MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
.
AVEitAGE DAILY UNIT PObER LEVEL DOCKET NO.
50-250 t
UNIT _IUrkevPoint Unit 3 DALE AUG 161982
.. ace COMPl.ETED 11Y TELENIONE -(305) 552-3654' s
MONm July 1982 .
I
/ DAY AVERAGEI I O ER LEVEL day AVER AGE DAILY POWER LEVEL
-(M1 Net) 672 6 .
- , i _s 2 677 g3 677 3 4 676 675 ..
~
4 675 20 676 5 678 .,,
167 c, 678 ,,
7 68,1 23
~~-
3 676 y 9 .680 ---
30 m 676 '
3 679 ,
, ,, 674 o ---
i.
~ .$ 2S 13 677 ---
3 g 677 ---
15 . . 642 3, ' . ---
p, !608 i 3
% 1 INSTRUCTIONS i On this formit. be t,% e euge daily unit power lesel in MWe Net ;or v2:h day m the repo. ring ruanth. Compute to I 'he norest wh.de repwort. s %
l ,
t >
- a
\
, (9/771 i s ,I
'f '
B209240205 820816 .
. PDR ADOCK 00000250- ,
'a 2
R PDR w 6 ' .] _
F 1
, ' OPERAllNG DATA REPORT f
DOCKET NO. 50 _250 DAYE .6 36, ,
i C051Pl.ETED DY '
- TEL.EPilONE (303)- d34-3654 OPTRATING STATUS Turkey Point 3- 3o,,,
3
- 2. Reporting Perm. d: July 1982 (Jnit 3 operated at UU essentially full power
- 3. Licensed Thennal Power (5the) except f0.r an Outage Which
- 4. Na.neplate Rating (Gross MWe) 760 693 started on July 21, 1982
- 5. Design Electrical Rating (Net MWe): and continued through the
- 6. Maximum Dependable Capacity (Gross MWe): -- 64b report period.
- 7. Masirnum Dependab!c Capacity (Net MWe):
- 8. If Chan;;es Occur in Capacity Ratings (Items Number 3 Through 7)Since t.ast Report. Give Reasons:
flA fl0flE
- 9. Power Lesel To Which Restricted,If Any (Net age):
- 10. Reawns For itestrictions,if Any:
J This Month Yr..to-Da te Cumularise
- 11. Hours in Reporting Period 744 5087 84632.~6
- 12. Number Of flours Reactor F*s Critical 486.3 2a8/.6 58147,7
- 13. Reactor Resene Shutdown flours -U- 844.4 -
- 14. Ilours Generator On Line 486.3 ~
2296.9 56186.9
- 15. Unit Resene Shutdown llours '
-U- 121.8
- 16. Gross Thermal Energy Cenerated (MWil) 1 067 596 4 987 62/ 114 165 382
- 17. Gross Electrical Energy Generated (Mb!!! 342905 _ , 1610400 36304Utd
- 18. Net Electrical Energ) Generated (MWil) 325007 1521205 J449eu/1
- 19. Unit Senice Factor 65.4% 45.1% 66.4%
- 20. Unit Availability Factor 65.4% 45.1% bb.bs
- 21. Unit Capacity Factor ilhing MDC Net! 67.6% 4b . a l. 62.6%
- 22. Unit Capacity Fastor IUsing DLit Ne') 63.0% 43.2% 58.6%
- 23. Unit Forced Outage Rate 34.6% 14.7% 5.5%
- 24. Shutdowns Scheduled Ostr Nest 6 Months ll>pe. Date.and Duratiem of Each t.
- 25. If Shut Down At I ed Of Report Period. I.stimated Date of Startup:
- 26. Units In Test Status tPrior in Commercial Operationi: I ureca t Achiesed INill \l CRiflCAl.IIY INI fI \I. I LI CIItICI f Y
( O\l\ll ItCl A! OPI It A iION rolm
~
. - -- . .-- _~
DOCKET NO.
