|
---|
Category:NOTICE OF DEVIATION/NONCONFORMANCE FROM A REGULATORY
MONTHYEARML20215G9881987-04-10010 April 1987 Notice of Nonconformance from Insp on 870223-27 & 0324 ML20206D8851987-04-0808 April 1987 Notice of Nonconformance from Insp on 870309-11 ML20207S2921987-03-17017 March 1987 Notice of Nonconformance from Insp on 870126-30 ML20211B8481987-02-13013 February 1987 Notice of Nonconformance from Insp on 870112-14 ML20210E9201987-02-0606 February 1987 Notice of Nonconformance from Insp on 861020-24 ML20210A9591987-02-0505 February 1987 Notice of Nonconformance from Insp on 861202-05 ML20210G0331987-02-0202 February 1987 Notice of Nonconformance from Insp on 861117-21 ML20213A0131987-01-29029 January 1987 Notice of Nonconformance from Insp on 861119-21 ML20207P4351987-01-0202 January 1987 Notice of Nonconformance from Insp on 860825-29 ML20207S2711986-12-24024 December 1986 Notice of Nonconformance from Insp on 860414-18 & 0714-18 ML20215A4901986-12-0303 December 1986 Notice of Nonconformance on 861027-30 ML20214Q3131986-11-28028 November 1986 Partially Deleted Notice of Nonconformance from Insp on 860714-18 (Ref 10CFR2.790) ML20214Q2361986-11-18018 November 1986 Notice of Nonconformance from Insp on 861020-24 ML20214A1991986-11-0707 November 1986 Notice of Nonconformance from Insp on 860714-16 ML20214A1191986-11-0707 November 1986 Notice of Nonconformance from Insp on 860922-26 ML20215N5641986-10-27027 October 1986 Notice of Nonconformance from Insp on 860825-29 ML20211D8481986-10-20020 October 1986 Notice of Nonconformance from Insp on 860915-18 ML20215J6821986-10-10010 October 1986 Notice of Nonconformance from Insp on 860519-23 ML20215F8671986-10-0303 October 1986 Notice of Nonconformance from Insp on 860623-27 ML20215B9491986-10-0202 October 1986 Notice of Nonconformance from Insp on 860728-0801 ML20215C9001986-10-0202 October 1986 Notice of Nonconformance from Insp on 860811 & 12 ML20210H0581986-09-24024 September 1986 Notice of Nonconformance from Insp on 860623-27 ML20210C9791986-09-16016 September 1986 Notice of Nonconformance from Insp on 860721-25 ML20214L7881986-09-0202 September 1986 Notice of Nonconformance from Insp on 860621-26 ML20212P7651986-08-28028 August 1986 Notice of Nonconformance from Insp on 860602-06 ML20206P5061986-08-21021 August 1986 Notice of Nonconformance from Insp on 860623-26 ML20214K3471986-08-14014 August 1986 Notice of Nonconformance from Insp on 860609-12 ML20203H9471986-08-0101 August 1986 Notice of Nonconformance from Insp on 860616-18 ML20207K9351986-07-28028 July 1986 Notice of Nonconformance from Insp on 860414-18 ML20203F1641986-07-28028 July 1986 Notice of Nonconformance from Insp on 860609-11 ML20204B3881986-07-28028 July 1986 Notice of Nonconformance from Insp on 860530-0604 ML20203F0631986-07-28028 July 1986 Notice of Nonconformance from Insp on 860414-30 ML20211P7341986-07-21021 July 1986 Notice of Nonconformance from Insp on 860422-25 ML20206J3161986-06-25025 June 1986 Notice of Nonconformance from Insp on 860512-16 ML20199C8821986-06-13013 June 1986 Notice of Nonconformance from Insp on 860324-27 ML20198J6571986-05-27027 May 1986 Notice of Nonconformance from Insp on 860211-13 ML20198D2151986-05-21021 May 1986 Notice of Nonconformance from Insp on 860317-21 ML20197E0211986-05-13013 May 1986 Notice of Nonconformance from Insp on 860127-31 ML20203H9401986-04-28028 April 1986 Notice of Nonconformance from Insp on 851209-13 ML20203D4001986-04-18018 April 1986 Notice of Nonconformance from Insp on 851021-23 ML20203A8591986-04-15015 April 1986 Notice of Nonconformance from Insp on 851217 & 31 ML20203A9051986-04-14014 April 1986 Notice of Nonconformance from Insp on 860127-31 ML20210G2281986-03-31031 March 1986 Notice of Nonconformance from Insp on 860210-14 ML20195B6951986-03-27027 March 1986 Notice of Nonconformance from Insp on 860317-19 ML20154N0201986-03-13013 March 1986 Notice of Nonconformance from Insp on 851120-22 ML20154B3661986-02-28028 February 1986 Notice of Nonconformance from Insp on 851104-08 ML20141M8431986-02-26026 February 1986 Notice of Nonconformance from Insp on 851220 ML20141G1661986-02-25025 February 1986 Notice of Nonconformance from Insp on 860106-10 ML20214C9651986-02-19019 February 1986 Notice of Nonconformance from Insp on 851112-15 ML20153C0541986-02-14014 February 1986 Notice of Nonconformance from Insp on 851209-13 1987-04-08
