.__________ - ____ _ _ _ _ _

OPERATING DATA REPORT DOCKET NO. 50-344 f DATE vmf 4 1988

( COMPLETED BY L G. Bair l TELEPHONE 503-556-3713 Ext. 232 OPERATING STATUS Trojan Nuclear Plant Notes j l. Unit Name:

2. Reporting Period: Acril 1988 3411
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

1216

5. Design Electrical Rating (Net MWe): 1130
6. Maximum Dependable Capacity (Gross MWe): 1153
7. Maximum Dependable Capacity (Net MWe): 1095
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted. lf Any (Net MWe): NA
10. Reasons For Restrictions.lf Any: NA l

l l

TMs Meath YrAo-Dete Cumalative 719* 2903 102239

11. Hours in Reporting Period
12. Number Of Hours Reector Was Critical 287.3 2344.6 63698.8 0 0 3887 l
13. Reector Reserve Shutdown Hours
14. Hours Gerwrator On Lhie 287.3 2342.2 63013.9 l 0 0 3249 l
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 969061 7955428 199806264 (
17. Gross Electrical Energy Generated (MWH) 324855 2692463 65558101
18. Net Eleetncal Energy Generated (MWH) 307012 2568357 62047664 40.0 80.7 61.6
19. Unit Service Factor
20. Unit Avsilability Facto, 40.3 80.7 64.8 39.0 80.8 56.9
21. Unit Capacity Factor (Using MDC Net) 37.8 78.3 53.8
22. Unit Capacity Factor (Uning DER Net) 0 5.2 13.7
23. Unit Forced Ostage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration of Eacht:

Refuelino / maintenance in orocress end of May 1988

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Unit:In Test Status IPrior to Commercial 0peration): Forecast Achieved NA NA INITIA L CRITICALITY INITIA L ELECTRICITY NA NA NA NA COMMERCI AL OPER AT10N
  • daylight savings time change. - 'I 8805090389 88043o ) (0/77)

PDR ADOCK 05000344 R DCD

AVERAGE DAILY L31T POWER LEVEL DOCKET NO: 50-344 L7IT: Trojan 4

DATE: Mav 4. 1988 COMPLETED BY: G. G. Bair ,

TELEPHONE: sol ssA_T711 ext 232 MONTH April 1988 DAY AVERAGE DAILY POWER LEVIL DAY AVERAGE DAILY POWER LEVEL (We-Net) (We-Ne t) 1 1103 17 -11 2 1101 18 -9 ,

3 1056 19 -4 i

4 1101 20 1097 21 -4 5 {

6 1098 22 -4  !

1 7 1082 23 -5 _

8 1095 24 -4 i

. 9 1095 25 -4 l 10 1093 26 -4 ,

+

11 1094 27 -4 ,

12 944 28 -3 13 -31 29 -4 i

l 14 -37 30 -5 15 -21 31 NA  ;

16 -11 l 1  !

1  !

4 INSTRUCTIONS l

! On this format, list the average daily unit power level in We-Net for each  !

day in the reporting month. Compute to the nearest whole megawatt, f i I

- (9/77)  ;

i k

DOCKET NO. 50-344 UNIT SHUTDOWNS AND FOWER REDUCT10NS UNIT NAME Trnjan DATE May 4 1988 -

COMPLETED BY G- G. Rair REFORT AIONTig April 1988 TELEPIIONE 503-556-3713 ext 232 E f

" E*, cg g jg }g Y~g Licensee Cause & Cowscstive

%. Date Q

  • T. E ) ~ ec Event g'g b' Action to s- g$ d g f5 Repost 8 in u } g P,c,ent Recurrence 6

S 431.7 C 1 NA NA NA Annua' refuel / maintenance 88-02 880413 outage l

.i l

3 4 l 1 Method: Exhibit G.Insts'ucttons F: ForceJ Reason: for Preparation of Data A-Equipment Fallese(Explain) 1-Manuel i S: Scheduled 2-Manual Scrans. Entry Sheets for Licemte 1 841aintensace o(Test Ettnt Report (LE R) File tNUREG-2 C-Refueling 3 Automatic Sc. ann..

4-Other(Emplain) 016I)

D-Reguisioey Resielction E Ope ator Training & Ucense Enseminailun 5

F-Administrathe Extdbit t Same Souice G Operational Ensus (Emplata) 11 Oilies E Emplaise) l'8/77)

a

, , mf Portland General Electric Company May 4, 1988 Trojan Nuclear Plant CAO-179-88 71760 Columbia Riser Hwy Rainier, Oregon 97048

~

(503) 556-3713 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

Motithly Operating Report P

In accordance with the Trojan Nuclear Plant Technical l Specifications reporting requirements, the Monthly Operating Data Report la submitted for April 1988.

Sincerely,

$' hv ,0 m C. A. Olmstead General Manager

[

Attachment

(

i c Mr. John B. Martin i Regional Administrator, Region V P US Nuclear Regulatory Commission Mr. William Dixon '

Department of Energy State of Oregon Resident Inspector MOR Distribution 1

I I

\

' \

l

3 -, .. ..i m' *

  • i s. . l

+ -, i 1 f l TROJAN NUCLEAR PLANT  !

, t 4

Summary of Operating Experience April 1988 l L

^

[

The plant entered the month in Mode 1 at 100% power. {

i On April 5, the 'B' centrifugal charging. pump developed a

! significant leak through its mechanical shaft seal. The pump was a removed from service and isolated'to stop the leak. The pump was ,

repaired and returned to service on April 7.

. On April 7 at 0436 hours0.00505 days <br />0.121 hours <br />7.208995e-4 weeks <br />1.65898e-4 months <br />, a turbine runback reduced power to 72%.

The runback was caused by loss of the generator stator cooling pumps due to loss of their electrical power. Power was restored  ;

l to 100% at 0815 hours0.00943 days <br />0.226 hours <br />0.00135 weeks <br />3.101075e-4 months <br />.

Power reduction for the 1988 refueling shutdown was begun at 1800 >

j on April 12. The turbine generator was removed from service at  :

0019 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> on April 13 and the. reactor shutdown at 0021, placing j the plant in Mode 3.
On April 13, pressurizer safety valve 8010C setpoint was found to ,

i be lower than its Technical Specification allowed value during i safety valve testing. The setpoint was adjusted, Gnd the valve [

was retested satisfactorily.

i Plant cooldown and depressurization was begun o's April 13 at 2325 l hours. The plant entered Mode 4 at 0535 on Apr il 14 and Mode 5 at- -

0627 on April 15. The reactor vessel head was detensioned on l April 20 at 2235, placing the plant in Mode 6. As of April 30, the plant remained in Mode 6 with unloading of fuel from the

reactor vessel in progress.

1 Maintenance f' i j -

Replaced leaking shaft seal on 'B' centrifugal charging  ;

i pump.  !

l

? License Amendments e i  !

l Two Amendments to the Trojan Operating License were received:  ;

2 i l Amendment 139 - revises Section 3/4.10, "Special Test Exceptions"  ;

j by extending the surveillance time period for l verifying control rod insertability during control  !

j rod worth and shutdown margin tests from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> j j to 7 days.  ;

4 i

j Amendment 140 - revises the Offsite and Facility Organization 1 Charts. l 1

4 I f 4 i

.