.O OPERATING DATA REPORT DOCKET NO.

50-344 DATE l-8-87 COMPLETED BY F. J. Ulmer TELEPllONE 503-556-3713 Ext. 495 OPERATING STATUS Trojan Nuclear Plant Notes

1. Unit Name:

. 2. Reporting Period:

OpcAmhar l006 g gg gg )g g

3. IIncensed Thermal Power (MWI):

34Il incorrectly report 2d as 77.4

4. Nameplate Rating (Gross MWe): 1216 in November, should have 1130 been 74.4.
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

1111

7. Maximum Dependable Capacity (Net MWe):

1075

8. If Changes occut in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

None

9. Power Level To Which Restricted. lf Any (Net MWe): N/A
10. Reasons For Restrictions.lf Any: N/A His Month Yr..to.Date Cumulative 744 A760 4n676
11. Ilours in Reporting Period 744 7069 CAA91
12. Number Of Ilours Reactor Was Critical 0 0 3887
13. Reactor Reserve Shutdown llours 744 6996 66040
14. Ilours Generator On Line 0 0 3249 __
15. Unit Reserve Shutdown llours 2497897.6  ??400917 177Asq199
16. Gross Thermal Energy Generated (MWil) 7466647 6A?A4AA1
17. Gross Electrical Energy Generated (MWil) _ 837338 ..

798P36 7090231 55181535

18. Net Electrical Energy Generated (MWil) 100 79.7 61.9
19. Unit Service Factor 100 79.7 65.5
20. Unit Availability Factor 99.8 76.6 57.7
21. Unit Capacity Factor IUsing MDC Net)
22. Unit Capacity FactorIUsing DER Net) 94.9 71.6 61.9 n 1.1 14 1
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Nest 6 Months (Type.Date,and Duration of Each):

Annual refuelina scheduled for Ancil 1. 14A7.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial 0perationi: Forecast Achieved N/A N/A INITIA L CillflCA LITY INITI Al. ELEC T RICITY N/A N/A--

COM%IlllCIAL OPER ATION N/A Hn (9/77) p 0701160147/,00CK 061231 0500 4 gi DR

} ,

s e

A' **

i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-144 UNIT: Trojan l' DATE: 1-8-87 COMPLETED BY: F. J. Ulmer TELEPHONE: M01. ERA-1711 ext. 495 MONTH Decanhar. 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (NWe-Net) 1 1093 17 1002

, 2 1095 18 1003 3 1096 19 1.0"8 4 1095 20 1005 5 1092 21 1091 6 1091 22 1039 7 1090 23 1092 8 1091 24 1092 9 1007 25 1019 10 705 26 1087 i

11 1093 27 1086 12 1098 28 1095 13 1096 29 1092 14 1091 30 1095 15 1092 31 1095

! 16 1094 l

l t INSTRUCTIONS I

on this format, list the average daily unit power level in HWe-Net for each

(

day in the reporting month. Compute to the nearest whole megawatt.

l (9/77) l t

UNITSHUIDOWNS AND POWER REDUCTIONS DOCKET NO.60-344

. . UNIT MARIE Ten bn

. DATE l-8-87 REFORTMONTH 09" lqog DW E M- mle

. . TEREF990NE E01 sir 6 1711 l

Ext. 495 -

1 =

- k

%. Date r

.1 g i j I~g

.g g ac Ucensee P,, {%

g'E Cause A Causessive g

3E 5 Event E? Actions ses f$ eE }.gg Report a mu jU - . Prewas Recursence 5

! E6-12 12-9 E6 5 0 A N/A N/A HC HTEXCH Reducad power to 55% for plugging of leaking condenser tubes in B condenser.

Returned to full power 27.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> later. Twenty-two tubes plugged in 3 Train, 8 Shell.

i 1

l 1

l i

l -

l l

r t 2 3 4 F: Forced Reason: Methed:

Enl68: C Insermettens 5: Schedated A-Equirenest Faamse(Explain)  !-Manuel for 7.. , z-_m rf Desa

B4taintemence of Test 2 Mensel Scrase. Entry Sheets for Ucessee C. Refueling J-Autoonstic Sc.asm. Ewne Report (I.ERI Fee (NUREG-D-Regulatory Restriction 40ther (Empiaki) 0161)

EOpesator Training & IJcense Exasuhession -

F-Adeninistratise 5 G-Orcrarianal Errq(Explais) , Exliihk I .Seene Siserce rs/77) II Otties !Esplein)

Portand Gener3 Electre u

TROJAN NUCLEAR PLANT DOCKET NO: 50-344 ,

SulHARY OF OPERATING EXPERIENCE DATE: 1-8-87 COMPLETED BY: F. J. Ulmer TELEPHONE: 503-556-3713 Ext. 495 OPERATIONS:

The Trojan Nuclear Plant entered the month of December at full power. On Deceniber 9,1986 at 1800 the plant decreased power to 55% to isolate and repair leaking condenser tubes. A total of 22 tubes were plugged in the B shell of the B Train condenser. At 2130 December 10, 1986 the plant returned to full power operation and continued at full power through the end of the month with the exception of a power decrease to 85% for testing on December 25 that lasted 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

A ruptured feed pump suction line at the Surry Nuclear Plant Unit 2 prompted Trojan's Engineering and Maintenance groups to ultrasonically test and evaluate the suction lines at Trojan's Main Feed Pumps, and various other high energy lines of concern.

No problems were found.

The Trojan Plant exceeded its 1985 Unit Capacity Factor record of 75.1% and set l a new plant record of 76.6% on December 31, 1986.

l Primary to secondary steam generator leakage remained constant at i gallon per day I and the RCS dose equivalent iodine concentration is 12% of the specification limit.

MAJOR SAFETY-RELATED MAINTENANCE:

1. A Train ESF equipment outage occurred for Preventative Maintenance.
2. B Train ESF equipment outage occurred for Preventative Maintenance.
3. CB-1 Control Room emergency ventilation fire dampers were upgraded to 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> I rated dampers. l MISCELLANEOUS MAINTENANCE:
1. Plugged 22 leaking condenser tubes in B Train condenser, 8 Shell.
2. Com31eted Incore/Excore detector calibration and adjustment in accordance with Tec1nical Specifications.
3. Ultrasonically tested Main Feed Pump suction piping (see coments above).
4. Performed Triannual Fire Protection System Flow Test.
5. Replaced Incore neutron flux detector cable unit due to a stripped helix.

l l

LICENSE CHANGES: None l

OTHER: None l

l l

l , K f Portland General Electric Company Trojan Nuclear Plant P.O. Box 439 Rainier, Oregon 97048 (503)556 3713 January 8, 1987 CAO-009-87 Trojan Nuclear Plant Docket 50-344 License NPF-1 US Nuclear Regulatory Commission Attention: Document Control Desk a Washington, DC 20555 g

Gentlemen:

Monthly Operating Data Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the monthly operating data report is submitted for December, 1986.

Sincerely, 00.

C. A. Olmstead General Manager Attachment c: Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David O. Kish Acting Director Department of Energy State of Oregon g3 S gI