Monthly Operating Rept for Dec 1993 for Trojan Nuclear Plant
ML20059E839
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/31/1993
From: Hugo B, Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SMO-005-94, SMO-5-94, NUDOCS 9401120290
Download: ML20059E839 (5)


Text

_

v

(',h-f

(. k.

~'

Portland General filectric Company Trojan Nuclear Plant 71760 Columbia River liwy.

Rainier, Oregon 97048 (503) 5 % 3713 SMQ-005-94 i

January 4, 1994 Trojan Nuclear Plant

]

Docket 50-344 l

License NPF-1 l

U.S.

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sirs:

i Monthly operatina Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly Operating Report is submitted for December 1993.

Sincerely, S.

M.

Quennoz General Manager I

Trojan Nuclear Plant Attachment

'j i

c:

Mr. Ken Perkins Regional Administrator, Region V U.S.

Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr.

H.

D.

Chaney Region V Project Manager U.S.

Nuclear Regulatory Commission 120003 1

9401120290 931231 PDR ADOCK 05000334 i

l R

PDR t

i IT

s

}

i Trojan Nuclear Plant Document Control Desk I

Docket 50-344 License NPF-1 Attachment 4 pages i

TROJAN NUCLEAR PLANT Trojan Monthly Operating Report pecember 1993 OPERATIONS The reporting period began and ended with the plant defueled.

i r

i l

I l

1 i

1 l

1 i

'l

. - i

~..

j w

\\

~

i, l

l l

OPERATING DATA REPORT DOCKET No.

50-344 DATE January 1994 COMPLETED BY B. R. Hugo OPERATIN7 STATUS:

TELEPHONE (503) 556-7278

1. Unit Nane Trojan Nuclear Notes:
  • Cumulative values Plant as of 3 p.m. January 4 when Portland General Electric 2, Reportir.s Period December 1993 Company's Board of Directors announced the permanent
3. Licensed Thermal Power (MWt)

N/A closure of Trojan.

4 Nameplate Rating (Gross MWe) 1216

5. Design Electrical Rating (Net MWe) 1130 1
6. Maximum Dependable Capacity (Gross MWe) 0
7. Maximum Dependable Capacity (Net MWe) 0
6. If Changes Occur in Capacity Ratings (Items No. 3 N/A through 7) Since Last Report, Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 0 1

l

10. Reasons For Restrictions, if Any Permanent Plant shutdown This Month Yr-to-Date Cumulative
11. Hours in Reportins Period 744 8760 143271*
12. Number of Hours Reactor Was Critical 0

0 85710'

13. Reactor Reserve Shutdown Hours 0

0 5097*

14. Hours Generator On-Line 0

0 83545'

15. Unit Reserve Shutdown Hours 0

0 4468'

16. Cross Thermal Energy Generat.ed (MWH) 0 0

267291694

17. Gross Electrical Energy Generated (PHH) 0 0

88265599*

IB. Nat Electrical Energy Generated (MWH) 0 0

83477241*

19. Unit Service Factor 0.0 0.0 58.3'
20. Unit Availability Factor 0.0 0.0 61.4*
21. Unit Capacity Factor (Using tDC Net) 0.0 0.0 54.2*
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 51.6*
23. Unit Forced Outage Rate 0.0 100.0 13.1*

24 Shutdowns Scheduled Over Next 6 Months (Type, N/A l

Date and Duration of Each):

25. If Shut Down at End of Report Period, N/A l.

Estimated Date of Startup:

26.1 Units In Test Status (Prior to Commercial FORFCAST ACHIEVED Operation):

INITIAL CRITICALITY N/A N/A i

INITIAL ELECTRICITY N/A N/A l

CottiERCIAL OFERATION N/A N/A

i AVERAGE DAILY UNIT POWER LEVEL i

l DOCKET NO.

50-344 UNIT TROJAN DATE JANUARY 1994 COMPLETED BY B.

R.

HUGO TELEPHONE (503) 556-7278 MONTH: December, 1993 1

i DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

i i

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

1 15 0

31 0

16 0

INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l

,, - ~ -

i m

t e

4 t

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-344 UNIT NAME Troian DATE January. 1994 REPORT MONTH December. 1993 COMPLETED BY-B. R. Huno TELEPHONE (503) 556-7278 i

L NO.

DATE TYPE'

' DURATION REASON METEIOD CF LICENSE SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO TREVENT RECURRENCE 8

!!OURS 55UTTING EVENT CODE

  • CODE' DOWN REPORT #

REACTGE' 93-01 930104 744.0 Portland General Electric's Board of Directors voted to f

permanently cease Trnjan operations on January 4, 1993.

L i

1

1. F: Torced
2. REASON:
3. METHOD:

4 IEEE Standard 805-1984 S: Scheduled A-Equipnent Failure (Explain) 1-Manual

5. IEEE Standard 803A-1983 B-Maintenance or Test 2-Manual Screm.

C-Refueling 3-Automatic Scram.

D-Resulatory Restriction 4-Other (Explain) r E-Operator-Training a Licensing Examination F-Administrative G-Operational Error (Ex i

plain)

S-Other (Explain) l

..