ML20245B399

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-327/OL-88-01 on 881212-15.Facility Comments Re Written Exam & Summary of Simulator Performance Deficiencies Observed During Conduct of Simulator Portion of Exams Also Encl
ML20245B399
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/17/1989
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20245B400 List:
References
NUDOCS 8904260092
Download: ML20245B399 (2)


Text

- . _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ .-. _ _ _ _ _ _ - _

April 17, 1989 Docket No. 50-327 License No. DPR-77 Mr. Oliver D. Kingsley, Jr.

Senior Vice President, Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Dear Mr. Kingsley:

SUBJECT:

SEQUOYAH NUCLEAR PLANT EXAMINATION REPORT 327/0L-88-01 The NRC administered examinations on December 12-15, 1988, to employees of your company who had applied for licenses to operate the Sequoyah Nuclear Plant. At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

Copies of the written examination questions and answer key are included in this report as Enclosure 2. Facility comments regarding the written examination are included in this report as Enclosure 3. Enclosure 4 summarizes simulator performance deficiencies observed during conduct of the simulator portion of the operating examinations.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.

Sincerely, (Original signed by T. A. Peebles)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety

Enclosures:

1. Exam Report No. 50-327/0L-88-01
2. RO/SR0 Exam Questions and Answer Key
3. Facility Comments
4. Simulation Facility Fidelity Report cc w/encls 1 and 3: (See page 2) l e904260092OQh27 PDR ADOCK O pg - j g v

Mr. Oliver D. Kingsley, Jr. 2 April 17, 1989 cc w/encls 1 and 3:

Mr. R. J. Johnson, Nuclear Training Branch S. Smith, Plant Manager cc w/ encl 1:

State of Tennessee bec w/enci 1:

J. Donohew, NRR L. Watson, DRP J. Moorman, DRS Senior Resident Inspector bcc w/encls 1, 2, 3 and 4:

Operator Licensing Branch, DLPQ:NRR Document Control Desk C. Shiraki, Contractor i

I l l l

RII RII RI RII RII bra BMichael:tj f

RBaldwin J fman v

ho Peebles 04//L/89 04/ p/89 04/0>/89 0 0/89 4///89

/

i