Text
.
7o
-m sus '
g:
a Portland General Electric Company Trojan Nuclear Plant-71760 Columbia River llwy Rainier, Oregon 97048 --
November 9,-1990 (503) $56-3713
-WRR-142-90 g
US Nuclear Regulatory Commission Document Control-Desk Washington, DC 20555 Gentlemen -
r Monthly Operating Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the. Monthly Operating Data Report is submitted for October,i1990.
Sincerely,-
W W. R. Robinson Plant General-Manager-
/ WRR: sp' Attachment
, c:
Mr. John B. Martin-Regional Administrator, Region V US. Nuclear Regulatory Commission
..Mr.-David-Stewart-Smith Department of: Energy
' State'of Oregon Resident' Inspector
'MOR' Distribution 9011200224 901031 DR ADOCK 05000344 PDC ggg7 Ilt
'(
1. 3
' TROJAN NUCLEAR PLANT Trojan Operating Report October 1990 L:
H OPERATIONS.
The plant entered October in Mode 3 with main turbine undergoing
~
!'t inspections / repairs. Mode 2 was entered at 0106 on October 6, 1990 and the-reactor was taken critical at 0152 on October 6, 1990.-
l The - plant entered - Mode l ' at- 0341 on October 6,
1990 and the generator _was synchronized to the grid at 1207 on October 6, 1990.
The plantc reached.100% power at 2059 on October 6, 1990.
PlantEoperationicontinued at~ essentially 100% power unti'l 1150 on October J18,.1990,- when power was reduced.to obtain 100% max delta-T untilfdelta-T' limit questions could be resolved.
[
JPower operation was further, restricted by the Plant General Manager
'- toL98% at 1638 'on October 25, 1990 while investigating an-indicated reduction of E RCS ' flow..The plant 1 operated at 98% power for the '
remainder,of.the month.
?
l MAJOR MAINTENANCE COMPLETED y
L L
- Significant maintenance completed during the month:-
Li 1'
-i
+..
Repair?of pins.in the turbine blades.
+.
tFurmanite repairs of the SI first off. check': valve (8948A),
4
- pressurizer level transmitter LT-461 isolation valve (8054C),
and flow element FE-437 valve..
h i
i p
{m' I
L l'
L I
[.,
u
,e,
i i
]
i
+
OPERATING DATA REPORT m
DOCKET NO.-
50-344 DATE Nov. 1990 j
COMPLETED BY
_F.
J.
Ulmer TELEPHONE 503-556-3713-Ext.4495 OPERATING STATUS
^'\\
Trojan' Nuclear Plant.
N*tes
- 1. Unit Name:
October. 1990-i 2. Reporting Period:
3411
- 3. Lisensed Thermal Power (MWt):.
1216 4.:Nameplete Rating (Cross MWe):
1130
- 5. Design Electrical Rating (Not MWe):
v.
-1153
'6. Maximum Dependable Capecity (Gross MWe):
1095
- 7. Maximum Dependable Capecity (Net MWe):
8.' If Changes Occur in Capacity Ratings (items Number 3 Tluough 7) Since Last Report. Give Reasons:
N/A j
m N/A j
- 9. Power Lewi To Which Restricted,1f Anf (Net MWe):
N/
- 10. Reesens For Restrictions.lf Any:
f l'tk%Meath Yr so.Dete Camulative 1
.III News la Reporthis Period J*
7296-124176-623.1-4346.6 77304.8
,s
- 12. Nassber Of Hours Reester Was Cattiset 13; Remoter Reserve Shutdown Hours
_2 -
0 3387
- j 612.9L 4195.I 75569.3
-l 4
i 14J Hears Generator On-Lkie 0
0 3249
!!St Unit Reserve Shutdown Heuss 2048102 14072756s 243017013
- 16s Geess Derinol taergy GeneretW (MWM) 695665-4775395
' RO AQ A?'t A -
17.t Gaes Electrieel Energy Genesated (MWH)
- 653619
=4464523 75861650 Lis. Ne's Ilestrieel Energy Generated (MWM)
. 9 1
82.1 57.5-60.9
- 19. Unit Servies F6 ster.
s 82.1-57.5
- 63.5 i 20.- Unit Aveliability Easte, L.21. Unit Capacity Fester (Using MDC Net)(
80.1' 55,9 57.0
._'i 77.6 54;2 54.'1 '
122. Unit capacity Fester (Using DER Net).
- 23. Unit Forced Osage Rate ~
17 9 9 1~
- 13. l ~
24.~ Shetdowns Scheduled Over Nest 4 Meaths (Type. Dete.and Duration ef Each):
-l g
ly
- -Daylight Saving Time r.
