Administration Results Other: ML20062B275, ML20062B279, ML20062B282, ML20062B286, ML20062B419, ML20062B425, ML20062B959, ML20062C142, ML20062C627, ML20062D348, ML20126B604, ML20126C064, ML20147E632, ML20147E640, ML20147F089, ML20147F096, ML20148A060, ML20150A644, ML20150A665, ML20150F064, ML20195C143, ML20195C345, ML20195C351, ML20195C364, ML20195C374, ML20195C385, ML20195C400, ML20195C458, ML20195C462, ML20195C533, ML20197D480 | |
MONTHYEARML20195C3451978-04-28028 April 1978
[Table View]Informs That Structure of Walls in Control Bldg Does Not Meet Seismic Criteria for Sar.Reanalysis Confirms Control Bldg Will Maintain Structural Integrity & Plant Will Retain Functional Capability Under Design Loads Project stage: Other ML20195C3641978-05-26026 May 1978 Clarifies Items 2 & 3 of DG Eisenhut 780502 Memo Re Proposed Mod to Plant Spent Fuel Storage Rack Proceedings.Design Engineer Activities in Fuel Bldg Design Should Be Considered Supporting Role Project stage: Other ML20195C3851978-06-29029 June 1978 Affidavit of Chales M. Trammel,Iii.* Staff Concluded That an Amendment Authorizing Operation of Trojan Nuclear Power Plant Pending Upgrading of Seismic Capability of Control Bldg Walls Would Constitute a Decrease in Safety Margin Project stage: Other ML20195C4001978-06-29029 June 1978 Affidavit of LC Shao Re Control Bldg Design Errors Resulting in Substantially Weaker Walls than Intended by Original Design criteria.As-built Structure Has one-half of Seismic Capacity & Safety Margin Project stage: Other ML20195C3511978-06-29029 June 1978 Forwards Affidavits of CM Trammell & LC Shao Re Safety Significance of Control Bldg Design Deficiencies & NRC Findings Concerning Significant Hazards Considerations Project stage: Other ML20195C3741978-06-30030 June 1978 Forwards Proposed Schedule of Actions to Bring Plant Control Bldg Into Substantial Compliance Ww/Requirements & Intended Design Margins.Detailed Description of Actions,Design Changes & Mods Will Be Submitted Prior to 780901.W/o Encl Project stage: Other ML20195C4581978-08-19019 August 1978 Forwards NRC Questions & Licensee Responses,780804-17 Based on Info Provided by Bechtel Re Control Bldg.All Walls Except 1B,2 & 3 Have Dowel Capacities Exceeding Shear Capacities Controlled by Either Shear or Bending Project stage: Other ML20195C4621978-08-21021 August 1978 Forwards Final NRC Responses to Questions 6 & 10 Re Control Bldg Mods,Based on Info Provided by Bechtel.Equipment in Structure Should Continue to Be Capable of Resisting Seismic Loadings Resulting from Real Earthquakes Project stage: Other ML20195C5331978-08-22022 August 1978 Responds to Re Amendment Permitting Temporary Operation of Plant Independent of Public Hearing.Law Requires Hearing to Be Held in Connection W/Amend to OL Project stage: Other ML20150A6081978-08-30030 August 1978 Forwards Request for Addl Info Re Control Bldg Per Seismic Nonconformance Project stage: RAI ML20150A6141978-09-0101 September 1978 Forwards Preliminary Results of Stardyne Finite Element Analysis of Trojan Control-Auxiliary-Fuel Bldg Complex & Assessment of Seismic Load Resistance of Bldg as Presented at 780828 Meeting. Lic. NPF-1 Project stage: Meeting ML20195C1431978-09-0707 September 1978 Responds to Commissioner Davis Addressed to Commissioner Bradford & Expressing Concerns Re non-conformance to Specs of Control Bldg at Plant & Effect of Facility Shutdown on Rate Payers Project stage: Other ML20147C2411978-09-12012 September 1978 Forwards Corrected Supplementary Info Transmitted by Ltr Project stage: Supplement ML20150A6651978-09-20020 September 1978 Responds to Specified SSE Event.Stardyne Dynamic Analysis Was Used to Determine Structural Capacities & Forces. Concludes That Control Bldg Can Withstand SSE Event Safely Project stage: Other ML20150A6441978-09-20020 September 1978 Forwards Final Results of Rev & Evaluation of Recent Stardyne Finite Element Analysis for Existing Control Bldg of Subj Facil.Suppl Structural Evaluation Response to Specified SSE Event,& Response to Questions Encl Project stage: Other ML20150A6581978-09-21021 September 1978 Order Re Responses to NRC Interrogatories by Coalition for Safe Pwr & Consolidation.Cfsp Must:Respond W/In 14 Days to S1,S2,E1,G1,G2,G3,G8 & All Other Interrogatories;Clarify the Status of Spokesmen.Motion for Reconsideration Is Denied Project stage: Approval ML20062B9611978-09-28028 September 1978 Forwards 780628 Memo to R Mattson Re Info on Failures of safety-related Pipe Supports at Millstone 1 & Design Deficiencies on Similar Equipment at Shoreham.Aslb Notified of Pipe Support Base Plate Design Project stage: Approval ML20147E6321978-10-0303 October 1978 Transcript of Dj Broehl Testimony Re Plant History, Chronology of Events Since Apr 1978 & Summary of Licensee Efforts to Ensure Safe Interim Operation of