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20215G9881987-04-10010 April 1987 Notice of Nonconformance from Insp on 870223-27 & 0324 ML20206D8851987-04-0808 April 1987 Notice of Nonconformance from Insp on 870309-11 ML20206D8361987-04-0707 April 1987 Insp Rept 99900271/87-01 on 870127-29.No Violations, Nonconformances or Unresolved Items Noted.Major Areas Inspected:Corrective Action Re Intermittent Failures & Review of Test Results on Three Failed Transmitters IR 05000354/19870101987-04-0707 April 1987 Insp Rept 50-354/87-10 on 870316-20.No Violations Noted. Major Areas inspected:post-accident Monitoring Sys Conformance W/Rev 2 to Reg Guide 1.97.Open Item Identified Re Identification of Category 2 Equipment ML20206M7981987-04-0707 April 1987 Insp Rept 50-312/86-41 on 861201-870212.Unresolved & Open Items Identified.Major Areas Inspected:Activities Supporting Restart & Ensuring Safe Operation of Plant After Restart, Including Stated Phases of Sys Review & Test Program ML20215G9961987-04-0606 April 1987 Insp Rept 99900383/87-01 on 870223-27.Nonconformance Noted: Pressure Gauge Not Calibr for Over 0-30 Psig Range & 30 Psig Pressure Test of O-ring Seals Failed Pressure Drop Requirement ML20206F9681987-04-0303 April 1987 EN-87-029:on 870408,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued.Action Based on Loss of Approx 141,000 Gallons of Water from Spent Fuel Pools Through Fuel Transfer Canal IR 05000327/19870061987-04-0303 April 1987 Design Calculation Review Insp Repts 50-327/87-06 & 50-328/87-06 on 870202-13.No Violations Noted.Major Areas Reviewed:Adequacy of Util Design Calculation Review Program & Extent Program Augments Design Baseline Re Restart IR 05000327/19870051987-04-0303 April 1987 Insp Repts 50-327/87-05 & 50-328/87-05 on 870119-23.No Violations or Deviations Noted.Major Areas Inspected:Review & Evaluation of 13 Employee Concern Task Group Final Sequoyah Element Repts IR 05000445/19860261987-04-0101 April 1987 Insp Repts 50-445/86-26 & 50-446/86-22 on 860901-1031. Violations & Deviations Noted:Cable Pulling Ropes Left in Unit 1 Conduits & Cable Trays & Failure of Inspector to Write Memo Documenting Nonconforming Condition ML20206D9141987-04-0101 April 1987 Insp Rept 99901085/87-01 on 870309-11.Nonconformances Noted: Failure to Administer Exam by Level III Examiner or Designated Representative & 1986 Eye Exams for Listed Level II Examiners Missing IR 05000327/19860681987-03-31031 March 1987 Insp Repts 50-327/86-68 & 50-328/86-68 on 861201-12 & 870112-23.Violations Noted:Licensee Failed to Assure That Applicable ASME Code Requirements Included in Procurement of Specific safety-related Code Class Equipment ML20215E4831987-03-31031 March 1987 EN-87-026:on 870331,order Suspending Power Operation & Order to Show Cause Issued to Util Due to Discovery That Control Room Staff Have Been Sleeping During Various Shifts.Related Documents Encl ML20206D1901987-03-31031 March 1987 Insp Rept 99901088/87-01 on 870121.Major Areas Inspected: Corrective Action Taken Re 860917 Part 21 Rept Concerning Potential Problem in Pressure Transducers ML20205R4601987-03-30030 March 1987 Insp Rept 99900762/87-01 on 870203-04.No Noncompliances or Violations Noted.Major Areas Inspected:Allegations Re Use of Uncertified Welders & Possible Falsification of Welding Records.Two of Nine Allegations Substantiated IR 05000267/19870041987-03-27027 March 1987 Insp Rept 50-267/87-04 