Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: 05000344/LER-1978-020, Forwards LER 78-020/03X-3, 05000344/LER-1978-020-03, /03L-0:on 780622,during Design Review for Piping Stress at Wall Penetrations,One Sys Was Found to Have Stress Exceeding Allowable Code.Caused by Design Error.Grouting Around Pipe Removed & Stress Reduced, ML19207C007, ML19209A322, ML19209A323, ML19209A336, ML19209A363, ML19209A432, ML19209A435, ML19209B063, ML19209B180, ML19209B241, ML19209D051, ML19209D056, ML19225A294, ML19241A963, ML19241A969, ML19241C194, ML19242B129, ML19242B972, ML19247B146, ML19248C628, ML19248C934, ML19249D678, ML19250C450, ML19253C727, ML19254D131, ML19254F178, ML19256F544, ML19256F546, ML19256F990, ML19256F993, ML19260C591, ML19261A687, ML19261D547, ML19261D820, ML19263E970, ML19267A290, ML19267A296, ML19269D190, ML19270E836, ML19270G402, ML19270H454, ML19271A997, ML19275A272, ML19282A785, ML19289C608, ML19289F192, ML19290C976, ML19294B198... further results
|
MONTHYEARML19209A3631974-02-25025 February 1974 Burn Tests on Silastic Rubber-Coated Glass Drop Cloths. Prof Qualifications of Ew Edwards Encl Project stage: Other ML19256F5461974-06-30030 June 1974 Miscellaneous Paper C-74-12,Pullout Resistance of Reinforcing Bars Embedded in Hardened Concrete, Prepared by Engineer Waterways Experiment Station Project stage: Other ML20195C3451978-04-28028 April 1978 Informs That Structure of Walls in Control Bldg Does Not Meet Seismic Criteria for Sar.Reanalysis Confirms Control Bldg Will Maintain Structural Integrity & Plant Will Retain Functional Capability Under Design Loads Project stage: Other ML20195C3641978-05-26026 May 1978 Clarifies Items 2 & 3 of DG Eisenhut 780502 Memo Re Proposed Mod to Plant Spent Fuel Storage Rack Proceedings.Design Engineer Activities in Fuel Bldg Design Should Be Considered Supporting Role Project stage: Other ML18004B9711978-06-0202 June 1978 Addresses Pipe Support Base Plate Problem.Discusses Review of Support Redesigns & Capability of Anchor Bolts to Withstand Cyclic Loadings Project stage: Approval ML20195C3511978-06-29029 June 1978 Forwards Affidavits of CM Trammell & LC Shao Re Safety Significance of Control Bldg Design Deficiencies & NRC Findings Concerning Significant Hazards Considerations Project stage: Other ML20195C3851978-06-29029 June 1978 Affidavit of Chales M. Trammel,Iii.* Staff Concluded That an Amendment Authorizing Operation of Trojan Nuclear Power Plant Pending Upgrading of Seismic Capability of Control Bldg Walls Would Constitute a Decrease in Safety Margin Project stage: Other ML20195C4001978-06-29029 June 1978 Affidavit of LC Shao Re Control Bldg Design Errors Resulting in Substantially Weaker Walls than Intended by Original Design criteria.As-built Structure Has one-half of Seismic Capacity & Safety Margin Project stage: Other ML20195C3741978-06-30030 June 1978 Forwards Proposed Schedule of Actions to Bring Plant Control Bldg Into Substantial Compliance Ww/Requirements & Intended Design Margins.Detailed Description of Actions,Design Changes & Mods Will Be Submitted Prior to 780901.W/o Encl Project stage: Other 05000344/LER-1978-020-03, /03L-0:on 780622,during Design Review for Piping Stress at Wall Penetrations,One Sys Was Found to Have Stress Exceeding Allowable Code.Caused by Design Error.Grouting Around Pipe Removed & Stress Reduced1978-07-21021 July 1978 /03L-0:on 780622,during Design Review for Piping Stress at Wall Penetrations,One Sys Was Found to Have Stress Exceeding Allowable Code.Caused by Design Error.Grouting Around Pipe Removed & Stress Reduced Project stage: Other ML20195C4581978-08-19019 August 1978 Forwards