Monthly Operating Rept for Nov 1992 for Trojan Nuclear Plant
ML20125E665
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/30/1992
From: Machon R, Ulmer F
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RDM-558-92, NUDOCS 9212170180
Download: ML20125E665 (5)


Text

_.

e===

J' E dh m

Portland Oc'icial i lectric bnnpa ny

'l roja'n Nuclear Plant 71760 Colornbia ither liwy Itainies, Oregon 97048 (503) $56-3713 December 11, 1992 RDM-558-92 Trojan Nuclear Plant Docket 50-344 Licenso NPF-1 U.S. Nuclear Regulatory Commission Attn:

Document Control Losk Washington DC 20555

Dear Sir:

Monthly operatinr. Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requiremonto, the Monthly Operating Data Report is submitted for November 1992.

Sincerely, R. D.

chon Plant Ceneral Manager Attachment c:

Mr. John D. Mart.in Regional Administratcr Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. R. C. Barr NRC Resident Inspector Trojen Nucicar Plant 17.~ 10 ~0

)

p\\' i

/4 9212170100 921130 L

[-

PDR ADOCK.05000344 i

R PDR v'

Trojan Nuclear Plant Document Control Desk Docket 50-344 December 11, 1992 License HPF-1 Attachment 4 pages TROJAN NUCLEAR PIANT Trojan Monthly Operating Report November 1992 QPERATIONS The reporting period began with the plant at 100 percent power.

The plant was shut down on November 9 due to a steam generator tube leak.

The reporting period ended with the plant in mode 5.-

OUTAGE SUPPORT LICENSING ACTIOjig PGE Requested Item Submittal Date Resnonse Date

1. License Change Application 223 November 1992 March 3, 1993 Steam Generator Tube Plugging Criteria.

2.

License Change Application 224 November 1992 May 1, 1993 Engineered Safety Feature Actuation System Surveillance Frequency Change and Slave Relay

Testing, l-l i

1

/

P OPERATING DATA REPORT toca:7 No.

30 344 DATE December 1992 coet.ETc sy

r. J. ulmer CID.ATIM ETAT'J$s TELEFBONE (503) 556-7495
1. Unit Name Trojan Nuclear Notes:

Plant

2. Reportins Period November 1992
3. Licensed Thorsel Power (Wt) 3411
4. Neeeplete Ratins (Gross We) 1216
5. Design tieetrieel Ratins (Not We) 1130
6. Maximum Dependable Capeetty (Groes Wel 1153
7. Marianas Dependable Capacity (Not Wel 1093
8. If Chansee occur in capacity Ratings (!teme No. 3 N/A throush 7) Since Last Report Give Reseone
9. Power Level To Which Restricted. If Any (Not We)

N/A

10. Reasons For Restrictions, !! Any N/A This it> nth Tr-to-Date Cumulative
11. Bours in Reportins Period 720 8040

-162440

12. Number of Nours Reacter Was critical 199.5 4797.0 83710
13. Reactor Reserve Shutdown Boure 0

1210.2 S0ff

14. Noure Generator on-Line 199.4 4639.1 83545
13. Unit Reserve shutdown Boure 0

1218.8 4468

16. Gross Therinal Energy Generated (WB) 676732 14585366 267291694
17. Oross Electrical Energy Generated (W8) 239845 4865232 88265599
18. Not Electrieel Energy Generated (WB) 210946 4580825 83446142
19. Unit Service Factor 27.7

$7.9

$8.7

20. Unit Availability Factor 27.7 73.1 61.8
21. Unit Capacity Factor (Using toc Net) 26.8

$2.0 54.5

22. Unit Capacity Factor (Usins DER Net) 25.9 30.4

$1.9

23. Unit Forced Outase Rets 72.3 13.6 13.1
24. Ehutdowns Scheduled Over Nort 6 Months (Type, Refuelins Outase. March 31, 1993 (90 days)

Date and Duration of Each):

25. If Shut Down et End of Report Period, January 11, 1993 tattmated Date of Startup:
6. Unite In Test Status (Frior to Comunercial F0FICAST ACMTIVED Operation)

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A CattERCIAL CPERATION N/A N/A

9 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-344 UNIT TROJAN DATE DECEMBER 1992 COMPLETED BY F. J.

ULMER TELEPHONE (503) 556-7495 HONTH: November. 1992 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 1105 17

-15 2

1106 18

-15 3

1109 19

-15 4

1108 20

-15 5

1110 21

-15 6

1107 22

-15 7

1106 23

-16 8

1109 24

-16 9

303 25

-15 26 26

-15 10 21 27

-20 11 21 28

-21 12 20 29

-22 13 15 30

_-26 14 15 15 31 16 15 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt, j

m.

m

,, -,. ~,

e l

UNIT SHUTDO4tS AND FJWER REDUCTICIES DOCIET IK).

50-344 UITT MAPE TroJ eo DATE Dacomber, 1992 RERRY PrWTB November. 1992 CENtu TED BY F. J. Ulmer TELKPEEEE (503) 5 M-74,3 NO.

DATE TYPE' Dt.GATION FJJtSON' METHOD OF LICENSE SYSTDt CtEPONENT cat 4E & CCRRICTITE ACTILD TO PRITENT RECL1tRE18CE fiOURS S3UTTING EVENT CODE

  • CODE' DOWN REIORT f PEACTOR' 92-C8 921109 T

$23.6 A

1 92-3?

A3 SG A

'B' steem generator tube leaked due to impreper poet weld strose rettet of a sleeve installed during the 1991 refveling outage. The tube wee plugged and other i

l ele m s were inepeeted to verify proper strees relief wee performed.

i

1. T: Terced
2. REASO'8
3. *1ETIKE 4 IEEE Standard 805-1984 S: Scheduled A-Equipnent Te11are (Explain) 1-Manuel S. IIII Standard 833A-1983 8-Maintenance or Test 2-Manuel Scree.

C-Refueling 3-Automette Screm.

D-Regulatory Restrictimi 4-Other (Erplein)

E-Operator Training &

Licensing Ereminatita T-Administrative G-Operational Frror (Ex plain)

E @.her (Erplein)

-