on 870126-30.No Violations Noted. Major Areas Inspected:Program to Maintain Qualification of Electrical Equipment Per 10CFR50.49.Potential Enforcement/ Unresolved Items & Open Items of Program Listed IR 05000277/19870061987-03-23023 March 1987 Fitness for Duty Program Insp Repts 50-277/87-06 & 50-278/87-06 on 870202-06.Observations Noted:Util Written Policies Do Not Address Features of Commission Policy Statement or EEI Guide & No Overall Audit Performed ML20205H3661987-03-23023 March 1987 EN-87-023:on 870326,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $50,000 Will Be Issued to Licensee.Action Based on Failure to Obtain Prior NRC Approval of Criteria Change for Reactor Coolant Flow ML20205H2411987-03-23023 March 1987 EN-87-022:on 870326,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $12,500 Will Be Issued to Licensee.Action Based on Numerous Violations of NRC Requirements Re Overexposure to Workers ML20207S2811987-03-17017 March 1987 Notice of Violation from Insp on 870126-30 IR 05000275/19860331987-03-17017 March 1987 Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19. Deficiencies Noted.Major Areas Inspected:Implementation Program for Establishing & Maintaining Environ Qualification of Electrical Equipment Important to Safety ML20207S2921987-03-17017 March 1987 Notice of Nonconformance from Insp on 870126-30 IR 05000445/19860221987-03-16016 March 1987 Insp Repts 50-445/86-22 & 50-446/86-20 on 860701-0831. Violations & Deviations Noted:Stainless Steel & Carbon Steel Stored in Outside Areas W/Improper Protective End Coverings & Records of Heat Treatment Not Available for Disc Inserts ML20207R5751987-03-13013 March 1987 EN-86-074A:on 870313,order Issued Imposing Civil Penalties in Amount of $3,000 to Univ of Utah,Based on Transportation, Health Physics,Safeguards & Operations Violations Noted in 860930 Enforcement Notification EN-86-074 ML20207R3341987-03-11011 March 1987 EN-87-019:on 870311,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $50,000 Will Be Issued for Licenses.Action Based on Three Examples of Degraded Vital Area Barriers ML20207R4851987-03-0909 March 1987 EN-87-017:on 870312,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Will Be Issued to Util Based on Failure to Provide Adequate Design Control to Ensure Emergency Feedwater Pump Operability ML20207R3701987-03-0909 March 1987 EN-87-015:on 870312,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $50,000 Will Be Issued for License.Action Based on Violation of Tech Spec Re ECCS Subsystems ML20207S3331987-03-0606 March 1987 Insp Rept 99901079/87-01 on 870126-30.Violation Noted:Two Nuclear Purchase Orders Accepted & Fulfilled W/O 10CFR21 Program in Effect.Nonconformance Noted:Master Ammeter Had No Sticker to Identify Calibr Status IR 05000327/19860701987-03-0303 March 1987 Insp Repts 50-327/86-70 & 50-328/86-70 on 861208-12.No Programmatic Deficiencies W/Regard to Facility Maint of Environmentally Qualified Equipment Identified.Major Areas Inspected:Maint Program & Previous Insp Items ML20207R0301987-03-0303 March 1987 EN-87-014:on 870306,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Issued to Licensee.Action Based on Failure to Establish & Maintain Operability of Nuclear Svc Water Sys ML20212F0181987-03-0202 March 1987 Notice of Violation from Insp on 870112-14 ML20212F0331987-02-27027 February 1987 Insp Rept 99901080/87-01 on 870112-14.Violation Noted: Failure to Adopt Procedure to Evaluate or Rept Defects Discovered in Motors Supplied to Customers Under Part 21 ML20212B1991987-02-26026 February 1987 EN-86-029A:on 870226,order Imposing Civil Monetary Penalty in Amount of $50,000 Issued to Licensee Based on Licensee 860703 Response to 860501 Notice of Violation & Proposed Imposition of Civil Penalty.Section I Violation Did Occur ML20212H0491987-02-26026 February 1987 EN-87-012:on 870303,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Will