IE Insp Repts 50-413/82-14 & 50-414/82-11 on 820608-11.No Noncompliance Noted.Major Areas Inspected:Electrical Cables & Terminations,Observation of Work Activities,Review of Quality Records & Instrumentation,Components & Sys
ML20058G083
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/02/1982
From: Conlon T, Ruff A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20058G078 List:
References
50-413-82-14, 50-414-82-11, NUDOCS 8208030196
Download: ML20058G083 (3)


Text

-

--

. %

,

/ k* '

UNITED STATES 8- NUCLEAR REGULATORY COMMISSION

$ S REGION 11 o,

  1. 101 MARIETTA ST., N.W.,'SulTE 3100 * ,

'

o ATLANTA, GEORGIA 30303

,

-

.

Report Nos. 50-413/82-14 and 50-414/82-11 Licensee: Duke Power Company *

422 South Church Street "

Charlotte, NC 28242 s

Facility Name: Catawba 1 and 2 Docket Nos. 50-413 and 50-414 License Nos. CPPR-116 and CPPR-117 Inspection at Catawba site near Rock Hill, SC Inspector: 8 I Yd 4~B. Ruff , 'T

Dat/ Signed

)

Approved by d* '

7 "N f M T. E. Conlon, Section Chief Date Signed

-

Engineering Inspection branch Division of Engineering and Technical Programs

.

  • -

SUMMARY Inspection on June 8-11, 1902 Areas Inspected This routine, unannounced inspection involved 26 inspector-hours on site in the areas of electrical cables and terminations, observation of work activities, and

, review of quality records; and instrumentation components and systems, observa-tion of work activities, and review of quality record Results ,

-

Of the areas inspected, no items of violations or dev'iations were identifie .

.

8208030196 820708 DR ADOCK 05000

,

I. . s

'

'

.

REPORT DETAILS

. Persons Contacted-s Licensee Employees (

  • S. Dressler, Senior Construction Engineer
  • R. Morgan, Project QA Engineer J. Glenn, QA Representative R. Bowling, Electrical QC Supervisor '

NRC Resident Inspector

  • P. K. VanDoorn
  • Attended exit interview Exit Interview The inspection scope and findings were summarized on June 11, 1982, with those persons indicated in paragraph 1 abov . Licensee Action on Previous Inspection Findings Not inspecte . Unresolved Items Unresolved items were not identified during this inspectio . Independent Inspection (Units 1 and 2)

The inspector conducted a general inspection of site work and work activities in the electrical construction progra The inspection was performed in the auxiliary building and cable spreading room Within the areas examined, there were no violations or deviations identi-fie . Electrical (Cables and Terminations II) - Observations of Work and Work Activities (51064B) - Unit 1 The terminations were examined for cables 1*VX538, 1*EPC578, 1*ND549, 1*EPC586, 1*EPC527, 1*ND514, 1*CA524, 1*EQA864, 1*ATC735, 1*EQA759, 1*EQA861, and 1*ATC90 All terminations were complete except for two cables and these were in the process of being completed. The licensee's QC termination inspection program is scheduled to start at future dat Within the areas examined, there were no violations or deviations identi-fie .

[, , ' s

7. Electrical (Cables and Terminations II) - Review of Quality Records (510668) - Unit 1 The cable support hanger inspection records for the following hangers were examined to confirm that supports and anchorage were installed as specifie Cable Support Harger Type Elevation / Location lHD12 560'/3'6" South of Row 43 on Column BB lHD12 560'/3'6" North of Row 43 on Column BB lHD12 560'/0'6" North of Row 44 on Column BB lHD12 560'/6'0" North of Row 44 on Column BB 1HD1 556'/9'6" West of Coit:mr BB on Row 41 lHD1 556'/6'8" West of Column BB on Row 41 Within the areas examined, there were no violations or deviations identi-fie . Instrumentation (Components and Systems I) - Observation of Work, Work Activities and Review of Quality Records (52053B and 520558) - Unit 1 The inspector selected intruments INVLT-5740 and INVLT-6070 for examinatio These transmitters and their associated records were examined to assure that SAR commitments were complied with in the areas of receipt inspection, storage, handling, identification, location and mounting, and installation inspection records. A certificate of conformance for material certification and performance tests for subject level transmitters was on file at the Licensee's Records Department Within the areas examined, there were no violations or deviations identi-fie l t