Portland General filectric Company Trojan Nuclear Plant 71760 Columbia River liwy.
Rainier, Oregon 97048 (503) 5 % 3713 SMQ-005-94 i
January 4, 1994 Trojan Nuclear Plant
]
Docket 50-344 l
License NPF-1 l
U.S.
Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sirs:
i Monthly operatina Report In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly Operating Report is submitted for December 1993.
Sincerely, S.
M.
Quennoz General Manager I
Trojan Nuclear Plant Attachment
'j i
c:
Mr. Ken Perkins Regional Administrator, Region V U.S.
Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr.
H.
D.
Chaney Region V Project Manager U.S.
Nuclear Regulatory Commission 120003 1
9401120290 931231 PDR ADOCK 05000334 i
l R
PDR t
i IT
s
}
i Trojan Nuclear Plant Document Control Desk I
Docket 50-344 License NPF-1 Attachment 4 pages i
TROJAN NUCLEAR PLANT Trojan Monthly Operating Report pecember 1993 OPERATIONS The reporting period began and ended with the plant defueled.
i r
i l
I l
1 i
1 l
1 i
'l
. - i
~..
j w
\\
~
i, l
l l
OPERATING DATA REPORT DOCKET No.
50-344 DATE January 1994 COMPLETED BY B. R. Hugo OPERATIN7 STATUS:
TELEPHONE (503) 556-7278
- 1. Unit Nane Trojan Nuclear Notes:
- Cumulative values Plant as of 3 p.m. January 4 when Portland General Electric 2, Reportir.s Period December 1993 Company's Board of Directors announced the permanent
- 3. Licensed Thermal Power (MWt)
N/A closure of Trojan.
4 Nameplate Rating (Gross MWe) 1216
- 5. Design Electrical Rating (Net MWe) 1130 1
- 6. Maximum Dependable Capacity (Gross MWe) 0
- 7. Maximum Dependable Capacity (Net MWe) 0
- 6. If Changes Occur in Capacity Ratings (Items No. 3 N/A through 7) Since Last Report, Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 0 1
l
- 10. Reasons For Restrictions, if Any Permanent Plant shutdown This Month Yr-to-Date Cumulative
- 11. Hours in Reportins Period 744 8760 143271*
- 12. Number of Hours Reactor Was Critical 0
0 85710'
- 13. Reactor Reserve Shutdown Hours 0
0 5097*
- 14. Hours Generator On-Line 0
0 83545'
- 15. Unit Reserve Shutdown Hours 0
0 4468'
- 16. Cross Thermal Energy Generat.ed (MWH) 0 0
267291694
- 17. Gross Electrical Energy Generated (PHH) 0 0
88265599*
IB. Nat Electrical Energy Generated (MWH) 0 0
83477241*
- 19. Unit Service Factor 0.0 0.0 58.3'
- 20. Unit Availability Factor 0.0 0.0 61.4*
- 21. Unit Capacity Factor (Using tDC Net) 0.0 0.0 54.2*
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 51.6*
- 23. Unit Forced Outage Rate 0.0 100.0 13.1*
24 Shutdowns Scheduled Over Next 6 Months (Type, N/A l
Date and Duration of Each):
- 25. If Shut Down at End of Report Period, N/A l.
Estimated Date of Startup:
26.1 Units In Test Status (Prior to Commercial FORFCAST ACHIEVED Operation):
INITIAL CRITICALITY N/A N/A i
INITIAL ELECTRICITY N/A N/A l
CottiERCIAL OFERATION N/A N/A
i AVERAGE DAILY UNIT POWER LEVEL i
l DOCKET NO.
50-344 UNIT TROJAN DATE JANUARY 1994 COMPLETED BY B.
R.
HUGO TELEPHONE (503) 556-7278 MONTH: December, 1993 1
i DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
i i
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
1 15 0
31 0
16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l
,, - ~ -
i m
t e
4 t
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-344 UNIT NAME Troian DATE January. 1994 REPORT MONTH December. 1993 COMPLETED BY-B. R. Huno TELEPHONE (503) 556-7278 i
L NO.
DATE TYPE'
' DURATION REASON METEIOD CF LICENSE SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO TREVENT RECURRENCE 8
!!OURS 55UTTING EVENT CODE
- CODE' DOWN REPORT #
REACTGE' 93-01 930104 744.0 Portland General Electric's Board of Directors voted to f
permanently cease Trnjan operations on January 4, 1993.
L i
1
- 1. F: Torced
- 2. REASON:
- 3. METHOD:
4 IEEE Standard 805-1984 S: Scheduled A-Equipnent Failure (Explain) 1-Manual
- 5. IEEE Standard 803A-1983 B-Maintenance or Test 2-Manual Screm.
C-Refueling 3-Automatic Scram.
D-Resulatory Restriction 4-Other (Explain) r E-Operator-Training a Licensing Examination F-Administrative G-Operational Error (Ex i
plain)
S-Other (Explain) l
..