Be Issued Based on Violations in Areas of Facility Design,Maint & Mods ML20211P4311987-02-19019 February 1987 EN-87-010:on 870224,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Will Be Issued to Util Based on Multiple Violations Re Safeguards Info Protection Program ML20212E7581987-02-18018 February 1987 Insp Rept 99900507/86-01 on 861201-05.No Violations or Noncompliance Noted.Major Areas Inspected:Status of Previous Findings,Dedication of Commercial Grade Items Overview & 10CFR21 Evaluation & Reporting Review ML20211B8161987-02-13013 February 1987 Notice of Violation from Insp on 870112-14 ML20211B9021987-02-13013 February 1987 Insp Rept 99900816/87-01 on 870112-14.Violation Noted:Mfg Did Not Specify Application of Part 21 Requirements on Listed Purchase Orders.Nonconformances Noted:Quality Sys Program Not Invoked on Listed Orders & Order Data Differed ML20211B8481987-02-13013 February 1987 Notice of Nonconformance from Insp on 870112-14 ML20211B5511987-02-12012 February 1987 EN-85-084A:on 851213,notice of Violation & Proposed Imposition of Civil Penalties in Amount of $900,000 Will Be Issued to Licensee.Action Based on 850609 Failure of Auxiliary Feedwater Sys to Perform Intended Function ML20210U0531987-02-10010 February 1987 Insp Rept 99901067/86-01 on 861103-07.Nonconformance Noted: NDE Technician Certified W/O Attaining Passing Grade on Magnetic Particle Exam,Per Procedure QC-2.Data Sheets Encl ML20210E9201987-02-0606 February 1987 Notice of Nonconformance from Insp on 861020-24 ML20210E9371987-02-0606 February 1987 Insp Rept 99900015/86-01 on 861020-29.Noncomformance Noted: Mechanical & Chemical Testing Svc Performed by Outside Lab W/O Advising Lab of 10CFR21 Requirements & Incorrect Audits of Vendors IR 05000508/19860121987-02-0606 February 1987 Insp Rept 50-508/86-12 on 860915-1215.No Violations Noted. Major Areas Inspected:Readiness Review Program Module C3-01, Earthwork & Followup on Insp Repts 50-508/86-10 & 50-508/86-11 ML20210A9591987-02-0505 February 1987 Notice of Nonconformance from Insp on 861202-05 ML20210B0011987-02-0404 February 1987 Insp Rept 99900835/86-01 on 861203-05.Nonconformances Noted:Controls Necessary to Ensure Charging Motors Purchased from Subvendors Conform to Drawings Not Established ML20210P9041987-02-0303 February 1987 EN-87-005:on 870209,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued to Util Based on Ofc of Investigations Investigation Re Employment Termination of Technician ML20211B7271987-02-0303 February 1987 Insp Rept 99900003/86-01 on 861208-12.No Violations or Nonconformances Noted.Major Areas Inspected:Fuel Assembly Fabrication & Testing Activities,Followup on Previous Insp Findings & Fuel Problems Reported at LaSalle Unit 2 ML20210G0331987-02-0202 February 1987 Notice of Nonconformance from Insp on 861117-21 ML20210G0091987-02-0202 February 1987 Notice of Violation from Insp on 861117-21 1987-04-08
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
_ _ _ _
APPENDIX B Airco Filler Metals Docket No. 99900774/86-01 NOTICE OF NONCONFORMANCE Based on the results of an NRC inspection conducted on January 27-31, 1986 it appears that certain of your activities were not conducted in accordance with NRC requirements.
1.
Criterion V of Appendix B to 10 CFR Part 50 states:
" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accom-plished in accordance with these instructions, procedures, or drawings.
Instructions, procedures, or drawings shall include appropriate quanti-tative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished."
Nonconformances with these requirements are as follows:
A.
The Airco Quality Assurance Instructions (QAI) Manual Section 7.2.2 states:
" Radiographic personnel shall be certified by The Level III in accordance with Airco's written practice which meets the requirements of ASNT recommended practice No. SNT-TC-1A, 1980 Edition and The Code."