NRC Questions & Licensee Responses,780804-17 Based on Info Provided by Bechtel Re Control Bldg.All Walls Except 1B,2 & 3 Have Dowel Capacities Exceeding Shear Capacities Controlled by Either Shear or Bending Project stage: Other ML20195C4621978-08-21021 August 1978 Forwards Final NRC Responses to Questions 6 & 10 Re Control Bldg Mods,Based on Info Provided by Bechtel.Equipment in Structure Should Continue to Be Capable of Resisting Seismic Loadings Resulting from Real Earthquakes Project stage: Other ML20195C5331978-08-22022 August 1978 Responds to Re Amendment Permitting Temporary Operation of Plant Independent of Public Hearing.Law Requires Hearing to Be Held in Connection W/Amend to OL Project stage: Other ML20150A6081978-08-30030 August 1978 Forwards Request for Addl Info Re Control Bldg Per Seismic Nonconformance Project stage: RAI ML20150A6141978-09-0101 September 1978 Forwards Preliminary Results of Stardyne Finite Element Analysis of Trojan Control-Auxiliary-Fuel Bldg Complex & Assessment of Seismic Load Resistance of Bldg as Presented at 780828 Meeting. Lic. NPF-1 Project stage: Meeting ML20195C1431978-09-0707 September 1978 Responds to Commissioner Davis Addressed to Commissioner Bradford & Expressing Concerns Re non-conformance to Specs of Control Bldg at Plant & Effect of Facility Shutdown on Rate Payers Project stage: Other ML20147C2411978-09-12012 September 1978 Forwards Corrected Supplementary Info Transmitted by Ltr Project stage: Supplement ML20150A6441978-09-20020 September 1978 Forwards Final Results of Rev & Evaluation of Recent Stardyne Finite Element Analysis for Existing Control Bldg of Subj Facil.Suppl Structural Evaluation Response to Specified SSE Event,& Response to Questions Encl Project stage: Other ML20150A6651978-09-20020 September 1978 Responds to Specified SSE Event.Stardyne Dynamic Analysis Was Used to Determine Structural Capacities & Forces. Concludes That Control Bldg Can Withstand SSE Event Safely Project stage: Other ML20150A6581978-09-21021 September 1978 Order Re Responses to NRC Interrogatories by Coalition for Safe Pwr & Consolidation.Cfsp Must:Respond W/In 14 Days to S1,S2,E1,G1,G2,G3,G8 & All Other Interrogatories;Clarify the Status of Spokesmen.Motion for Reconsideration Is Denied Project stage: Approval ML20062B9611978-09-28028 September 1978 Forwards 780628 Memo to R Mattson Re Info on Failures of safety-related Pipe Supports at Millstone 1 & Design Deficiencies on Similar Equipment at Shoreham.Aslb Notified of Pipe Support Base Plate Design Project stage: Approval ML20062A5471978-09-29029 September 1978 Notifies That Staff Is Unable to File Testimony on Interim Oper of Subj Facil Before 781013 Re Finite Element Analysis. Urges That ASLB Commence Hearing on 781018 or 781023 Project stage: Request ML20147E6401978-10-0303 October 1978 Transcript of SR Christensen Testimony Re Description of Seismic Instrumentation & Engineering Investigations to Be Conducted Following Earthquake Project stage: Other ML20147E6321978-10-0303 October 1978 Transcript of Dj Broehl Testimony Re Plant History, Chronology of Events Since Apr 1978 & Summary of Licensee Efforts to Ensure Safe Interim Operation of Control Bldg Project stage: Other ML20148A0601978-10-0606 October 1978 Direct Testimony of Harold Laursen Re Assignment to Eval Ability of Subj Facil Bldg Shear Walls to Resist Seismic Loading.Determined Shear Walls Can Withstand .25g Safe Shutdown Earthquake Project stage: Other ML20062C1421978-10-11011 October 1978 Notice of Evidentiary Hearing on Issue of Interim Operation & Limited Appearance.Hearing to Determine Whether Interim Operation