Monthly Operating Rept for Mar 1986
ML20206D871
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/31/1986
From: Orser W, Ulmer F
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
WSO-132-86, NUDOCS 8606200387
Download: ML20206D871 (6)


Text

'

. l l

i OPERATING DATA REPORT DOCKET NO. 50-344 DATE 4-8-86 COMPLETED BY F. .T - Ulmer TELEPHONE nna 6"-3713 Ext. 495 OPERATING STATUS Notes

1. Unit Name:

Troian Nuc1 ear P1 ant

. 2. Reporting Period:

March 1986 3411

3. Licensed Thennal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

1130 1100

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1050

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

n/a n/a

9. Power Level To Which Restricted,If Ang( et MWe):
10. Reasons For Restrictions. If Any: ,

i This Month Yr.-to-Date Cumulative l 83976

11. Hours In ReportingI Period 744 2160 744 2146 51696
12. Number Of Hours Reactor Was Critical 0 3887 0
13. Reactor Reserve Shutdown Hours 744 7144 6 s1149
14. Hours Generator On.Line 0 0 3249
15. Unit Reserve Shutdown Hours 162064419 2397417 7109614
15. Gross Thermal Energy Generated (MWH) 762001 2275229 53093545 l*/. Gross Electrical Energy Generated (MWH) _

725424 2167740 50259044 18'. Net Electrical Energy Generated (MWH) 100 99.3 61.0

19. Unit Service Factor 100 99.3 64.8
20. Unit Availability Factor 92.9 95.6 55.5
21. Unit Capacity Factor (Using MDC Net) 86.3 88.8 53.0 l 22. Unit Capacity Factor (Using DER Net) 0.0 0.7 14.8 23.' Unit Forced Outage Rate l -

l

24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

! Cycle 8/9 Refueling Outage is scheduled for April 16. 1986.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: n/a
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved n la n/n INITIAL CRITICALITY l n/a n/a l INITIAL ELECTRICITY n/a n/a COMMERCIAL OPERATION Q t l e606200387 e60331 ADOCK 05000344 g6 7 (9/77)

PDR R PDR \[\

t + .

t.

AVERAGE DAILY UNIT POWER LEVEL <

4 DOCKET NO: 50-344

-UNIT: Troian DATE: 4-8-86 COMPLETED-BY: F. J. Ulmer TELEPHONE: 503-556-3713 4 Ext. 495 i

MONTH March 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) -(MWe-Net) 1 1046 17 1047 2 1043 18 1044 3 1045 19 1041 4 668 20 1040 5 423 21 1044 6 752 22 1046 7 535 23 1047 4

8 702 24 1047 9 1043 +

25 1047 10 26 1042 4

1041 1039 11 1044 27 12 1034 1048 28 1040 13 1049 29 041 14 1049 30 1042 15 1048 31 i

16 1048 4

, INSTRUCTIONS i

i On this format,- list the average daily unit power level in MWe-Net-for each-day in the' reporting month. . Compute to the nearest ~whole megawatt.

  • I
(9/77)

DOCKET NO. 50-344 UNITSIIUIDOWNS AND POWER REDUCTIONS UNIT N AME Troian DATE 4-8-86 COMPLETED IIY F. J. Ulmer REPORT MONTil MARCH 1986 TELErilONE 501-5s6-7711

. Ext. 495 I'

- E E

-, lj }n $ .73 L!censee h  % Cause & Coercetive m No. Date R = jss , Event gy 91 Action to H

fE E y5=

e R Report se mO '5V u

. Prevent Recurrence 6

86-02 3-4-86 B ~0 H 4 N/A SH VALVOP Reduced power to' 35% while maintenance work was performed o'n auxiliary feedwater valves to 4

4, correct misaligned couplings on the stem to motor connection. -

l 86-0.3 3-6-86 8 0 H 4 N/A HF PIPEXX Reduced power to 55% to drain .

one circulating water train and

,. repair a crack in 'A' train circulating water pipe connectiot at condenser inlet.

