Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20195C345 | 28 April 1978 | Portland General Electric Broehl D | Informs That Structure of Walls in Control Bldg Does Not Meet Seismic Criteria for Sar.Reanalysis Confirms Control Bldg Will Maintain Structural Integrity & Plant Will Retain Functional Capability Under Design Loads | Other |
ML20195C364 | 26 May 1978 | Portland General Electric Broehl D | Clarifies Items 2 & 3 of DG Eisenhut 780502 Memo Re Proposed Mod to Plant Spent Fuel Storage Rack Proceedings.Design Engineer Activities in Fuel Bldg Design Should Be Considered Supporting Role | Other |
ML20195C385 | 29 June 1978 | Office of Nuclear Reactor Regulation Trammell C | Affidavit of Chales M. Trammel,Iii.* Staff Concluded That an Amendment Authorizing Operation of Trojan Nuclear Power Plant Pending Upgrading of Seismic Capability of Control Bldg Walls Would Constitute a Decrease in Safety Margin | Other |
ML20195C400 | 29 June 1978 | NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) Shao L C | Affidavit of LC Shao Re Control Bldg Design Errors Resulting in Substantially Weaker Walls than Intended by Original Design criteria.As-built Structure Has one-half of Seismic Capacity & Safety Margin | Other |
ML20195C351 | 29 June 1978 | NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) Gray J | Forwards Affidavits of CM Trammell & LC Shao Re Safety Significance of Control Bldg Design Deficiencies & NRC Findings Concerning Significant Hazards Considerations | Other |
ML20195C374 | 30 June 1978 | Goodwin C Portland General Electric | Forwards Proposed Schedule of Actions to Bring Plant Control Bldg Into Substantial Compliance Ww/Requirements & Intended Design Margins.Detailed Description of Actions,Design Changes & Mods Will Be Submitted Prior to 780901.W/o Encl | Other |
ML20195C458 | 19 August 1978 | Portland General Electric Broehl D | Forwards NRC Questions & Licensee Responses,780804-17 Based on Info Provided by Bechtel Re Control Bldg.All Walls Except 1B,2 & 3 Have Dowel Capacities Exceeding Shear Capacities Controlled by Either Shear or Bending | Other |
ML20195C462 | 21 August 1978 | Goodwin C Portland General Electric | Forwards Final NRC Responses to Questions 6 & 10 Re Control Bldg Mods,Based on Info Provided by Bechtel.Equipment in Structure Should Continue to Be Capable of Resisting Seismic Loadings Resulting from Real Earthquakes | Other |
ML20195C533 | 22 August 1978 | NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) Gossick L | Responds to Re Amendment Permitting Temporary Operation of Plant Independent of Public Hearing.Law Requires Hearing to Be Held in Connection W/Amend to OL | Other |
ML20150A608 | 30 August 1978 | Schwencer A Office of Nuclear Reactor Regulation | Forwards Request for Addl Info Re Control Bldg Per Seismic Nonconformance | RAI |
ML20150A614 | 1 September 1978 | Portland General Electric Broehl D Broehe D | Forwards Preliminary Results of Stardyne Finite Element Analysis of Trojan Control-Auxiliary-Fuel Bldg Complex & Assessment of Seismic Load Resistance of Bldg as Presented at 780828 Meeting. Lic. NPF-1 | Meeting |
ML20195C143 | 7 September 1978 | NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) Gossick L | Responds to Commissioner Davis Addressed to Commissioner Bradford & Expressing Concerns Re non-conformance to Specs of Control Bldg at Plant & Effect of Facility Shutdown on Rate Payers | Other |
ML20147C241 | 12 September 1978 | Goodwin C Portland General Electric | Forwards Corrected Supplementary Info Transmitted by Ltr | Supplement |
ML20150A665 | 20 September 1978 | Portland General Electric Holley M Bresler B | Responds to Specified SSE Event.Stardyne Dynamic Analysis Was Used to Determine Structural Capacities & Forces. Concludes That Control Bldg Can Withstand SSE Event Safely | Other |
ML20150A644 | 20 September 1978 | Portland General Electric Broehl D | Forwards Final Results of Rev & Evaluation of Recent Stardyne Finite Element Analysis for Existing Control Bldg of Subj Facil.Suppl Structural Evaluation Response to Specified SSE Event,& Response to Questions Encl | Other |
ML20150A658 | 21 September 1978 | Mark Miller Atomic Safety and Licensing Board Panel | Order Re Responses to NRC Interrogatories by Coalition for Safe Pwr & Consolidation.Cfsp Must:Respond W/In 14 Days to S1,S2,E1,G1,G2,G3,G8 & All Other Interrogatories;Clarify the Status of Spokesmen.Motion for Reconsideration Is Denied | Approval |
ML20062B961 | 28 September 1978 | Stello V Office of Nuclear Reactor Regulation | Forwards 780628 Memo to R Mattson Re Info on Failures of safety-related Pipe Supports at Millstone 1 & Design Deficiencies on Similar Equipment at Shoreham.Aslb Notified of Pipe Support Base Plate Design | Approval |
ML20147E632 | 3 October 1978 | Portland General Electric Broehl D | Transcript of Dj Broehl Testimony Re Plant History, Chronology of Events Since Apr 1978 & Summary of Licensee Efforts to Ensure Safe Interim Operation of Control Bldg | Other |
ML20147E640 | 3 October 1978 | Portland General Electric Christensen S | Transcript of SR Christensen Testimony Re Description of Seismic Instrumentation & Engineering Investigations to Be Conducted Following Earthquake | Other |
