e Portland General Electric Company Trojan Nuclear Plant i
71760 Columliia River liwy.
Rainier, Oregon 97048 (5033 556-3713 SMQ-069-93 October 11, 1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S.
Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sirs:
Monthly Operatina Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly Operating Report is submitted for September 1993.
i Sincerely, p&=
S. M.
Quennoz General Manager Trojan Nuclear Plant
' At.
nt c:
In. Bobby H.
Paulkenberry Regional Administrator, Region V U.S.
Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. J.
F. Melfi USNRC Resident Inspector Trojan Nuclear Plant s
90AD^m 9310190'359 930930 Q
/
es PDR ALOCK 05000344 h
R '
PDR w
'I
.]
4>
i l-',
=
Trojan Nuclear Plant Document Control Desk Docket 50-344 October 11, 1993' License NPF-1 Attachment 4 pages j
i TROJAN NUCLEAR PLANT Trojan Monthly Operating Report September 1993 OPERATIONS The reporting period began and ended with the plant defueled.
l l
l l
a AVERAGE DAILY 'JNIT POWER LEVEL DOCKET NO.
50-344 UNIT TROJAN DATE-OCTOBER 1993 COMPLETED BY B.
R. HUGO TELEPHONE (503) 556-7278 MONTH: September, 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 16 0
INSTRUCTIONS:
On this format, list the average Jaily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest
~
whole negawatt.
4' OPERATING DATA REPORT DOCKET No.
50-344 DATE October 1993 COMFLETED BY B. R. Hugo OPEP.ATING STATUS:
TELEPHONE (503) 556-7278
- 1. Unit Name Trojan Nuclear Notes: ' Cumulative values Plant as of 3 p.m. January 4 when Portland General Electric
- 2. Reporting Period September 1993 Company's Board of Directors announced the permanent
- 3. Licensed Thermal Power (MWt)
N/A closure of Trojan.
4 Nameplate Rating (Gross MWe) 1216
- 5. Design Electrical Rating (Net MWe) 1130
- 6. Maximum Dependable Capacity (Gross MWe) 0
- 7. Maximum Dependable Capacity (Not MWe) 0 l
- 8. If Changes Occur in Capacity Ratings (Items No. 3 N/A through 7) Since Last Report, G4ve Reasons PowerLevelToWhichpestricted. If Any (Net MWe) 0 9.
- 10. Reasons For Restrics.uns, If Any Permanent Plant shutdown This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720 6551 143271*
- 12. Number of Bours Reactor Was Critical 0
0 85710*
- 13. keactor Reserve Shutdown Bourn 0
0 5097*
- 14. Hours Generator On-Line 0
0 83545*
- 15. Unit Reserve Shutdown Hours 0
0 4468*
16, Gross Thermal Energy Generated (MWH) 0 0
267291694*
- 17. Gross Electrical Energy Generated (MWH) 0 0
88265599*
- 18. Net Electrical Enesgy Generated (MWH) 0 0
83477241*
19 Unit Service Facter 0.0 0.0 58.3*
- 20. Unit Availability Factor 0.0 0.0 61.4*
- 21. Unit Capacity Factor (Using M'C Net) 0.0 0.0 54.2*
J
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 51.6*
- 23. Unit Forc ed Outage Rate 0.0 100.0 13.1*
- 24. Shutdowns Scheduled Over Next 6 Hanths (Type, N/A Date and Duration of Each):
- 25. If Shut Down at End of Report Feriod, N/A Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial FORECAST ACHIEVED
)
Operation):
INITIAL CRITICALITY N/A N/A 2NITIAL ELECTRICITY N/A N/A C0ttG3d:IAL OFERATION N/A N/A i
.~
UNIT SHUTDOVHS AND POWER REDUCTIONS DOCKET NO.
50-344 UNIT NAME lro1an DATE October. 1993 REPORT MONTH September. 1993 COMPLETED BY, Rd. Husto TELEPHONE iS03) 556-7278 NO.
DATE TYFE' DURATION REASON' METHOD OF LICENSE SYSTD1 COMFONENT CAUSE & CORRECTIVE ACTION TO FREVENT RECURFENCE HOURS SHUTT2RG EVENT CODE' CODE' DCNN REPORT #
REACTOR' 93*01 930104 720,0 H
Portland General Electric's Board of Directors voted to permanently cease Trojan operations on January 4, 1993.
- 1. F: Forced
- 2. REACCN:
- 3. METHOD:
4 IEEE Standard 805-1984-5: Scheduled A-Equipnent Failure (Explain).
, 1-Manual
C-Refueling 3-Automat.ic Scram.
D-Regulatory Restriction 4-Other (Explain)
.E-operator Training a Licensing Examination F-Administrative G-Operational Error (Ex plain)
H-Other (Explain)
.~.-.'....m
.J.-
-...,.. -,. - ~ _...
..-~,-_.._..,..,./
,J,,._.
.. _.., _ _ -.,.