Monthly Operating Rept for Aug 1993 for Trojan Nuclear Plant
ML20056G909
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/31/1993
From: Hugo B, Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SMQ-062-93, SMQ-62-93, NUDOCS 9309070302
Download: ML20056G909 (5)


Text

_

i

(

17 ?

mamm.

====E9k Portland General Electric Company 4

Trojan Nuclear Plant 71760 Columbia River llwy.

i Rainier, Oregon 97048 i

(503)356-3713 SMQ-062-93 September 2, 1993 Trojan. Nuclear Plant l

Docket 50-344 License NPF-1 e

U.S.

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i

Dear Sirs:

Monthly operatina Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly-Operating l

Report is submitted for August 1993.

I Sincerely, i

MO ' ; - -

S. M. Quennoz General Manager Trojan. Nuclear Plant Attachment l

c:

Mr. Bobby H.

Faulkenberry Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr.

J.'F.

Melfi l

USNRC Resident Inspector j

l Trojan Nuclear Plant l-l 1

4 9309070302 930831 o

PDR. ADOCK=05000344 g-R PDR

,j

4 Trbjan Nuclear Plant Document Control Desk Docket 50-344 September 2, 1993 License NPF-1 Attachment 4 pages TROJAN NUCLEAR PLANT Trojan Monthly Operating Report Auciust 1993 OPERATIONS The reporting period began and ended with the plant defueled.

l l

l l

l l

I l

l l

l

\\

i i

AVERAGE DAILY UNIT POWER LEVEL t

l l

DOCKET NO.

50-344 l

f UNIT TROJAN DATE SEPTEMBER 1993 COMPLETED BY B. R. HUGO TELEPHONE (503) 556-7278 i

l MONTH: Auaust. 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)-

LEVEL-(MWe-Net)

{

1-0 17 0

2 0

18-0 3

0 19 0

4 0

20 0

[

i l

5 0

21 0

6 0

22 O'

i 7

0 23 0

I 8

0 24 0

9 0

25 0

t i

l 10 0

26-0 i

l l

l 11 0

27 0

i i

12 0

28 0

I

?

13 0

29 0

14 0

30-0-

15 0

31 0

16 0

INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-l Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i I

l

l l

l l

t OPERATING DATA REPORT DOCKET No.

50-344 DATE September 1993 l

COMPLETED BY B. R. Bugo l

OPERATING STATUS:

TELETHONE (503) 556-727e l

1. Unit Name Trojan Nuclear Notes:
  • Cumulative values i

Flant as of 3 p.m. January 4 when

2. Reporting Period August 1993 Company's Board of Directors

. l Fortland General Electric announced the pezinanent

3. Licensed Thermal Power (W t)

N/A closure of Trojan, r

I 4 Nameplate Rating (Gross We) 1216

$. Design Electrical Rating (Not We) 1130

6. Maximum Dependable Capacity (Gross We) 0

[

7. Maximum Dependable Capacity (Net. We) 0
8. If Changes Occur in Capacity Ratings (Items No. 3 N/A h

through 7) Since Last Report, Give Reasons

~ j i

9. Power Level To Wnich Restricted, If Any (Net We) 0
10. Reasons For Restrictions, If Any Fermanent Flent shutdown j

~

f This Month Yr-to-Date Cumulative e

i

11. Hours in Reporting Period 744 5831

'143271*

l

12. Number of Hours Reactor Was Critical 0

0 85710*

13. Reactor Reserve Shutdown Hours 0

0 5097*

14. Bours Generator On-Line-0 0

83545*

15. Unit Reserve Shutdown Bours 0

0 4468*

16. Gross Thermal Energy Generated (MWfl) 0

~0 267291694*

{

f

17. Gross Electrical Energy Generated (IMH; D

0 88265599*

18. Het Electrical Energy Generated (WH) 0 0

83477241*

I i

19. Unit Service Factor 0.0 0.0 58.3*
20. Unit Availability Factor 0.0 0.0 61.4*
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 54.2*

'l

22. Unit Capacity Factor (Using DER Net).

0.0 0.0 51.6*

23. Unit Forced Outage Kate 0.0 100.0 13.1*
24. Shutdowns Scheduled Over Next 6 Months (Type.

- N/A Date and Duration of Each):

25. If Shut Down at End of Report Period, N/A Estimated Date of Startup:
26. Units In Test Status (Prior to Connercial FORECAST ACf!IDTD Operation):

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A CottERCIAL OPERATION N/A N/A l

g.

e r-p e

a.

p-

,em~w

,ae aea

l e =

l i

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-344 UNIT NAME Troian DATE September. 1993 REPORT MONTH Auzust. 1993 COMPLETED BY B. R. Huco TELEPHONE (503) 556-7278 NO.

DATE TYTE' DURATION REASON' METHOD OF LICENSE SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO FREVENT RECIFrJENCE HOURS SHUTTING EVENT CODE' CODE' DOWN REPORT #

REACTOR' 93-01 930104 744.0 H

Portland General Electric's Board of Directors voted to permanently ecase Trojan operations on January 4, 1993,

1. F: Forced
2. REASON:
3. METHOD:

4 IEEE Standard 805+1984 S: Scheduled A+ Equipment Failure (Explain) 1-Manual

5. IEEE Standard 803A-1983 B-Maintenance or Test 2-Manuel Scram.

C-Refueling 3-Automatic Scram, D-Regulatory Restriction 4-Other (Explain)

E-Operator Training &

Licensing Examination F-Administrative G-Operational Error (Ex plain)

.H-Other (Explain)

.