ML20148A060 | 6 October 1978 | AFFILIATION NOT ASSIGNED Laursen H | Direct Testimony of Harold Laursen Re Assignment to Eval Ability of Subj Facil Bldg Shear Walls to Resist Seismic Loading.Determined Shear Walls Can Withstand .25g Safe Shutdown Earthquake | Other |
ML20062C142 | 11 October 1978 | Mark Miller Atomic Safety and Licensing Board Panel | Notice of Evidentiary Hearing on Issue of Interim Operation & Limited Appearance.Hearing to Determine Whether Interim Operation Should Be Permitted Prior to Mods Required by Order Will Be Held on 781023 & 1030-1101 | Other |
ML20062B275 | 13 October 1978 | Gray J NRC OFFICE OF THE GENERAL COUNSEL (OGC) | Forwards Ks Herring Testimony on Structural Adequacy of Trojan Control Bldg for Interim Operation & Rt Dodds & Je Knight Testimony on Seismic Features Relevant to Facility Safety | Other |
ML20062B279 | 13 October 1978 | Office of Nuclear Reactor Regulation Herring K | Testimony Verifying That Reasonable Assurance Exists That Shear Walls Will Withstand SSE or Obe.Original Intended Margins of Safety Reduced & Should Be Restored | Other |
ML20062B282 | 13 October 1978 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) Dodds R | Testimony Describing Insp of Humboldt Bay Following 5.4 Richter Magnitude Earthquake on 750609 & Std Insp Procedures After Seismic Event.Procedures to Be Followed During Earthquake Detailed | Other |
ML20062B286 | 13 October 1978 | Office of Nuclear Reactor Regulation Knight J | Testimony Responding to ASLB Questions Re Effects of Seismic Event on Plant Features Important to Maintaining Safety of Facility.Certificate of Svc Encl | Other |
ML20148C025 | 13 October 1978 | Goodwin C Portland General Electric | Responds to NRC 781011-13 Questions Re Supplemental Structural Evaluation of Control Bldg,Particularly Shear Wall Capacity.Certificate of Svc Encl | Supplement |
ML20147F089 | 16 October 1978 | Withers B Portland General Electric | Testimony of Bart Withers,As Superintendent of Subj Facil W/Statement of Qual Attached.Describes Capability of Plant to Function & Plant Staff to Respond Properly Immediately Following a Seismic Event | Other |
ML20147F096 | 16 October 1978 | Richard Anderson Johnson T Katanics G Portland General Electric | Licensee'S Testimony on Capability of Subj Facil to W/Stand Seismic Events.Statements of Qualifications,Ref & Append Are Attached.Description of Affected Structure & Deficiencies Such as Amount & Arrangement of Reinforcing Steel Provided | Other |
ML20062B419 | 16 October 1978 | NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) Gray J | Forwards Ks Herring Testimony Re Suppl to Stardyne Analysis & Effect on Structural Capacity of Control Bldg.Certificate of Svc Encl | Other |
ML20062B425 | 17 October 1978 | Office of Nuclear Reactor Regulation Herring K | Testimony Re Suppl to Stardyne Analysis & Effect of Structural Capacity of Control Bldg.Structure Can Withstand SSE & Less Severe Obe,But Suppl Info Alters Earthquake Level Requiring Plant Insp | Other |
ML20062B959 | 19 October 1978 | NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) Gray J | Forwards Recent Memoranda Re Certain Problems Experienced in Connection W/Pipe Support Base Plate Design.Staff Determining If Problems Have Generic Implications for Operating Facilities.Aslb Will Be Kept Informed | Other |
ML20062C627 | 27 October 1978 | Portland General Electric Broehl D | Forwards Further Response to NRC Staff Tech Questions Re Stardyne Analysis & Review.Includes Description of Criteria & Procedures Used & Explanation of Dev of New Acceleration time-history.Cert of Svc Encl | Other |
ML20062D348 | 6 November 1978 | Mark Miller Atomic Safety and Licensing Board Panel | Cross-examination or Testimony Re Analysis & Review by Licensee Poge of safety-related Matls in Control-Auxiliary- Fuel Bldg Complex Will Be Taken at 781211 Hearing.Nrc Given Time to Reply to Interrogs.Proposed Findings Due 781120 | Other |
ML20197D469 | 22 November 1978 | Portland General Electric Broehl D | Forwards Suppl Document Supporting Floor Response Spectra Provided in 781027 & 781102 Submittals to NRC in Response to Request for Additional Info | Request |
ML20197D480 | 22 November 1978 | Rachel Johnson Portland General Electric | Forwards Suppl Documentation in Support of Floor Response Spectra Provided in 781027 & 781102 Responses to NRC Info Requests.W/Cert of Svc Encl | Other |
ML20150F022 | 3 January 1979 | Rosolie E NORTHWEST ENVIRONMENTAL ADVOCATES (FORMERLY COALITION | FOIA Request for 20 Documents Listed Re ECCS Performance Calculations & Calculational Errors Identified by Westinghouse & Portland GE, & on Pipe Cracks in Containment Vessel of Trojan Plant | Request |
ML20150F064 | 28 March 1979 | Lindblad W Portland General Electric | Forwards Response to NRC 790308 Technical Questions Re Control Bldg Design Mods.Response Also Being Served on ASLB & All Parties to Control Bldg Proceeding | Other |
ML20126B604 | 7 March 1980 | Goodwin C Lentsch J Portland General Electric Christensen S | Forwards Info Re Environ Qualification of Class IE Equipment in Response to Reporting Requirement of IE Bulletin 79-01B. Info Includes List of Class IE Components Required to Function Under Accident Resulting in Harsh Environ | Other |
ML20126C064 | 20 March 1980 | Portland General Electric Broehl D | Forwards Summary Tables Describing Reinforcing Steel in Shear Wall Panels of Control Auxiliary Fuel Bldg Complex in Response to NRC Verbal Request | Other |