50-250 ,
UNITS!!UTDOWNS AND POWER REDUCTIONS Turkey Point 3 UNIT NAME DATE AUG 1A me, July 1982 COMP'.ETED BY P. Pa ce --'
REPORT MONTH TELEPIIONE (305) 552-3654 n.
-, jg i hYk Licensee h, h% Cause & Corrective No- D.iie y, 3@ $ is5:: Event it b ET 53 -Action to ,
H 2 5 $ 3.c f3g Report : mL oEV Prevent Recurrence !
6 12 820721 F 257.7 A 3 CB MOTORX Reactor tripped due to loss of reactor coolant pump which tripped due to instantaneous overcurrent.
The reactor coolant' pump motor was :
replaced.
t I 2 3 4 F: Forced Reason: Method: Exhibit G . Instructions S: Schedufed A Equiprnent Failure (Explain) 1 Manual for Preparation ot Data B Maintenance or Test 2 Manual Scram. -
Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) Fde (NUREG-D Regulatory Restrietion C}-Other (Explain) 01611 E-Operator Training & License Examination F Adnumstrative p , 3, 5
, G-Operational Error (Explain) s Aoao 44c w.,. .cl Exhibit 1. Same Souree (9/77) ll Other (Explain) ,
i
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point 3 DATE AUG 16 7382 COMPLETED BY P.L. Pace TELEPHONE (305) 552-3654 REPORT MONTH July 1982 Unit 3 operated at essentially full power until the unit tripped on July 21, 1982.
The trip was caused by the loss of the "A" Reactor Coolant Pump (RCP) which tripped due to instantaneous overcurrent. The RCP motor was replaced and the unit was returned to operation in August.
Major Safety-related maintenance activites performed during the month included:
e A pressurizer Safety Valve was overhauled A containment sump pump was replaced Inspections and requirements of IE Bulletins and NUREG-0737 and continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
1 I
i i
l i
I
i 4t taat.L vasts um a rowtg i,iytt 50-251 DOCKLTNO.
UNIT - Turkey Point Unit 6 DA7c AUG 161982
' COMPLL1ED llY TELEPilONE (305) 552-3654 July 1982 MONTil ,
I DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) -(MWe-Net)
I 653 ---
l _e 2 660 Ig 3
658 ___
f 19 f 4 657 ---
20 ...
5 656 .__
21 6 659 ___
7 324 ---
- 23 8 -~~ c 24
-~~
9 25 E0 23 26
~~~
621 II p
~~-
664 12 _
28 13 668 29 663 14 15 3,
657 16 INSTRUCTIONS On this fonnit. Int the aserage daily i:ni power leselin MWe Net fut cs:h day in the reporting m.inth. Compute to the nearest wh. lc twpwatt.
' (9/771 0
__r-, - - - , - .--,4_. , , - - . - - - - - ~ - - - - - -
OPERAllNG DATA REPORT DOCKET NO. 50-251 DATE AUG 1613t!2 COAIPLETED fly _P.L.. Face TELEPilONE (305) 552-3654 OPERATING STATUS Turkey Point Unit 4
- 1. Unit Name: N"'Enit 4 operated at
- 2. Reporting Period: July 1962-- essentially full power
- 3. Licensed Thermal Power (SIWt): except for an Outage for
- 4. Nameplate Rating (Gross SIWE): 760 steam generator inspection 3
- 5. Design Electrical Rating (Net SIWE): ___ and maintenance.