SNT-TC-1A 4.2 states, in part:
"While in the process of being qualified and certified to NDT Level I, an individual should be considered a trainee. A trainee should work with a certified individual and shall not independently conduct any test....."
Contrary to the above, a radiographic test trainee independently performed radiographic tests on Lot #026C003, Heat #72181, Test No. E391F on June 28, 1984, without being qualified and certified as a NDT Level I.
(85-01-02)
B.
SNT-TC-1A 8.1.1 states, in part:
"(1) The examination should assure natural or corrected near-distance acuity in at least one eye such that the applicant is capable of reading a minimum of Jaeger Number 2 or equivalent type and size letters at a distance of not less than 12 inches (30.5 cm) on a standard Jaeger test chart....(5) Examination results are to be kept on file for the period of certification."
Contrary to the above, there was no record or objective evidence of an eye examination on file for a Radiographic test technician qualified to Level III between the years 1977-83.
The 1986 eye examination at the time of the inspection was approximately one month past due.
(85-01-03) 8605150142 860513 C0
C.
The Airco Quality Assurance Instructions (QAI) Manual Section 2.2.1 states, in prt:
"To help assure quality the following actions for quciity assurance personnel shall be established and maintained...~o. A program for personnel indoctrination and training and development in all aspects of the QA program is conducted under the direction of the QA manager...c. Training programs shall be designed to:
... Provide on-the-job training in all facets of the iob's requirements... Identify any manual indoctrination sessions that may be required...d. QA Department personnel's qualification and training status shall be documented in a "Qualificatien of Personnel" record sheet...."
Contrary to the above, the qualification records did not describe in detail the qualifications of the quality department personnel.
In addition, the records do not show correlation between training and qualification of quality personnel and the required qualifi-cations for the position.
(85-01-04)
D.
The Airco Quality System Manual (QSM) Section 3.2.b states: "The QA manager shall be responsible for the periodic training of quality and non-quality related personnel in matters relating to product quality and this Quality System Program. This training shall be performed in the form of meetings and seminars."
Contrary to the above, wire mill personnel, press operators, packers and inspection spares performing quality related functions were not trained and indoctrinated in the Airco quality system program.
(85-01-05)
E.
The Airco QSM Section 3.1.3 states:
" Wire Mill personnel are responsible for constant surveillance of their operations.
Procedures are available at all work stations."
Contrary to the above, procedures for wire mill operations were not available at the work stations for wire mill personnel.
(85-01-06)
F.
The Airco QAI 13.2.1 Section 2.4 states, in part:
"The quality assurance records as described in Table I shall be retained for the periods listed. After this time, these records may be disposed of by the QA Manager." Table I specifies three years retention for documentation of personnel qualifications.
Contrary to the above, approximately 25'4 of the qualification records requested were not available for quality system employees (inspectors, radiographers and welders) involved in production of nuclear grade weld rods in 1983.
(85-01-07)
. G.
The Airco QAI Section 4.2.2 states, in part:
"QA Manager shall review and approve all purchase orders prior to release to a vendor....
Review and approval shall be indicated by signature and date on the purchase order."
Contrary to the above, in 1985 11 purchase orders for core wire were not approved by the QA Manager's signature.
In addition, the QA Manager did not sign purchase order
(#4-2019-02) from the blanket order requisition #489114, dated 1985, to The Tensile Test Co. for machining and heat treating services. (85-01-08)
H.
The Airco Quality Systen Manual (QSM) section states, in part, "The QA Department shall assure that necessary quality and documentation provisions are included in purchase orders for Raw Materials and shall verify compliance to such provisions for Raw Materials received from qualified vendors."
Contrary to the above, the requirements of Appendix B to 10 CFR Part 50 were not imposed on vendors that supplied calibration services and test specimen machining and heat treatment to Airco.
(85-01-09)
I.
The Airco QAI manual Section 4.2.1 states:
"2.4.4 Vendors of Calibration Services - All vendors of calibration services sfiall be capable of providing services meeting all requirements of MIL-STD-45662 and may be approved without a survey provided the QA Manager reviews and approves the vendor's procedures."
