Monthly Operating Rept for Nov 1993 for Trojan Nuclear Plant
ML20058L800
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/30/1993
From: Hugo B, Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SMQ-083-93, SMQ-83-93, NUDOCS 9312200015
Download: ML20058L800 (5)


Text

._

l

)

a *~

j m'e m I..

-j mum l

Ponland General Electic Company Trojan Nuclear Plant l

71760 Columbia River liwy.

Rainier, Oregon 97448 (503) 556-3713 SMQ-083-93

. December' 15,-1993.

l Trojan Nuclear Plant-l I

Docket 50-344 License NPF-1 l

l U.S.

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l

Dear Sirs:

l

'l Monthly Operatina Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly operating l

Report is submitted for-November 1993.

l Sincerely, i

  1. ,__'- u.._ g S. M.

Quennoz General Manager Trojan' Nuclear Plant Attachment i

c:

Mr. Bobby H. Faulkenberry Regional Administrator, Region V U.S.

Nuclear Regulatory Commission j

Mr. David Stewart-Smith 1

State of Oregon l

Department of Energy l

Mr. H.

D.

Chaney Region V Project Manager U.S. Nuclear Regulatory Commission l

i j['[hchbbb 9312200015 931130 y

PDR ADOCK 05000344 R

PDR

/l

,~

Trojan Nuclear Plant Document Control Desk Docket 50-344 License NPF-1 Attachment 4 pages 9

TROJAN NUCLEAR PLANT Trojan Monthly Operating Report November 1993 OPERATIONS The reporting period began and ended with the plant defueled.

l l

i 2

+

AVERAGE DAILY UNIT POWER LEVEL.

DOCKET'NO.

50-344 1

UNIT TROJAN-

)

DATE-

. DECEMBER 1993 1

COMPLETED BY B. R. NUGO i

TELEPHONE (503) 556-7278.

MONTH: Hovember, 1993 l

i DAY AVERAGE DAILY POWER DAY-AVERAGE DAILY POWER

{

LEVEL-(MWe-Net)

LEVEL..(MWe-Net) 1 0

17 0

2 0

18-0-

l

-3 0

19 0-

?

4 0

20 0

t 5

0

- 21. -

0

-i 6

0 22 0

7 0

23 0

8 0

24 0

9 0

~25-O f

i f

10 0

26 0

11 0

27.

0 12 0

28

-0 13 0

29-O' i

14 0

30 0

i 15 0

31 16 0

f INSTRUCTIONS:

On this format, list the average daily unit power' level in=MWe-1 Net for each day in the reporting month.

Compute to the' nearest-4 whole megawatt.

l

.=.

l i

~~

OPERATING DATA REPORT DOCKET NO.

50-344 DATE December 1993 COMPLETED BY B. R. Hugo j

OPERATING STATUS:

1LLEPHONE (503) 556-7278 e

Ii

1. Unit Name Trojan Nuclear Notes:
  • Cumulative values Plant as of 3 p.m. January 4 when i

Portland General Electric l

2. Reporting Period November 1993 Company's Board of Directors announced the permanent
3. Licensed Thermal Power (MWt)

N/A closure of Trojan.

4 Nameplate Rating (Gross MWe) 1216 f

5. Design Electrical Rating (Net MWe) 1130
6. Maximum Dependable Capacity (Gross MWe) 0
7. Maximum Dependable Capacity (Not HWa) 0
8. If Changes Occur in Capacity Ratings (Items No. 3 N/A through 7) Since Last Report, Give Reasons i
9. Power Level To Which Restricted, If Any (Net MWe) 0
10. Reasons For Restrictions, If Any Permanent Plant shutdown This Month Ye-to-Date Cumulative i
11. Hours in Reporting Period 720 8016 143271*

j

12. Number of Hours Reactor Was Critical 0

0 85710"

13. Reactor Reserve Shutdown Hours 0

0 5097*

14. Hours Generator On-Line 0

0 83545'

15. Unit Reserve Shutdown Hours 0

0 4468" l

16. Gross Thermal Ensrgy Generated (MWH) 0 0

267291694' t

17. Gross Electrical Energy Generated (MWH) 0 0

88265599*

18. Net Electrical Energy Generated (MWH) 0 0

83477241' l

19. Unit Service Factor 0.0 0.0 58.3*

i

20. Unit Availability Factor 0.0 0.0 61.4'

?

i

21. Unit Capacity Tactor (Using MDC Net) 0.0 0.0 54.2*
22. Unit Capacity Factor (Using DER Net) 0.0 0,0 51.6*
23. Unit Forced Outage Rate 0.0 100.0 13.1'
24. Shutdowns Scheduled Dver Next 6 Months (Type, N/A Date and Duration of Each):
25. If Shut Down at End of Report Period.

N/A I

Estimated Date of Startup:

26. Units In Test Status (Prsor to Commercial FORECAST ACHIEVED Operation):

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COtNERCIAL OPERATION N/A N/A

i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No.

50-344 UNIT NAME Troian DATE December. 1993 REPORT MONTH November. 1993 COMPLETED BY B. R. Hugo TELEPHONE (503) 556-7278 NO.

DATE TYFE' DURATION REASON' METHOD OF LICENSE SYSTEM CCNFONENT CAUSE & CORRECTIVE ACTION TO FREVENT RECURRENCE HOURS SHUTTING EVENT CODE 4 CODE' DOWN REIORT #

REACTOR' 93-01 930104 720.0 H

Portland General Electric's Board of Directors voted to permanently cease Trojan operations on January 4, 1993.

1. F: Forced
2. REASON:
3. METHOD:

4 IEEE Standard 805-1984 S: Scheduled A-Equipnent Failure (Explain) 1-Manual

5. IEEE Standard 803A-1983 B-Maintenance or Test-2-Manual Scram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Other (Explain)

E-Operator Trainins &

Licensing Examination F-Administrative G-Operational Error (Ex plain)

H-Other (Explain)

'I 1

I

..