Control Bldg Project stage: Other ML20147E6401978-10-0303 October 1978 Transcript of SR Christensen Testimony Re Description of Seismic Instrumentation & Engineering Investigations to Be Conducted Following Earthquake Project stage: Other ML20148A0601978-10-0606 October 1978 Direct Testimony of Harold Laursen Re Assignment to Eval Ability of Subj Facil Bldg Shear Walls to Resist Seismic Loading.Determined Shear Walls Can Withstand .25g Safe Shutdown Earthquake Project stage: Other ML20062C1421978-10-11011 October 1978 Notice of Evidentiary Hearing on Issue of Interim Operation & Limited Appearance.Hearing to Determine Whether Interim Operation Should Be Permitted Prior to Mods Required by Order Will Be Held on 781023 & 1030-1101 Project stage: Other ML20062B2751978-10-13013 October 1978 Forwards Ks Herring Testimony on Structural Adequacy of Trojan Control Bldg for Interim Operation & Rt Dodds & Je Knight Testimony on Seismic Features Relevant to Facility Safety Project stage: Other ML20062B2791978-10-13013 October 1978 Testimony Verifying That Reasonable Assurance Exists That Shear Walls Will Withstand SSE or Obe.Original Intended Margins of Safety Reduced & Should Be Restored Project stage: Other ML20062B2821978-10-13013 October 1978 Testimony Describing Insp of Humboldt Bay Following 5.4 Richter Magnitude Earthquake on 750609 & Std Insp Procedures After Seismic Event.Procedures to Be Followed During Earthquake Detailed Project stage: Other ML20062B2861978-10-13013 October 1978 Testimony Responding to ASLB Questions Re Effects of Seismic Event on Plant Features Important to Maintaining Safety of Facility.Certificate of Svc Encl Project stage: Other ML20148C0251978-10-13013 October 1978 Responds to NRC 781011-13 Questions Re Supplemental Structural Evaluation of Control Bldg,Particularly Shear Wall Capacity.Certificate of Svc Encl Project stage: Supplement ML20147F0891978-10-16016 October 1978 Testimony of Bart Withers,As Superintendent of Subj Facil W/Statement of Qual Attached.Describes Capability of Plant to Function & Plant Staff to Respond Properly Immediately Following a Seismic Event Project stage: Other ML20147F0961978-10-16016 October 1978 Licensee'S Testimony on Capability of Subj Facil to W/Stand Seismic Events.Statements of Qualifications,Ref & Append Are Attached.Description of Affected Structure & Deficiencies Such as Amount & Arrangement of Reinforcing Steel Provided Project stage: Other ML20062B4191978-10-16016 October 1978 Forwards Ks Herring Testimony Re Suppl to Stardyne Analysis & Effect on Structural Capacity of Control Bldg.Certificate of Svc Encl Project stage: Other ML20062B4251978-10-17017 October 1978 Testimony Re Suppl to Stardyne Analysis & Effect of Structural Capacity of Control Bldg.Structure Can Withstand SSE & Less Severe Obe,But Suppl Info Alters Earthquake Level Requiring Plant Insp Project stage: Other ML20062B9591978-10-19019 October 1978 Forwards Recent Memoranda Re Certain Problems Experienced in Connection W/Pipe Support Base Plate Design.Staff Determining If Problems Have Generic Implications for Operating Facilities.Aslb Will Be Kept Informed Project stage: Other ML20062C6271978-10-27027 October 1978 Forwards Further Response to NRC Staff Tech Questions Re Stardyne Analysis & Review.Includes Description of Criteria & Procedures Used & Explanation of Dev of New Acceleration time-history.Cert of Svc Encl Project stage: Other ML20062D3481978-11-0606 November 1978 Cross-examination or Testimony Re Analysis & Review by Licensee Poge of safety-related Matls in Control-Auxiliary- Fuel Bldg Complex Will Be Taken at 781211 Hearing.Nrc Given Time to Reply to Interrogs.Proposed Findings Due 781120 Project stage: Other ML20197D4691978-11-22022 November 1978 Forwards Suppl Document Supporting Floor Response Spectra Provided in 781027 & 781102 Submittals to NRC in Response to Request for Additional Info Project stage: Request ML20197D4801978-11-22022 November 1978 Forwards Suppl Documentation in Support of Floor Response Spectra Provided in 781027 & 781102 Responses to NRC Info Requests.W/Cert of Svc Encl Project stage: Other ML20150F0221979-01-0303 January 1979 FOIA Request for 20 Documents Listed Re ECCS Performance Calculations & Calculational Errors Identified by Westinghouse & Portland GE, & on Pipe Cracks in Containment Vessel of Trojan Plant Project stage: Request ML20150F0641979-03-28028 March 1979 Forwards Response to NRC 790308 Technical Questions Re Control Bldg Design Mods.Response Also Being Served on ASLB & All Parties to Control Bldg Proceeding Project stage: Other ML20126B6041980-03-0707 March 1980 Forwards Info Re Environ Qualification of Class IE Equipment in Response to Reporting Requirement of IE Bulletin 79-01B. Info Includes List of Class IE Components Required to Function Under Accident Resulting in Harsh Environ Project stage: Other ML20126C0641980-03-20020 March 1980 Forwards Summary Tables Describing Reinforcing Steel in Shear Wall Panels of Control Auxiliary Fuel Bldg Complex in Response to NRC Verbal Request Project stage: Other 1978-06-30 |