Contrary to the above, the QA Manager did not review and approve the calibration procedures for Brinkman Instruments and Brown &
Sharpe. Brinkman Instruments supplied calibration services to Airco in 1985 for calibration of the Mettle analytical balance model #H10TW.
Brown and Sharpe supplied calibration services to Airco in 1984 for calibration of the Jo Block set model #2119.
(85-01-10)
J.
The Airco QAI Section 8.2.1 states:
...All procedures shall require that standards used for calibration be certified as traceable to the NBS, or other nationally recognized standards if such standards do not exist...."
Contrary to the above, as of January 31, 1986 there was no objective evidence that the Sartorius analyical balance model #2462 was calibrated and certified traceable to NBS in 1985.
K.
Section 2.2 of QAI 8.2 states "The frequency of calibration is (SIC) established for each piece or type of equipment is defined in Table I.
Measuring and test equipment shall be calibrated at periodic intervals established on the basis of degree of usage, required accuracy, stability and past history."
Contrary to the above, the certificate of calibration and tracea-bility for Jo Blocks (gage block) set serial #2119 dated June 20, 1984 was incomplete, and therefore invalid since there was no authorized signature from the calibration vendor (Brown & Sharpe).
(85-01-11)
L.
The Airco QAI Section 7.2.2 states, in part:
" Control of special processes shall be the responsibility of the QA Manager or Welding Supervisor...special processes requiring control are:
- a. Welding for determining the acceptability of filler metals to specification requirements... records of qualification of welding procedures and personnel shall be filed and maintained current by the QA Manager."
Contrary to the above, welders performing welding to fabricate weld samples used for acceptance testing of nuclear orders #026C007 and #026C008 were not identified by signature on the weld test report.
(85-01-12)
M.
The Airco QAI Section 4.2.1 states:
"Upon satisfactory completion of 2.4.1, 2.4.2 and 2.4.3, QA manager shall approve the vendor and add the vendors name to the Approved Vendors List (AVL)."
Contrary to the above, Brinkman Instruments, supplier of analytical balance calibration for Airco in 1985 and 1986, were not on the Airco AVL. The analytical balance is used in measurements for the rod moisture test.
(85-01-12)
N.
The Airco QAI manual Section 12.2.1 states, in part:
" Vendors not responding or reacting effectively to corrective action reauests shall be subject to removal from the AVL by QA."
Contrary to the above, as of January 1986, there was no objective evidence available to verify that Georgetown Steel implemented corrective action for an audit finding identified in February 1984 by Airco.
[The finding involved Georgetown Steels failure to calibrate the Mike Master set, SN 632, used to calibrate their micrometers and provide traceability to NBS.] As of January 1986, Georgetown Steel was not removed from the Airco AVL.
Two nuclear purchase orders #497807 and #497810 for core wire were placed with Georgetown Steel in 1985.
(85-01-14) 0.
The Airco QAI manual Section 14.2.1 states, in part:
"The audit shall be performed by trained and qualified auditor (s) not having direct responsibility in the area being audited."
Contrary to the above, as of January 1986, there was no objective evidence that the internal audit performed in August 1985 of the quality department was done by a trained and qualified auditor.
P.
Section 2.1 of QAI 14.2.1 states, in part:
"The frequency of audits shall be based on the importance, quantity and complexity of the work being performed...; the results of previous audits; and the severity of reported nonconformances. However, audits shall be conducted of the entire system, as a minimum, on a semi-annual basis."
Contrary to the above, in 1985 the quality system was audited on an annual basis. Additionally, the frequency of audits performed in 1985 did not reflect the audit results found in 1984, since in 4
1984 a minimum of 26 audit findings were reported.
Q.
Criterion VI of Appendix B to 10 CFR Part 50 states, in part:
that " Measures shall be established to assure that purchased...
services, whether purchased directly or through contractors and subcontractors, conform to the procurement documents.
These measures shall include provisions, as appropriate, for source evaluation and selection, objective evidence of quality furnished by the contractor or subcontractor, inspection at the contractor or subcontractor source, and examination of products upon delivery...the effectiveness of the control of quality by contractors and subcontractors shall be assessed by the applicant or designee at intervals consistent with the importance, complexity...of...or services."
Contrary to the above, quality program audits have never been performed on Airco vendors for calibration services, test specimen machining, and heat treatment vendors.
(85-01-16)
_