Notification of Prehearing Conference in Portland,Or,On 790329-30 Re Phase II Control Bldg Proceeding.Conference Will Consider Intervenors Contentions,Scheduling Matters & Status of NRC Review of Mod
ML19261C348
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/08/1979
From: Mark Miller
Atomic Safety and Licensing Board Panel
To:
References
TAC-08348, TAC-11299, TAC-13152, TAC-8348, NUDOCS 7903220305
Download: ML19261C348 (2)


Text

,

E E. 7 f-NRC PUBLIC DOCUMENT E00M 2

C y

MAR 9 C'"

INITED SIATES OF AMzRICA NUCLEAR REGUIAIORY COtMISSION cd 71 Ey

)

\\

- ~,.

WJ In the Matter of

)

J =. ' C

)

PORIUlND GE:ERAL ELECIRIC C0t@ANY, L_T A_L. )

Docket No. 50-344.SP

)

(Trojan Nuclear Plant)

)

(Control Building)

IUfICE OF PREHEhRHG C(NEERENCE ON PHASE 11 CCNTROL BUIIDHG PROCEEDHC (March 8,1979)

Phase II of this proceeding involves a consideration of whether the scope and timeliness of the proposed modifications to the Control Build-ing of the Trojan facility, required to bring the facility into substan-tial coc:pliance with the license, are adequate frcxn a safety standpoint.

Please take Notice that a pareknring conference will be held in this proceeding on March 29-30, 1979 ccm mncing at 9:00 a.m., local time, in the Main Auditoriun of the Bonneville Power Adninistration Euilding located at 1002 N.E. Holladay Street, Portland, Oregon 97205.

Utis prehearing conference will consider:

(1) the contentions filed by the Intervenors and the responses thereto; (2) the duration and extent of any remining discovery; (3) schew ng catters, including dates for filing motions for smm7 disposition, if any, dates for filing written direct testineny and exhibits, and the date of crmmnce-ment of the evidentiary hearing; (4) the status of the Staff's review of PGE-1020 and the Staff's Safety Evaluadca of the proposed modifica-tions; and (5) any additicnal procedural matters raised by the parties.

v 7003220 305 If time pecits, the Licensing Board will also hear scne limited appearance statements from those persons who have made written requests for limited appearances, and who have not been previously heard in this proceeding. Such Hmited appearance statements may be rade, if the Board's schedule pemits, at 1:30 p.m. on March 30, 1979 at the.Bonneville Power Administration Main Auditoriun described above.

IT IS SO 0:wr. Jeu.

EUR THE ATOMIC SAFETY AND LICENSHU BOARD

- da i es r M L Marshall E. Miller, Cbni m m Dated at Bethesda, Maryland this 8th. day of March 1979.