EN-87-026:on 870331,order Suspending Power Operation & Order to Show Cause Issued to Util Due to Discovery That Control Room Staff Have Been Sleeping During Various Shifts.Related Documents Encl
ML20215E483
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/31/1987
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
Shared Package
ML20215E414 List:
References
FOIA-87-209 EN-87-026, EN-87-26, NUDOCS 8706190385
Download: ML20215E483 (5)


Text

March 31,1987 EN 87-26 k

0FFICE OF INSPECTION AND ENFORCEMENT NOTIFICATION OF SIGNIFICANT GFOTGRENT ACTION Licensee: Philadelphia Electric Company (Peach Bottom Atomic Power Station, Units 2 and 3)

Docket Nos. 50-277 and 50-278

Subject:

ORDER SUSPENDING POWER OPERATION AND ORDER TO SHOW CAUSE (EFFECTIVE IMMEDIATELY)

This is to inform the Commission that an Order Suspending Power Operation l and Order to Show Cause (Effective Immediately) is being issued today to Philadelphia Electric Company for its Peach Bottom facility (Units 2 and 3).

The Order is based on the fact that at times during various shifts one or more of the Peach Bottom operations control room staff (including licensed

. operators, senior licensed operators, and shift supervisors) have for at least the past five months periodically slept or have been otherwise inattentive to licensed duties. In addition, plant management either knew or condoned this inattentiveness, or should have known of these facts, and either took no action or inadequate action to correct this situation. Prior NRC inspections have identified other instances of inattention to duty or failure to adhere to procedures on the part of licensed operators in the control room dt Peach Bottom.

Under the terms of the Order, the licensee may show cause within 20 days of

( the issuance of this Order why this Order should not have been issued by l filing a written answer under oath or affirmation and may also request a hea ring .

A news release has been issued and the states of Pennsylvania and Maryland have been notified.

Contact:

A. Beach, IE 24909 Distribution:

H Street v T MNBBS'([ Phillips Tl/C EW Willste F Chairman ec E00 NRR IE NMSS Comm. Roberts DED/ROGR OIA Comm. Asselstine PA OI Comm. Bernthal OGC AE00 Comm. Carr RM C Air Rights $ I Regi ces MAIL CA SP RI C ti RIV T;(I ADM: Doc. Ngt. Br.

0GC RII _L g RV

~

Ot PDR RIII 5 il RES g 61 g 5 870611 pcq, g _ g ,; . g og .

LEWIS87-209 PDR f rs/x

Fa;t N:. 1 (l l'd ic t ST:r:r : W EVEC E FrE2','Ev.:V FE r0'c.:! IN:!:tt0: h:. 3 8Ai u'? EST EVEr IEE:EI'T:0\ GTR CA'.'!E IAi!

CALkE:,' C. !FFS 1 OL'0!!!7 PLANT SHUT:Chh DUE TC EC FRCBLE",E It!NTIFIED D3EING AUI!T.

1 ADft!NISTF.ATIVE BREAKDOWN 0:CN!! 1 04'?!/S7 REA:10; E!LIIN3 AV: LECH HEAT CCO.EES DES:,AIEC ZE T0 w

1 EDUIPMEKT FAIL'JtE N FOULINS -

3C:NIE 2 04/0!/67 F.EACT0; IJ!LDIM AN? DE AY PEAT C0hERS DES;A!!D I'E J TO  ! EGL'IPMENT FA! LURE FDL'.!kS ,

DCONEE ~ 0!/31/27 REA: TOR PUILDING AND DECAY HEAT C00LEc5 D!scA!!! Dt! TO 1 EQJ!PME4T FAILURE '

FOULIWS 4 PEACHBOTTOM2 03/3!/67 NRC OR.EER SUSPEN2!NS OcEFATIONS DUE TO OcE?aT08 1 FIRSON E ERROR lhATTENT!VENESSJODUTIES.

f PEACH 93TTCM ; 03/31/67 N;C OC. DER SUSPEN! INS OFERATIONS t]! TO O'E'AT08 iPERSONNELERROR .

! INATTENTIVENESS 70 DUTIES. 4%,r

  • l.

'i+3 I

.?[d{ h 4 J.%

l .

{ .I i  ; i t

. .yy l

k

'i AF l l;f l M i

', -. g.4 l

.
17 i

.'3h

.y

,Y t.t

,/;2

.. Tih.

,e g s '4

' , . . "/~q:QQ f

, 's ,

,h '* I

f

?b ., n;,:y; e e ',, $ 3 'g

'l." l , l l -

N ~ 'j.4y,.lh

, r. l:?