ML20062B419 | |
Person / Time | |
---|---|
Site: | Trojan File:Portland General Electric icon.png |
Issue date: | 10/16/1978 |
From: | Gray J NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
To: | Mccollom K, Mark Miller, Paxton H Atomic Safety and Licensing Board Panel |
Shared Package | |
ML20062B422 | List: |
References | |
TAC-07551, TAC-08348, TAC-7551, TAC-8348, NUDOCS 7810300070 | |
Download: ML20062B419 (3) | |
Similar Documents at Trojan | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217E9711999-10-13013 October 1999
[Table view]Submits Notification of Major Changes to Trojan Liquid Radioactive Waste Treatment Sys,Iaw PGE-1201.Detailed Description of Change Provided ML20217C8171999-10-0606 October 1999 Forwards Notice of Receipt of Availability for Comment & Meeting to Discuss License Termination Plan,Per 990805 Application ML20216F7621999-09-23023 September 1999 Forwards Corrected Response to Request 2 Contained in NRC 990920 RAI Re Application of Pacificorp for Transfer of License NPF-1.Response 2 Should Have Stated That Na General Partnership Is Partnership Formed in Nv ML20216F2871999-09-20020 September 1999 Informs NRC of Developments That Have Occurred Since 990524 Application Was Filed Re Pacificorp Transfer of License of FOL NPF-1.NRC Is Urged to Act & Approve Transaction Expeditiously by 990930.Supporting Documentation Encl ML20211Q3281999-09-0909 September 1999 Forwards Insp Rept 50-344/99-06 on 990630-0701,21 & 0408-08. No Violations Noted.Insp Conducted to Review Decommissioning Activities Underway at Trojan Site & to Accompany Shipment of Reactor Vessel to Hanford,Washington for Burial ML20211J2101999-08-30030 August 1999 Forwards Request for Addl Info Re Application for Approval of Proposed Corporate Merger of Pacificorp & Scottishpower ML20211B6611999-08-16016 August 1999 Forwards fitness-for-duty Program Performance Data Rept for Period of 990101-0630,IAW 10CFR26.71(d) ML20211B4091999-08-16016 August 1999 Forwards Environ Assessment & Finding No Significant Impact to Application for an Exemption & License Amend Dated 980129.Proposed Exemption & License Amend Would Delete Security Plan Requirements of 10CFR50.54(p) & 10CFR73.55 ML20211A7131999-08-16016 August 1999 Forwards Environ Assessment & Finding of No Significant Impact to Application for Exemption & License Amend Dtd 980827.Proposed Exemption & License Amend Would Delete EP Requirements of 10CFR50.54(q),10CFR50.47(b) & 10CFR50,app E ML20210R7691999-08-11011 August 1999 Forwards Proposed Rev 23 to PGE-8010, Trojan Nuclear QAP, in Response to NRC 990708 RAI Re Relocation of TS ACs to Qap.Revised QAP Will Be Made Effective Concurrently with Implementation of License Change Application Lca 245 ML20210H5971999-07-27027 July 1999 Forwards Notice of Consideration of Approval of Application Re Merger & Opportunity for Hearing.Notice Being Forwarded to Ofc of Fr for Publication ML20216D6611999-07-23023 July 1999 Submits Summary of Proprietary Submittals for Transtor Part 71 & Part 72 & Trojan ISFSI Applications ML20210F8601999-07-22022 July 1999 Forwards Rev 1 to PGE-1076, Trojan Reactor Vessel Package Sar. Changes to Rept Contained in Rev 1 Received NRC Approval by Ltr ML20210A6401999-07-19019 July 1999 Corrects Ref in Item 4 of Which Constitutes Rev 2 of Authorization from Wf Kane, for Trojan Reactor Vessel Package as Approved Package for Shipment Under General License,Subj to Listed Conditions ML20210B4481999-07-12012 July 1999 Forwards Rept Describing Effects of Earthquake That Occurred on 990702 Near Satsop,Wa,Iaw Trojan Nuclear Plant Defueled Sar,Section 4.1.3.1 ML20209D6231999-07-0808 July 1999 Forwards RAI Re Licensee 980827 Request for Amend That Would Delete Number of License Conditions & TS Requirements That Would Be Implemented After All Sf Has Been Removed from 10CFR50 Licensed Area.Response Requested within 30 Days ML20209C6481999-07-0606 July 1999 Forwards Rev 8 to Defueled Sar,Including Changes Since Last Submittal.Attachment Includes Brief Description of Each Change Included in Rev ML20209B7821999-07-0101 July 1999 Responds to NRC 990609 RAI Re License Change Application 244 & Accompanying Request for Exemption.Detailed Info Supports Estimation of Remaining Radioactive Matl Previously Provided by Licensee ML20212J3281999-06-15015 June 1999 Forwards Amend 22 to PGE-1012, Trojan Nuclear Plant Fire Protection Plan, IAW 10CFR50.48(f).Amend Reflects Revs Made During Decommissioning Activities & Does Not Reduce Effectiveness of Fire Protection ML20195J0111999-06-0909 June 1999 Responds