Text

{{#Wiki_filter:.. OPERATING DATA REPORT 50-344 DOCKET NO. DATE 5 / 8 / 89 COMPLETED BY __F. J. Ulmer TELEPHONE 503-556-3713 Ext. 495 OPERATING STATUS Notes Trojan Nuclear Plant

1. Unit Nam April 1989

. 2. Reporting Period: 3411

3. Licensed Thermal Power (MWI):

1216 4 Nameplate Rating (Gross MWe): 117n . 5. Design Electrical Rating (Net MWs): 1191

6. Maximum Dependable Capacity (Gross MWe):

1095

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (1tems Number 3 Through 7) Since Last Report, Give Reasons:

n/a n /a P. Power LevelTo Which Restricted,lf Any (Net MWe): n/a

10. Reasons For Restrictions.If Any:

o His Moeth YrAo.Dete Cumaleth ~M o

  • 7o,o

,4nnnn

11. Hours in Reporting Period Aoino'o 120.4 779n a
12. Number Of Hours Reactor Was Critical 0

0 33g7

13. Reactor Reserve Shutdown Hom:

120.4 2280.4 68815.3

14. Hours Generator On-Lkne 0

0 3249

15. Unit Reserve Shuidown Hom:
16. Geoss Thermal Energy Generated (MWH)

_ 7744985 219345985-404549 135785 2630498 771soosn

17. Gross Electrical Energy Genereled (MWH) 124178 2500908 68368978
18. Net Electrical Energy Generated (MWH) 16.8 79.2 62.0
19. Unit Service Factor 16J 79.2 64.9
20. Unit Availability Eactor 15.8 79.3 s7.g
21. Unit Capacity Factor (Using MDC Net)'

15.3 26.9 54.4 ' 22. Unit Capacity Factor (Using DER Net) 0 0 13.4

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Dete.and Duration of Each t:

Annual Refuelino Outace start nato. a m-4 x nc sono

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Forecast Achieved

26. Units in Test Status (Prior to Comenercial Operation):

"I" "/ INITIAL CRITICALITY j n/ n/a INITIAL ELECTRICITY I n/ n/a COMMERCIAL OPERATION WD G905180194 890430 @S ( fl PDR ADOCK 05000344 R PDC

i ,;N g-1 ~ AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-344 UNIT: Trojan DATE: May 9, 1989 COMPLETED BY:_F. ' J '. U1mer TELEPEONE: %o 4 's;6-1714 ext 495 MONTE April, 1989 DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P'OWER LEVEL (MWe-Nat) (MWe-Net) 1 .1107 17 -5 2 1108 18' -5 3-1108 19 -5 4 1108 20 -5 1021 21 -5 5 e -31 22 -4 6 -36 23 -4 7 8 24 -4 -36 -13 -4 9 25 10 -11 26 -4 -8 27 -4 11 -11 28 -5 12 -8 29 -4 1., 13 ' -5 30 -3 14 i' -5 31 n/a 15 -5 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Computa to the nearest whole megawatt. (9/77)

TROJAN NUCLEAR PLANT Trojan Operating Report April 1989 OPERATIONS The plant entered the month operating quietly at 100% power in Mode 1. The annual refueling outage, which started April 6, has been extended from 60 to 65 days. The increase is due to additional scope of work necessary to replace or modify 82 potentially defective mechanical tube plugs in steam generators A, C and D and perform eddy current examinations of steam generator tubes in all four steam generators. Power reduction for the refueling outage began at 2000, hours on April 5, with the plant coming off line smoothly at 0022 hours on April 6. Sludge lancing was performed on the four steam generatois beginning April 13 and finishing April 19. Inspection of the main turbine and generator was begun April 11 and continued through the remainder of the month. During this inspection, examination of the main generator rotor bars disclosed an unacceptable amount of copper dust

  • and flakes. At the end of the month, corrective actions were being evaluated.

On April 25, in-service inspection of the reactor vessel was begun, and continued through the remainder of the month. The plant ended the month in Mode 6, with the reactor defueled and preparation for refueling.in progress. Preparing for the lifting of the reactor vessel head and the commencement of refueling operations. MAINTENANCE Significant maintenance completed during this period includes: Repaired body-to-bonnet leak on the "A" safety injection first-off check valve Replacement of degraded cables inside containment (in progress) Machined sealing surfaces of steam generator handholes to remove pitting APPROVED / PlariC96neral Manager

ll]j 4 fc. 6 3 G r 1 E 9 e 7 R 8 m 3 U 9 l N l 6 5 ( 1 I e e 4 n 5 9 eW e s s s . 5 4 n n aF c 4 a s 3 iv 1-w oac r iD e)R ou n a 3 t o t J c d 'o4IE S - 0 x e 0 r M 5 P E 5-e e t rL e s e n u snfot m t v c l no a t s e .EEYE moe h Ii sr e t t a S O - ae t w S MTBN n r ep r Gahe N I A A D O Ome g AepS R t T N D l t Ei hR i yt) b n t r EK T T F &trt ipr n8 i I E E. eAn i h t e6 h r nvf x CN LR s e l x o O U P E u v EfEEO E D M T a e e r C P u O f 4 5 C eR la itnnA S m) N s O m c. n ia I 9 t aSl T 8 cp r C j cim 9 U StE s 1 lt i D e i n (r E dus oe onnth R haaue l tMMAO

  • ,yu R

i e E r ggn MI2J4 W p i O h. 3 P l D i N T A NO e a SN M et t s n n n W T e v p m ei O R k.E e k D O I R sa P I n E d U R n ti a S s E "hfeg6 T s ) e ) I n N E.yg s n 1 I n i U l e s ,g p c i x nJ p E oI n E it& (t s t c e e I g s

  • }n4 oT n

u) s t C f si s fao enen n l Fe RirEi a si o t l l 6 t c ap nn. yT a nu s r 5.3g eagurt oE 1g 8 nt oi i( s 9 mnelist nt i. i pt ei si 5 ninu uimrehe o uif ge qa eepdpt s a E M. R R. O A. O. O e - ,cN RABCDEFG1 1 S 2 e 6 ta 0 d D 3 e l 0 du 9 ed ce 8 s i F"teS 9 ) 8 7 7 F5 7 .N 2 8 3 0 !I l1ll ll)lJl[illIl.

y e ;g .l' m' ,e

n.

' Portland General Electric Company. Trojsn Nuclear Plant -71760 Columbia River liwy . Rainier,' Oregon 97048 - (503) 556-3713: May 9, 1989 CPY-091-89 L l1 US Nuclear Regulatory Commission Document Control Desk _ Washington, DC 20555 s n- .' I :. Gentlemen: Monthly Operating Report In accordance with the Trojan Nuclear Plant Technical Specifications' reporting requirements, the Monthly Operating Data' Report is' submitted for April, 1989. .n. Sincerely, C. . Yundt General Manager CPY:st Attachment ct. Mr. John B. Martin Regional Administrator, Region V US Nuclear Regulatory Commission Mr. William T. Dixon ' Department of Energf State'of Oregon Resident. Inspector MOR Distribution i = _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ ___.}}