Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: 05000344/LER-1978-020, Forwards LER 78-020/03X-3, 05000344/LER-1978-020-03, /03L-0:on 780622,during Design Review for Piping Stress at Wall Penetrations,One Sys Was Found to Have Stress Exceeding Allowable Code.Caused by Design Error.Grouting Around Pipe Removed & Stress Reduced, ML19207C007, ML19209A322, ML19209A323, ML19209A336, ML19209A363, ML19209A432, ML19209A435, ML19209B063, ML19209B180, ML19209B241, ML19209D051, ML19209D056, ML19225A294, ML19241A963, ML19241A969, ML19241C194, ML19242B129, ML19242B972, ML19247B146, ML19248C628, ML19248C934, ML19249D678, ML19250C450, ML19253C727, ML19254D131, ML19254F178, ML19256F544, ML19256F546, ML19256F990, ML19256F993, ML19260C591, ML19261A687, ML19261D547, ML19261D820, ML19263E970, ML19267A290, ML19267A296, ML19269D190, ML19270E836, ML19270G402, ML19270H454, ML19271A997, ML19275A272, ML19282A785, ML19289C608, ML19289F192, ML19290C976, ML19294B198... further results
|
MONTHYEARML19209A3631974-02-25025 February 1974 Burn Tests on Silastic Rubber-Coated Glass Drop Cloths. Prof Qualifications of Ew Edwards Encl Project stage: Other ML19256F5461974-06-30030 June 1974 Miscellaneous Paper C-74-12,Pullout Resistance of Reinforcing Bars Embedded in Hardened Concrete, Prepared by Engineer Waterways Experiment Station Project stage: Other ML20195C3451978-04-28028 April 1978 Informs That Structure of Walls in Control Bldg Does Not Meet Seismic Criteria for Sar.Reanalysis Confirms Control Bldg Will Maintain Structural Integrity & Plant Will Retain Functional Capability Under Design Loads Project stage: Other ML20195C3641978-05-26026 May 1978 Clarifies Items 2 & 3 of DG Eisenhut 780502 Memo Re Proposed Mod to Plant Spent Fuel Storage Rack Proceedings.Design Engineer Activities in Fuel Bldg Design Should Be Considered Supporting Role Project stage: Other ML18004B9711978-06-0202 June 1978 Addresses Pipe Support Base Plate Problem.Discusses Review of Support Redesigns & Capability of Anchor Bolts to Withstand Cyclic Loadings Project stage: Approval ML20195C3511978-06-29029 June 1978 Forwards Affidavits of CM Trammell & LC Shao Re Safety Significance of Control Bldg Design Deficiencies & NRC Findings Concerning Significant Hazards Considerations Project stage: Other ML20195C3851978-06-29029 June 1978 Affidavit of Chales M. Trammel,Iii.* Staff Concluded That an Amendment Authorizing Operation of Trojan Nuclear Power Plant Pending Upgrading of Seismic Capability of Control Bldg Walls Would Constitute a Decrease in Safety Margin Project stage: Other ML20195C4001978-06-29029 June 1978 Affidavit of LC Shao Re Control Bldg Design Errors Resulting in Substantially Weaker Walls than Intended by Original Design criteria.As-built Structure Has one-half of Seismic Capacity & Safety Margin Project stage: Other ML20195C3741978-06-30030 June 1978 Forwards Proposed Schedule of Actions to Bring Plant Control Bldg Into Substantial Compliance Ww/Requirements & Intended Design Margins.Detailed Description of Actions,Design Changes & Mods Will Be Submitted Prior to 780901.W/o Encl Project stage: Other 05000344/LER-1978-020-03, /03L-0:on 780622,during Design Review for Piping Stress at Wall Penetrations,One Sys Was Found to Have Stress Exceeding Allowable Code.Caused by Design Error.Grouting Around Pipe Removed & Stress Reduced1978-07-21021 July 1978 /03L-0:on 780622,during Design Review for Piping Stress at Wall Penetrations,One Sys Was Found to Have Stress Exceeding Allowable Code.Caused by Design Error.Grouting Around Pipe Removed & Stress Reduced Project stage: Other ML20195C4581978-08-19019 August 1978 Forwards NRC Questions & Licensee Responses,780804-17 Based on Info Provided by Bechtel