to Requesting License & Exemption Re Emergency Preparedness ML20207D3861999-06-0101 June 1999 Forwards Rev 1 to PGE-1077, Trojan Nuclear Plant Reactor Vessel & Internals Removal Project Transportation Safety Plan ML20196L1251999-05-24024 May 1999 Forwards Application for Amend to License NPF-1 for Indirect Transfer of License,To Extent That Such Approval Required Solely to Reflect Change in Upstream Economic Ownership of Pacificorp ML20207A2751999-05-14014 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created.Organization Chart Encl ML20206N9411999-05-11011 May 1999 Forwards Revised Epips,Including Rev 7 to EPIP 3, Response Organization Checklists & Rev 9 to EPIP 5, Emergency Preparedness Test Propgram. Changes to EPIPs 3 & 5 Ref New Owners of on-site Railroad Line,Portland & Western Railroad ML20206J8681999-05-0707 May 1999 Forwards Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Insp Observed Work Activities Associated with Lifting of Reactor Vessel in Preparation for Removal & Shipment to Hanford Reservation for Burial ML20206J7931999-05-0707 May 1999 Forwards Insp Repts 50-344/99-04 & 72-0017/99-02 on 990322- 25 & 29-0408.One Violations Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206H4331999-05-0505 May 1999 Forwards Amend 201 to License NPF-1 & Se.Amend Revises PDTSs by Deleting ISFSI Area,Revises Subsection 4.1.1,replaces Figure 4.1-1 with New Figure 4.1-1 & Adds New Page to Figure 4.1-1 to Reflect Access Control (ISFSI) Area ML20206N1571999-05-0404 May 1999 Forwards Util Quarterly Decommissioning Status Rept for First Quarter of 1999,IAW State of or Energy Facility Siting Council Order Approving Trojan Decommissioning Plan, ML20206E1731999-04-29029 April 1999 Informs That NRC Staff Has Performed an Acceptance Review of Trojan Nuclear Plant License Termination Plan,Submitted by ,To Determine Whether LTP Provides Adequate Info to Allow Staff to Conduct Detailed Review ML20206E0211999-04-28028 April 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re 970212 Application for Amend.Proposed Amend Would Revise Trojan Permanently Defueled TS to Delete ISFSI Area ML20206C9591999-04-23023 April 1999 Forwards Amend 200 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Revising License Condition 2.C.(10), Loading of Fuel Into Casks in Fuel Building ML20206C9221999-04-23023 April 1999 Forwards Amend 199 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Adding New License Condition Entitled, Loading of Fuel Into Casks in Fuel Building ML20205S9761999-04-21021 April 1999 Forwards Trojan Nuclear Plant,Radiological Environ Monitoring Rept for CY98. Rept Submitted in Accordance with Trojan Permanently Defueled TS 5.8.1.2 & Sections IV.B.2, IV.B.3 & Iv.C of App I to Title 10CFR50 ML20205T5471999-04-20020 April 1999 Forwards Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted ML20205N9061999-04-13013 April 1999 Forwards Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted.Inspectors Examined Portions of Physical Security, Access Authorization & FFD Programs ML20205P7301999-04-0808 April 1999 Forwards PGE-1009-98, Operational Ecological Monitoring Program for TNP,Jan-Dec 1998, Including All Existing non-radiological Effluents ML20205B3661999-03-25025 March 1999 Transmits Completed Application for Renewal of NPDES Permit for Trojan Nuclear Plant,Iaw License NPF-1,App B,Epp,Section 3.2 ML20204G1781999-03-18018 March 1999 Forwards Rev 4 to PGE-1063, Suppl to Applicants Environ Rept - Post Operating License Stage ML20204B7551999-03-18018 March 1999 Forwards Updated TS 5.6 Re High Radiation Area,Per Telcons with Nrc.Justification for TS Was Provided Previously with Util Ltr Dtd 990317,but Has Been Updated & Is Included as Encl 2 ML20204C5151999-03-17017 March 1999 Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas ML20207J3721999-03-10010 March 1999 Forwards License Amend Application 247 Requesting Amend to License NPF-1 to Add License Condition Denoting NRC Approval of PGE-1078, Trojan Nuclear Plant License Termination Plan, Also Encl.With Certificate of Svc ML20207L0011999-03-0808 March 1999 Transmits Tnp co-owners Annual Rept of Status of Decommissioning Funding for Tnp.Rept Is Based on Most Recent Analysis of Tnp Decommissioning Estimate & Funding Plan,Per Rev 6 to Pge, Tnp Decommissioning Plan ML20207G9691999-03-0303 March 1999 Forwards Rev 6 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan. Summary of Changes,Attached.Revised Portions Denoted by Side Bars ML20207D7751999-03-0202 March 1999 Forwards Amend 21 to PGE-1012, Trojan Nuclear Plant Fire Protection Plan, Per 10CFR50.48(f).Amend Reflects Revs Made During Decommissioning Activities ML20207B0441999-02-24024 February 1999 Forwards Endorsements 139 to Nelia Policy NF-0225 & 2 to Nelia Policy NW-0602 ML20207J0701999-02-11011 February 1999 Forwards