Monthly Operating Repts for Jul 1982
ML20071L979
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 08/16/1982
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20071L973 List:
References
NUDOCS 8209240205
Download: ML20071L979 (12)


Text

.

AVEitAGE DAILY UNIT PObER LEVEL DOCKET NO.

50-250 t

UNIT _IUrkevPoint Unit 3 DALE AUG 161982

.. ace COMPl.ETED 11Y TELENIONE -(305) 552-3654' s

MONm July 1982 .

I

/ DAY AVERAGEI I O ER LEVEL day AVER AGE DAILY POWER LEVEL

-(M1 Net) 672 6 .

, i _s 2 677 g3 677 3 4 676 675 ..

~

4 675 20 676 5 678 .,,

167 c, 678 ,,

7 68,1 23

~~-

3 676 y 9 .680 ---

30 m 676 '

3 679 ,

, ,, 674 o ---

i.

~ .$ 2S 13 677 ---

3 g 677 ---

15 . . 642 3, ' . ---

p, !608 i 3

% 1 INSTRUCTIONS i On this formit. be t,% e euge daily unit power lesel in MWe Net ;or v2:h day m the repo. ring ruanth. Compute to I 'he norest wh.de repwort. s  %

l ,

t >

- a

\

, (9/771 i s ,I

  • s A;

'f '

B209240205 820816 .

. PDR ADOCK 00000250- ,

'a 2

R PDR w 6 ' .] _

  • t -

F 1

, ' OPERAllNG DATA REPORT f

DOCKET NO. 50 _250 DAYE .6 36, ,

i C051Pl.ETED DY '

  • TEL.EPilONE (303)- d34-3654 OPTRATING STATUS Turkey Point 3- 3o,,,

3

  • U"I' , "'
2. Reporting Perm. d: July 1982 (Jnit 3 operated at UU essentially full power
3. Licensed Thennal Power (5the) except f0.r an Outage Which
4. Na.neplate Rating (Gross MWe) 760 693 started on July 21, 1982
5. Design Electrical Rating (Net MWe): and continued through the
6. Maximum Dependable Capacity (Gross MWe): -- 64b report period.
7. Masirnum Dependab!c Capacity (Net MWe):
8. If Chan;;es Occur in Capacity Ratings (Items Number 3 Through 7)Since t.ast Report. Give Reasons:

flA fl0flE

9. Power Lesel To Which Restricted,If Any (Net age):
10. Reawns For itestrictions,if Any:

J This Month Yr..to-Da te Cumularise

11. Hours in Reporting Period 744 5087 84632.~6
12. Number Of flours Reactor F*s Critical 486.3 2a8/.6 58147,7
13. Reactor Resene Shutdown flours -U- 844.4 -
14. Ilours Generator On Line 486.3 ~

2296.9 56186.9

15. Unit Resene Shutdown llours '

-U- 121.8

16. Gross Thermal Energy Cenerated (MWil) 1 067 596 4 987 62/ 114 165 382
17. Gross Electrical Energy Generated (Mb!!! 342905 _ , 1610400 36304Utd
18. Net Electrical Energ) Generated (MWil) 325007 1521205 J449eu/1
19. Unit Senice Factor 65.4% 45.1% 66.4%
20. Unit Availability Factor 65.4% 45.1% bb.bs
21. Unit Capacity Factor ilhing MDC Net! 67.6% 4b . a l. 62.6%
22. Unit Capacity Fastor IUsing DLit Ne') 63.0% 43.2% 58.6%
23. Unit Forced Outage Rate 34.6% 14.7% 5.5%
24. Shutdowns Scheduled Ostr Nest 6 Months ll>pe. Date.and Duratiem of Each t.
25. If Shut Down At I ed Of Report Period. I.stimated Date of Startup:
26. Units In Test Status tPrior in Commercial Operationi: I ureca t Achiesed INill \l CRiflCAl.IIY INI fI \I. I LI CIItICI f Y

( O\l\ll ItCl A! OPI It A iION rolm

~

. - -- . .-- _~

DOCKET NO.

