Initiation
Results Other: ML20062B275, ML20062B279, ML20062B282, ML20062B286, ML20062B419, ML20062B425, ML20062B959, ML20062C142, ML20062C627, ML20062D348, ML20126B604, ML20126C064, ML20147E632, ML20147E640, ML20147F089, ML20147F096, ML20148A060, ML20150A644, ML20150A665, ML20150F064, ML20195C143, ML20195C345, ML20195C351, ML20195C364, ML20195C374, ML20195C385, ML20195C400, ML20195C458, ML20195C462, ML20195C533, ML20197D480 | |
From | |
MONTHYEARML20195C3451978-04-28028 April 1978
[table view]Informs That Structure of Walls in Control Bldg Does Not Meet Seismic Criteria for Sar.Reanalysis Confirms Control Bldg Will Maintain Structural Integrity & Plant Will Retain Functional Capability Under Design Loads ML20195C3641978-05-26026 May 1978 Clarifies Items 2 & 3 of DG Eisenhut 780502 Memo Re Proposed Mod to Plant Spent Fuel Storage Rack Proceedings.Design Engineer Activities in Fuel Bldg Design Should Be Considered Supporting Role ML20195C3851978-06-29029 June 1978 Affidavit of Chales M. Trammel,Iii.* Staff Concluded That an Amendment Authorizing Operation of Trojan Nuclear Power Plant Pending Upgrading of Seismic Capability of Control Bldg Walls Would Constitute a Decrease in Safety Margin ML20195C4001978-06-29029 June 1978 Affidavit of LC Shao Re Control Bldg Design Errors Resulting in Substantially Weaker Walls than Intended by Original Design criteria.As-built Structure Has one-half of Seismic Capacity & Safety Margin ML20195C3511978-06-29029 June 1978 Forwards Affidavits of CM Trammell & LC Shao Re Safety Significance of Control Bldg Design Deficiencies & NRC Findings Concerning Significant Hazards Considerations ML20195C3741978-06-30030 June 1978 Forwards Proposed Schedule of Actions to Bring Plant Control Bldg Into Substantial Compliance Ww/Requirements & Intended Design Margins.Detailed Description of Actions,Design Changes & Mods Will Be Submitted Prior to 780901.W/o Encl ML20195C4581978-08-19019 August 1978 Forwards NRC Questions & Licensee Responses,780804-17 Based on Info Provided by Bechtel Re Control Bldg.All Walls Except 1B,2 & 3 Have Dowel Capacities Exceeding Shear Capacities Controlled by Either Shear or Bending ML20195C4621978-08-21021 August 1978 Forwards Final NRC Responses to Questions 6 & 10 Re Control Bldg Mods,Based on Info Provided by Bechtel.Equipment in Structure Should Continue to Be Capable of Resisting Seismic Loadings Resulting from Real Earthquakes ML20195C5331978-08-22022 August 1978 Responds to Re Amendment Permitting Temporary Operation of Plant Independent of Public Hearing.Law Requires Hearing to Be Held in Connection W/Amend to OL ML20150A6081978-08-30030 August 1978 Forwards Request for Addl Info Re Control Bldg Per Seismic Nonconformance ML20150A6141978-09-0101 September 1978 Forwards Preliminary Results of Stardyne Finite Element Analysis of Trojan Control-Auxiliary-Fuel Bldg Complex & Assessment of Seismic Load Resistance of Bldg as Presented at 780828 Meeting. Lic. NPF-1 ML20195C1431978-09-0707 September 1978 Responds to Commissioner Davis Addressed to Commissioner Bradford & Expressing Concerns Re non-conformance to Specs of Control Bldg at Plant & Effect of Facility Shutdown on Rate Payers ML20147C2411978-09-12012 September 1978 Forwards Corrected Supplementary Info Transmitted by Ltr ML20150A6651978-09-20020 September 1978 Responds to Specified SSE Event.Stardyne Dynamic Analysis Was Used to Determine Structural Capacities & Forces. Concludes That Control Bldg Can Withstand SSE Event Safely ML20150A6441978-09-20020 September 1978 Forwards Final Results of Rev & Evaluation of Recent Stardyne Finite Element Analysis for Existing Control Bldg of Subj Facil.Suppl Structural Evaluation Response to Specified SSE Event,& Response to Questions Encl ML20150A6581978-09-21021 September 1978 Order Re Responses to NRC Interrogatories by Coalition for Safe Pwr & Consolidation.Cfsp Must:Respond W/In 14 Days to S1,S2,E1,G1,G2,G3,G8 & All Other Interrogatories;Clarify the Status of Spokesmen.Motion for Reconsideration Is Denied ML20062B9611978-09-28028 September 1978 Forwards 780628 Memo to R Mattson Re Info on Failures of safety-related Pipe Supports at Millstone 1 & Design Deficiencies on Similar Equipment at Shoreham.Aslb Notified of Pipe Support Base Plate Design ML20147E6321978-10-0303 October 1978 Transcript of Dj Broehl Testimony Re Plant History, Chronology of Events Since Apr 1978 & Summary of Licensee Efforts to Ensure Safe Interim Operation of Control Bldg ML20147E6401978-10-0303 October 1978 Transcript of SR Christensen Testimony Re Description of Seismic