- 6. Stasimum Dependable Capacity (Gross SlWe):
- 7. .'.lasimum Dependable Capacity (Net SIWE):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:
NA NONE
- 9. Power Leiel To Which Restricted. If Any (Net SIWE): -
- 10. Reasons For Restrictions. lf Any: NA This Slonth Yr..to.Date Cumulatise
- 11. Ilours in Reporting Period 744 5087 78360
- 12. Number Of flours Reactor Was Critical 286.4 42JJ./ 56212.6
- 13. Reactor Reserve Shutdown flours -U- 106.o
- 14. Ilours Generator On Line 280.4 4179.1 bb263.b
- 15. Unit Resene Shutdown llours '
-U-
-U- 31.2
- 16. Gross Thermal Energy Generated (SlWil) 611146 9144U/b ild40U096
- 17. Gross Electrical Energy Generated (31WH) 191630 -"
2932045 3/bb4112
- 18. Net Electrical Energy Generated (SlWil) 179236 Z/631/6 Jbo/isso
- 19. Unit Service factor 3/./% dt.o li.6A
- 20. Unit Availability Factor 37.7% 82.2% 71.8%
- 21. Unit Capacity FactorlUsing 31DC Net) 37.3% 84.7% 70.5%
- 22. Unit Capacity Factor (Using DER Net) 34.8% 78.9% 65.7%
- 23. Unit Forced Outage Rate 60.9% 14.2% 3.9%
- 24. Shutdowns Scheduled Oscr Ne.st 6 Sim.ths(Type.Date and Duration of Each t: ,
Steam Generator Repair Project, mid October 1982' 9 months.
- 25. If Shot Down At 1.nd Of Report Period. Estunateil Date of Startup:
- 26. Units in Test Stains IPrior to Conunercial Operationi: Forecast Achiesed INIIIA L CHIIICA LII Y INill AI. Ell C TRICIIY
( Oll\11.RCIA L OPER ATiON 19/77)
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 00~?0I UNIT NA3f E t urkey M n t 4 DATE _ AUG 161982 REPORT AfONTH July 1982 COMPLETED BY P. Pace TELEPilONE (305) 55c M 4 I
I, e.
- , jg 3 5'i Licensee $%
%- Da:e r- 3= E
,E -r,, Cause & Correctise 4 Event C b 3? E?
- 2 s 5 ;E 3{5 NC Action to
-@ Report :
< g o! C Prevent Recurrence 6
13 820707 F 463.6 F 1 251-82-10 CC HIEXCH '
Unit removed from service to investigate primary to secondary leakage. Foreign objects on secondary side found to be the cause. Most of the forejgn objects were removed and preventive plugging was completed. The unit was returned to operation.
2 F: forced 3 4 Renon:
S. S6heduled Method:
A Equipment Failure (Explain) l Manual Exhibit C . Instructions B-Mainterance of Test for Preparation ot' Data C Refueling 2-mn ual Scrarn. -
Entry Sheets for Licensee D Regulatory Restriction 3 Automatic Scram. Event Repori tLER) File (NUREG.
Cl-Other (Explam' ) 01611 E-Operator Training & License Examination F Administrative g-
. G Operational Error (Explain) 5 19/77) 4, _ Aoao r 4m w.,..cs Eshibit I- Same Source Il Other (Esplain)
L -
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point 4 DATE AUG 18 S82 COMPLETED BY P.L. Pace TELEPIIONE (305) 552-3654 REPORT MONTII July 1982 Unit 4 operated at essentially full power except for an outage from July 7 to July 26. The unit was shutdown to investigate minor primary to secondary leakage in the "3" steam generator. The leak was associated with foreign objects at or near the tube sheet evaluation. A full report was provided to the NRC in FPL's letter L-82-336 dated August 9, 1982 and in Licensee Event Report 251-82-10 dated August 12, 1982.
' Other Major SaYety-related maintenance activites performed during the month included:
A power operated relief valve motor was overhauled A Boron Injection tank inlet motor operated valve (MOV) was overhauled.
The "4B" liigh Pressure Safety Injection Pump was overhauled The "4B" Boric Acid pump was overhauled The Steam Generator manway gaskets were replaced.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional, information.
AVER AGE DAILY UNIT POWER LEVEL
~
50-335 DOCKET NO.
UNIT St. Lucie Unit 1 DATE -AUG 161982 COMPLETED BY '
TELEPil0NE -(305) 552-3654 s
MONm July 1982 .
DAY AVERAGE DAILY POWER LEVEL DAY
- AVER AGE DAILY POWER LEVEL IMWe Net) -(MWe-Nei) 841 833 37 .
