ML20217A211

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1990 for Trojan Nuclear Plant
ML20217A211
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/31/1990
From: Robinson W, Ulmer F
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WRR-142-90, NUDOCS 9011200224
Download: ML20217A211 (5)


Text

.

7o

-m sus '

g:

a Portland General Electric Company Trojan Nuclear Plant-71760 Columbia River llwy Rainier, Oregon 97048 --

November 9,-1990 (503) $56-3713

-WRR-142-90 g

US Nuclear Regulatory Commission Document Control-Desk Washington, DC 20555 Gentlemen -

r Monthly Operating Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the. Monthly Operating Data Report is submitted for October,i1990.

Sincerely,-

W W. R. Robinson Plant General-Manager-

/ WRR: sp' Attachment

, c:

Mr. John B. Martin-Regional Administrator, Region V US. Nuclear Regulatory Commission

..Mr.-David-Stewart-Smith Department of: Energy

' State'of Oregon Resident' Inspector

'MOR' Distribution 9011200224 901031 DR ADOCK 05000344 PDC ggg7 Ilt

'(

1. 3

' TROJAN NUCLEAR PLANT Trojan Operating Report October 1990 L:

H OPERATIONS.

The plant entered October in Mode 3 with main turbine undergoing

~

!'t inspections / repairs. Mode 2 was entered at 0106 on October 6, 1990 and the-reactor was taken critical at 0152 on October 6, 1990.-

l The - plant entered - Mode l ' at- 0341 on October 6,

1990 and the generator _was synchronized to the grid at 1207 on October 6, 1990.

The plantc reached.100% power at 2059 on October 6, 1990.

PlantEoperationicontinued at~ essentially 100% power unti'l 1150 on October J18,.1990,- when power was reduced.to obtain 100% max delta-T untilfdelta-T' limit questions could be resolved.

[

JPower operation was further, restricted by the Plant General Manager

'- toL98% at 1638 'on October 25, 1990 while investigating an-indicated reduction of E RCS ' flow..The plant 1 operated at 98% power for the '

remainder,of.the month.

?

l MAJOR MAINTENANCE COMPLETED y

L L

Significant maintenance completed during the month:-

Li 1'

-i

+..

Repair?of pins.in the turbine blades.

+.

tFurmanite repairs of the SI first off. check': valve (8948A),

4

pressurizer level transmitter LT-461 isolation valve (8054C),

and flow element FE-437 valve..

h i

i p

{m' I

L l'

L I

[.,

u

,e,

i i

]

i

+

OPERATING DATA REPORT m

DOCKET NO.-

50-344 DATE Nov. 1990 j

COMPLETED BY

_F.

J.

Ulmer TELEPHONE 503-556-3713-Ext.4495 OPERATING STATUS

^'\\

Trojan' Nuclear Plant.

N*tes

1. Unit Name:

October. 1990-i 2. Reporting Period:

3411

3. Lisensed Thermal Power (MWt):.

1216 4.:Nameplete Rating (Cross MWe):

1130

5. Design Electrical Rating (Not MWe):

v.

-1153

'6. Maximum Dependable Capecity (Gross MWe):

1095

7. Maximum Dependable Capecity (Net MWe):

8.' If Changes Occur in Capacity Ratings (items Number 3 Tluough 7) Since Last Report. Give Reasons:

N/A j

m N/A j

9. Power Lewi To Which Restricted,1f Anf (Net MWe):

N/

10. Reesens For Restrictions.lf Any:

f l'tk%Meath Yr so.Dete Camulative 1

.III News la Reporthis Period J*

7296-124176-623.1-4346.6 77304.8

,s

- 12. Nassber Of Hours Reester Was Cattiset 13; Remoter Reserve Shutdown Hours

_2 -

0 3387

j 612.9L 4195.I 75569.3

-l 4

i 14J Hears Generator On-Lkie 0

0 3249

!!St Unit Reserve Shutdown Heuss 2048102 14072756s 243017013

- 16s Geess Derinol taergy GeneretW (MWM) 695665-4775395

' RO AQ A?'t A -

17.t Gaes Electrieel Energy Genesated (MWH)

653619

=4464523 75861650 Lis. Ne's Ilestrieel Energy Generated (MWM)

. 9 1

82.1 57.5-60.9

19. Unit Servies F6 ster.

s 82.1-57.5

63.5 i 20.- Unit Aveliability Easte, L.21. Unit Capacity Fester (Using MDC Net)(

80.1' 55,9 57.0

._'i 77.6 54;2 54.'1 '

122. Unit capacity Fester (Using DER Net).

23. Unit Forced Osage Rate ~

17 9 9 1~

13. l ~

24.~ Shetdowns Scheduled Over Nest 4 Meaths (Type. Dete.and Duration ef Each):

-l g

ly

  • -Daylight Saving Time r.

