Text
_
i
(
17 ?
mamm.
====E9k Portland General Electric Company 4
Trojan Nuclear Plant 71760 Columbia River llwy.
i Rainier, Oregon 97048 i
(503)356-3713 SMQ-062-93 September 2, 1993 Trojan. Nuclear Plant l
Docket 50-344 License NPF-1 e
U.S.
Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i
Dear Sirs:
Monthly operatina Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly-Operating l
Report is submitted for August 1993.
I Sincerely, i
MO ' ; - -
S. M. Quennoz General Manager Trojan. Nuclear Plant Attachment l
c:
Mr. Bobby H.
Faulkenberry Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr.
J.'F.
Melfi l
USNRC Resident Inspector j
l Trojan Nuclear Plant l-l 1
4 9309070302 930831 o
,j
4 Trbjan Nuclear Plant Document Control Desk Docket 50-344 September 2, 1993 License NPF-1 Attachment 4 pages TROJAN NUCLEAR PLANT Trojan Monthly Operating Report Auciust 1993 OPERATIONS The reporting period began and ended with the plant defueled.
l l
l l
l l
I l
l l
l
\\
i i
AVERAGE DAILY UNIT POWER LEVEL t
l l
DOCKET NO.
50-344 l
f UNIT TROJAN DATE SEPTEMBER 1993 COMPLETED BY B. R. HUGO TELEPHONE (503) 556-7278 i
l MONTH: Auaust. 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)-
LEVEL-(MWe-Net)
{
1-0 17 0
2 0
18-0 3
0 19 0
4 0
20 0
[
i l
5 0
21 0
6 0
22 O'
i 7
0 23 0
I 8
0 24 0
9 0
25 0
t i
l 10 0
26-0 i
l l
l 11 0
27 0
i i
12 0
28 0
I
?
13 0
29 0
14 0
30-0-
15 0
31 0
16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-l Net for each day in the reporting month.
Compute to the nearest whole megawatt.
i I
l
l l
l l
t OPERATING DATA REPORT DOCKET No.
50-344 DATE September 1993 l
COMPLETED BY B. R. Bugo l
OPERATING STATUS:
TELETHONE (503) 556-727e l
- 1. Unit Name Trojan Nuclear Notes:
- Cumulative values i
Flant as of 3 p.m. January 4 when
- 2. Reporting Period August 1993 Company's Board of Directors
. l Fortland General Electric announced the pezinanent
- 3. Licensed Thermal Power (W t)
N/A closure of Trojan, r
I 4 Nameplate Rating (Gross We) 1216
$. Design Electrical Rating (Not We) 1130
- 6. Maximum Dependable Capacity (Gross We) 0
[
- 7. Maximum Dependable Capacity (Net. We) 0
- 8. If Changes Occur in Capacity Ratings (Items No. 3 N/A h
through 7) Since Last Report, Give Reasons
~ j i
- 9. Power Level To Wnich Restricted, If Any (Net We) 0
- 10. Reasons For Restrictions, If Any Fermanent Flent shutdown j
~
f This Month Yr-to-Date Cumulative e
i
- 11. Hours in Reporting Period 744 5831
'143271*
l
- 12. Number of Hours Reactor Was Critical 0
0 85710*
- 13. Reactor Reserve Shutdown Hours 0
0 5097*
- 14. Bours Generator On-Line-0 0
83545*
- 15. Unit Reserve Shutdown Bours 0
0 4468*
- 16. Gross Thermal Energy Generated (MWfl) 0
~0 267291694*
{
f
- 17. Gross Electrical Energy Generated (IMH; D
0 88265599*
- 18. Het Electrical Energy Generated (WH) 0 0
83477241*
I i
- 19. Unit Service Factor 0.0 0.0 58.3*
- 20. Unit Availability Factor 0.0 0.0 61.4*
- 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 54.2*
'l
- 22. Unit Capacity Factor (Using DER Net).
0.0 0.0 51.6*
- 23. Unit Forced Outage Kate 0.0 100.0 13.1*
- 24. Shutdowns Scheduled Over Next 6 Months (Type.
- N/A Date and Duration of Each):
- 25. If Shut Down at End of Report Period, N/A Estimated Date of Startup:
- 26. Units In Test Status (Prior to Connercial FORECAST ACf!IDTD Operation):
INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A CottERCIAL OPERATION N/A N/A l
g.
e r-p e
a.
p-
,em~w
,ae aea
l e =
l i
l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-344 UNIT NAME Troian DATE September. 1993 REPORT MONTH Auzust. 1993 COMPLETED BY B. R. Huco TELEPHONE (503) 556-7278 NO.
DATE TYTE' DURATION REASON' METHOD OF LICENSE SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO FREVENT RECIFrJENCE HOURS SHUTTING EVENT CODE' CODE' DOWN REPORT #
REACTOR' 93-01 930104 744.0 H
Portland General Electric's Board of Directors voted to permanently ecase Trojan operations on January 4, 1993,
- 1. F: Forced
- 2. REASON:
- 3. METHOD:
4 IEEE Standard 805+1984 S: Scheduled A+ Equipment Failure (Explain) 1-Manual
C-Refueling 3-Automatic Scram, D-Regulatory Restriction 4-Other (Explain)
E-Operator Training &
Licensing Examination F-Administrative G-Operational Error (Ex plain)
.H-Other (Explain)
.