Proposed Ts,Update to ISFSI SAR & Revised Calculation,Per Application for Trojan ISFSI License ML20202G4291999-02-0202 February 1999 Forwards Rev 0 to PGE-1076, Trojan Reactor Vessel Package Sar. Approval,With Certain Conditions,For one-time Shipment of Trojan Reactor Vessel Package Granted by Commission Via Ltr ML20202G0931999-01-26026 January 1999 Submits Following Info That Will Be Needed for NRC Staff to Complete Review & Issue Trojan ISFSI License,As Result of 990121 Meeting with NRC Following Insp & Observation of ISFSI Preoperational Testing During Wk of 990118 ML20202F2551999-01-25025 January 1999 Forwards Fitness for Duty Program Performance Data Rept for July-Dec 1998 ML20202C1621999-01-21021 January 1999 Forwards Insp Repts 50-344/98-04 & 72-0017/98-01 & NOV Re Inadequate Actions Taken by Radiation Protection Technician to Ensure That Radiological Conditions Safe Prior to Removing Warning Signs for Airborne Radioactivity Area 1999-09-09 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20217D1071999-09-16016 September 1999
[Table view]Provides Proposed Schedule for Review of Trojan License Termination Plan (Ltp),As Committed in 990903 Memo.Project Manager Should Schedule LTP Meeting Near Trojan Site for Late Nov or Early Dec,Based on Region IV Availability ML20216E4091999-09-0303 September 1999 Informs That Staff Has Performed Acceptance Review of Trojan Nuclear Plant License Termination Plan Submitted by Ltr Dtd 990805.NMSS Determined That Licensee Has Provided Sufficient Info for NRC to Proceed with Detailed Review ML20205R4091999-04-16016 April 1999 Informs That LTP for Trojan Nuclear Plant Did Not Provide Sufficient Info to Perform Detailed Review & Waste Mgt Recommends Returning LTP to Licensee So That LTP Can Be Resubmitted as Complete Application ML20195B6401998-11-10010 November 1998 Notification of 981119 Meeting with Util in Rockville,Md to Discuss Preliminary Plans for Plant Final Site Surveys ML20155G6571998-11-0303 November 1998 Notification of 981119-990331 Meeting with Util in Rockville,Md to Clarify Remaining Technical Issues Associated with Util Application for License to Operate ISFSI at Tpp ML20236S5361998-07-22022 July 1998 Notification of 980812 Meeting W/Portland General Electric in Arlington,Texas to Discuss Status of Decommissioning Activities at Trojan NPP ML20236R6511998-07-15015 July 1998 Notification of 980730 Meeting W/Listed Participants in Kelso,Wa Re Proposed Request from Portland General Electric Co for Approval to Allow one-time Shipment of Plant Decommissioned Reactor Vessel.Meeting Agenda Encl ML20236R6931998-07-15015 July 1998 Notification of 980730 Meeting W/Util to Discuss Request for Addl Info Re Ongoing Review of Portland General Electric Co Request for Approval to Allow one-time Shipment of Trojan Decommissioned Reactor Vessel.Meeting Agenda Encl ML20248L4691998-03-17017 March 1998 Notifies of in-house Research Project Re Digital I&C in NPP & Forwards Technical Training Div (TTD) ML20216E7421998-03-0606 March 1998 Notification of 980318 Meeting W/Portland General Electric in Rockville,Maryland to Discuss Proposed Shallow Land Disposal of Trojan Reactor Vessel ML20199D4951998-01-26026 January 1998 Notification of Licensee Meeting W/Util on 980209 in Arlington,Tx to Discuss Changes to Protected Area for Plant to Facilitate Ongoing Decommissioning of Site ML20199G1121998-01-20020 January 1998 Submits Addl Views on Proposal to Dispose of Trojan Reactor Vessel,Per SECY-97-244 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20141G2911997-05-15015 May 1997 Forwards Page A-25 of Rev 5 to PGE-1060, Tnp Permanently Defueled Emergency Plan ML20137W9801997-04-16016 April 1997 Notification of Significant Licensee Meeting W/Util on 970508 in Rockville,Md to Discuss Plans for Decommissioning of Plant ML20137H2231997-03-31031 March 1997 Forwards Info in Support of Pnl Modeling for Fgeis Final Rule on Radiological Criteria for License Termination ML20135B1941997-01-30030 January 1997 Responds to Re Util Position Re Potential for Ash Fall at Trojan Site ML20138J2731997-01-21021 January 1997 Submits Comments on 970113-16 QA Insp of Sierra Nuclear Corp in Scott Valley,Ca ML20134B6001997-01-13013 January 1997 Provides Meeting Minutes from NRC Insp 97-201 Exit Meeting Re Insp of Trojan'S QA Program for Isfsi,From 970107-09 ML20133N2821997-01-0808 January 1997 Requests Comments on Poge Position Re Potential for Ashfall at Trojan Site ML20135B8581996-12-0303 December 1996 Requests Guidance on Use of 10CFR71.41(c) Per Licensee Request for Authorization to Transport Reactor Vessel as Type B Package ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20237F1891996-01-22022 January 1996 Notification of 960131 Meeting W/Util in Rockville,Md to Discuss Planned Removal of Plant Pressure Vessel ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20057B6071993-09-16016 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Status of Decommission Activities & Physical Security ML20057A6651993-08-27027 August 1993 Forwards Notice of Consideration of Issuance of Amend to License NPF-1 & Proposed NSHC Determination & Opportunity for Hearing ML20056E5331993-08-16016 August 1993 Notification of 930901 Mtg W/Util & State of or in Rainier, or to Discuss Proposed Studies of Plant Sys at Plant ML20056E4451993-08-0606 August 1993 Notifies of 930812 Meeting W/Util in Rockville,Md for Presentation on Plant Decommissioned TS ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128G0061993-02-0101 February 1993 Notifies of Cancelled 930210 Meeting W/Technical Analysis Corp to Discuss Shutdown Plans & Decommissioning Strategies for Plant ML20127L9741993-01-22022 January 1993 Notification of 930204 Meeting W/Util in Rockville,Md to Discuss Shutdown Plans & Decommissioning Strategies for Plant ML20127J7691993-01-15015 January 1993 Discusses Interim Plugging Criteria for Util & Provides Discription of Core Damage Frequency Derivation & Present RES Plans for Addl Work on Steam Generator Tube NDE That RES Intends to Do This Year ML20127E7821993-01-11011 January 1993 Notification of Significant Licensee Meeting W/Util on 930120 to Discuss Shutdown Plans & Decommissioning Strategies for Facility ML20127F4461993-01-0707 January 1993 Revised Notification of Significant Meeting W/Util on 930202 to Discuss One Violation of 10CFR50.7(f) Identified During OI Investigation of Security Department at Plant ML20127A5381993-01-0707 January 1993 Discusses QC Concerns W/Mine Safety Appliances Co Full Face Negative Pressure Respirators (Ultra View & Ultra Twin) W/Potential 10CFR21 Implications ML20127A5701993-01-0505 January 1993 Provides Position on Interim Plugging Criteria for Plant ML20126G9861992-12-22022 December 1992 Notification of Significant Licensee Meeting W/Util on 930113 to Discuss One Violation of 10CFR50.7(f) Identified During OI Investigation of Security Dept at Plant ML20126E6501992-12-18018 December 1992 Notification of or Energy Facility Siting Council Special Meeting & Hearing on 930105 & 06 in Portland,Or to Discuss Tnp SG Tube Cracking Issue,Interim SG Tube Plugging Criteria & Issues from Current Forced Outage.Agenda Encl ML20126F4271992-12-18018 December 1992 Notification of 921230 Meeting W/Util in Rockville,Md to to Discuss Steam Generator Insp Program & Results as Consequence of primary-to-secondary Steam Generator Leak Event on 921109 ML20126F4821992-12-18018 December 1992 Notification of Cancellation of 921230 Meeting W/Util in Rockville,Md to Discuss SG Insp Program & Results as Consequence of 921109 primary-to-secondary SG Tube Leak Event & Recent Issues Raised Re Interim Plugging Criteria ML20126E7641992-12-16016 December 1992 Notification of 921223 Meeting W/Util in Rockville,Md to Discuss Steam Generator Insp Program & Results as Consequence of 921109 primary-to-secondary Steam Generator Tube Leak Event ML20126F4651992-12-16016 December 1992 Cancelled Notification of 921223 Meeting W/Util in Rockville,Md to Discuss SG Insp Program & Results as Consequence of 921109,primary-to-secondary SG Tube Leak Event ML20125C7641992-12-0909 December 1992 Discusses Technical Aspects of Rationale Used to Support Steam Generator Tube Interim Plugging Criteria for Plant & Independent Conclusions on Viability of Independent Plugging Criteria for One Fuel Cycle ML20126F4711992-12-0707 December 1992 Forwards Draft Rept of RES Position on Steam Generator Tube Integrity ML20126E5221992-11-30030 November 1992 Informs Staff Revised Prioritization Will Be Forwarded for Further Comments in Response to 921124 Memo Re GI 163, Multiple Steam Geneator Tube Leakage ML20125A6311992-11-25025 November 1992 Notification of 921201 Meeting W/Util to Discuss Assessment of Recent SG Tube Leak ML20128C3491992-06-16016 June 1992 Discusses Proposal of New Generic Issue, Multiple SG Tube Leakage, as Resolution to DPO Received Addressing Operation of SGs W/Microscopic Tube Wall Cracks.Dpo Encl ML20128C3141992-03-27027 March 1992 Submits Analysis, Safety Issue Re Continuous Operation W/ Degraded SG Tubes, Indicating Core Melt Probability Frequency of 10 -4/Ry W/Containment Bypass NUREG-5055, Notification of 901017 Meeting W/Util in Rockville,Md,To Discuss Proposed Mods to Control Bldg Per NUREG-50551990-10-10010 October 1990 Notification of 901017 Meeting W/Util in Rockville,Md,To Discuss Proposed Mods to Control Bldg Per NUREG-5055 ML20059C1331990-08-21021 August 1990 Notification of Enforcement Conference 90-143 W/Util on 900830 to Discuss Violation Noted During Special Security Insp 1999-09-03 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217D1071999-09-16016 September 1999
