Monthly Operating Rept for Aug 1987
ML20238E809
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/31/1987
From: Olmstead C, Ulmer F
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CAO-305-87, NUDOCS 8709150223
Download: ML20238E809 (6)


Text

P.y W. .

r ,> .

" ' OPERATING DATA REPORT.

DOCKET NO.

50-344 DATE 4/A7

- COMPLETED BY F. J. Ulmer

[ < TELEPHONE 503-556-3713 Ext. 495

- OPERATING STATUS Trojan Nuclear Plant Notes p I.' Unit Name:

2. Reporting Period

August 1987

' 3411

3. Licensed Thermal Power (MWt): '
4. Namepiste Rating (Gross MWe): '
5. Design Electrical Rating (Net MWe): 1130

. 6. Maximum Dependable Capacity (Gross MWe): 1133

. 7. Maximum Dependable Capacity (Net MWe): 1075 l L

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

N/A _

9. Power Level To Which Restricted lf Any (Net MWe): N/A .
10. Reasons For Restrictions,if Any: N/A .

' This Month Yr. to-Date Cumulative 744 5837 96407

11. Hours in Reporting Period 175 2326 58949
12. Number Of Hours Reactor Was Critical 0 0 3887 ]
13. Reactor Reserve Shutdown Hours 93 2241 58281 ,
14. Hours Generator On Line '

0 0 3249

15. Unit P.eserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 119537 7198032 185053354 31680 _, 2392579 60677442
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) 17974 2258245 57439780 12.5 38.4 60.4  ;
19. Unit Service factor 12.5_ 38.4 63.8 I
20. Unit Availability Factor 22 36.0 5s.9 l
21. Unit Capacity Factor (Using MDC Net) 2.1 34.3 52.7 22.' Unit Capacity Factor (Using DER Net) 4.6 0.8 13.8
23. Unit Forced Outage Rate -

24.' Shutdowns Scheduled Over Next 6 Months (Type. Date.snd Duration of Ench):

None

' 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A l

26. Units in Test Status (Prior io Commercial Operation): Forecast Achieved

, 'l N/A N/A INITIAL CRITICALITY INITIA L ELECTRICITY i N/A N/A ,

N/A N/A l COMMERCIAL OPERATION 8709150223 870831 (oI77I

.PDR R

ADOCK 05000344 ppg f

i..

1 . 0:

, 9:' " '

D K M, : Q s; 3 ,.

(; , ,

Ql 7, F%1

. .l ,

[i .

AVERAGE DAILY UNIT POWER LEVEL

.m ,

i ,l ,

- ,[

i' 7

.. Gross's- 31680l DOCKET NO: 50-144

  • Netr : 17974

.. UNIT: . Troj an

M >

DATE:

, 0 pi '

COMPLETED SY: F. J. U1mer TELEPHONE: 503-s56-1711 g . ext 495 A , ',

g..

MONTH Auoust-1987-cA- '

' , . ' DAY AVERAGE DAILY POWER LEVEL . DAY AVERAGE DAILY POWER LEVEL'

['

(MWe-Net) (MWe-Het)

~

1 17 -5

2 -4' 18 -5

< 4 l3 -8' 19 -

-5

! t 41 -9" 20 -8

'5 -13 21 -31 6' -12 22. -36 17 -12'- 23' -36 8

-12' 24 - -38

9 25 -38

.n 10- -10 26 -37 .

i 11 -5 27 +88 1

12 -5 28 +126

13 -5 29 + 71 s

'14: -4 30 +76n

15' -5 31 4a??  ;

1 d

. 16' =5

.a T i

^ ;,- INSTRUCTIONS

On this fomat, list the average daily unit power icvel in MWe-Net for each

. day ~in the reporting month. Compute to the nearest whol, megawatt.

o (9/77) m_____------

4 n 59 4 a 54 2 ms s s esR nn nF 3 j7 J - s ae uae I t c e DiR

- n8 3t et c et t 0 'r/

gsi t .

u fL E 5 e e e aus se r orL 5 T _910 x i v c n t gy l t noisnf r s o t t

c e uuh Ii t E I. ta O.EEpN N MT e

r r t oru r oAp Hh

-w r e

t ep o

AAOO l Csome c g- g I , Gahe pSR TND r E

f iR n n Hl s t

i e br yt KT &ii t  ;

i 7i ep dPr n1e CN I

L eAn s e l8t nvm l x r tnv1 o

O D U m.T E E

c u

a P

v e

r e9 c u1u oeu p

l p EfEE0 -

f d e ,n ird 4 r1 o ro e c tt e ll a f ait t r urn ne n npa an i nAl l e a A( P Pg m S

N 7 U m O

I 8

)1U

, R m. a T 9

  • Z Z T sSl C 1 f9y Z Z S t cix c

U N St D I

sa il E o m R n duu onnt oe ha a ut R n g7U t eMMA E n - Z Z H - - -

W A $gn e Z Z H Mt2J4 O

P 3 D H N T A N S O e 8 8

M et N s n ne n t

A A 4 W T e v p e

/ / 2 O R iEc e N N -

D O L R 7 P

T 8 U E f

i R

S T

I N

"E f :a gb A )

E.5f, /

N in U 1 3 a

.hE.j l p

x E

(t s

3N E t C B G er e t

uT l f 5

ao Fec t

?E5 9 8 4 nn ea 5.3$ 6 5

7 mn pt el el ninu o uif s qa e aEMR e - -

gP S S F RABC 2

1 5 8 e 0 2 2 ta 4 8 8 D 0 0 0 d 7 7 7 le 8 8 8 d u ed r

ce o h c 2 3 4 F S

. 0 0 0  : :

- - - ' 5 W 7 7 7 I

8 8 8 f

q, 4 .-

TROJAN NUCLEAR PLANT Summary of Operating Experience-August 1987 OPERATIONS The plant entered the month in Mode 5.