50-250 ,

UNITS!!UTDOWNS AND POWER REDUCTIONS Turkey Point 3 UNIT NAME DATE AUG 1A me, July 1982 COMP'.ETED BY P. Pa ce --'

REPORT MONTH TELEPIIONE (305) 552-3654 n.

-, jg i hYk Licensee h, h% Cause & Corrective No- D.iie y, 3@ $ is5:: Event it b ET 53 -Action to ,

H 2 5 $ 3.c f3g Report : mL oEV Prevent Recurrence  !

6 12 820721 F 257.7 A 3 CB MOTORX Reactor tripped due to loss of reactor coolant pump which tripped due to instantaneous overcurrent.

The reactor coolant' pump motor was  :

replaced.

t I 2 3 4 F: Forced Reason: Method: Exhibit G . Instructions S: Schedufed A Equiprnent Failure (Explain) 1 Manual for Preparation ot Data B Maintenance or Test 2 Manual Scram. -

Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) Fde (NUREG-D Regulatory Restrietion C}-Other (Explain) 01611 E-Operator Training & License Examination F Adnumstrative p , 3, 5

, G-Operational Error (Explain) s Aoao 44c w.,. .cl Exhibit 1. Same Souree (9/77) ll Other (Explain) ,

i

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point 3 DATE AUG 16 7382 COMPLETED BY P.L. Pace TELEPHONE (305) 552-3654 REPORT MONTH July 1982 Unit 3 operated at essentially full power until the unit tripped on July 21, 1982.

The trip was caused by the loss of the "A" Reactor Coolant Pump (RCP) which tripped due to instantaneous overcurrent. The RCP motor was replaced and the unit was returned to operation in August.

Major Safety-related maintenance activites performed during the month included:

e A pressurizer Safety Valve was overhauled A containment sump pump was replaced Inspections and requirements of IE Bulletins and NUREG-0737 and continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

1 I

i i

l i

I

i 4t taat.L vasts um a rowtg i,iytt 50-251 DOCKLTNO.

UNIT - Turkey Point Unit 6 DA7c AUG 161982

' COMPLL1ED llY TELEPilONE (305) 552-3654 July 1982 MONTil ,

I DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) -(MWe-Net)

I 653 ---

l _e 2 660 Ig 3

658 ___

f 19 f 4 657 ---

20 ...

