3824 Unit No.3 operated at approximately 100%R.P., except for outage of Aug.6-7, 1980.Refer to"Unit Shutdowns and Power Reductions" section of August, 1980, Operating Status Report for additional infor-mation.Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power&Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

-~.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-'251 Turkey.Point UNIT Unit No.4 DATE Se t.6, 1980 COMPLETED BY V.T.Chilson REPORT MONTH AUGUST 1980 TELEPHONE.

(305)552-3824 Unit No.4 operated at approximately 100%, R.P.Refer to"Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.

Major Safety-related maintenance activities performed duning the month included: Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power&Light Company commitments for NUREG-'0578 implementation are continuning.

Refer to correspondence between FPL and NRC for ad-ditional information.

.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-335 St.Lucie UNIT Unit No.1 DATE Se t.6 1980 COMPLETED BY TELEPHONE V.T.Chilson (305)552-3824 REPORT MONTH Unit operated at approximately 100%R.P., except for outages of August 14, 14-15, and 16-18, 1980, and reduced load operation of August 14-18, 1980.Refer to"Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power G Light Company Commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for.ad-ditional information.

A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.