)

' N. If Shut Down At End Of Report Period.Estlanated Date of Startsp:

Li

' 26. Units la Test Status (Prior to Commercial Operation):-

Feroomst Achiewd N/A

.'N/A

INITIAL CRITICALITY.

INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION M/^

M/A

{

p Y

(0/77) i

.t.-

--. - -~

1:

,c w pc,

~

4 4

1 i

i

{ g,,

i0.

j 4 jj t -

1 AVERAGE DAILY UNIT POWER LEVEL

~

?$

DOCT.~.T - NO : 50-344 I

UNIT: Troian

'? -

LDATE!-November, 1990

, COMPLETED'BY:_F.

J.

U1mer

.f

~ TELEPHONE: sol's9A-1717-q" M

ext 4495-

'N

MONTE' -October, 1990' l

L.

,M DAY AVERAGELDAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

-(MWe-Net)

(MWe-Net)'

l 1

ci :

1

-28 17

~1098-

  • 1

' 32 18 1085

'2

..,]

y. g

>-39 19 1075 j

m 23 j{

~4.

.-45' 20 1073

.c n

j E'

55

-46 21 1068

'{, ' 0

$6' 321~

22 1070-y ns4 37 1095l 123_

1069.

j;\\

y:;

w k,,'

8-

,1100-24 (1034 c,

1

]

'?y 19-

'1100

.25 ~

1065

-)

I.10l 1102t 26 "1073 1

gj) 1J

]

L. $

4 Lil 1 1100-27 1072 o

=

r 12-1096:

28

  • 1119-(1074)'

+

pl <.

.~i.

K, q ' '

j 13 ",

1095' 29.

'1073' i;

l l

y

@ $ g!"

l14 1097

30.

1074' lj z,

i m.

s t.. n f/ll

- 15 1095..

.3p 1076 j

jfy W

c16 :

1098:

lc T l,

4; t

,.

  • Daylight Saving Time

.n L,

' INSTRUCTIONS 1

4 list the average daily unit power level in MWe-Net for each On this format,

?g.

gday in the reporting month. Compute to the nearest whole megawatt.:

!';g<+

I Ri! '

- wb m

._._.,...__.............f.y.

DOCKET NO. 50-344 UNITSHUIDOWNS AND POWER REDUCTIONS UNIT NAME~ Trnian DATE November, 1990 COMPLETED BY P-

.1 - In me r REPORT MONile ' october, 1990 TEl.EF880NE 503-556-3713 ext 195

-_. 3 Lkssisce Ew

  • L Caisse & Ceuscceive

.$ g

}

}Yj m.i a s E.a.

gi

,3 x..

na.c e

3a n

,gme we Le Pscocas Rerweence f$

el jgg Repensa.

g 6

04-90 900924 F

133.1 A

1 N/A-HC Pipe XX-Condenser tube leak failure forced shutdown of plant due to high

, conductivity caused by circulating water contamination. Subsequent-start-up of plant was delayed by generator Toutput breaker problems.. Condenser tubes were plugged and.a turbine.

~

~

generator:-inspection followed breaker maintenance.:

^4 3

Enliible G.las sucaluns -

1.

.?

Mesbad:

. Tw Preparation of Data l f; F=ced-

-- Reason:

I-Mamael.

Easey Sheets fue Occaste Sj Scheduled A-Egelpaness Fallese(Explala)

.'284ansalScsase.

Evens Rep ns (LERI FliriNUREG-

'B-Maissessence of Test.

3-Ausosassic Sc.am.

C. Refueling 0168)

~

~ D-Reguissosy Resssiction -

Oslice(Earlain)

~- o '

. E-Opesaene Tsalaisig A Uccase Ezasa aa: use ~

l I 5'

. : F Ad i.isesasise Enliibis f-Sanne Source G Orcsational Essig(Emplain).

se (Mt.c sI!.ps,i ).

__ytm-s