5 656 .__

21 6 659 ___

7 324 ---

23 8 -~~ c 24

-~~

9 25 E0 23 26

~~~

621 II p

~~-

664 12 _

28 13 668 29 663 14 15 3,

657 16 INSTRUCTIONS On this fonnit. Int the aserage daily i:ni power leselin MWe Net fut cs:h day in the reporting m.inth. Compute to the nearest wh. lc twpwatt.

' (9/771 0

__r-, - - - , - .--,4_. , , - - . - - - - - ~ - - - - - -

OPERAllNG DATA REPORT DOCKET NO. 50-251 DATE AUG 1613t!2 COAIPLETED fly _P.L.. Face TELEPilONE (305) 552-3654 OPERATING STATUS Turkey Point Unit 4

1. Unit Name: N"'Enit 4 operated at
2. Reporting Period: July 1962-- essentially full power
3. Licensed Thermal Power (SIWt): except for an Outage for
4. Nameplate Rating (Gross SIWE): 760 steam generator inspection 3
5. Design Electrical Rating (Net SIWE): ___ and maintenance.
6. Stasimum Dependable Capacity (Gross SlWe):
7. .'.lasimum Dependable Capacity (Net SIWE):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:

NA NONE

9. Power Leiel To Which Restricted. If Any (Net SIWE): -
10. Reasons For Restrictions. lf Any: NA This Slonth Yr..to.Date Cumulatise
11. Ilours in Reporting Period 744 5087 78360
12. Number Of flours Reactor Was Critical 286.4 42JJ./ 56212.6
13. Reactor Reserve Shutdown flours -U- 106.o
14. Ilours Generator On Line 280.4 4179.1 bb263.b
15. Unit Resene Shutdown llours '

-U-

-U- 31.2

16. Gross Thermal Energy Generated (SlWil) 611146 9144U/b ild40U096
17. Gross Electrical Energy Generated (31WH) 191630 -"

2932045 3/bb4112

18. Net Electrical Energy Generated (SlWil) 179236 Z/631/6 Jbo/isso
19. Unit Service factor 3/./% dt.o li.6A
20. Unit Availability Factor 37.7% 82.2% 71.8%
21. Unit Capacity FactorlUsing 31DC Net) 37.3% 84.7% 70.5%
22. Unit Capacity Factor (Using DER Net) 34.8% 78.9% 65.7%
23. Unit Forced Outage Rate 60.9% 14.2% 3.9%
24. Shutdowns Scheduled Oscr Ne.st 6 Sim.ths(Type.Date and Duration of Each t: ,

Steam Generator Repair Project, mid October 1982' 9 months.

25. If Shot Down At 1.nd Of Report Period. Estunateil Date of Startup:
26. Units in Test Stains IPrior to Conunercial Operationi: Forecast Achiesed INIIIA L CHIIICA LII Y INill AI. Ell C TRICIIY

( Oll\11.RCIA L OPER ATiON 19/77)

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 00~?0I UNIT NA3f E t urkey M n t 4 DATE _ AUG 161982 REPORT AfONTH July 1982 COMPLETED BY P. Pace TELEPilONE (305) 55c M 4 I

I, e.

, jg 3 5'i Licensee $%

%- Da:e r- 3= E

,E -r,, Cause & Correctise 4 Event C b 3? E?

  1. 2 s 5 ;E 3{5 NC Action to

-@ Report :

< g o! C Prevent Recurrence 6

13 820707 F 463.6 F 1 251-82-10 CC HIEXCH '

Unit removed from service to investigate primary to secondary leakage. Foreign objects on secondary side found to be the cause. Most of the forejgn objects were removed and preventive plugging was completed. The unit was returned to operation.

2 F: forced 3 4 Renon:

S. S6heduled Method:

A Equipment Failure (Explain) l Manual Exhibit C . Instructions B-Mainterance of Test for Preparation ot' Data C Refueling 2-mn ual Scrarn. -

Entry Sheets for Licensee D Regulatory Restriction 3 Automatic Scram. Event Repori tLER) File (NUREG.

Cl-Other (Explam' ) 01611 E-Operator Training & License Examination F Administrative g-

. G Operational Error (Explain) 5 19/77) 4, _ Aoao r 4m w.,..cs Eshibit I- Same Source Il Other (Esplain)

L -

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point 4 DATE AUG 18 S82 COMPLETED BY P.L. Pace TELEPIIONE (305) 552-3654 REPORT MONTII July 1982 Unit 4 operated at essentially full power except for an outage from July 7 to July 26. The unit was shutdown to investigate minor primary to secondary leakage in the "3" steam generator. The leak was associated with foreign objects at or near the tube sheet evaluation. A full report was provided to the NRC in FPL's letter L-82-336 dated August 9, 1982 and in Licensee Event Report 251-82-10 dated August 12, 1982.

