a OPERATING DATA REPORT f
50-344 DOCKET NO.
A DATE N1" 19R8 COM/LETED BY P.
3 Ulmer TELEPHONE 503-556-3713 Ext. 493 OPERATING STATUS Notes Trojan Nuclear Plant I. UWt Now, June 1988 j
. 2. Reporting Period:
1411
- 3. Licensed Thermal Power (MWt):
1216
- 4. Nameplate Rating (Gross MWe):
1130
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
1153 1095 7.~ Maximum Dependable Capacity (Net MWe):
- 3. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
NA NA
- 9. Power LevelTo Which Ratricted lf Any(Net MWe):
NA
- 10. Reasons For Restrictions.lf Any:
~
r
(
This Month Yr.to Date Cumulative 720 4367 103703
- 11. Hours In Reporting Period
~
- 12. Number of Hours Reactor Was Critical 0
2344.6 61698.8 0
0 3887
- 13. Rosetor Reserve Shutdown Hours 0
2342.2 63013.9
- 14. Hours Generator On Line
- 15. Unit Reserve Shutdown Hours 0
0 3249 0
7oss4?A 199A06?64
- 16. Gross Thermal Energy Genorsted (MWH)
- 17. Gross Electrical Energy Genersted (MWH)
_ 0, _.
2692463 65558101
-3192 2562746 62092053
~
- 18. Net Electrical Energy Generated (WWH) 0 53.6 60.8,
- 19. Unit Service Facto, 0
53.6 63.9
- 20. Unit Availability Factor
~
-0.4 53.6 56.1
- 21. Unit Capacity Factor (Using MDC Net)
-0.4 51.9 53.0
- 22. Unit Capecity Factor (Using DER Net) 0 5.2 13.7
- 23. Unit Forced Outage Rai,
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Dete.and Duration of Each):
Refuelino/ Maintenance in Proarens 6
July. 1988
- 25. If Shut Down At End Of Report Period Estimated Cate of Startup:
- 26. Units in Test Status Irrior io Commercial Operation):
Forecast Achieved NA NA INITIAL CRITICALITY NA NA INITIA L ELECTRICITY COMMERCIAL OPER ATION NA NA h
(*l77) 8807250200 000630 l
PDR ADOCK 05000344 PNV l)
R
a AVERAGE DAILY' UNIT POWER LEVEL i
DOCKET NO: 50-344 UNII: Trojan I
DATE: ' July 1988-f 6
COMPLETED BY:_P.
J.
U 1mo r _.
l TELEPHONE: s03 s;A-1711 l
ext 495 i
MONTH ' June 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-2 17
-5 2
-2 18
-5 3
-3 19
-3 4
-5 20
-4 l
1 5
-2 21
-5 l
6
-2 22
-7 b
7
-5 23
-4 8
-5 24
-6 l
9
-2 25
-7 i
a
]
10
-2 26
-4 11
-3 27
-10 i
12
-2 28
-12 i
13
-2 29
-12 14
-2 30
-11 j
15
~2 31 NA
-3 16
)
i i
1 j
INSTRUCTIONS I
j On this forsat, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
a a
(9/77)
= - -,
. -, -.. -. -. - ~ _
(
(r
~
DOCKET NO. 5f.- 3 4 4 UNIT SIIUIDOWNS AND FOWER REDUCTIONS UNIT NAME TrnJan DATE July 1988 Nt. ERD p F_
a m m-r REFORT E10NTit June 1988 TELErtlONE 503-556-3713 ext 495
~
l-c h*
Cau c & CeusectIve
- 5. E 3
Y ~~
Ucensee E,
$"L Atti.w to Deze R
~~g s
.c 5 ce Event gy
~ lF, c Repina 't en O 5 d Pee,ent Recurrence d5 E
~3 u
e 6
88-02 880413 S
720 C
1 NA.
NA NA Continued Annual Refueling Shutdown.
i 1
1 I
i i
3 4
I 2
Exhible G-Insts'uctions Afethod:
F: F n e1 Itesson:
5: Sefiedufed A-Equiprnent Falfuse(Explain)
I. Manual for Preparation of Data s
B4fa;ntenance of Test 2.ManualScram.
Entry Sheets for Ucems 3-Automatic Sc:arn.
Event Report tLEP) File (NUREG.
C. Refueling 01611 D-Regulaeony Resarletlovi 4-Other (Explain)
E-Opesator Training A Ucense Ex=enination 5
F-Administrative Exhibit i.Same Source G-Operavional Ensus(Empfain) i r8/77)
!! Otties (Explain)
J
TROJAN NUCLEAR PLANT
.[ )
Summary of Operating Experience
(,/
June 1988 The plant entered the month in Mode 5 with the annual refueling and maintenance outage in progress.
Fne' Toloading had been completed.
Work was in progress to complete several maintenance items.
Final checkout and acceptance testing of the newly installed remote snutdown station was completed on June 26.
A final test to verify that the plant can be maintained in hot standby and then cooled down 50*F from the remote shutdown station will be performed after heatup.
Degraded electrical cables which were discovered in Containment in the vicinity of the reactor coolant pumps have been evaluated as satisfactory for continued operation.
They will be replaced next outage.
During inspection of the pressurizer surge line, the surge line piping was found to be in contact with a pipe whip restraint.
Evaluation of this finding led to performance of non-destructive 7-~s examination of pressurizer surge line piping welds.
Repairable indications were found in welds en the surge line elbow just x
downstream of the pressurizer, 15e piping elbow containing these welds was cut out and replaced.
Pipe whip restraints on the surge line were modified.
Temporature detectors and motion detectors were instslied to monitor the surge line during heatup and power operation.
On June 6, excessive in-leakage to the Control Room envelope was discovered via the Control Room Emergency Ventilation System.
Extensive work was performed to repair the ducting leaks and reduce in-leakage to within allowable values.
Other n.ujer jobs completed during the month were:
Large bore pipe hanger and pipe whip restraint mo6ification Functional testing of newly installed Control Poom Chiller System.
At month's end the plant was in Mode 5 with reactor coolant system temperature at 90 F and one reactor coolant pump operating.
Preparations are being made to draw a bubble in the pressurizer and perform plant heatup.
\\
,U
MAINTENANCE
[/
A previously plugged tube in steam generator
'D' which had
')
(
heen found to be leaking was repaired.
Repaired train
'A' and
'B' inverters.
Repaired three leaking tubes found in the 6A feedwater heater.
LICENSE AMENDMENTS Amendments to the Trojan Operating License were received:
Amendment 142 Exclusion from Limiting Condition for Operation 3.0.4.
Amendment 143 Adds two new instruments for monitoring steam generator blowdown liquid effluent disch.arge.
Amendment 144 Reflects relocation of the remote shutdown monitoring instrumentation from the C-160 panel in the Turbine Building to the new Rch.c+' Shutdown Station.
Amendment 145 Revises means by which source range neutron flux instrumentation calibration will be g
performed.
J G
.7
(_ -
A A
%p; )
g irtland General Electric Company rojan Nuclear Plant July 8, 1988 71760 Columbia River llwy CAO-260-88 Rainier. Oregon 97048 (503) 556-3713 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen Monthly Operating Report In accordance with the Trojan Nuclear Plant Technical l
Specifications reporting requirements, the Monthly Operating Data Report is submitted for June 1988.
Sincerely,
(. Q. 0 1
C.
A.
Olmstead General Manager Attachment c:
Mr. John B.
Martin j
Regiona) Administrator, Region V US Nuclear Regulatory Commission Mr. William Dixon Department of Energy State of Oregon Resident Inspector MOR Distribution i )
- - - - - - - - - - - - - -