Monthly Operating Rept for Sept 1993 for Trojan Nuclear Plant
ML20057F930
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/30/1993
From: Hugo B, Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SMQ-069-93, SMQ-69-93, NUDOCS 9310190358
Download: ML20057F930 (5)


Text

=

~

]

e Portland General Electric Company Trojan Nuclear Plant i

71760 Columliia River liwy.

Rainier, Oregon 97048 (5033 556-3713 SMQ-069-93 October 11, 1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S.

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sirs:

Monthly Operatina Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly Operating Report is submitted for September 1993.

i Sincerely, p&=

S. M.

Quennoz General Manager Trojan Nuclear Plant

' At.

nt c:

In. Bobby H.

Paulkenberry Regional Administrator, Region V U.S.

Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. J.

F. Melfi USNRC Resident Inspector Trojan Nuclear Plant s

90AD^m 9310190'359 930930 Q

/

es PDR ALOCK 05000344 h

R '

PDR w

'I

.]

4>

i l-',

=

Trojan Nuclear Plant Document Control Desk Docket 50-344 October 11, 1993' License NPF-1 Attachment 4 pages j

i TROJAN NUCLEAR PLANT Trojan Monthly Operating Report September 1993 OPERATIONS The reporting period began and ended with the plant defueled.

l l

l l

a AVERAGE DAILY 'JNIT POWER LEVEL DOCKET NO.

50-344 UNIT TROJAN DATE-OCTOBER 1993 COMPLETED BY B.

R. HUGO TELEPHONE (503) 556-7278 MONTH: September, 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 16 0

INSTRUCTIONS:

On this format, list the average Jaily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest

~

whole negawatt.

4' OPERATING DATA REPORT DOCKET No.

50-344 DATE October 1993 COMFLETED BY B. R. Hugo OPEP.ATING STATUS:

TELEPHONE (503) 556-7278

1. Unit Name Trojan Nuclear Notes: ' Cumulative values Plant as of 3 p.m. January 4 when Portland General Electric
2. Reporting Period September 1993 Company's Board of Directors announced the permanent
3. Licensed Thermal Power (MWt)

N/A closure of Trojan.

4 Nameplate Rating (Gross MWe) 1216

5. Design Electrical Rating (Net MWe) 1130
6. Maximum Dependable Capacity (Gross MWe) 0
7. Maximum Dependable Capacity (Not MWe) 0 l
8. If Changes Occur in Capacity Ratings (Items No. 3 N/A through 7) Since Last Report, G4ve Reasons PowerLevelToWhichpestricted. If Any (Net MWe) 0 9.
10. Reasons For Restrics.uns, If Any Permanent Plant shutdown This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 720 6551 143271*
12. Number of Bours Reactor Was Critical 0

0 85710*

13. keactor Reserve Shutdown Bourn 0

0 5097*

14. Hours Generator On-Line 0

0 83545*

15. Unit Reserve Shutdown Hours 0

0 4468*

16, Gross Thermal Energy Generated (MWH) 0 0

267291694*

17. Gross Electrical Energy Generated (MWH) 0 0

88265599*

18. Net Electrical Enesgy Generated (MWH) 0 0

83477241*

19 Unit Service Facter 0.0 0.0 58.3*

20. Unit Availability Factor 0.0 0.0 61.4*
21. Unit Capacity Factor (Using M'C Net) 0.0 0.0 54.2*

J

22. Unit Capacity Factor (Using DER Net) 0.0 0.0 51.6*
23. Unit Forc ed Outage Rate 0.0 100.0 13.1*
24. Shutdowns Scheduled Over Next 6 Hanths (Type, N/A Date and Duration of Each):
25. If Shut Down at End of Report Feriod, N/A Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial FORECAST ACHIEVED

)

Operation):

INITIAL CRITICALITY N/A N/A 2NITIAL ELECTRICITY N/A N/A C0ttG3d:IAL OFERATION N/A N/A i

.~

UNIT SHUTDOVHS AND POWER REDUCTIONS DOCKET NO.

50-344 UNIT NAME lro1an DATE October. 1993 REPORT MONTH September. 1993 COMPLETED BY, Rd. Husto TELEPHONE iS03) 556-7278 NO.

DATE TYFE' DURATION REASON' METHOD OF LICENSE SYSTD1 COMFONENT CAUSE & CORRECTIVE ACTION TO FREVENT RECURFENCE HOURS SHUTT2RG EVENT CODE' CODE' DCNN REPORT #

REACTOR' 93*01 930104 720,0 H

Portland General Electric's Board of Directors voted to permanently cease Trojan operations on January 4, 1993.

1. F: Forced
2. REACCN:
3. METHOD:

4 IEEE Standard 805-1984-5: Scheduled A-Equipnent Failure (Explain).

, 1-Manual

5. IEEE Standard 803A-1983 B-Maintenance or Test 2-Manuel Scram.

C-Refueling 3-Automat.ic Scram.

D-Regulatory Restriction 4-Other (Explain)

.E-operator Training a Licensing Examination F-Administrative G-Operational Error (Ex plain)

H-Other (Explain)

.~.-.'....m

.J.-

-...,.. -,. - ~ _...

..-~,-_.._..,..,./

,J,,._.

.. _.., _ _ -.,.