Should Be Permitted Prior to Mods Required by Order Will Be Held on 781023 & 1030-1101 Project stage: Other ML20148C0251978-10-13013 October 1978 Responds to NRC 781011-13 Questions Re Supplemental Structural Evaluation of Control Bldg,Particularly Shear Wall Capacity.Certificate of Svc Encl Project stage: Supplement ML20062B2751978-10-13013 October 1978 Forwards Ks Herring Testimony on Structural Adequacy of Trojan Control Bldg for Interim Operation & RT Dodds & Je Knight Testimony on Seismic Features Relevant to Facility Safety Project stage: Other ML20062B2791978-10-13013 October 1978 Testimony Verifying That Reasonable Assurance Exists That Shear Walls Will Withstand SSE or Obe.Original Intended Margins of Safety Reduced & Should Be Restored Project stage: Other ML20062B2821978-10-13013 October 1978 Testimony Describing Insp of Humboldt Bay Following 5.4 Richter Magnitude Earthquake on 750609 & Std Insp Procedures After Seismic Event.Procedures to Be Followed During Earthquake Detailed Project stage: Other ML20062B2861978-10-13013 October 1978 Testimony Responding to ASLB Questions Re Effects of Seismic Event on Plant Features Important to Maintaining Safety of Facility.Certificate of Svc Encl Project stage: Other ML20147F0961978-10-16016 October 1978 Licensees Testimony on Capability of Subj Facil to W/Stand Seismic Events.Statements of Qualifications,Ref & Append Are Attached.Description of Affected Structure & Deficiencies Such as Amount & Arrangement of Reinforcing Steel Provided Project stage: Other ML20147F0891978-10-16016 October 1978 Testimony of Bart Withers,As Superintendent of Subj Facil W/Statement of Qual Attached.Describes Capability of Plant to Function & Plant Staff to Respond Properly Immediately Following a Seismic Event Project stage: Other IR 05000344/19780201978-10-16016 October 1978 IE Inspec Rept 50-344/78-20 on 780905-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspec Incl: Plant Opers,Maint,Surveillance Test,Facil Security & Licensee Event Followup Project stage: Request ML20062B4191978-10-16016 October 1978 Forwards Ks Herring Testimony Re Suppl to Stardyne Analysis & Effect on Structural Capacity of Control Bldg.Certificate of Svc Encl Project stage: Other ML20062B4251978-10-17017 October 1978 Testimony Re Suppl to Stardyne Analysis & Effect of Structural Capacity of Control Bldg.Structure Can Withstand SSE & Less Severe Obe,But Suppl Info Alters Earthquake Level Requiring Plant Insp Project stage: Other ML20062B9591978-10-19019 October 1978 Forwards Recent Memoranda Re Certain Problems Experienced in Connection W/Pipe Support Base Plate Design.Staff Determining If Problems Have Generic Implications for Operating Facilities.Aslb Will Be Kept Informed Project stage: Other ML20062C6271978-10-27027 October 1978 Forwards Further Response to NRC Staff Tech Questions Re Stardyne Analysis & Review.Includes Description of Criteria & Procedures Used & Explanation of Dev of New Acceleration time-history.Cert of Svc Encl Project stage: Other ML20062D3481978-11-0606 November 1978 Cross-examination or Testimony Re Analysis & Review by Licensee Poge of safety-related Matls in Control-Auxiliary- Fuel Bldg Complex Will Be Taken at 781211 Hearing.Nrc Given Time to Reply to Interrogs.Proposed Findings Due 781120 Project stage: Other ML20197D4801978-11-22022 November 1978 Forwards Suppl Documentation in Support of Floor Response Spectra Provided in 781027 & 781102 Responses to NRC Info Requests.W/Cert of Svc Encl Project stage: Other ML20197D4691978-11-22022 November 1978 Forwards Suppl Document Supporting Floor Response Spectra Provided in 781027 & 781102 