' Other Major SaYety-related maintenance activites performed during the month included:

A power operated relief valve motor was overhauled A Boron Injection tank inlet motor operated valve (MOV) was overhauled.

The "4B" liigh Pressure Safety Injection Pump was overhauled The "4B" Boric Acid pump was overhauled The Steam Generator manway gaskets were replaced.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional, information.

AVER AGE DAILY UNIT POWER LEVEL

~

50-335 DOCKET NO.

UNIT St. Lucie Unit 1 DATE -AUG 161982 COMPLETED BY '

TELEPil0NE -(305) 552-3654 s

MONm July 1982 .

DAY AVERAGE DAILY POWER LEVEL DAY

  • AVER AGE DAILY POWER LEVEL IMWe Net) -(MWe-Nei) 841 833 37 .

2 841 ,3 834 3 837 835 .t 39 4 838 ,,

837 ,,,

5 _ 841 .,

2 838 800 836 6

7 839 836

.
33 8 839 837 24 9 839 838 23 sc 841

,3 833 11 842 834 37

,~, 841 832 28 13 838 834

, 29 14 838 835 3g is 835 837 16 832 I

INSTRUCTIONS n P" I In . If ca h day un the reporting anonth. Coinpute to ie neare h[>l ravati (i)/771 l

l . - - . . - , _ _ _ _. . .-

d OPERATING DATA REPORT DOCKET NO.

50-335 DATE AUG 161982 P,L. Face CONIPLETED BY .

TELEPlIONE ( 30)_Lp52-3654 OPER ATING STATUS I U"I' h.***. St. Lucie Unit 1. Notes July 196z linit 1 operated at

2. Reporting Pen.o d:

/UU essentially full power

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net blWe): 830
6. Stasimum Dependable Capacity (Gross MWe):

662

7. Masim sm Dependable Capacity (Net MWe): 817
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA NONE

9. Power Lesel to which Restricted,1f Any (Net 31We):
10. Reasons for Restrictions,if Any: NA This Month Yr..to Date Cumulatise II. Ilours in Reporting Period 744 5087 _

49175 _

12. Number Of Hours Reactor Was Critical 79 "D""**

"$* ** 2"

13. Reactor Reserve Shutdown llours "U" ~"~
14. Hours Generator On-Line 744 4617 38629.9
15. Unit Resene Shutdown llours '

-U- 49.3

16. Gross Thermal Energy Generated (MWil) 199U692 123ul665 95625584
17. Gross Electrical Energy Generated (MWil) 654760 .

403931U 41us7425

18. Net Electrical Energy Generated (MWil) 621878 3829713 -293U92bu
19. Unit Service Factor 100 9U.c /u.o
20. Unit Asailability Factor 100 90.8 /6.b
21. Unit Capacity Factor (Using MDC Net) 102.3 94.1 76.5
22. Unit Capacity Factor (Using DER Neti 100.7 9FO- /4.z-
23. Unit Forced Outage Rate .1 4.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duraticm of Each :
25. If Shut Down At I:nd Of Report Period. Estimated Date of Startup:
26. Units in lest Status (Prior to Conunercial Operation): Forecast Achiesed INi flA L CRillCA LIIY INI fl \ L ELI C I RICI f Y _

( OM\1l.itCIA L OPEll A IlON N/776 i

DOCKET NO. 50-335 ,

UNIT SilUTDOWNS AND POWER REDUCTIONS St. Lucie Unit 1

. UNIT NA.\f E ~

DATE AUG 16 inR2 COMPLETED BY P. L. Pace REPORT MONTH July 1982 (305) 552-'I534 TELEPilONE I

-  ? 5

, .{ E 'h 4Y5 Licensee 3 r,, h Cause & Corrective No. Date i 3g i .5 i $ Event Ob ET 5-3 Action to H

f: $ Report : mV uEV Prevent Recurrence 3

< 5 :t 6

No plant shutdowns or significant reductions in power level.

n I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S; Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. -

Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161)

E-Operator Training & License Examination F Admmistrative p ,

5 C-Operational Error (Explain) ,v /.oao 44cw ,..el Eshibit I Same Souree

(*1/77 ) Il Other (Esplain) i

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie Unit No.1 DATE AUG 161982 COMPLETED BY P.L. Pace TELEPHONE (305) 552-3654 REPORT MONTII July 1982 Unit 1 operated ar essentially full power except for the entire month.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bullentins and NUREG 0737 in progress.

Florida Power & Light Company commitments for NUREG-0737 implementation -

are cont'inuing. Refer to correspondence between FPL and NRC for additional information.

i 1

i l

l L