Re Control Bldg.All Walls Except 1B,2 & 3 Have Dowel Capacities Exceeding Shear Capacities Controlled by Either Shear or Bending Project stage: Other ML20195C4621978-08-21021 August 1978 Forwards Final NRC Responses to Questions 6 & 10 Re Control Bldg Mods,Based on Info Provided by Bechtel.Equipment in Structure Should Continue to Be Capable of Resisting Seismic Loadings Resulting from Real Earthquakes Project stage: Other ML20195C5331978-08-22022 August 1978 Responds to Re Amendment Permitting Temporary Operation of Plant Independent of Public Hearing.Law Requires Hearing to Be Held in Connection W/Amend to OL Project stage: Other ML20150A6081978-08-30030 August 1978 Forwards Request for Addl Info Re Control Bldg Per Seismic Nonconformance Project stage: RAI ML20150A6141978-09-0101 September 1978 Forwards Preliminary Results of Stardyne Finite Element Analysis of Trojan Control-Auxiliary-Fuel Bldg Complex & Assessment of Seismic Load Resistance of Bldg as Presented at 780828 Meeting. Lic. NPF-1 Project stage: Meeting ML20195C1431978-09-0707 September 1978 Responds to Commissioner Davis Addressed to Commissioner Bradford & Expressing Concerns Re non-conformance to Specs of Control Bldg at Plant & Effect of Facility Shutdown on Rate Payers Project stage: Other ML20147C2411978-09-12012 September 1978 Forwards Corrected Supplementary Info Transmitted by Ltr Project stage: Supplement ML20150A6441978-09-20020 September 1978 Forwards Final Results of Rev & Evaluation of Recent Stardyne Finite Element Analysis for Existing Control Bldg of Subj Facil.Suppl Structural Evaluation Response to Specified SSE Event,& Response to Questions Encl Project stage: Other ML20150A6651978-09-20020 September 1978 Responds to Specified SSE Event.Stardyne Dynamic Analysis Was Used to Determine Structural Capacities & Forces. Concludes That Control Bldg Can Withstand SSE Event Safely Project stage: Other ML20150A6581978-09-21021 September 1978 Order Re Responses to NRC Interrogatories by Coalition for Safe Pwr & Consolidation.Cfsp Must:Respond W/In 14 Days to S1,S2,E1,G1,G2,G3,G8 & All Other Interrogatories;Clarify the Status of Spokesmen.Motion for Reconsideration Is Denied Project stage: Approval ML20062B9611978-09-28028 September 1978 Forwards 780628 Memo to R Mattson Re Info on Failures of safety-related Pipe Supports at Millstone 1 & Design Deficiencies on Similar Equipment at Shoreham.Aslb Notified of Pipe Support Base Plate Design Project stage: Approval ML20062A5471978-09-29029 September 1978 Notifies That Staff Is Unable to File Testimony on Interim Oper of Subj Facil Before 781013 Re Finite Element Analysis. Urges That ASLB Commence Hearing on 781018 or 781023 Project stage: Request ML20147E6401978-10-0303 October 1978 Transcript of SR Christensen Testimony Re Description of Seismic Instrumentation & Engineering Investigations to Be Conducted Following Earthquake Project stage: Other ML20147E6321978-10-0303 October 1978 Transcript of Dj Broehl Testimony Re Plant History, Chronology of Events Since Apr 1978 & Summary of Licensee Efforts to Ensure Safe Interim Operation of Control Bldg Project stage: Other ML20148A0601978-10-0606 October 1978 Direct Testimony of Harold Laursen Re Assignment to Eval Ability of Subj Facil Bldg Shear Walls to Resist Seismic Loading.Determined Shear Walls Can Withstand .25g Safe Shutdown Earthquake Project stage: Other ML20062C1421978-10-11011 October 1978 Notice of Evidentiary Hearing on Issue of Interim Operation & Limited Appearance.Hearing to Determine Whether Interim Operation Should Be Permitted Prior to Mods Required by Order Will Be Held on 781023 & 1030-1101 Project stage: Other ML20148C0251978-10-13013 October 1978 Responds to