)
' N. If Shut Down At End Of Report Period.Estlanated Date of Startsp:
Li
' 26. Units la Test Status (Prior to Commercial Operation):-
Feroomst Achiewd N/A
.'N/A
- INITIAL CRITICALITY.
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION M/^
M/A
{
p Y
(0/77) i
.t.-
--. - -~
1:
,c w pc,
~
4 4
1 i
- i
{ g,,
i0.
j 4 jj t -
1 AVERAGE DAILY UNIT POWER LEVEL
~
?$
DOCT.~.T - NO : 50-344 I
UNIT: Troian
'? -
LDATE!-November, 1990
, COMPLETED'BY:_F.
J.
U1mer
.f
~ TELEPHONE: sol's9A-1717-q" M
ext 4495-
'N
MONTE' -October, 1990' l
L.
,M DAY AVERAGELDAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
-(MWe-Net)
(MWe-Net)'
l 1
ci :
1
-28 17
~1098-
- 1
' 32 18 1085
'2
..,]
- y. g
>-39 19 1075 j
m 23 j{
~4.
.-45' 20 1073
.c n
j E'
55
-46 21 1068
'{, ' 0
$6' 321~
- 22 1070-y ns4 37 1095l 123_
1069.
j;\\
y:;
w k,,'
8-
,1100-24 (1034 c,
1
]
'?y 19-
'1100
.25 ~
1065
-)
I.10l 1102t 26 "1073 1
gj) 1J
]
L. $
4 Lil 1 1100-27 1072 o
=
r 12-1096:
28
- 1119-(1074)'
+
pl <.
.~i.
K, q ' '
j 13 ",
1095' 29.
'1073' i;
l l
y
@ $ g!"
l14 1097
- 30.
1074' lj z,
i m.
s t.. n f/ll
- 15 1095..
.3p 1076 j
jfy W
c16 :
1098:
lc T l,
4; t
,.
- Daylight Saving Time
.n L,
' INSTRUCTIONS 1
4 list the average daily unit power level in MWe-Net for each On this format,
?g.
gday in the reporting month. Compute to the nearest whole megawatt.:
!';g<+
I Ri! '
- wb m
._._.,...__.............f.y.
DOCKET NO. 50-344 UNITSHUIDOWNS AND POWER REDUCTIONS UNIT NAME~ Trnian DATE November, 1990 COMPLETED BY P-
.1 - In me r REPORT MONile ' october, 1990 TEl.EF880NE 503-556-3713 ext 195
-_. 3 Lkssisce Ew
- L Caisse & Ceuscceive
.$ g
}
}Yj m.i a s E.a.
gi
,3 x..
na.c e
3a n
,gme we Le Pscocas Rerweence f$
el jgg Repensa.
g 6
04-90 900924 F
133.1 A
1 N/A-HC Pipe XX-Condenser tube leak failure forced shutdown of plant due to high
, conductivity caused by circulating water contamination. Subsequent-start-up of plant was delayed by generator Toutput breaker problems.. Condenser tubes were plugged and.a turbine.
~
~
generator:-inspection followed breaker maintenance.:
^4 3
Enliible G.las sucaluns -
1.
.?
Mesbad:
. Tw Preparation of Data l f; F=ced-
-- Reason:
I-Mamael.
Easey Sheets fue Occaste Sj Scheduled A-Egelpaness Fallese(Explala)
.'284ansalScsase.
Evens Rep ns (LERI FliriNUREG-
'B-Maissessence of Test.
3-Ausosassic Sc.am.
C. Refueling 0168)
~
~ D-Reguissosy Resssiction -
Oslice(Earlain)
~- o '
. E-Opesaene Tsalaisig A Uccase Ezasa aa: use ~
l I 5'
. : F Ad i.isesasise Enliibis f-Sanne Source G Orcsational Essig(Emplain).
se (Mt.c sI!.ps,i ).
__ytm-s