[Table view]Provides Proposed Schedule for Review of Trojan License Termination Plan (Ltp),As Committed in 990903 Memo.Project Manager Should Schedule LTP Meeting Near Trojan Site for Late Nov or Early Dec,Based on Region IV Availability ML20216E4091999-09-0303 September 1999 Informs That Staff Has Performed Acceptance Review of Trojan Nuclear Plant License Termination Plan Submitted by Ltr Dtd 990805.NMSS Determined That Licensee Has Provided Sufficient Info for NRC to Proceed with Detailed Review ML20205R4091999-04-16016 April 1999 Informs That LTP for Trojan Nuclear Plant Did Not Provide Sufficient Info to Perform Detailed Review & Waste Mgt Recommends Returning LTP to Licensee So That LTP Can Be Resubmitted as Complete Application ML20195B6401998-11-10010 November 1998 Notification of 981119 Meeting with Util in Rockville,Md to Discuss Preliminary Plans for Plant Final Site Surveys ML20155G6571998-11-0303 November 1998 Notification of 981119-990331 Meeting with Util in Rockville,Md to Clarify Remaining Technical Issues Associated with Util Application for License to Operate ISFSI at Tpp ML20236S5361998-07-22022 July 1998 Notification of 980812 Meeting W/Portland General Electric in Arlington,Texas to Discuss Status of Decommissioning Activities at Trojan NPP ML20236R6511998-07-15015 July 1998 Notification of 980730 Meeting W/Listed Participants in Kelso,Wa Re Proposed Request from Portland General Electric Co for Approval to Allow one-time Shipment of Plant Decommissioned Reactor Vessel.Meeting Agenda Encl ML20236R6931998-07-15015 July 1998 Notification of 980730 Meeting W/Util to Discuss Request for Addl Info Re Ongoing Review of Portland General Electric Co Request for Approval to Allow one-time Shipment of Trojan Decommissioned Reactor Vessel.Meeting Agenda Encl ML20248L4691998-03-17017 March 1998 Notifies of in-house Research Project Re Digital I&C in NPP & Forwards Technical Training Div (TTD) ML20216E7421998-03-0606 March 1998 Notification of 980318 Meeting W/Portland General Electric in Rockville,Maryland to Discuss Proposed Shallow Land Disposal of Trojan Reactor Vessel ML20199D4951998-01-26026 January 1998 Notification of Licensee Meeting W/Util on 980209 in Arlington,Tx to Discuss Changes to Protected Area for Plant to Facilitate Ongoing Decommissioning of Site ML20199G1561998-01-22022 January 1998 Staff Requirements Memo Re SECY-97-244, Waste Classification of Plant Reactor Vessel ML20199G1121998-01-20020 January 1998 Submits Addl Views on Proposal to Dispose of Trojan Reactor Vessel,Per SECY-97-244 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20216F2611997-08-26026 August 1997 Staff Requirements Memo Re SECY-97-164, Shipment of Decommissioned Reactor Vessel,Containing Irradiated Internals,From Trojan Nuclear Plant to Hanford Nuclear Reservation,Richland,Wa ML20141G2911997-05-15015 May 1997 Forwards Page A-25 of Rev 5 to PGE-1060, Tnp Permanently Defueled Emergency Plan ML20137W9801997-04-16016 April 1997 Notification of Significant Licensee Meeting W/Util on 970508 in Rockville,Md to Discuss Plans for Decommissioning of Plant ML20137H2231997-03-31031 March 1997 Forwards Info in Support of Pnl Modeling for Fgeis Final Rule on Radiological Criteria for License Termination ML20135B1941997-01-30030 January 1997 Responds to Re Util Position Re Potential for Ash Fall at Trojan Site ML20138J2731997-01-21021 January 1997 Submits Comments on 970113-16 QA Insp of Sierra Nuclear Corp in Scott Valley,Ca ML20134B6001997-01-13013 January 1997 Provides Meeting Minutes from NRC Insp 97-201 Exit Meeting Re Insp of Trojan'S QA Program for Isfsi,From 970107-09 ML20133N2821997-01-0808 January 1997 Requests Comments on Poge Position Re Potential for Ashfall at Trojan Site ML20135B8581996-12-0303 December 1996 Requests Guidance on Use of 10CFR71.41(c) Per Licensee Request for Authorization to Transport Reactor Vessel as Type B Package ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20237F1891996-01-22022 January 1996 Notification of 960131 Meeting W/Util in Rockville,Md to Discuss Planned Removal of Plant Pressure Vessel ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20057B6071993-09-16016 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Status of Decommission Activities & Physical Security ML20057A6651993-08-27027 August 1993 Forwards Notice of Consideration of Issuance of Amend to License NPF-1 & Proposed NSHC Determination & Opportunity for Hearing ML20056E5331993-08-16016 August 1993 Notification of 930901 Mtg W/Util & State of or in Rainier, or to Discuss Proposed Studies of Plant Sys at Plant ML20056E4451993-08-0606 August 1993 Notifies of 930812 Meeting W/Util in Rockville,Md for Presentation on Plant Decommissioned TS ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128G0061993-02-0101 February 1993 Notifies of Cancelled 