NRC 781011-13 Questions Re Supplemental Structural Evaluation of Control Bldg,Particularly Shear Wall Capacity.Certificate of Svc Encl Project stage: Supplement ML20062B2751978-10-13013 October 1978 Forwards Ks Herring Testimony on Structural Adequacy of Trojan Control Bldg for Interim Operation & RT Dodds & Je Knight Testimony on Seismic Features Relevant to Facility Safety Project stage: Other ML20062B2791978-10-13013 October 1978 Testimony Verifying That Reasonable Assurance Exists That Shear Walls Will Withstand SSE or Obe.Original Intended Margins of Safety Reduced & Should Be Restored Project stage: Other ML20062B2821978-10-13013 October 1978 Testimony Describing Insp of Humboldt Bay Following 5.4 Richter Magnitude Earthquake on 750609 & Std Insp Procedures After Seismic Event.Procedures to Be Followed During Earthquake Detailed Project stage: Other ML20062B2861978-10-13013 October 1978 Testimony Responding to ASLB Questions Re Effects of Seismic Event on Plant Features Important to Maintaining Safety of Facility.Certificate of Svc Encl Project stage: Other ML20147F0961978-10-16016 October 1978 Licensees Testimony on Capability of Subj Facil to W/Stand Seismic Events.Statements of Qualifications,Ref & Append Are Attached.Description of Affected Structure & Deficiencies Such as Amount & Arrangement of Reinforcing Steel Provided Project stage: Other ML20147F0891978-10-16016 October 1978 Testimony of Bart Withers,As Superintendent of Subj Facil W/Statement of Qual Attached.Describes Capability of Plant to Function & Plant Staff to Respond Properly Immediately Following a Seismic Event Project stage: Other IR 05000344/19780201978-10-16016 October 1978 IE Inspec Rept 50-344/78-20 on 780905-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspec Incl: Plant Opers,Maint,Surveillance Test,Facil Security & Licensee Event Followup Project stage: Request ML20062B4191978-10-16016 October 1978 Forwards Ks Herring Testimony Re Suppl to Stardyne Analysis & Effect on Structural Capacity of Control Bldg.Certificate of Svc Encl Project stage: Other ML20062B4251978-10-17017 October 1978 Testimony Re Suppl to Stardyne Analysis & Effect of Structural Capacity of Control Bldg.Structure Can Withstand SSE & Less Severe Obe,But Suppl Info Alters Earthquake Level Requiring Plant Insp Project stage: Other ML20062B9591978-10-19019 October 1978 Forwards Recent Memoranda Re Certain Problems Experienced in Connection W/Pipe Support Base Plate Design.Staff Determining If Problems Have Generic Implications for Operating Facilities.Aslb Will Be Kept Informed Project stage: Other ML20062C6271978-10-27027 October 1978 Forwards Further Response to NRC Staff Tech Questions Re Stardyne Analysis & Review.Includes Description of Criteria & Procedures Used & Explanation of Dev of New Acceleration time-history.Cert of Svc Encl Project stage: Other ML20062D3481978-11-0606 November 1978 Cross-examination or Testimony Re Analysis & Review by Licensee Poge of safety-related Matls in Control-Auxiliary- Fuel Bldg Complex Will Be Taken at 781211 Hearing.Nrc Given Time to Reply to Interrogs.Proposed Findings Due 781120 Project stage: Other ML20197D4801978-11-22022 November 1978 Forwards Suppl Documentation in Support of Floor Response Spectra Provided in 781027 & 781102 Responses to NRC Info Requests.W/Cert of Svc Encl Project stage: Other ML20197D4691978-11-22022 November 1978 Forwards Suppl Document Supporting Floor Response Spectra Provided in 781027 & 781102 Submittals to NRC in Response to Request for Additional Info Project stage: Request ML19305A0701978-12-11011 December 1978 Limited Appearance Statement by Rd Pollard of Ucs to Explain the Kind of Inquiry Possible,Yet Untapped,W/Respect to