Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20195C34528 April 1978Portland General Electric
Broehl D
Informs That Structure of Walls in Control Bldg Does Not Meet Seismic Criteria for Sar.Reanalysis Confirms Control Bldg Will Maintain Structural Integrity & Plant Will Retain Functional Capability Under Design LoadsOther
ML20195C36426 May 1978Portland General Electric
Broehl D
Clarifies Items 2 & 3 of DG Eisenhut 780502 Memo Re Proposed Mod to Plant Spent Fuel Storage Rack Proceedings.Design Engineer Activities in Fuel Bldg Design Should Be Considered Supporting RoleOther
ML20195C38529 June 1978Office of Nuclear Reactor Regulation
Trammell C
Affidavit of Chales M. Trammel,Iii.* Staff Concluded That an Amendment Authorizing Operation of Trojan Nuclear Power Plant Pending Upgrading of Seismic Capability of Control Bldg Walls Would Constitute a Decrease in Safety MarginOther
ML20195C40029 June 1978NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shao L C
Affidavit of LC Shao Re Control Bldg Design Errors Resulting in Substantially Weaker Walls than Intended by Original Design criteria.As-built Structure Has one-half of Seismic Capacity & Safety MarginOther
ML20195C35129 June 1978NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Gray J
Forwards Affidavits of CM Trammell & LC Shao Re Safety Significance of Control Bldg Design Deficiencies & NRC Findings Concerning Significant Hazards ConsiderationsOther
ML20195C37430 June 1978Goodwin C
Portland General Electric
Forwards Proposed Schedule of Actions to Bring Plant Control Bldg Into Substantial Compliance Ww/Requirements & Intended Design Margins.Detailed Description of Actions,Design Changes & Mods Will Be Submitted Prior to 780901.W/o EnclOther
ML20195C45819 August 1978Portland General Electric
Broehl D
Forwards NRC Questions & Licensee Responses,780804-17 Based on Info Provided by Bechtel Re Control Bldg.All Walls Except 1B,2 & 3 Have Dowel Capacities Exceeding Shear Capacities Controlled by Either Shear or BendingOther
ML20195C46221 August 1978Goodwin C
Portland General Electric
Forwards Final NRC Responses to Questions 6 & 10 Re Control Bldg Mods,Based on Info Provided by Bechtel.Equipment in Structure Should Continue to Be Capable of Resisting Seismic Loadings Resulting from Real EarthquakesOther
ML20195C53322 August 1978NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Gossick L
Responds to Re Amendment Permitting Temporary Operation of Plant Independent of Public Hearing.Law Requires Hearing to Be Held in Connection W/Amend to OLOther
ML20150A60830 August 1978Schwencer A
Office of Nuclear Reactor Regulation
Forwards Request for Addl Info Re Control Bldg Per Seismic NonconformanceRAI
ML20150A6141 September 1978Portland General Electric
Broehl D
Broehe D
Forwards Preliminary Results of Stardyne Finite Element Analysis of Trojan Control-Auxiliary-Fuel Bldg Complex & Assessment of Seismic Load Resistance of Bldg as Presented at 780828 Meeting. Lic. NPF-1Meeting
ML20195C1437 September 1978NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Gossick L
Responds to Commissioner Davis Addressed to Commissioner Bradford & Expressing Concerns Re non-conformance to Specs of Control Bldg at Plant & Effect of Facility Shutdown on Rate PayersOther
ML20147C24112 September 1978Goodwin C
Portland General Electric
Forwards Corrected Supplementary Info Transmitted by LtrSupplement
ML20150A66520 September 1978Portland General Electric
Holley M
Bresler B
Responds to Specified SSE Event.Stardyne Dynamic Analysis Was Used to Determine Structural Capacities & Forces. Concludes That Control Bldg Can Withstand SSE Event SafelyOther
ML20150A64420 September 1978Portland General Electric
Broehl D
Forwards Final Results of Rev & Evaluation of Recent Stardyne Finite Element Analysis for Existing Control Bldg of Subj Facil.Suppl Structural Evaluation Response to Specified SSE Event,& Response to Questions EnclOther
ML20150A65821 September 1978Mark Miller
Atomic Safety and Licensing Board Panel
Order Re Responses to NRC Interrogatories by Coalition for Safe Pwr & Consolidation.Cfsp Must:Respond W/In 14 Days to S1,S2,E1,G1,G2,G3,G8 & All Other Interrogatories;Clarify the Status of Spokesmen.Motion for Reconsideration Is DeniedApproval
ML20062B96128 September 1978Stello V
Office of Nuclear Reactor Regulation
Forwards 780628 Memo to R Mattson Re Info on Failures of safety-related Pipe Supports at Millstone 1 & Design Deficiencies on Similar Equipment at Shoreham.Aslb Notified of Pipe Support Base Plate DesignApproval
ML20147E6323 October 1978Portland General Electric
Broehl D
Transcript of Dj Broehl Testimony Re Plant History, Chronology of Events Since Apr 1978 & Summary of Licensee Efforts to Ensure Safe Interim Operation of Control BldgOther
ML20147E6403 October 1978Portland General Electric
Christensen S
Transcript of SR Christensen Testimony Re Description of Seismic Instrumentation & Engineering Investigations to Be Conducted Following EarthquakeOther
ML20148A0606 October 1978AFFILIATION NOT ASSIGNED
Laursen H