t

, '\

1 2 l 3 4 F: Forced Reason: Method: Exhibit G. instr'uctions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3. Automatic Sc.am. Event Report (LER) File INUREG-D Regulatory Restriction 4 Other (Explain) 0161)

E-Operstor Training A License Examination F-Administrative 5

. G Operational Errog (Explain) , Exhibit i . Same Source li Other IEsplain)

~

. Pl/77) 9

Trojan Nuclear Plant Summary of Operating Experience Docket No: 503344 Date: 4-8-86 Completed By: F. J. Ulmer Telephone 503-556-3713 OPERATIONS:

The plant began the month operating at full power and continued at

, full power until 1105 on March 4, 1986. At this time, power was reduced to 35% while maintenance work was performed on auxiliary feed-water valves to correct misaligned motor-to-valve stem couplings.

The coupling problem was corrected and system flow tests were performed to insure that adequate auxiliary feedwater flow was available. The plant returned.to. full power at 0800 on March 5. Full power continued until 1658, March 6; then power was' reduced to 55% to allow-repair of a cracked pipe and installation of additional supports in the 'A' train circulating water system at the 'A' condenser inlet connection.

Additional support was also added to the 'B' train. The plant returned to full power at 2115 on March 8.

During the month, the steam generator tube leakage into the 'C' steam generator increased from 250 gallons per day to about 350 gallons per day. The reactor coolant dose equivalent iodine remained steady at about 16% of the luCi/gm technical specification limit.

MAJOR SAFETY RELATED MAINTENANCE:

'A' train ESF outage for monthly preventative maintenance.-

'B' train ESF outage for monthly preventative maintenance.

CB-1 Control Room Emergency Ventilation repair / testing.

'A' and 'B' train auxiliary feedwater flow control valve coupling repairs.

Various breaker and MOV testing.

Time Response testing of the inputs to the Reactor Protection System.

MISCELLANEOUS MAINTENANCE:

Steam Dump (TCV-500c) bottom flange repair.

LICENSE CHANGES:

During the month of March, the following amendments-to Trojan's Operating License were incorporated:

l l

i

Trojan Nuclear Plant Summary of Operating Experience Page 2 Amendment No. 110 The amendment revises the Operating License and the Technical Specifi-cations to (1) revise the Surveillance Requirements for Axial Flux Difference, (2) delete the ACTION statement associated with reporta-bility of out-of-specification RCS chemistry in accordance with the revised Licensee Event Report (LER) rule of 10 CFR 50.72 and 50.73, (3) reflect a change to the fire pump diesel engine Surveillance Requirement, (4) correct inconsistencies in the RCS volume, (5) more clearly identify the low population zone, and (6) make editorial corrections.

Amendment No. 111 The amendment revised the Technical Specifications to clarify the surveillance requirements for the Containment Ventilation Isolation System (Section 4.9.9) by specifying which monitoring channels must be included in the system operability test.

Amendment No. 112 The amendment revised the Technical Specifications to add operability and surveillance requirements for the core exit thermocouples and the Reactor Vessel Level Instrumentation System (RVLIS).

Amendment No. 113 The amendment revised the Technical Specifications to reflect a change in the offsite and onsite Quality Assurance (QA) Organizations made to clarity the delineation of responsibilities, improve coordination between onsite and offsite QA groups, and improve operating indepen-dence for the onsite QA group.

Amendment No. 114 The amendment revises a number of areas of the Technical Specifications in order to clarify existing operability and surveillance requirements, to add new requirements or to correct errors that have been identified.

MISCELLANEOUS:

The NRC returned to the plant to continue their review of the ade-quacy of Trojan control room emergency ventilation system and testing methods. Additional changes were made to the system to correct its design and improve operability.

On March 27, members of the Trojan staff attended an NRC enforcement-meeting in Walnut Creek, California, regarding control. room emergency ventilation.

. 1-

' C>

- same s

Portland General Electric Company Trojan Nuclear Plant P.O. Box 439 Rainier, Oregon 97048 (503)556 3713 April 8, 1986 WSO-132-86 Office'ofsResource Management US Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the monthly operating data report is submitted for March, 1986.

Sincerel ,

W. S. Orser General Manager Attachments i t l