Ponland General Electic Company Trojan Nuclear Plant l
71760 Columbia River liwy.
Rainier, Oregon 97448 (503) 556-3713 SMQ-083-93
. December' 15,-1993.
l Trojan Nuclear Plant-l I
Docket 50-344 License NPF-1 l
l U.S.
Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l
Dear Sirs:
l
'l Monthly Operatina Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly operating l
Report is submitted for-November 1993.
l Sincerely, i
- ,__'- u.._ g S. M.
Quennoz General Manager Trojan' Nuclear Plant Attachment i
c:
Mr. Bobby H. Faulkenberry Regional Administrator, Region V U.S.
Nuclear Regulatory Commission j
Mr. David Stewart-Smith 1
State of Oregon l
Department of Energy l
Mr. H.
D.
Chaney Region V Project Manager U.S. Nuclear Regulatory Commission l
i j['[hchbbb 9312200015 931130 y
PDR ADOCK 05000344 R
/l
,~
Trojan Nuclear Plant Document Control Desk Docket 50-344 License NPF-1 Attachment 4 pages 9
TROJAN NUCLEAR PLANT Trojan Monthly Operating Report November 1993 OPERATIONS The reporting period began and ended with the plant defueled.
l l
i 2
+
AVERAGE DAILY UNIT POWER LEVEL.
DOCKET'NO.
50-344 1
UNIT TROJAN-
)
DATE-
. DECEMBER 1993 1
COMPLETED BY B. R. NUGO i
TELEPHONE (503) 556-7278.
MONTH: Hovember, 1993 l
i DAY AVERAGE DAILY POWER DAY-AVERAGE DAILY POWER
{
LEVEL-(MWe-Net)
LEVEL..(MWe-Net) 1 0
17 0
2 0
18-0-
l
-3 0
19 0-
?
4 0
20 0
t 5
0
- 21. -
0
-i 6
0 22 0
7 0
23 0
8 0
24 0
9 0
~25-O f
i f
10 0
26 0
11 0
27.
0 12 0
28
-0 13 0
29-O' i
14 0
30 0
i 15 0
31 16 0
f INSTRUCTIONS:
On this format, list the average daily unit power' level in=MWe-1 Net for each day in the reporting month.
Compute to the' nearest-4 whole megawatt.
l
.=.
l i
~~
OPERATING DATA REPORT DOCKET NO.
50-344 DATE December 1993 COMPLETED BY B. R. Hugo j
OPERATING STATUS:
1LLEPHONE (503) 556-7278 e
Ii
- 1. Unit Name Trojan Nuclear Notes:
- Cumulative values Plant as of 3 p.m. January 4 when i
Portland General Electric l
- 2. Reporting Period November 1993 Company's Board of Directors announced the permanent
- 3. Licensed Thermal Power (MWt)
N/A closure of Trojan.
4 Nameplate Rating (Gross MWe) 1216 f
- 5. Design Electrical Rating (Net MWe) 1130
- 6. Maximum Dependable Capacity (Gross MWe) 0
- 7. Maximum Dependable Capacity (Not HWa) 0
- 8. If Changes Occur in Capacity Ratings (Items No. 3 N/A through 7) Since Last Report, Give Reasons i
- 9. Power Level To Which Restricted, If Any (Net MWe) 0
- 10. Reasons For Restrictions, If Any Permanent Plant shutdown This Month Ye-to-Date Cumulative i
- 11. Hours in Reporting Period 720 8016 143271*
j
- 12. Number of Hours Reactor Was Critical 0
0 85710"
- 13. Reactor Reserve Shutdown Hours 0
0 5097*
- 14. Hours Generator On-Line 0
0 83545'
- 15. Unit Reserve Shutdown Hours 0
0 4468" l
- 16. Gross Thermal Ensrgy Generated (MWH) 0 0
267291694' t
- 17. Gross Electrical Energy Generated (MWH) 0 0
88265599*
- 18. Net Electrical Energy Generated (MWH) 0 0
83477241' l
- 19. Unit Service Factor 0.0 0.0 58.3*
i
- 20. Unit Availability Factor 0.0 0.0 61.4'
?
i
- 21. Unit Capacity Tactor (Using MDC Net) 0.0 0.0 54.2*
- 22. Unit Capacity Factor (Using DER Net) 0.0 0,0 51.6*
- 23. Unit Forced Outage Rate 0.0 100.0 13.1'
- 24. Shutdowns Scheduled Dver Next 6 Months (Type, N/A Date and Duration of Each):
- 25. If Shut Down at End of Report Period.
N/A I
Estimated Date of Startup:
- 26. Units In Test Status (Prsor to Commercial FORECAST ACHIEVED Operation):
INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COtNERCIAL OPERATION N/A N/A
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No.
50-344 UNIT NAME Troian DATE December. 1993 REPORT MONTH November. 1993 COMPLETED BY B. R. Hugo TELEPHONE (503) 556-7278 NO.
DATE TYFE' DURATION REASON' METHOD OF LICENSE SYSTEM CCNFONENT CAUSE & CORRECTIVE ACTION TO FREVENT RECURRENCE HOURS SHUTTING EVENT CODE 4 CODE' DOWN REIORT #
REACTOR' 93-01 930104 720.0 H
Portland General Electric's Board of Directors voted to permanently cease Trojan operations on January 4, 1993.
- 1. F: Forced
- 2. REASON:
- 3. METHOD:
4 IEEE Standard 805-1984 S: Scheduled A-Equipnent Failure (Explain) 1-Manual
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Other (Explain)
E-Operator Trainins &
Licensing Examination F-Administrative G-Operational Error (Ex plain)
H-Other (Explain)