Instrumentation & Engineering Investigations to Be Conducted Following Earthquake ML20148A0601978-10-0606 October 1978 Direct Testimony of Harold Laursen Re Assignment to Eval Ability of Subj Facil Bldg Shear Walls to Resist Seismic Loading.Determined Shear Walls Can Withstand .25g Safe Shutdown Earthquake ML20062C1421978-10-11011 October 1978 Notice of Evidentiary Hearing on Issue of Interim Operation & Limited Appearance.Hearing to Determine Whether Interim Operation Should Be Permitted Prior to Mods Required by Order Will Be Held on 781023 & 1030-1101 ML20062B2751978-10-13013 October 1978 Forwards Ks Herring Testimony on Structural Adequacy of Trojan Control Bldg for Interim Operation & Rt Dodds & Je Knight Testimony on Seismic Features Relevant to Facility Safety ML20062B2791978-10-13013 October 1978 Testimony Verifying That Reasonable Assurance Exists That Shear Walls Will Withstand SSE or Obe.Original Intended Margins of Safety Reduced & Should Be Restored ML20062B2821978-10-13013 October 1978 Testimony Describing Insp of Humboldt Bay Following 5.4 Richter Magnitude Earthquake on 750609 & Std Insp Procedures After Seismic Event.Procedures to Be Followed During Earthquake Detailed ML20062B2861978-10-13013 October 1978 Testimony Responding to ASLB Questions Re Effects of Seismic Event on Plant Features Important to Maintaining Safety of Facility.Certificate of Svc Encl ML20148C0251978-10-13013 October 1978 Responds to NRC 781011-13 Questions Re Supplemental Structural Evaluation of Control Bldg,Particularly Shear Wall Capacity.Certificate of Svc Encl ML20147F0891978-10-16016 October 1978 Testimony of Bart Withers,As Superintendent of Subj Facil W/Statement of Qual Attached.Describes Capability of Plant to Function & Plant Staff to Respond Properly Immediately Following a Seismic Event ML20147F0961978-10-16016 October 1978 Licensee'S Testimony on Capability of Subj Facil to W/Stand Seismic Events.Statements of Qualifications,Ref & Append Are Attached.Description of Affected Structure & Deficiencies Such as Amount & Arrangement of Reinforcing Steel Provided ML20062B4191978-10-16016 October 1978 Forwards Ks Herring Testimony Re Suppl to Stardyne Analysis & Effect on Structural Capacity of Control Bldg.Certificate of Svc Encl ML20062B4251978-10-17017 October 1978 Testimony Re Suppl to Stardyne Analysis & Effect of Structural Capacity of Control Bldg.Structure Can Withstand SSE & Less Severe Obe,But Suppl Info Alters Earthquake Level Requiring Plant Insp ML20062B9591978-10-19019 October 1978 Forwards Recent Memoranda Re Certain Problems Experienced in Connection W/Pipe Support Base Plate Design.Staff Determining If Problems Have Generic Implications for Operating Facilities.Aslb Will Be Kept Informed ML20062C6271978-10-27027 October 1978 Forwards Further Response to NRC Staff Tech Questions Re Stardyne Analysis & Review.Includes Description of Criteria & Procedures Used & Explanation of Dev of New Acceleration time-history.Cert of Svc Encl ML20062D3481978-11-0606 November 1978 Cross-examination or Testimony Re Analysis & Review by Licensee Poge of safety-related Matls in Control-Auxiliary- Fuel Bldg Complex Will Be Taken at 781211 Hearing.Nrc Given Time to Reply to Interrogs.Proposed Findings Due 781120 ML20197D4691978-11-22022 November 1978 Forwards Suppl Document Supporting Floor Response Spectra Provided in 781027 & 781102 Submittals to NRC in Response to Request for Additional Info ML20197D4801978-11-22022 November 1978 Forwards Suppl Documentation in Support of Floor Response Spectra Provided in 781027 & 781102 Responses to NRC Info Requests.W/Cert of Svc Encl ML20150F0221979-01-0303 January 1979 FOIA Request for 20 Documents Listed Re ECCS Performance Calculations & Calculational Errors Identified by Westinghouse & Portland GE, & on Pipe Cracks in Containment Vessel of Trojan Plant ML20150F0641979-03-28028 March 1979 Forwards Response to NRC 790308 Technical Questions Re Control Bldg Design Mods.Response Also Being Served on ASLB & All Parties to Control Bldg Proceeding ML20126B6041980-03-0707 March 1980 Forwards Info Re Environ Qualification of Class IE Equipment in Response to Reporting Requirement of IE Bulletin 79-01B. Info Includes List of Class IE Components Required to Function Under Accident Resulting in Harsh Environ ML20126C0641980-03-20020 March 1980 Forwards Summary Tables Describing Reinforcing Steel in Shear Wall Panels of Control Auxiliary Fuel Bldg Complex in Response to NRC Verbal Request 1978-06-30 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:07551&oldid=3341966"