Text
.__________ - ____
OPERATING DATA REPORT 50-344 DOCKET NO.
f DATE vmf 4 1988
(
COMPLETED BY L G.
Bair l
TELEPHONE 503-556-3713 Ext. 232 OPERATING STATUS Trojan Nuclear Plant Notes j
- l. Unit Name:
- 2. Reporting Period:
Acril 1988 3411
- 3. Licensed Thermal Power (MWt):
1216
- 4. Nameplate Rating (Gross MWe):
1130
- 5. Design Electrical Rating (Net MWe):
1153
- 6. Maximum Dependable Capacity (Gross MWe):
1095
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA NA
- 9. Power Level To Which Restricted. lf Any (Net MWe):
NA
- 10. Reasons For Restrictions.lf Any:
l l
l TMs Meath YrAo-Dete Cumalative 719*
2903 102239
- 11. Hours in Reporting Period
- 12. Number Of Hours Reector Was Critical 287.3 2344.6 63698.8 0
0 3887 l
- 13. Reector Reserve Shutdown Hours 287.3 2342.2 63013.9 l
- 14. Hours Gerwrator On Lhie 0
0 3249 l
- 15. Unit Reserve Shutdown Hours 969061 7955428 199806264
(
- 16. Gross Thermal Energy Generated (MWH) 324855 2692463 65558101
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Eleetncal Energy Generated (MWH) 307012 2568357 62047664 40.0 80.7 61.6
- 19. Unit Service Factor 40.3 80.7 64.8
- 20. Unit Avsilability Facto, 39.0 80.8 56.9
- 21. Unit Capacity Factor (Using MDC Net) 37.8 78.3 53.8
- 22. Unit Capacity Factor (Uning DER Net) 0 5.2 13.7
- 23. Unit Forced Ostage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration of Eacht:
Refuelino / maintenance in orocress end of May 1988
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Unit:In Test Status IPrior to Commercial 0peration):
Forecast Achieved NA NA INITIA L CRITICALITY INITIA L ELECTRICITY NA NA NA NA COMMERCI AL OPER AT10N
- daylight savings time change.
- 'I 8805090389 88043o
)
(0/77)
PDR ADOCK 05000344 R
AVERAGE DAILY L31T POWER LEVEL DOCKET NO: 50-344 L7IT: Trojan DATE: Mav 4.
1988 4
COMPLETED BY: G.
G.
Bair TELEPHONE: sol ssA_T711 ext 232 MONTH April 1988 DAY AVERAGE DAILY POWER LEVIL DAY AVERAGE DAILY POWER LEVEL (We-Net)
(We-Ne t) 1 1103 17
-11 2
1101 18
-9 3
1056 19
-4 i
4 1101 20
-4
{
5 1097 21
-4 6
1098 22
-4 1
7 1082 23
-5 8
1095 24
-4 i
9 1095 25
-4 l
10 1093 26
-4 11 1094 27
-4
+
12 944 28
-3 13
-31 29
-4 i
l 14
-37 30
-5 15
-21 31 NA 16
-11 l
1 1
INSTRUCTIONS l
4' On this format, list the average daily unit power level in We-Net for each day in the reporting month. Compute to the nearest whole megawatt, f
i I
(9/77)
i k
DOCKET NO. 50-344 UNIT SHUTDOWNS AND FOWER REDUCT10NS UNIT NAME Trnjan DATE May 4 1988 COMPLETED BY G-G.
Rair REFORT AIONTig April 1988 TELEPIIONE 503-556-3713 ext 232 E
f jg
}
Y~g Licensee E*
cg Cause & Cowscstive b'
Action to g
) ~ ec Event g'g
} g
Date Q
- T. E g
P,c,ent Recurrence g$
d g f5 Repost 8 in u s-6 88-02 880413 S
431.7 C
1 NA NA NA Annua' refuel / maintenance outage l
.i l
3 4
l 1
Exhibit G.Insts'ucttons Method:
F: ForceJ Reason:
i S: Scheduled A-Equipment Fallese(Explain) 1-Manuel for Preparation of Data 841aintensace o(Test 2-Manual Scrans.
Entry Sheets for Licemte 1
3 Automatic Sc. ann..
Ettnt Report (LE R) File tNUREG-2 C-Refueling D-Reguisioey Resielction 4-Other(Emplain) 016I)
E Ope ator Training & Ucense Enseminailun 5
F-Administrathe Extdbit t Same Souice G Operational Ensus (Emplata) l'8/77) 11 Oilies E Emplaise)
mf a
Portland General Electric Company May 4, 1988 Trojan Nuclear Plant CAO-179-88 71760 Columbia Riser Hwy Rainier, Oregon 97048 (503) 556-3713
~
US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
Motithly Operating Report P
In accordance with the Trojan Nuclear Plant Technical l
Specifications reporting requirements, the Monthly Operating Data Report la submitted for April 1988.
Sincerely,
$' hv,0 m C.
A. Olmstead General Manager
[
Attachment i
c Mr. John B. Martin i
Regional Administrator, Region V P
US Nuclear Regulatory Commission Mr. William Dixon Department of Energy State of Oregon Resident Inspector MOR Distribution 1
I I
\\' \\
l
3
..i i s..
m' l
i
+ -,
1 f
l TROJAN NUCLEAR PLANT t
Summary of Operating Experience 4
April 1988 l
L
^
[
The plant entered the month in Mode 1 at 100% power.
{
On April 5, the
'B' centrifugal charging. pump developed a i
significant leak through its mechanical shaft seal.
The pump was a
removed from service and isolated'to stop the leak.
The pump was repaired and returned to service on April 7.
On April 7 at 0436 hours0.00505 days <br />0.121 hours <br />7.208995e-4 weeks <br />1.65898e-4 months <br />, a turbine runback reduced power to 72%.
The runback was caused by loss of the generator stator cooling pumps due to loss of their electrical power.
Power was restored l
to 100% at 0815 hours0.00943 days <br />0.226 hours <br />0.00135 weeks <br />3.101075e-4 months <br />.
Power reduction for the 1988 refueling shutdown was begun at 1800 j
on April 12.
The turbine generator was removed from service at 0019 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> on April 13 and the. reactor shutdown at 0021, placing j
the plant in Mode 3.
On April 13, pressurizer safety valve 8010C setpoint was found to i
be lower than its Technical Specification allowed value during i
safety valve testing.
The setpoint was adjusted, Gnd the valve
[
was retested satisfactorily.
i Plant cooldown and depressurization was begun o's April 13 at 2325 l
hours.
The plant entered Mode 4 at 0535 on Apr il 14 and Mode 5 at-0627 on April 15.
The reactor vessel head was detensioned on l
April 20 at 2235, placing the plant in Mode 6.
As of April 30, the plant remained in Mode 6 with unloading of fuel from the reactor vessel in progress.
1 Maintenance f'
i j
Replaced leaking shaft seal on
'B' centrifugal charging i
pump.
l
?
License Amendments e
i l
Two Amendments to the Trojan Operating License were received:
2 i
l Amendment 139 - revises Section 3/4.10, "Special Test Exceptions" j
by extending the surveillance time period for l
verifying control rod insertability during control j
rod worth and shutdown margin tests from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> j
j to 7 days.
4 i
Amendment 140 - revises the Offsite and Facility Organization j
1 Charts.
l 1
4 I
f 4
i
.