Any Person of Pollards Competence & Commitment in Field of Nuclear Plant Licensing Project stage: Other ML19305A0631978-12-18018 December 1978 Forwards Limited Appearance Statement by Rd Pollard of Ucs. W/Encls Project stage: Other ML19270E8361978-12-21021 December 1978 Partial Initial Decision Re Whether Operation of Facility Should Be Permitted in Spite of Identified Design Deficiencies in Control Bldg & Prior to Mod.Decision Is to Allow Interim Operation Project stage: Other ML19267A3021978-12-22022 December 1978 Notice of Issuance of Amend 35 License NPF-1 Project stage: Approval ML19267A2901978-12-22022 December 1978 Forwards Partial Initial Decision,Amend 35 to License NPF-1 & Notice of Issuance Project stage: Other ML19267A2961978-12-22022 December 1978 Amend 35 to License NPF-1.Modifies Waiver Portions of Tech Specs & FSAR Criteria Which Have Not Been Followed Due to Design Deficiency in Control Bldg Shear Walls Project stage: Other 05000344/LER-1978-020, Forwards LER 78-020/03X-31978-12-26026 December 1978 Forwards LER 78-020/03X-3 Project stage: Other ML19308A2121978-12-26026 December 1978 Reportable Occurrence on 780622: Piping Penetrations Not Designed to Be Solidly Grouted Were Found to Be Solidly Grounted.During Subsequent Design Review,Excessive Support or Pipe Stresses Found on 11 Isometrics. Probable DELETE-RO Project stage: Other ML20150F0221979-01-0303 January 1979 FOIA Request for 20 Documents Listed Re ECCS Performance Calculations & Calculational Errors Identified by Westinghouse & Portland GE, & on Pipe Cracks in Containment Vessel of Trojan Plant Project stage: Request 1978-04-28
[Table View] |
Text
,
'e PORTLAND CsENEMAL E LEcTHrc Cox e.wy sat 5.W. S ALM os Sta tt?
PORTLAND.CncoON 97204 CMA ALES GOO CWIN. JR.
att s*aar c;s.sts.ct=t August 21, 1978 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation ATTN Mr. A. Schwencer, mief g 9050 Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Attached is the final NRC question and our response based on information provided by Bechtel in confirmation of telephone conversations between Portland General Electric Company (PGE),
Bechtel and the NRC's Ken Herring on August 4, 7, 8, 9, 10 and 16, 1978. We have also included supplementary information to our previous responses (Broehl to Schwencer latter dated August 19, 1978) to the other NRC questions received on the above dates.
This letter and attachments are being served on the Atomic Safety Licensing Board (ASLB) and all parties to the Control Building Hearings.
Sincerely, Y,o*1 C. Goodwin, Jr.
Assistaat Vice President Thermal Operation and Maintenance CG/LWE/TEB/crwtTCBB19 At t achment s 4
8811030120 780821 782360299 POR ADOCK 05000344 P
PDR (t4,i
/
t
NRC STAFF QUESTIONS AND LICCNSEE RESPONSES 1.
Supplement to the Response to Question 6 On Page 9, at the end of the second paragraph, add the s.
following sentence:
"An upper limit for other walls is 6 to 8 times yield".
b.
Delete the last sentence on Page 9. Itse a, and on Page 12, Ites b, and substitute the following:
[
"Table 6-2 gives the breakdown of me.ber capacities for 1
various aspect ratios. As indicated by the table, the.
major portion of the capacity comes from shear walls with aspect ratios less than 0.5."
TABLE 6-2 r
MEMBER CAPACITY AT VARIOUS ASPECT RATIOS CONTROL BUILDING l
Location and Ameet Ratio 'l I
Direction 0-0.5 0.5-0.75
>0.75 l
45'-61' 67(S) 15(S) 18(3)
N8 45'-61' 100(S) 0 0
EW 61'-77' 92(S) 0 8(3)
NS 61'-77' 93(S) 0 7(B)
EW
[a] Aspect ratio = height / length.
(b) The number indicates the percent of the capacity contributed by members having the indicated aspect ratio. The letters 5 or B indicate if the member is controlled by shear or bending, respectively.
