ML20195C345

From kanterella
Jump to navigation Jump to search

Informs That Structure of Walls in Control Bldg Does Not Meet Seismic Criteria for Sar.Reanalysis Confirms Control Bldg Will Maintain Structural Integrity & Plant Will Retain Functional Capability Under Design Loads
ML20195C345
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/28/1978
From: Broehl D
PORTLAND GENERAL ELECTRIC CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-07551, TAC-08348, TAC-7551, TAC-8348, NUDOCS 8811030022
Download: ML20195C345 (1)


Text

-

s PORTbND GnxnnAL Er.nc rure Co>u'Axy 12t 5. W. S A LM O N STACE?

Penn,ANo.OntooN 97204 C. J. 5 m O C H l.

.......,m......

April 28, 1178 5-i c

n Ed

._.n Mr. A. Schwencer, Chief g/!

Operating Reactors Branch #1

,' M b

/k E' Division of Operating Reactors CMS U. S. Nuclear Regulatory Commission U

E[

~

Wa shington, D. C.

20555 5

??

~

m

Dear Mr. Schwencer:

Trojan Nuclear Plant Docket 50-344 License NPF-1 Confirming our verbal notification to Resgion V on April 13,1978, and to NRR on April 14, 1978, we wish to inform you of the following non=

conformance at our Trojan Nuclear Plant. Bechtel Power Corporation, Architect-Engineer for our Trojan Nuclear Plant, has informed us of a non-conformance with the design criteria stated in our Safety Analysis Report.

From an investigation of the walls in the Control Building of the Trojan Nuclear Plant, Bechtel has determined that the structure does not fully meet the Seismic Criteria of the Safety Analysis Report. However, their re-analysis confirms that the Control Building will maintain its structural integrity and the plant will retain its functional capability under design loads, and that there will be no reduction in equipment reliability in the unlikely event that a design earthquake is experienced. Hence, a safety issue is not presented.

We would Itke to meet with you and review these findings at your earliest convenience.

Sinc er ely,

{P-8811030022 700420

/M4 g

ApocK 05000344 g,.

e PQR-L kg&y V

kr cc:

R. H. Engelken. Director 781220117 Nuclear Regulatory Commission, Region V g\\

D Dr. Fred D. Miller, Director State of Oret,on, Department of Energy

-