J! ,*

.. ., g

o kl

' k y,.h fS 7, l..j ppj u 4N F o I N~- T 1 -~w l o t .lw5 . ,

I$ ,

n wcq,

, f

q

' . l'IP,,R 06 ' 87 10 8 41 W S 'G"ilo, E 00 NRC KING OF PRUSSIR P02 /  !

HFK 06.

  • M/ .10310 : I"t31  !

APR.06 '87 10:12 FCCO . CORP FEWS CENTER 137H FL P.01 y

g. PHILADELPHIA: ELECTRIC COMPANY frpm the PUBLIC INFORMATIO5 l)lVISION (215) 841-5553 y 2301 M ARE ET STREET
  • PHIL ADELPHIA. P A 19101 FOR RELEASE '

IMMEDIATE' Monday; April-6, 1987 '

Conta c.t: Neil McDermott, (215)'841-4122 (215).841-555b i

PE ANNOUNCEB PEACH BOTTOM PLAN At a news conference at Philadelphia Electric company headquarters today J.1.. Everetti Chairman and' Chief Executive i

Of ficer, : announced the Company's plan to investigate the reasons for the Nuclear. Regulatory Commission (NRC) order suspending operations I at the Peach Bottom Atomic Power: Station.

A nultiple . team approach ;will:be used to assess the situation, i

. implement corrective actions where necessary. and develop a recovery plan.

1) There: Vill be an in-house organization consisting of corporate ottieers and consultants with participation by joint: owners.of the: plant.
2) A committee of outside directors from PE's Board was.

formed at' a special meeting of the Board held this l mo r ning .- This committee, with the assistance of outside expertise, will review the findings of the investigation.  !

3) A nucitar industry peer group will be utilized to evaluate l the investigation and to provide advice for corrective actionse t

-MORE-fd3 4 - k7"2 0 N Su revme sidefor basic PE data. Of4

NRC KING OF PRUSSIA P03

' APR 06 ' 87 10:42 VWZi )

. HPR 86 8( :10316 P.02 APR.06 '0710:1E PECO CORP tOf5 CENTER 13TM h.

b-

  • 2,- l

- j ADD ONE:

l Austin, Jr.',  ;

The in-house organization will consist of John ~M.

f President and Chief Operating Officer; John S. Xemperi senior Vies President. Engineering and Production; Joseph W. Gallagher, Vice President. Nuclear' Operations;, Management Analysic Company (MAC) and Corbin A. McNeill, Jr., representing the Peach Bottom: joint owners.

McNeill is Senior Vice President, Nucleafe~ Cor Public Service Electric and Gas Company..  !

the MAC:of San @iego, California, <was retained to assist )

j in-houseiinvestigation and advise management on the development of an action plan that will lead.to restart. The MAc organization MAC-has a team of seven people I 5 began its work on Thursday, April 2.

at the site.' The company has a staff of more than 350 professionals l

5 1 l

who have provided management and consulting services to the electric utility industry since-1975. More than ,100 utilities have used MAC their services including 85 percent of the nuclear utilities.

has. extensive experience in performing assessments, developing and successfully implementing action plans for nuclear plants.

The Board of Directors special committee is comprised of Robert F. Gilkeson, Joseph c. Ledd, Edi'the J. Levit, M.D. and Robert D.

Harrison, who will serve as chairman. Admiral Eugene P. Wilkinson has agreed to serve as a consultant to the committee. Wilkinson is past president. Institute of Nuclear Power operations and the initial commanding officer of both the world's first nuclear-powered submarine. the U.S.S. Nautilus. and our country's first nuclear-powered surface ship, the U.s.s. Long Beach. He'will advies the

-MORE-

W.K Ub

  • U (' 10s44 NKL, WINb Ut- l'KUdb1H t'U4 )

HPK 06 'Of IWil/ Vd4

  • P.03 APR.E '07 10:10 PCCO CO T PCWC COITCR 13TH fl. l 1

.. )

ADD TWO:

special committes during the review and reenvery phases. Tha' i

in-house committee wi11 ' report its findings and recommendations to l the special' committee of the board.t The Institute of Nuclear Power. operations (INPO) has agreed to provide an assistance team of professional nuclear industry l

' personnel tn devntop an : independent analysis of Peach pottom operations. INPO, an international nonprofit organization headquartered in Atlanta, was established by the U.S. nuclear l l

utility industry following the accident at Thron Mile Icland. I t s' )

basic mission is to assist its members achieve the highest standards )

of excellence in the operation of nuclear power plants.  !

l Mr. Everett reported that, "the Company?is fully aware of the extreme seriousness of this matter and is totally committed to take all action necessary to restore the operation of Peach Bottom to the highest possible standards, ! WAnt.to assure our customers, shareholders and the public, no requent will be made to the NRC to permit the restart'of the plant until the highest safety standards of the industry are guaranteed."