2.
Question 10 Describe how the floor response spectra of the Control Building were prepared and how the curves were broadeneJ in the reSion of peak re spons e s.
i l
J Refer to the Licensee submittal of May 5,1978, Figure A-3 and, for example, the Control Building El. 93 f t N-S OBE floor response spectrum. The Fundamental Mode frequency is given as 6.2 Es in Figure A-3.
However, the horizontal portion representing the peak of the response spectrum appears to occur b' tween 4.0 Hz and 6.0 Hz.
e i
Please explain why the response spectrum broadening is not centered about the fundamental mode frequency of 6.2 Hz.
Also, describe the ef fects on floor spectra of upper bound and lower bound mass and stiffness characteristics of the Control Building.
l Response to Question 10 Floor response spectra were prepared from time history analysis of lumped-mass mathematical models. The mathematical model used for the Control Auxiliary and Fuei Buildings is shown in FSAR Figure 3.7-3, which is reproduced as Figure A-2 in the May 5,1978 Licensee sub-mittal. The derived time history input used in the analysis corre-t sponds to a spectrum which conservatively envelopes the required i
OBE spectrum as shown in FSAR Figures 3.7-6a through 3.7-6c.
In development of the spectra, response accelerations were calculated i
at the following frequencies in Hz, 0.1, 0.2, 0.3, 0.4, 0.5, 0.6, O.7, 0.8, 0.9. 1.0, 2.0, 3.0, 4.0, 5.0, 6.0, 7.0, 8.0, 9.0, 10, 20, i
30, 40, 50, 60, 70, 80, 90, and 100.
After initial plots were pre-1 pared, the spectra were broadened in the region of peak responses i
at the above center frequencies to provide envelope floor response spectra for use in seismic qualification of equipment.
For example, on the El. 93 f t N-S OBE floor response spectrum, the peak accelera-tion of about 5.lg (5 percent damping) calculated at the center fre-tuency of 5 Ez, was held at this peak value from about 4.2 Hz to about 6.3 Ez, which is approximately a + 20% frequency range about 5 Hz.
Trojan SSE floor response spectra were conservatively derived by multiplying OBE derived spectra by a factor of 1.67 which is the ratio of tne SSE peak horizontal acceleration to the OBE peak hori-zontal acceleration. This ratio was held constant throughout the entire frequency range of the spectra for a given damping ratio, hence, the SSE Spectra are very conservative.
Safety-related equipment in the Control Building were qualified by basically three different approaches.
a) For Control Building equipment furnished by Westinghouse, a generic seismic qualification test spectrum for "high seismic plants" was used. This spectrum for test input motion at the equipment mounting has a broadened peak in the frequency range of 5 Hz to 10 Hz, and envelopes the Trojan control room floor accelerations in the N-S, E-W and vertical directions through the frequency range of about 5 Rz to 20 Rs.
Hence, the control roon equipnent supplied by Westinghouse was qualified to levels higher than reauired with respect to the Control Building re s pons e.
b) Most of the other equipment not supplied by Westinghouse was qualified by testing, such as the motor control centers, and was subjected to a sinusoidal vibration scan test to identify r esonant frequencies.
These vibration scans typically showed that such equipment was outside the range of the pean response as shown on the Control Building floor response spectra, and gtnerally ranged from about 15 to 20 Hz.
Some of the equipment, such r.s HVAC control compo-nents, was qualified by subjecting it to test input motion for which the response enveloped the required support point response spectra.
c) The equipment which was qualified by analysis used two methods of calculating responses. Most of this equipment, such as the main control boards, used the response spec-trum peak acceleration without any frequency consideration.
Hence, throughout the entire frequency range, the peak value of the floor response spectra was used for qualifi-ca tion.
Some structurally simple equipment, such as spring-mounted EVAC f an motors, was qualified by calculat-ing the natural frequency and using the floor response spectra to determine the seismic response. This equipment had frequencies either much higher or much lower than the frequency corresponding to the peak value.
The ef fect of reduction in mass together with consideration of elastic stiffness produces a small change in the Control Building floor response spectra.