Direct Testimony of Harold Laursen Re Assignment to Eval Ability of Subj Facil Bldg Shear Walls to Resist Seismic Loading.Determined Shear Walls Can Withstand .25g Safe Shutdown EarthquakeOther
ML20062C14211 October 1978Mark Miller
Atomic Safety and Licensing Board Panel
Notice of Evidentiary Hearing on Issue of Interim Operation & Limited Appearance.Hearing to Determine Whether Interim Operation Should Be Permitted Prior to Mods Required by Order Will Be Held on 781023 & 1030-1101Other
ML20062B27513 October 1978Gray J
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
Forwards Ks Herring Testimony on Structural Adequacy of Trojan Control Bldg for Interim Operation & Rt Dodds & Je Knight Testimony on Seismic Features Relevant to Facility SafetyOther
ML20062B27913 October 1978Office of Nuclear Reactor Regulation
Herring K
Testimony Verifying That Reasonable Assurance Exists That Shear Walls Will Withstand SSE or Obe.Original Intended Margins of Safety Reduced & Should Be RestoredOther
ML20062B28213 October 1978NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Dodds R
Testimony Describing Insp of Humboldt Bay Following 5.4 Richter Magnitude Earthquake on 750609 & Std Insp Procedures After Seismic Event.Procedures to Be Followed During Earthquake DetailedOther
ML20062B28613 October 1978Office of Nuclear Reactor Regulation
Knight J
Testimony Responding to ASLB Questions Re Effects of Seismic Event on Plant Features Important to Maintaining Safety of Facility.Certificate of Svc EnclOther
ML20148C02513 October 1978Goodwin C
Portland General Electric
Responds to NRC 781011-13 Questions Re Supplemental Structural Evaluation of Control Bldg,Particularly Shear Wall Capacity.Certificate of Svc EnclSupplement
ML20147F08916 October 1978Withers B
Portland General Electric
Testimony of Bart Withers,As Superintendent of Subj Facil W/Statement of Qual Attached.Describes Capability of Plant to Function & Plant Staff to Respond Properly Immediately Following a Seismic EventOther
ML20147F09616 October 1978Richard Anderson
Johnson T
Katanics G
Portland General Electric
Licensee'S Testimony on Capability of Subj Facil to W/Stand Seismic Events.Statements of Qualifications,Ref & Append Are Attached.Description of Affected Structure & Deficiencies Such as Amount & Arrangement of Reinforcing Steel ProvidedOther
ML20062B41916 October 1978NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Gray J
Forwards Ks Herring Testimony Re Suppl to Stardyne Analysis & Effect on Structural Capacity of Control Bldg.Certificate of Svc EnclOther
ML20062B42517 October 1978Office of Nuclear Reactor Regulation
Herring K
Testimony Re Suppl to Stardyne Analysis & Effect of Structural Capacity of Control Bldg.Structure Can Withstand SSE & Less Severe Obe,But Suppl Info Alters Earthquake Level Requiring Plant InspOther
ML20062B95919 October 1978NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Gray J
Forwards Recent Memoranda Re Certain Problems Experienced in Connection W/Pipe Support Base Plate Design.Staff Determining If Problems Have Generic Implications for Operating Facilities.Aslb Will Be Kept InformedOther
ML20062C62727 October 1978Portland General Electric
Broehl D
Forwards Further Response to NRC Staff Tech Questions Re Stardyne Analysis & Review.Includes Description of Criteria & Procedures Used & Explanation of Dev of New Acceleration time-history.Cert of Svc EnclOther
ML20062D3486 November 1978Mark Miller
Atomic Safety and Licensing Board Panel
Cross-examination or Testimony Re Analysis & Review by Licensee Poge of safety-related Matls in Control-Auxiliary- Fuel Bldg Complex Will Be Taken at 781211 Hearing.Nrc Given Time to Reply to Interrogs.Proposed Findings Due 781120Other
ML20197D46922 November 1978Portland General Electric
Broehl D
Forwards Suppl Document Supporting Floor Response Spectra Provided in 781027 & 781102 Submittals to NRC in Response to Request for Additional InfoRequest
ML20197D48022 November 1978Rachel Johnson
Portland General Electric
Forwards Suppl Documentation in Support of Floor Response Spectra Provided in 781027 & 781102 Responses to NRC Info Requests.W/Cert of Svc EnclOther
ML20150F0223 January 1979Rosolie E
NORTHWEST ENVIRONMENTAL ADVOCATES (FORMERLY COALITION
FOIA Request for 20 Documents Listed Re ECCS Performance Calculations & Calculational Errors Identified by Westinghouse & Portland GE, & on Pipe Cracks in Containment Vessel of Trojan PlantRequest
ML20150F06428 March 1979Lindblad W
Portland General Electric
Forwards Response to NRC 790308 Technical Questions Re Control Bldg Design Mods.Response Also Being Served on ASLB & All Parties to Control Bldg ProceedingOther
ML20126B6047 March 1980Goodwin C
Lentsch J
Portland General Electric
Christensen S
Forwards Info Re Environ Qualification of Class IE Equipment in Response to Reporting Requirement of IE Bulletin 79-01B. Info Includes List of Class IE Components Required to Function Under Accident Resulting in Harsh EnvironOther
ML20126C06420 March 1980Portland General Electric
Broehl D
Forwards Summary Tables Describing Reinforcing Steel in Shear Wall Panels of Control Auxiliary Fuel Bldg Complex in Response to NRC Verbal RequestOther