%N#

V >

p reco o.,, UNITED STATES QG.Q

's ,[

g NUCLEAR REGULATORY COMMISSION 5 :j REGION I os g 631 PARK AVENUE KINO OF PRUSSIA, PENNSYLVANIA 19406

%, . . . . . ,d s)

Docket Nos. 50-277 13 APR w' 50-278 Philadelphia Electric Company ATTN: Mr. J. S. Kemper Senior Vice President Engineering and Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Order Suspending Power Operation Peach Bottom Atomic Power Station Units 2 and 3 This is to acknowledge receipt of your letter dated April 6,1987 in resporise to Section V.B. of our March 31, 1987 Order. We will evaluate the response, review its implementation as part of our inspection program and contact you if we have any questions.  ;

Thank you for your cooperation in this matter.

Sincerely, WM .

es M. Allan Deputy Regional Administrator j i

cc:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station l J. W. Gallagher, Vice President, Nuclear Operations Troy B. Conner, Jr. , Esquire l W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric G. Leitch, Nuclear Generation Manager l Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report) l Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section Public Document Room (PDR) ,

Local Public Document Room (LPDR) )

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania

) foI /) - 87 dd 9/M.f7$27t 6/I 2-g.

4 Philadelphia Electric 2 10oADD a ni nlCC~-

w:

Company bec w/ encl:

Region 1 Occket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP Robert J. Bores, DRSS 1 Paul Lohaus, SLO

)

i e

l

)

~

,..' " , vNiet u si A s t >

I

  1. ), NUCLE AR RE GULATOR Y COMMtsSIOTi l # .

k r.[oloN f

{

~

j ssi rAax ovtNut

,, KING or e m V$51 A. PENNiv bV ANI A 19406 j J 1

  • ...* JUL 171985 )

i i

Docket No. 55-8685 l License No. OP-6048-1 l EA 85-75

{

l

)

I  !

L.-. . . _ .1

~,

" {

gearl l L- .

2 h^g , /o l

SUBJECT:

ENFORCEMENT CONFERENCE On June 21, 1985, an enforcement conference was conducted with you, your employer (Philadelphia Electric Company) and members of the NRC Region I and Office of Inspection and Enforcement Headquarters staff to discuss the events which occurred on June 10, 1985 at the Peach Bottom Atomic Power Station. On that day, an NRC inspector observed you in the Unit 3 control room with your eyes apparently closed, thereby giving the appearance of being inattentive to your duties as a licensed reactor operator.

During the enforcement conference you maintained that, notwithstanding your appearance, you were not asleep and not inattentive to your duties, but were only relaxing your eyes. However, you indicated that you were aware that an NRC inspector was in the control room, and that your appearance had given the NRC inspector the impression that you were asleep, yet you did not change your demeanor. Further, you acknowledged that you exercised poor judgment by maintaining that demeanor until confronted by your shift supervisor, after he was advised of your condition by the NRC inspector. These actions and your failure to explain yourself to the inspector or supervisor at the time of this incident demonstrated an apparent lack of appreciation for the role of the NRC in overseeing licensed activities.

At the enforcement conference, you apologized for your actions of June 10, 1985

[i relative to your attitude towards the NRC inspector. We acknowledge and i commend your openness and candor at the enforcement conference in describing the Circumstances surrounding your admitted exercise of poor judgment on June 10, 1985. We expect that you will maintain such openness and candor i

in your future dealings with the NRC and, in particular, with NRC inspectors. i f

Fm- 2V' 1 l 77chq29,2gg c// I

,p

4 N

/ S

.J The NRC Electric does not Company intend tothese regarding take events.

enforcement action against you or Philadelphi6 is required. Further, no response to this letter However, if your have any questions, feel free to contact us.

Sincerely, Thomas E. Murley Regional Administrator cc w/ encl:

R. S. Fleischmann, Station Superintendent Distribution Docket 55-8685 (with concurrences)

Section Chief DRP JMTaylor, IE RVo11mer, IE JAAxelrad, IE /

TPoindexter, IE JLieberman, ELD TMurley, RI Er.'orcement Coordinators RI, RII, RIII, RIV, RV IE:ES File IE:EA File

,