Submittals to NRC in Response to Request for Additional Info Project stage: Request ML19305A0701978-12-11011 December 1978 Limited Appearance Statement by Rd Pollard of Ucs to Explain the Kind of Inquiry Possible,Yet Untapped,W/Respect to Any Person of Pollards Competence & Commitment in Field of Nuclear Plant Licensing Project stage: Other ML19305A0631978-12-18018 December 1978 Forwards Limited Appearance Statement by Rd Pollard of Ucs. W/Encls Project stage: Other ML19270E8361978-12-21021 December 1978 Partial Initial Decision Re Whether Operation of Facility Should Be Permitted in Spite of Identified Design Deficiencies in Control Bldg & Prior to Mod.Decision Is to Allow Interim Operation Project stage: Other ML19267A3021978-12-22022 December 1978 Notice of Issuance of Amend 35 License NPF-1 Project stage: Approval ML19267A2901978-12-22022 December 1978 Forwards Partial Initial Decision,Amend 35 to License NPF-1 & Notice of Issuance Project stage: Other ML19267A2961978-12-22022 December 1978 Amend 35 to License NPF-1.Modifies Waiver Portions of Tech Specs & FSAR Criteria Which Have Not Been Followed Due to Design Deficiency in Control Bldg Shear Walls Project stage: Other 05000344/LER-1978-020, Forwards LER 78-020/03X-31978-12-26026 December 1978 Forwards LER 78-020/03X-3 Project stage: Other ML19308A2121978-12-26026 December 1978 Reportable Occurrence on 780622: Piping Penetrations Not Designed to Be Solidly Grouted Were Found to Be Solidly Grounted.During Subsequent Design Review,Excessive Support or Pipe Stresses Found on 11 Isometrics. Probable DELETE-RO Project stage: Other ML20150F0221979-01-0303 January 1979 FOIA Request for 20 Documents Listed Re ECCS Performance Calculations & Calculational Errors Identified by Westinghouse & Portland GE, & on Pipe Cracks in Containment Vessel of Trojan Plant Project stage: Request 1978-04-28
[Table View] |
Text
.
s 7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY C0!iMISSION In the Matter of
)
Portland General Electric Company, et al.)
Docket No. 50-344 (Trojan Nuclear Power Plant)
)
DIRECTOR'S DECISICN UNDER 10 CFR 2.2C5 By petition dated fiay 17, 1979, Nina Bell and Eugene Rosolie, on behalf of the Coalition for Safe Power (Coalition) requested that the Nuclear Regulatory Commission order shutdown of the Trojan Nuclear Power Plant. This petition was filed pursuant to 10 CFR 2.206 of the Commission's regulations.
The asserted bases for the request by the Coalition are that deficiencies exist with respect to fire protection and environmental qualification of electrical equipment.
The issues raised by the Coalition are generic in nature and directly related to those raised by the Union of Ccncerned Scientists in its November 1977 and May 1978 petitions. The Commission is now in the process of preparing a final Memorandum and Order in that proceeding.
The Coalition is correct in its statement that neither the NRC Staff Safety Evaluation Report dated October 7,1974 ncr its supplement dated November 21, 1975 addressed the environmental qualifications of electrical equipment.
Notwithstanding this onission, these 1087 034 7910080 [g/
s 7590-01 components were reviewed by the Staff and the Staff is not aware of the presence of any unqualified electrical equipnent. However, the pressure transmi,tters, while qualified for their safety trip function, have not been found qualified for long tern nonitoring. Accordingly, the licensee has provided an acceptable alternate means to obtain the long tern monitoring infomation in the fom of pressure and differential pressure transmitter. in the auxiliary building located outside containment.