2 841 ,3 834 3 837 835 .t 39 4 838 ,,
837 ,,,
5 _ 841 .,
2 838 800 836 6
7 839 836
- .
- 33 8 839 837 24 9 839 838 23 sc 841
,3 833 11 842 834 37
,~, 841 832 28 13 838 834
, 29 14 838 835 3g is 835 837 16 832 I
INSTRUCTIONS n P" I In . If ca h day un the reporting anonth. Coinpute to ie neare h[>l ravati (i)/771 l
l . - - . . - , _ _ _ _. . .-
d OPERATING DATA REPORT DOCKET NO.
50-335 DATE AUG 161982 P,L. Face CONIPLETED BY .
TELEPlIONE ( 30)_Lp52-3654 OPER ATING STATUS I U"I' h.***. St. Lucie Unit 1. Notes July 196z linit 1 operated at
- 2. Reporting Pen.o d:
/UU essentially full power
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 890
- 5. Design Electrical Rating (Net blWe): 830
- 6. Stasimum Dependable Capacity (Gross MWe):
662
- 7. Masim sm Dependable Capacity (Net MWe): 817
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA NONE
- 9. Power Lesel to which Restricted,1f Any (Net 31We):
- 10. Reasons for Restrictions,if Any: NA This Month Yr..to Date Cumulatise II. Ilours in Reporting Period 744 5087 _
49175 _
- 12. Number Of Hours Reactor Was Critical 79 "D""**
"$* ** 2"
- 13. Reactor Reserve Shutdown llours "U" ~"~
- 14. Hours Generator On-Line 744 4617 38629.9
- 15. Unit Resene Shutdown llours '
-U- 49.3
- 16. Gross Thermal Energy Generated (MWil) 199U692 123ul665 95625584
- 17. Gross Electrical Energy Generated (MWil) 654760 .
403931U 41us7425
- 18. Net Electrical Energy Generated (MWil) 621878 3829713 -293U92bu
- 19. Unit Service Factor 100 9U.c /u.o
- 20. Unit Asailability Factor 100 90.8 /6.b
- 21. Unit Capacity Factor (Using MDC Net) 102.3 94.1 76.5
- 22. Unit Capacity Factor (Using DER Neti 100.7 9FO- /4.z-
- 23. Unit Forced Outage Rate .1 4.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duraticm of Each :
- 25. If Shut Down At I:nd Of Report Period. Estimated Date of Startup:
- 26. Units in lest Status (Prior to Conunercial Operation): Forecast Achiesed INi flA L CRillCA LIIY INI fl \ L ELI C I RICI f Y _
( OM\1l.itCIA L OPEll A IlON N/776 i
DOCKET NO. 50-335 ,
UNIT SilUTDOWNS AND POWER REDUCTIONS St. Lucie Unit 1
. UNIT NA.\f E ~
DATE AUG 16 inR2 COMPLETED BY P. L. Pace REPORT MONTH July 1982 (305) 552-'I534 TELEPilONE I
- ? 5
, .{ E 'h 4Y5 Licensee 3 r,, h Cause & Corrective No. Date i 3g i .5 i $ Event Ob ET 5-3 Action to H
f: $ Report : mV uEV Prevent Recurrence 3
< 5 :t 6
No plant shutdowns or significant reductions in power level.
n I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S; Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. -
Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161)
E-Operator Training & License Examination F Admmistrative p ,
5 C-Operational Error (Explain) ,v /.oao 44cw ,..el Eshibit I Same Souree
(*1/77 ) Il Other (Esplain) i
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie Unit No.1 DATE AUG 161982 COMPLETED BY P.L. Pace TELEPHONE (305) 552-3654 REPORT MONTII July 1982 Unit 1 operated ar essentially full power except for the entire month.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bullentins and NUREG 0737 in progress.
Florida Power & Light Company commitments for NUREG-0737 implementation -
are cont'inuing. Refer to correspondence between FPL and NRC for additional information.