'An extensive evaluation was performed in August to demonstrate the adequacy of' rock bolts used for pipe supports. Embeddment depth and load cap: city of rock bolts were verified by inspections and testing.

The results of the evaluation were presented to the NRC in a meeting on August 20 at which time the NRC concurred that the pipe support design was adequate to allow plant startup.

Plant heatup commenced on August 21. Mode 4 was entered at 0923 hours0.0107 days <br />0.256 hours <br />0.00153 weeks <br />3.512015e-4 months <br /> and Mode 3 was entered at 1348 hours0.0156 days <br />0.374 hours <br />0.00223 weeks <br />5.12914e-4 months <br />. , Reactor startup began on August 25 with Mode 2 entered at 0406 hours0.0047 days <br />0.113 hours <br />6.712963e-4 weeks <br />1.54483e-4 months <br /> and reactor criticality attained at 0628 hours0.00727 days <br />0.174 hours <br />0.00104 weeks <br />2.38954e-4 months <br />. Low power physics testing began on August 25 and w*s completed on August 26. '

A turbine trip and feedwater isolation occurred on Hi-Hi steam generator ,

level on August 26 at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br /> due to failure of a feedwater regulating l valve to fully close. Mode 1 was entered on August 27 at 1405 hours0.0163 days <br />0.39 hours <br />0.00232 weeks <br />5.346025e-4 months <br />, I the generator was synchronized tc the grid at 1435 hours0.0166 days <br />0.399 hours <br />0.00237 weeks <br />5.460175e-4 months <br />, and power was stabilized at 30% at 1810 hours0.0209 days <br />0.503 hours <br />0.00299 weeks <br />6.88705e-4 months <br /> for testing and chemistry control.

On August 28,1987 at 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br /> a turbine trip and feedwater isolation occurred on Hi-Hi steam generator level due to . operator error while controlling feedwater flow. The plant was returned to operation at 1345 hours0.0156 days <br />0.374 hours <br />0.00222 weeks <br />5.117725e-4 months <br /> and power was again stabilized at 30% at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br /> for testirg '

and chemistry control. i On August 30 power escalation to 50% power began and at 2225 hours0.0258 days <br />0.618 hours <br />0.00368 weeks <br />8.466125e-4 months <br /> 50% j power was attained. On August 31 at about 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br />, a phase to ground fault occurred in the west circulating water pump motor. The pump motor  ;

was sent offsite to be rewound. The pump will be unavailable for about four weeks which will result in a power limitation of about 65%.

MAINTENANCE The following major maintenance was completed during August:

The reactor vessel head vent valves were replaced.

  • The remainder of feedwater piping exhibiting erosion / corrosion was replaced.

I l

i 1 y,; ,

Summary of Operating Experience Page Two Miscellaneous. pipe support maintenance was performed.

Control Room to Cable Spreading Room cable penetrations were sealed.

' Repaired a leaking instrument port on the reactor vessel head. o

  • Control Room indicating lights were replaced with light emitting diodey, a

OTHER > @j A reactor coolant system hydrostatic test was completed. 2i ;[;j Local leak rate testing of Containment penetrations was completed. g pd s: c LICENSE AMENDMENTS ,g

=

Two Amendments to the Trojan Operating. License were received:

Amendment 132: Clarifies the requirements for the-onsite electrical distribution system.

, andment 133: Revises the steam generator tube surveillance requirements to relax the tube plugging criteria for indications in the tube sheet region.

l L

l 1

l, i

w____ _ _ _ _ _ _ _ _ _ - _i

2 Y

s 4

4 W.

m

. en C 4

-i UW Z G-sn D N c--

E

7,,,,

& -(;

o .:.

pD, ._

, ' ;m f a

[ ,

September 9, :1987 :

h CAO-305-87

!; ,, Portland General Electric Company li ' , Trojan Nuclear Plant P.0; Box'439 '

Rainier, Oregon 97048

-(503)556-3713_.

i l ~.

l:

, g ,. US Nuclear-Regulatory:Commiss'on i Document. Control Desk

' Washington,'DC 20555 t

Gentlemen 4 >

l Monthly Operating Data Report-1-

In accordance with the Trojan Nuclear' Plant Technical'Specifi-cations reporting' requirements, the Monthly Operating Data Report is submitted'for August 1987.

' Sincerely, f.h C. A. Olmstead General Manager Attachment ct Mr. John B. Martin Regional Administrator, Region V J US. Nuclear Regulatory Commission Mr. David,0. Kish Acting Director Department of Energy ,