Ir. addition, in response to IE Bulletin 79-01, PGE has reexamined the environmental qualification of all safety-related electrical equipment, and submitted this infomation in letters of June 12,1979 and June 15, 1979 to Mr. R. H. Engelken, Director, NRC Region V.
T. lese submittal s are in the process of being*rev'.ewed.
Based on the foregoing discussion, I have dete ned that no adequate basis exists at this tine for ordering shutdown of the Trojan Nuclear Power Plant. The request of the Coalition for Safe Power for immediate action is hereby denied.
Further consideration of the Coalition',s petition will be held in abeyance pending the Commission's decision in the UCS proceeding.*
- This is in accordance with the Secretary of the Connission's July 31, 1979 nemorandum to the Director which stated:
"The Connission requests that you detemine if this petition contains any infomation indicating that immediate action is needed at the Trojan plant, as distinguished from generic actions which may result from the Comission's final detemination in the UCS proceeding. The petitioner should be infomed of the results of this inquiry.
If it is found that no imediate action is warranted, petitioner should be informed that further consideration of its petition will be held in abeyance pending the Connission's decision in the UCS proceeding."
1087 035
s 7590-01 A copy of this determination will be placed in the Connission's Public Document Roou at 1717 H Street, N.W., Washington, D. C.
20555 and the local public document roon for the Trojan Nuclear Power Plant located at the Colunbia County Courthouse, Law Library, Circuit Court Roon, St. Helent, Oregon 97051. A copy of this docunent will also be filed with the Secretary of the Connission fo its review in accordance with 10 CFP. 52.c.c(c) of the Connission's regulations.
In accordance with 10 CFR 52.206(c) of the Connissiof s Rules of Practice, this decision will constitute the final action of the Connission twenty (20) days after the date of issuance, unless the Connission on its own notion institutes the rev;eo Of t.'i: f cicion within that time.
Harold R. Denten, Director Office of Nuclear Reactor Regulation
.fT.yland Dated at Bethesda Mar Sedet-this 104d 1087 036
\\
CCAUTION c MTE P T5 :.
"il'I
~
UNITED STATES OF AMERICA FC RT M N; ; ' :4 972M NUCLEAR REGULATORY COMMISSION PETITION TO TIIE COMMISSIC" FROM Tile C0ALITION FOR SAFE F0h'ER REGARDING SAFETY DEFICIENCIES AT,T.
TROJAN NUCLEAR PLANT, PURSUSANT TO 10 CFR 2 206(a).
1 This petition is brought by the Coalition for Safe Power (CFSP) to the Nuclear Regull. tory Conmission (NRC) regarding the operation of th'e Trujan Nuclear Power Plant i.. Rainer Orego1 This petition re-quests that immediate currective action be taken by the Commission to reltuve sertous safety problems at the plant.
Failure by the NRG Staff to compel Portl.:.d General Electric, the owner / operator of the plant, and on the part of the utility to remedy these deficiencies inja timely mannei or to indicate a willlingness to proceed expeditiously is the primary basis for bring!.ng this petition to the Commission rather than the Staff.
2 The Coalition for Safe Power is a non-profit citizens group that was founded in 1969 for the purpose of promoting appropriate tech-nologies and working to ensure the safety of nuclear power paints.
Its members and affiliated attorneys have representec' the CESP in several NRC proceedings regarding the Trojan Nuclear Plant as well as in rate hearings before theoregon Public Utility Commission. CFSP represents people throughout Oregon but primarily in the Portland area.
AUTHORITY 3.
The authority of the Comasion is not only appropriate, b st necessary, in this case.
The Office of Nuclear Reactor Regulation has known about at least one of the alleged deficiencies cince July 6,1978.
Not only has this office taken no acticpb& savor 3Ljjtab%f, acts.,ser,,
forth herein have been made known to a } DUPLICATE DOCUMENT I
Board presently sitting on the Trojan c ! Entire document previously entered iinto system under:
hh ANO 1087 037 No. of pages.
/
L aussa
- "~
=,w _ n - -
t