The reduced mass will result in a slight shif t of the structural frequencies toward the higher frequency range.
Concerning the possibility of inelastic behavior, the ef fective stiffness of the strue ure will decrease and the effective damping vill increase.
The decrease in stif fness will result in a shif t of the structural frequencies, and thus the spectral peak locations, to the lower frequency range.
The increase in structural damping will result in lowering of the spectral peak values. The frequency shif ts due to inelastic behavior may or may not be totally enveloped by the spectrum broadening proc.edure, depending upon the extent of the inelastic action.
Nevertheless, consider-ing the lower spectral values, the compensating ef fect on the spectra of reduction in mass, the vide band nature of the ground spectra and the built-f s conservatiras of the equipment design, the equipment in the structure should continue to be capable of resisting seismic loadings resulting f rom real earthquakes.
TEB/c rwTTCBB22
F UNITED STtTES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
Docket 50-344 PORTLAND GENERAL ELECTRIC COMPANY,
)
et at
)
(Control Building Proceeding)
)
(Trojan Nuclear Power Plant)
)
CERTIFICATE OF SERVICE I hereby certify that on August 22, 1978, a letter dated August 21, 1978 frem the Licensee to the Director of Nuclear Reactor Regulation with attached "NRC Staff Questions and Licensee Responses", and "Licensees' Answer to ' Notice of Hearing on Order for Modification of License, and of Special Prehearing Conference' and to ' Notice of Eviden-tiary Hearing'" dated August 21, 1978 have been served upon the persons listed below by depositing copies thereof in the United States mail with proper postage af fixed for first class mail.
t Marshall E. Miller, Esq., Chairman Atomic Safety and Licensing Board Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Washington, D. C.
20555 Dr. Kenneth A. McCollom, Dean Atomic Safety and Licensing Appeal Division of Eng.. sering, Board Architecture and Technology U. S. Nuclear Regulatory Commission Oklahoma State University Washington, D. C.
20555 Stillwater, Oklahoma 74074 Robert M. Johnson, Esq.
Dr. Hugh C. Paxton Assistant Attorney General 1229 - 41st Street 100 State Office Building Los Alamos, New Mexico 97544 Salem, Oregon 97310 Joseph R. Gray, Esq.
Robert Lovenstein, Esq.
Counsel for NRC Staff Lovenstein, Newman, Reis & Axelrad U. S. Nuclear Regulatory Commission Suite 1214 Washington, D. C.
20555 1025 Connec ticut Ave., N. W.
Washington, D. C.
20036 Columbia County Courthouse Law Library Mr. Eugene Rosolie Circuit Court Room Coalition for Safe Power St. Helens, Oregon 97051 215 S. E. 9th Avenue Portland, Oregon 97214 l
Ms. Nina 3 ell l
2018 N. W. Everett 1210 Mr. Stephen M. Willingham l
Portland, Oregon 97209 555 N. Tomahawk Drive Portland, Oregon 97217 I
s:
CERTIFICATE OF SERVICE (Concluded)
Columbia Environmental Council John H. Socolofsky, Esq.
P. O. Box 611 Assistant Attorney General St. Helens, Oregon 97051 of Attorneys for the. State of Oregon 100 State Office Building Mr. John A. Kullberg Sales Oregon 97310 Route 1 Box 250Q Sauvie Island, Oregon 97231 Cregory Kafoury, Esq.
Counsel for Columbia Environmental Mr. Davii.'. ' S, McCoy Council 348 Husety Lane 202 Oregon Pioneer Building Crants ;**s, Oregon 97526 320 S. W. Stark -
Portland, Oregon 97204 Ms. C. Call Parson 800 S. '/. Creen #6 William Kinsey, Esq.
Portland, Oregon 97205 Bonneville Power Administration P. O. Box 3621 Docketing and Service Section Portland, Oregon 97208 Office of the Secretary U. S. Nuclear Regulatory Commission Washington, D. C.
20555 j
t
(
I 1
)
l t
i i
i
~
Ronald W. Jo ~ lo n Attorney for the Licensee I
Dated:
August 22, 1978
-