930210 Meeting W/Technical Analysis Corp to Discuss Shutdown Plans & Decommissioning Strategies for Plant ML20127L9741993-01-22022 January 1993 Notification of 930204 Meeting W/Util in Rockville,Md to Discuss Shutdown Plans & Decommissioning Strategies for Plant ML20127J7691993-01-15015 January 1993 Discusses Interim Plugging Criteria for Util & Provides Discription of Core Damage Frequency Derivation & Present RES Plans for Addl Work on Steam Generator Tube NDE That RES Intends to Do This Year ML20127E7821993-01-11011 January 1993 Notification of Significant Licensee Meeting W/Util on 930120 to Discuss Shutdown Plans & Decommissioning Strategies for Facility ML20127A5381993-01-0707 January 1993 Discusses QC Concerns W/Mine Safety Appliances Co Full Face Negative Pressure Respirators (Ultra View & Ultra Twin) W/Potential 10CFR21 Implications ML20127F4461993-01-0707 January 1993 Revised Notification of Significant Meeting W/Util on 930202 to Discuss One Violation of 10CFR50.7(f) Identified During OI Investigation of Security Department at Plant ML20127A5701993-01-0505 January 1993 Provides Position on Interim Plugging Criteria for Plant ML20126G9861992-12-22022 December 1992 Notification of Significant Licensee Meeting W/Util on 930113 to Discuss One Violation of 10CFR50.7(f) Identified During OI Investigation of Security Dept at Plant ML20126E6501992-12-18018 December 1992 Notification of or Energy Facility Siting Council Special Meeting & Hearing on 930105 & 06 in Portland,Or to Discuss Tnp SG Tube Cracking Issue,Interim SG Tube Plugging Criteria & Issues from Current Forced Outage.Agenda Encl ML20126F4271992-12-18018 December 1992 Notification of 921230 Meeting W/Util in Rockville,Md to to Discuss Steam Generator Insp Program & Results as Consequence of primary-to-secondary Steam Generator Leak Event on 921109 ML20126F4821992-12-18018 December 1992 Notification of Cancellation of 921230 Meeting W/Util in Rockville,Md to Discuss SG Insp Program & Results as Consequence of 921109 primary-to-secondary SG Tube Leak Event & Recent Issues Raised Re Interim Plugging Criteria ML20126E7641992-12-16016 December 1992 Notification of 921223 Meeting W/Util in Rockville,Md to Discuss Steam Generator Insp Program & Results as Consequence of 921109 primary-to-secondary Steam Generator Tube Leak Event ML20126F4651992-12-16016 December 1992 Cancelled Notification of 921223 Meeting W/Util in Rockville,Md to Discuss SG Insp Program & Results as Consequence of 921109,primary-to-secondary SG Tube Leak Event ML20125C7641992-12-0909 December 1992 Discusses Technical Aspects of Rationale Used to Support Steam Generator Tube Interim Plugging Criteria for Plant & Independent Conclusions on Viability of Independent Plugging Criteria for One Fuel Cycle ML20126F4711992-12-0707 December 1992 Forwards Draft Rept of RES Position on Steam Generator Tube Integrity ML20126E5221992-11-30030 November 1992 Informs Staff Revised Prioritization Will Be Forwarded for Further Comments in Response to 921124 Memo Re GI 163, Multiple Steam Geneator Tube Leakage ML20125A6311992-11-25025 November 1992 Notification of 921201 Meeting W/Util to Discuss Assessment of Recent SG Tube Leak ML20128C3491992-06-16016 June 1992 Discusses Proposal of New Generic Issue, Multiple SG Tube Leakage, as Resolution to DPO Received Addressing Operation of SGs W/Microscopic Tube Wall Cracks.Dpo Encl ML20128C3141992-03-27027 March 1992 Submits Analysis, Safety Issue Re Continuous Operation W/ Degraded SG Tubes, Indicating Core Melt Probability Frequency of 10 -4/Ry W/Containment Bypass 1999-09-03 Category:NRC TO ASLP MONTHYEARML20062E4631978-11-20020 November 1978
[Table view]Forwards NRC Proposed Findings of Fact & Conclusions of Law on Evidentiary Record Re Control Bldg Per ASLB 781106 Order. Testimony Will Be Filed by 781125 ML20062E5021978-11-17017 November 1978 Forwards Copy of Trojan Decomm Alliance Telegram to J Hendrie ML20062B4191978-10-16016 October 1978 Forwards Ks Herring Testimony Re Suppl to Stardyne Analysis & Effect on Structural Capacity of Control Bldg.Certificate of Svc Encl ML20062B2751978-10-13013 October 1978 Forwards Ks Herring Testimony on Structural Adequacy of Trojan Control Bldg for Interim Operation & Rt Dodds & Je Knight Testimony on Seismic Features Relevant to Facility Safety ML20062B3181978-10-11011 October 1978 Informs That Staff Will File Its Testimony Re Interim Oper of Subj Facil on 781013.There Will Be a 3 Day Delay in Filing Testimony Re Reeval of Control Bldg Structure ML20062A5471978-09-29029 September 1978 Notifies That Staff Is Unable to File Testimony on Interim Oper of Subj Facil Before 781013 Re Finite Element Analysis. Urges That ASLB Commence Hearing on 781018 or 781023 1978-09-29 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20062B419&oldid=3556298"