Monthly Operating Rept for Aug 1992 for Tnp
ML20127D350
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/31/1992
From: Machon R, Ulmer F
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RDM-502-92, NUDOCS 9209140272
Download: ML20127D350 (5)


Text

"

>w d

-- (L :"; { _ [ 7 ~ _

[

7 m.

Portland General I:lcettic Company "Irojan Nuclear Plant 717(4) Columbia Itiver 11wy llainier. Oregon 97048 (503) 55tw3713 September 10, 1992 RDM-502-92 Trojan Nuclear Plant Dockot 50-344 Licenso NPF-1 U.F. Nuclear Regulatcry Commission Attn:

Document Control Desk Washington DC 20555

Dear Sir:

Monj Operatiny, Report It. accordance with the Trojan Nucioar Plant Technical Specifications reporting requirements, the Monthly Operating Data Report is submitted for August 1992.

Sincerely,

/'

R. D. Ma hon Plant General Manager Attachment c:

Mr. John B. Martin D

Regional Admin.strator, Region V U.S. Nuclear Regulatory Commiculon Mr. David Stewart-Smith State of Oregon Department of Energy Mr. R. C. Barr NRC Resident. Inupoctor Trojan Huclear Plant it 00.11 9209140272 92,0831 J-goomcx o xmo R

PCR

}

-. o 4

Trojan Nuclear Plant' Cocument Control Desk Docket 50-344 September 10, 1992 License NPF-1 Attachment 4 pages TROJAN NUCLEAR PLANT Trojan Monthly Operating Report Auaust 1992 OPERATIONS The Plant began and ended the reporting period in Mode 1 at 100

. percent power.

OUTAGE SUPPORT LICENSING ACTIONS PGE Requested Item-

_ Submittal Date Response Date 1.

Sceam Generator Tube Saptember 1992 February 1,1993 Plugging Criteria t.

l; l-L

  • e e

OPEPATING DATA REPORT DOCKET NO.

50-344 DATE Septector, 1992 CG1PLETED BY F, J. Ulmer of-rRATING STAl1@s TELEPHONE (503) 556-7495

1. Unit Name Trojen Nuclear Notest Plent
2. Reporting Period August 1992
3. Licensed Tharpal Fower (twt) 3411
4. Nameplete Rating (Gross tWe) 1216
5. Dastan Electrical Rating (Net tHe) 1130
6. Maximum Dependable Cepecity (Oross tue) 1153
7. Maximum Dependable Capacity (Not FHe) 1095
8. If Changes occur in Capacity Retings (Items No. 3 N/A through 7) Since Last Report, Olve Reasons
9. Power Level To Which Restricted, If Any (Not FMe)

N/A

10. Reasons For Restrictions, If Any N/A Thie Month Yr-to-Date Cumulative
11. Hours in Reporting Period 744 5855 140255
12. Number of Hours Reactor Was Critical 744 3171.5 84085
13. Reactor Reserve Shutdown Hours 0

1210.2 5097

14. Houre Generator on-Line 744 3042.3 81928 15, Unit Reserve Shutdown Hourn 0

1218.8 4468

16. Gross Thermal Energy Generated (HWH) 1534015 9835220 262541348
17. Gross Electrical Energy Generated (FMH) 850420 3286732 86687079
18. Not Electrical Energy Generated (FNH) 815710 3066532 81991849
19. Unit Service Factor 100.0 52.0 58.4
20. Unit Availability Factor 100.0 72.8 61.6
21. Unit C.pacity Factor (Using HDC Nat) 100.1 48.1 54.4
22. Unit Capacity Factor (Using DER Net) 97.0 46.7

-51.7

_23. Unit Forced Outage Rate 0

5.1 12.8 24'. Shutdowne Scheduled Over Next 6 Honths (Type, N/A Date and Duration of Each):

25. If Shut Down at End of Report Period, N/A Estimated Date of Startup:
26. Unite In Test Etatus (Prior to Cocraercial FORECAST ACHIEVED

' Operation):

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY -

N/A N/A CCetiERCIAL OPERATION N/A N/A

i AVERAGE DAILY UNIT POWER LEVEL i

DOCKET NO.

50-344 UNIT TROJAN DATE-SEPTEMEER, 1992 COMPLETED BY F.

J.

ULMER (503) 556-7495 TELEPHONE MONTH: Auctust, 1992 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL (MWe-Net)

POWER LEVEL (MWe-Net) 1 1085 17 1094 2

1099 18 109

3 1097

'19 1099 4

1101 20 1101 5

1097 21 1104 6

1100 22 1095 7

1102 23 1099 8

1104-24 1102 9

1101 25

'1099 10

'1092 26 1096 11 1064 27 1099 12 1C75 28

-1103

-1" 1092 29 1100 14 1097 30 1101 15' 1090 31 1100 16:

1097

. INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Computo to the nearest

.whole megawatt.

UNIT SHUTDOWNS AND F0VER REDUCTIONS DOCKET No.

50-344 UNIT NAME Troian DATE September. 1992-REFORT MONTH August. 1992 COMPLETED BY F. J. Ulmer l

l TELEPHONE (503) 556-7495 i

NO.

DATE TTFE' DURATIOff Rf>M MET!!OD Or LICENSE SYSTEM CatEOfqEM CAUSE & LMCTIVE ACTION TO 11tEVENT RECUFJJDICE HOURS SHUTTING EVENT CODE' CODE

  • DOWN REPORT #

REACTOR' l

NOME 4 IEEE Standard 805-1984

3. METHOD:
1. F: Forced
2. REASON l

S: Scheduled

5. IEEE Standard SO3A-1983 A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

3-Automatic Seram.

C-Refueling D-Regulatory Restriction 4-Other (Erpiain) f E-Operator Training A Licensing Examination l

F-AMuinistrative G-Operational Error (Ex plain)

B-Other (Explain)

_ _ _ _ _ _